CN213204385U - FRP porous permeable pipe - Google Patents

FRP porous permeable pipe Download PDF

Info

Publication number
CN213204385U
CN213204385U CN202021885084.9U CN202021885084U CN213204385U CN 213204385 U CN213204385 U CN 213204385U CN 202021885084 U CN202021885084 U CN 202021885084U CN 213204385 U CN213204385 U CN 213204385U
Authority
CN
China
Prior art keywords
pipe
shaped
pipe wall
pipe body
frp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202021885084.9U
Other languages
Chinese (zh)
Inventor
孔少云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Shiyiye Construction Co ltd
Original Assignee
Jiangsu Zhile Wind Industry Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhile Wind Industry Technology Co ltd filed Critical Jiangsu Zhile Wind Industry Technology Co ltd
Priority to CN202021885084.9U priority Critical patent/CN213204385U/en
Application granted granted Critical
Publication of CN213204385U publication Critical patent/CN213204385U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model relates to a plastic tubing technical field, concretely relates to porous pipe of permeating water of FRP, include: the main pipe body and the side pipe bodies are arranged on two sides of the main pipe body, and the main pipe body is communicated with the side pipe bodies; the main pipe body comprises a U-shaped pipe wall and a horizontal pipe wall connected to the U-shaped pipe avoiding opening, a plurality of longitudinal arc-shaped grooves are arranged on the horizontal pipe wall at intervals, and a plurality of first water permeable holes are arranged in the longitudinal arc-shaped grooves at intervals; the side pipe body comprises a side U-shaped pipe wall and an arc plate connected to an opening of the side U-shaped pipe wall, and a plurality of second water permeable holes are formed in the arc plate at intervals. In this way, the porous pipe of permeating water of FRP, improved drainage efficiency, strengthened the result of use.

