CN213204310U - Water supply installation for water plant construction - Google Patents

Water supply installation for water plant construction Download PDF

Info

Publication number
CN213204310U
CN213204310U CN202021982698.9U CN202021982698U CN213204310U CN 213204310 U CN213204310 U CN 213204310U CN 202021982698 U CN202021982698 U CN 202021982698U CN 213204310 U CN213204310 U CN 213204310U
Authority
CN
China
Prior art keywords
water
lead screw
bevel gear
motor
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021982698.9U
Other languages
Chinese (zh)
Inventor
周厚勇
李振强
郑斌
王嵩嵩
汤腾飞
马强
顾兴进
邱海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Zhengtong Construction Engineering Co ltd
Original Assignee
Jining Zhengtong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Zhengtong Construction Engineering Co ltd filed Critical Jining Zhengtong Construction Engineering Co ltd
Priority to CN202021982698.9U priority Critical patent/CN213204310U/en
Application granted granted Critical
Publication of CN213204310U publication Critical patent/CN213204310U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a water works construction water supply installation, the on-line screen storage device comprises a base, be provided with box and water tank on the base, wear to be equipped with first lead screw on the box, first lead screw one end is provided with driven bevel gear, the meshing has transmission bevel gear on the driven bevel gear, be provided with first motor on the box, first motor is connected with transmission bevel gear, the cover is equipped with the supporting shoe on the first lead screw, wear to be equipped with the movable block in the supporting shoe, be provided with the second motor on the supporting shoe, be provided with the second lead screw on the second motor, the second lead screw is worn to establish on the movable block, water tank one side is provided with water supply connector, be provided with the water pump on the water tank, wear to be equipped with the raceway on the water pump, raceway pot head is. Through transmission bevel gear and driven bevel gear's cooperation can provide very big portablely when not co-altitude construction, through the cooperation of second lead screw with the movable block for it is very practical when carrying out the water delivery in different positions, the utility model discloses simple structure, easy to operate.

Description

Water supply installation for water plant construction
Technical Field
The utility model relates to a construction water supply installation field, specific is a water supply installation of water works construction.
Background
As a country with extremely short water resources, the current situation of the water environment in China is not optimistic, and the contradiction of the short water resources is increasingly aggravated, so that the sewage treatment becomes the primary task of water pollution treatment, a water plant is often required to be built to carry out certain treatment on sewage, when the water plant is built, concrete irrigation and the like are often required to be carried out through water delivery, the water delivery process is that a water pipe is manually dragged to a construction position through manpower at present, a large amount of time is wasted, a large amount of manpower is also spent, and the construction efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a water supply installation is under construction to solve prior art, need artifical manually operation water pipe to carry out the water delivery when carrying out water works construction, lead to wasting time and energy technical problem.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a water supply installation of water works construction, includes the base, be provided with box and water tank on the base, wear to be equipped with first lead screw on the box, first lead screw one end is provided with driven bevel gear, the meshing has transmission bevel gear on the driven bevel gear, be provided with first motor on the box, first motor passes the box with transmission bevel gear connects, the cover is equipped with the supporting shoe on the first lead screw, wear to be equipped with the movable block in the supporting shoe, be provided with the second motor on the supporting shoe, be provided with the second lead screw on the second motor, the second lead screw is worn to establish on the movable block, water tank one side is provided with water supply connector, be provided with the water pump on the water tank, wear to be equipped with the raceway on the water pump, a raceway pot head is equipped with water outlet connector, water outlet connector wears to establish on the movable block.
As the utility model discloses a preferred technical scheme, the supporting legs is worn to be equipped with to the base bottom, be provided with the key seat on the supporting legs, the key seat is connected with connecting rod one end through the round pin axle, the connecting rod other end passes through the round pin axle is connected with the fixture block, the draw-in groove has been seted up to the base inboard, the fixture block card is established in the draw-in groove, fixture block one side is provided with the hydraulic pump, the hydraulic pump is fixed to be set up the base is inboard.
As the utility model discloses a preferred technical scheme, the base bottom is provided with the universal wheel.
As an optimal technical scheme of the utility model, wear to be equipped with the bracing piece on the box, the bracing piece is worn to establish on the supporting shoe.
As the utility model discloses a preferred technical scheme, be provided with the bearing on the water tank, wear to be equipped with solid fixed cylinder in the bearing, the raceway cover is established gu fixed cylinder is last, gu be provided with the handle on the fixed cylinder.
The utility model provides a water supply installation of water factory construction possesses following beneficial effect: the utility model has the advantages that the first motor and the first lead screw are arranged, so that the transmission bevel gear drives the driven bevel gear to rotate, thereby achieving the lifting motion of the supporting block, ensuring that the supporting block can be used at different heights and being very practical; through opening the second motor, can make the motion of second lead screw to reach the use that makes water outlet port in different positions, need not the manual work and transport, saved a large amount of time and manpower.
Drawings
FIG. 1 is a perspective view of the water supply installation for water plant construction of the present invention;
FIG. 2 is an exploded view of the water supply installation for water plant construction according to the present invention;
FIG. 3 is an enlarged view of area A of FIG. 2;
fig. 4 is a structural diagram of a base in the water supply installation for water plant construction.
In the figure: 1. a base; 2. a water inlet joint; 3. a water pump; 4. a driven bevel gear; 5. a support bar; 6. a first lead screw; 7. a support block; 8. a second motor; 9. a second lead screw; 10. a movable block; 11. a water outlet joint; 14. a drive bevel gear; 15. a first motor; 16. a universal wheel; 17. a bearing; 18. a connecting rod; 19. a pin boss; 20. supporting legs; 21. a pin shaft; 22. a clamping block; 23. a hydraulic pump; 24. a card slot; 26. a water tank; 27. a handle; 28. a fixed cylinder; 29. a box body; 30. a water delivery pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a water supply device for construction of a water plant comprises a base 1, wherein a box body 29 and a water tank 26 are arranged on the base 1, a first lead screw 6 penetrates through the box body 29, a driven bevel gear 4 is arranged at one end of the first lead screw 6, a transmission bevel gear 14 is meshed with the driven bevel gear 4, a first motor 15 is arranged on the box body 29, the first motor 15 penetrates through the box body 29 to be connected with the transmission bevel gear 14, a supporting block 7 is sleeved on the first lead screw 6, a movable block 10 penetrates through the supporting block 7, a second motor 8 is arranged on the supporting block 7, a second lead screw 9 is arranged on the second motor 8, the second lead screw 9 penetrates through the movable block 10, a water inlet connector 2 is arranged on one side of the water tank 26, a water pump 3 is arranged on the water tank 26, a water conveying pipe 30 penetrates through the water pump 3, and a water outlet connector 11 is sleeved at one end of the water conveying pipe 30, the water outlet joint 11 is arranged on the movable block 10 in a penetrating way.
When the water supply device for water plant construction is used, firstly, the first motor 15 is turned on, the first motor 15 is provided with a transmission bevel gear 14, the transmission bevel gear 14 is meshed with a driven bevel gear 4, the driven bevel gear 4 is provided with a first lead screw 6, the first lead screw 6 is sleeved with a supporting block 7, the transmission bevel gear 14 rotates to drive the driven bevel gear 4 to rotate, and the first lead screw 6 rotates, so that the lifting motion of the supporting block 7 is realized, and great portability is provided at construction positions with different heights; the second motor 8 is turned on, a second lead screw 9 is arranged on the second motor 8, the second lead screw 9 penetrates through the movable block 10, and the second lead screw 9 is made to rotate, so that the movable block 10 moves on the supporting block 7, and portability is provided for water delivery at different positions.
Supporting legs 20 are worn to be equipped with by 1 bottom of base, be provided with key seat 19 on the supporting legs 20, key seat 19 is connected with 18 one end of connecting rod through round pin axle 21, the connecting rod 18 other end passes through round pin axle 21 is connected with fixture block 22, draw-in groove 24 has been seted up to 1 inboard of base, fixture block 22 is blocked and is established in the draw-in groove 24, fixture block 22 one side is provided with hydraulic pump 23, hydraulic pump 23 is fixed to be set up 1 inboard of base, the accessible is opened hydraulic pump 23 makes fixture block 22 to supporting legs 20 motion makes connecting rod 18 with supporting legs 20 contained angle diminishes, makes the utility model discloses it is fixed more stable.
Specifically, base 1 bottom is provided with universal wheel 16, and is convenient the utility model discloses a remove, the portability is high.
Specifically, a support rod 5 penetrates through the box 29, and the support rod 5 penetrates through the support block 7, so that the support block 7 can be more stably fixed on the first lead screw 6.
Specifically, the water tank 26 is provided with a bearing 17, a fixing cylinder 28 penetrates through the bearing 17, the water pipe 30 is sleeved on the fixing cylinder 28, the fixing cylinder 28 is provided with a handle 27, and the fixing cylinder 28 can be used for accommodating the water pipe 30.
The water supply device for water plant construction is used in the principle that the utility model is moved to a construction area through the universal wheel 16 arranged at the bottom end of the base 1, the hydraulic pump 23 is opened, the fixture block 22 moves towards the supporting leg 20, the included angle between the connecting rod 18 and the supporting leg 20 is reduced, the universal wheel 16 leaves the ground, and the supporting leg 20 is arranged to be more stably fixed; then, the first motor 15 is opened, a transmission bevel gear 14 is arranged on the first motor 15, a driven bevel gear 4 is meshed on the transmission bevel gear 14, a first lead screw 6 is arranged on the driven bevel gear 4, a supporting block 7 is sleeved on the first lead screw 6, the transmission bevel gear 14 rotates to drive the driven bevel gear 4 to rotate, and the first lead screw 6 rotates, so that the supporting block 7 is lifted, great portability can be provided at construction positions with different heights, a supporting rod 5 penetrates through the supporting block 7, and the supporting rod 5 penetrates through the box body 29, so that the supporting block 7 is more stable, and the service cycle of the first lead screw 6 is also prolonged; open second motor 8, be provided with second lead screw 9 on the second motor 8, second lead screw 9 wears to establish on the movable block 10, make second lead screw 9 rotates, thereby makes the movable block 10 is in the water delivery of different positions provides portablely, and after finishing using, the accessible bearing 17 that sets up on the water tank 26, the solid fixed cylinder 28 of wearing to establish in the bearing 17, raceway 30 cover is established on the solid fixed cylinder 28, be provided with handle 27 on the solid fixed cylinder 28, rotate handle 27, will raceway 30 is accomodate on the solid fixed cylinder 28, makes things convenient for follow-up continuation to use, the utility model discloses the structure is very simple, has not only saved plenty of time and manpower, still makes things convenient for the staff to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a water supply installation of water factory construction which characterized in that: comprises a base (1), a box body (29) and a water tank (26) are arranged on the base (1), a first lead screw (6) penetrates through the box body (29), a driven bevel gear (4) is arranged at one end of the first lead screw (6), a transmission bevel gear (14) is meshed with the driven bevel gear (4), a first motor (15) is arranged on the box body (29), the first motor (15) penetrates through the box body (29) to be connected with the transmission bevel gear (14), a supporting block (7) is sleeved on the first lead screw (6), a movable block (10) penetrates through the supporting block (7), a second motor (8) is arranged on the supporting block (7), a second lead screw (9) is arranged on the second motor (8), the second lead screw (9) penetrates through the movable block (10), a water inlet joint (2) is arranged on one side of the water tank (26), the water tank (26) is provided with a water pump (3), a water pipe (30) penetrates through the water pump (3), one end of the water pipe (30) is sleeved with a water outlet connector (11), and the water outlet connector (11) penetrates through the movable block (10).
2. The water supply device for water plant construction according to claim 1, wherein: supporting legs (20) are worn to be equipped with by base (1) bottom, be provided with key seat (19) on supporting legs (20), key seat (19) are connected with connecting rod (18) one end through round pin axle (21), connecting rod (18) other end passes through round pin axle (21) is connected with fixture block (22), draw-in groove (24) have been seted up to base (1) inboard, fixture block (22) card is established in draw-in groove (24), fixture block (22) one side is provided with hydraulic pump (23), hydraulic pump (23) are fixed to be set up base (1) inboard.
3. The water supply device for water plant construction according to claim 1, wherein: the bottom end of the base (1) is provided with universal wheels (16).
4. The water supply device for water plant construction according to claim 1, wherein: the box body (29) is provided with a support rod (5) in a penetrating mode, and the support rod (5) is arranged on the support block (7) in a penetrating mode.
5. The water supply device for water plant construction according to claim 1, wherein: the water tank (26) is provided with a bearing (17), a fixed cylinder (28) penetrates through the bearing (17), the water pipe (30) is sleeved on the fixed cylinder (28), and a handle (27) is arranged on the fixed cylinder (28).
CN202021982698.9U 2020-09-11 2020-09-11 Water supply installation for water plant construction Expired - Fee Related CN213204310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021982698.9U CN213204310U (en) 2020-09-11 2020-09-11 Water supply installation for water plant construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021982698.9U CN213204310U (en) 2020-09-11 2020-09-11 Water supply installation for water plant construction