Description

FRP porous permeable pipe
Technical Field
The utility model relates to a plastic tubing technical field especially relates to a porous pipe of permeating water of FRP.
Background
Tubing is a tool that is used in a wide variety of applications, primarily for the transport of various fluids. They can be roughly classified into metal pipes and plastic pipes according to the raw materials. The metal pipe has high strength, but high cost, heavy weight and high transportation cost. The plastic pipe has low cost and easy processing and connection, so that various plastic pipes are increasingly applied in various industries; especially FRP pipe, is mainly used for drainage in the building industry. The existing FRP pipe is buried below the ground, rainwater can be discharged only after flowing into the FRP pipe from an inlet in rainy weather, but the rainwater can be discharged after flowing into the FRP pipe from the inlet along a longer distance of the ground surface when the rainfall is larger, so that the ground is easy to generate a phenomenon of serious water accumulation, the drainage efficiency is reduced, and the improvement is needed.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the main technical problem who solves provides a porous pipe of permeating water of FRP, simple structure, and processing is easy, has improved drainage efficiency, has strengthened the result of use.
In order to solve the technical problem, the utility model discloses a technical scheme be: provided is an FRP porous permeable pipe, comprising: the main pipe body and the side pipe bodies are arranged on two sides of the main pipe body, and the main pipe body is communicated with the side pipe bodies;
the main pipe body comprises a U-shaped pipe wall and a horizontal pipe wall connected to an opening of the U-shaped pipe wall, a plurality of longitudinal arc-shaped grooves are arranged on the horizontal pipe wall at intervals, and a plurality of first water permeable holes are arranged in the longitudinal arc-shaped grooves at intervals;
the side pipe body comprises a side U-shaped pipe wall and an arc plate connected to an opening of the side U-shaped pipe wall, and a plurality of second water permeable holes are formed in the arc plate at intervals.
In a preferred embodiment of the present invention, a plurality of first through holes are disposed on the U-shaped pipe wall, a plurality of second through holes are disposed on the side U-shaped pipe wall, and the first through holes and the second through holes are connected by pipelines.
In a preferred embodiment of the present invention, a vertical distance from the first through hole to the ground surface is greater than a vertical distance from the second through hole to the ground surface.
In a preferred embodiment of the present invention, the upper surface of the horizontal tube wall is covered with a first nonwoven fabric layer.
In a preferred embodiment of the present invention, the inner surface of the arc plate is covered with a second nonwoven fabric layer.
In a preferred embodiment of the present invention, the U-shaped pipe wall and the horizontal pipe wall are integrally designed, and the side U-shaped pipe wall and the arc plate are integrally designed.
The utility model has the advantages that: the utility model discloses a porous pipe of permeating water of FRP, through being responsible for the first hole of permeating water on the body and the setting in the second hole of permeating water on the side pipe body, make subaerial downward infiltration's rainwater flow away fast, improved drainage efficiency, strengthened the result of use.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained without inventive work, wherein:
fig. 1 is a schematic structural view of a preferred embodiment of the FRP porous water permeable pipe of the present invention.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for purposes of illustration and explanation only and are not intended to limit the invention.
It should be noted that these drawings are simplified schematic views, and the basic structure of the present invention is described only in a schematic manner, and therefore, only the configuration related to the present invention is shown.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1, an embodiment of the present invention includes:
an FRP porous permeable pipe comprising: the main pipe body 10 and the side pipe bodies 20 arranged at both sides of the main pipe body 10 are communicated with each other between the main pipe body 10 and the side pipe bodies 20.
The main pipe body 10 comprises a U-shaped pipe wall 11 and a horizontal pipe wall 12 connected to an opening of the U-shaped pipe wall 11, a plurality of longitudinal arcs 13 are arranged on the horizontal pipe wall 12 at intervals, and a plurality of first water permeable holes 14 are arranged in the longitudinal arcs 13 at intervals.
The side pipe body 20 comprises a side U-shaped pipe wall 21 and an arc plate 22 connected to an opening of the side U-shaped pipe wall 21, and a plurality of second water permeable holes 23 are formed in the arc plate 22 at intervals; when the rainwater drainage device is used, the excavator is used for excavating a pit groove on the ground, the main pipe body 10 and the side pipe body 20 are placed in the pit groove, the horizontal pipe wall 12 on the main pipe body 10 faces upwards, the arc-shaped plate 22 on the side pipe body 20 faces upwards, then the pit groove is filled, in heavy rainy days, a part of rainwater directly permeates downwards, enters the main pipe body 10 through the first water permeating hole 14 and is quickly discharged, meanwhile, enters the side pipe body 20 through the second water permeating hole 23 and is quickly discharged, the other part of rainwater flows along the ground surface for a certain distance and then flows into a pipeline from an inlet and is discharged, the drainage efficiency is improved, the using effect is enhanced, when more rainwater enters the side pipe body 20 and cannot be discharged in time, a part of rainwater in the side pipe body 20 flows into the main pipe body 10 and is discharged, and the drainage efficiency of the side pipe body 20 is improved.
The U-shaped pipe wall 11 is provided with a plurality of first through holes 3, the side U-shaped pipe wall 21 is provided with a plurality of second through holes 4, and the first through holes 3 are connected with the second through holes 4 through pipelines.
The vertical distance from the first through hole 3 to the ground surface is greater than the vertical distance from the second through hole 4 to the ground surface, that is, the depth of the first through hole 3 buried underground is greater than the depth of the second through hole 4 buried underground, when the water level in the side pipe body 20 is higher than the second through hole 4, the rainwater in the side pipe body 20 flows to the main pipe body 10.
The upper surface of horizontal pipe wall 12 covers there is first non-woven fabric layer 5, avoids the granule impurity of rainwater to block up first hole 14 of permeating water, has strengthened the result of use.
The internal surface of arc 22 covers has second non-woven fabrics layer 6, avoids the granule impurity in the rainwater to block up second hole 23 of permeating water, has strengthened the result of use, the utility model discloses a tub of permeating water is effectively applied to saline and alkaline area and marine zone, has the effect of filtering grit and saline and alkaline, effectively improves soil index.
The U-shaped pipe wall 11 and the horizontal pipe wall 12 are designed into an integrated structure, the side U-shaped pipe wall 21 and the arc-shaped plate 22 are designed into an integrated structure, the structure is simple, and the processing is easy.
To sum up, the utility model discloses a porous pipe of permeating water of FRP who points out, simple structure, processing is easy, has improved drainage efficiency, has strengthened the result of use.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all of which utilize the equivalent structure or equivalent flow transformation made by the content of the specification of the present invention, or directly or indirectly applied to other related technical fields, all included in the same way in the patent protection scope of the present invention.