Publications (1)

Publication Number Publication Date
CN213204310U true CN213204310U (en) 2021-05-14

Family

ID=75819861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021982698.9U Expired - Fee Related CN213204310U (en) 2020-09-11 2020-09-11 Water supply installation for water plant construction

Country Status (1)

Country Link
CN (1) CN213204310U (en)

Similar Documents

Publication Publication Date Title
CN108816628A (en) A kind of nursery stock trunk whitewashing machine
CN209663917U (en) A kind of cleaning plant of cleaning shaft
CN213204310U (en) Water supply installation for water plant construction
CN215314707U (en) Organic contaminated soil and groundwater enhanced bioremediation medicament delivery device
CN202503982U (en) Wind power diversion irrigation device
CN202317947U (en) Dust-free double-wheel polisher
CN210563233U (en) Portable humidification device of wall for building engineering
CN217308211U (en) A soil improvement device for agricultural
CN214108299U (en) Chemical leaching soil remediation device
CN211728597U (en) Assembled building wall body is polished and is repaiied angle device
CN210247823U (en) Forestry seedling watering device
CN208976454U (en) A kind of heavy metal sewage sludge processing pond inner wall cleaning equipment
CN209854523U (en) Warning line marking device
CN210046403U (en) Grinding device for bearing machining
CN210226422U (en) Biological ceramic running water equipment for agricultural irrigation
CN208162171U (en) A kind of device of drift ice bucket addition drift ice
CN214472015U (en) A sampling device for sewage monitoring
CN111495961A (en) Pollute soil environmental protection repair equipment
CN219761852U (en) Soil turning device for ecological restoration of saline-alkali soil
CN217808729U (en) Barreled mineral water filling device
CN211020379U (en) Irrigation device for hydraulic engineering
CN209567892U (en) A kind of collapsible underground water pollution prosthetic device
CN209879980U (en) Boiler examination simulator
CN216297498U (en) Movable soil contaminated land prosthetic devices
CN214184583U (en) Soil pollution uses remediation equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210514