Claims (6)

1. The FRP porous permeable pipe is characterized by comprising: the main pipe body and the side pipe bodies are arranged on two sides of the main pipe body, and the main pipe body is communicated with the side pipe bodies;
the main pipe body comprises a U-shaped pipe wall and a horizontal pipe wall connected to an opening of the U-shaped pipe wall, a plurality of longitudinal arc-shaped grooves are arranged on the horizontal pipe wall at intervals, and a plurality of first water permeable holes are arranged in the longitudinal arc-shaped grooves at intervals;
the side pipe body comprises a side U-shaped pipe wall and an arc plate connected to an opening of the side U-shaped pipe wall, and a plurality of second water permeable holes are formed in the arc plate at intervals.
2. The FRP porous permeable pipe as claimed in claim 1, wherein the U-shaped pipe wall is provided with a plurality of first through holes, the side U-shaped pipe wall is provided with a plurality of second through holes, and the first through holes and the second through holes are connected by pipes.
3. The FRP porous permeable pipe according to claim 2, wherein the vertical distance from the first through hole to the ground surface is larger than the vertical distance from the second through hole to the ground surface.
4. The FRP porous permeable pipe according to claim 1, wherein the upper surface of the horizontal pipe wall is covered with a first non-woven layer.
5. The FRP porous permeable pipe according to claim 1, wherein the inner surface of the arc plate is covered with a second nonwoven layer.
6. The FRP porous permeable pipe as claimed in claim 1, wherein the U-shaped pipe wall and the horizontal pipe wall are designed as an integral structure, and the side U-shaped pipe wall and the arc-shaped plate are designed as an integral structure.
CN202021885084.9U 2020-09-01 2020-09-01 FRP porous permeable pipe Withdrawn - After Issue CN213204385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021885084.9U CN213204385U (en) 2020-09-01 2020-09-01 FRP porous permeable pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021885084.9U CN213204385U (en) 2020-09-01 2020-09-01 FRP porous permeable pipe

Publications (1)

Publication Number Publication Date
CN213204385U true CN213204385U (en) 2021-05-14

Family

ID=75843297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021885084.9U Withdrawn - After Issue CN213204385U (en) 2020-09-01 2020-09-01 FRP porous permeable pipe

Country Status (1)

Country Link
CN (1) CN213204385U (en)

Similar Documents

Publication Publication Date Title
US7909535B2 (en) Soil drainage system
KR100926482B1 (en) Riverbed filtration method using multi-diameter horizontal well
CN109881557A (en) A kind of drainage system and its water discharge method
CN213204385U (en) FRP porous permeable pipe
CN204779025U (en) A anaerobism device for waste water treatment
CN213204377U (en) PP solid-wall porous permeable pipe
CN213204383U (en) HDPE porous solid wall permeable pipe
CN217710571U (en) Mountain-climbing channel crossing gully structure
CN213204379U (en) PVC solid wall porous permeable pipe
KR101962037B1 (en) Manhole of rain water with flood control function of infiltration structure
CN213174065U (en) PE porous permeable pipe
US9206574B2 (en) Aggregate replacement
CN213204380U (en) HDPE porous ripple saline-alkali soil permeable pipe
CN212271176U (en) Catch basin and road rainwater collecting system
CN213256223U (en) Drainage and exhaust system for refuse landfill
CN209702332U (en) A kind of buried under earth type sewage treatment equipment
CN108043084B (en) DKPE double-walled corrugated water filter pipe for well
CN209082649U (en) Waste landfill site leachate connects well
KR20150002028U (en) Structure to drain water in slope with s type drain pipe
CN213204378U (en) PVC protection type pipe of permeating water
CN217733656U (en) Road antiskid permeable pavement
CN213448533U (en) Foundation pit drainage structure
JP2005179919A (en) Facility for storage and percolation of rainwater and the like
CN216108549U (en) Side slope drainage device
CN217711032U (en) Rain sewage reposition of redundant personnel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240419

Address after: Room 301, Building 18, Zone D, Green Space 21, No.1 Xingshui Road, Xingqing District, Yinchuan City, Ningxia Hui Autonomous Region, 750001

Patentee after: Ningxia shiyiye Construction Co.,Ltd.

Country or region after: China

Address before: 223600 No.1, Cifu Road, Shuyang Economic Development Zone, Suqian City, Jiangsu Province

Patentee before: Jiangsu Zhile Wind Industry Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20210514

Effective date of abandoning: 20240507

AV01 Patent right actively abandoned

Granted publication date: 20210514

Effective date of abandoning: 20240507

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned