CN213203251U - Batch electrophoresis hoist - Google Patents

Batch electrophoresis hoist Download PDF

Info

Publication number
CN213203251U
CN213203251U CN202021559107.7U CN202021559107U CN213203251U CN 213203251 U CN213203251 U CN 213203251U CN 202021559107 U CN202021559107 U CN 202021559107U CN 213203251 U CN213203251 U CN 213203251U
Authority
CN
China
Prior art keywords
hanging
plate
fixedly connected
electrophoresis
spreader according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021559107.7U
Other languages
Chinese (zh)
Inventor
于东岭
于作连
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshuo Tangshan Technology Co ltd
Original Assignee
Hengshuo Tangshan Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshuo Tangshan Technology Co ltd filed Critical Hengshuo Tangshan Technology Co ltd
Priority to CN202021559107.7U priority Critical patent/CN213203251U/en
Application granted granted Critical
Publication of CN213203251U publication Critical patent/CN213203251U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to the technical field of electrophoresis slings, in particular to a batch electrophoresis sling, which comprises a plurality of sling bodies, a plurality of hanging plates fixedly connected with the sling bodies, a plurality of hanging devices and a plurality of connecting devices, wherein each hanging device comprises a hanging plate, two groups of clamps are connected with the hanging plate, a plurality of hanging grooves are arranged on the hanging plate, each connecting device comprises a J-shaped hook and a plurality of hanging frames, the J-shaped hook is arranged in each hanging groove, the bottom end of the J-shaped hook is connected with a hanging rod, the bottom end of each hanging rod is fixedly connected with a mounting plate, each hanging frame comprises a frame plate, the top end and the bottom end of each frame plate are fixedly connected with an installing plate, a plurality of hanging blocks are fixedly connected with the top end of each frame plate, fixing screw holes are respectively arranged on the hanging plate, the clamps, the mounting plates and the installing plates, fixing screws are internally provided with fixing bolts, and the disassembly and the assembly are convenient, the damaged parts can be replaced after the damage is generated, the maintenance cost is lower, and the practicability is higher.

Description

Batch electrophoresis hoist
Technical Field
The utility model relates to an electrophoresis hoist technical field specifically is a batch electrophoresis hoist.
Background
As is well known, when electrophoresis process treatment is performed, a series of processes such as ultrasonic degreasing (rough washing), ultrasonic degreasing (fine washing), spraying washing, soaking washing, involucra (phosphating), spraying washing, soaking washing, ultrasonic pure washing, soaking pure washing, ED (electrophoresis), circulating ultrafiltration recovery, overflow recovery, pure water spraying, baking by pure water soaking are required to be performed, wherein a lifting appliance is frequently used in electrophoresis coating, a workpiece to be subjected to electrophoresis treatment is hung on the lifting appliance, and then the lifting appliance is hung on a transmission chain to perform subsequent electrophoresis treatment operation.
Most of the existing electrophoresis lifting appliances are all integrated, so that the electrophoresis lifting appliances are not convenient to adjust according to actual use conditions, the use limitation is high, and due to the fact that the electrophoresis lifting appliances are not convenient to disassemble and assemble, the electrophoresis lifting appliances need to be integrally replaced after being damaged, and therefore the electrophoresis lifting appliances are extremely wasted, high in maintenance cost and low in practicability.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a batch electrophoresis hoist, it is convenient for adjust according to the in-service use condition, uses the limitation lower, and is convenient for carry out the dismouting, produce damage after change the part can, the maintenance cost is lower, the practicality is higher.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an electrophoresis hoist in batches, includes a plurality of hoist bodies, equal fixedly connected with hanger plate on a plurality of hoist bodies, still include a plurality of hanging and put device and a plurality of connecting device, it includes the link plate to hang and put the device, be connected with two sets of anchor clamps on the link plate, and seted up a plurality of grooves of hanging on the link plate, connecting device includes J type couple and a plurality of stores pylon, J type couple is put at the inslot, and the bottom of J type couple is connected with the peg, the bottom fixedly connected with mounting panel of peg, the stores pylon includes the frame plate, the top of frame plate and the equal fixedly connected with in bottom add the dress board, and a plurality of blocks of hanging of top fixedly connected with of frame plate are put, the hanger plate, the link plate, anchor clamps, fixed screw has all been seted up on mounting panel and the dress board, and the threaded.
Preferably, anchor clamps include two splint, and two splint are arranged respectively in the front end and the rear end of link plate, and a plurality of connecting plates of fixedly connected with between two splint.
Preferably, the top end of the hanging rod is fixedly connected with a plurality of limiting rods.
Preferably, the J-shaped hook, the hanging rod and the mounting plate are welded.
Preferably, the frame plate, the additional mounting plate and the plurality of hanging blocks are welded.
Preferably, the fixing bolt is in threaded connection with a fixing nut.
Preferably, the J-shaped hook is fixedly connected with an anti-slip pad on the outer part.
Preferably, waterproof paint is sprayed on the frame plate, the additional mounting plate and the hanging blocks.
(III) advantageous effects
Compared with the prior art, the utility model provides a batch electrophoresis hoist possesses following beneficial effect:
this electrophoresis hoist in batches, screw-thread fit through fixing bolt and fixed screw, be convenient for between hanger plate and the anchor clamps, between anchor clamps and the link plate, the mounting panel with install between the board and a plurality of install between the board can dismantle the connection additional, thereby be convenient for be connected and dismantle between anchor clamps and the link plate, be connected and dismantle between hoist body and the link plate, be connected and dismantle between mounting panel and the stores pylon and a plurality of stores pylon, therefore be convenient for adjust the position of each position according to the in-service use condition, quantity, direction and height etc, the use limitation is lower, and be convenient for carry out the dismouting, produce after damaging change the part that damages can, maintenance cost is lower, the practicality is higher.
Drawings
FIG. 1 is a schematic view of the exploded perspective structure of the present invention;
FIG. 2 is a schematic view of a portion of the enlarged structure of FIG. 1;
FIG. 3 is a schematic view of the overall three-dimensional structure of the present invention;
fig. 4 is a schematic diagram of the right-side plan structure of the present invention.
In the figure: 1. a hanger body; 2. a hanger plate; 3. hanging the plate; 4. hanging a groove; 5. j-shaped hooks; 6. a hanging rod; 7. mounting a plate; 8. a frame plate; 9. adding a plate; 10. hanging the block; 11. fixing the bolt; 12. a splint; 13. a connecting plate; 14. a limiting rod; 15. fixing a nut; 16. a non-slip mat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, a batch electrophoresis sling comprises a plurality of sling bodies 1, a plurality of sling plates 2 fixedly connected to the sling bodies 1, a plurality of hanging devices and a plurality of connecting devices, wherein each hanging device comprises a hanging plate 3, two sets of clamps are connected to the hanging plates 3, each clamp comprises two clamping plates 12, the two clamping plates 12 are respectively arranged at the front end and the rear end of the corresponding hanging plate 3, the stability of the connection with the corresponding sling plate 2 is high, the connecting plates 13 are fixedly connected between the two clamping plates 12, the connection strength between the two clamping plates 12 is increased, the stability and the durability of the connection with the sling bodies 1 through the corresponding hanging plates 2 are good, a plurality of hanging grooves 4 are formed in the corresponding hanging plates 3, the hanging devices comprise J-shaped hooks 5 and a plurality of hanging racks, the J-shaped hooks 5 are hung in the hanging grooves 4, anti-slip pads are fixedly connected to the outer portions of the J-shaped hooks 5, be convenient for increase the outside frictional force of J type couple 5, be difficult for skidding and displacement when hanging and putting, and the bottom of J type couple 5 is connected with peg 6, a plurality of gag lever posts 14 of top fixedly connected with of peg 6, a plurality of connecting device cooperation of being convenient for is used, can continue to add on peg 6 and hang a plurality of J type couples 5, and can spacing difficult dropping after adding hanging, the bottom fixedly connected with mounting panel 7 of peg 6, J type couple 5, peg 6 and mounting panel 7 weld form, not only J type couple 5, it is easy to operate when peg 6 and mounting panel 7 are connected, and holistic joint strength is higher, stability when connecting is better, and service life is longer, the rack plate includes rack 8, rack plate 8's the equal fixedly connected with in top and bottom adds mounting panel 9, and rack plate 8's a plurality of hanging of blocks 10 of putting of top fixedly connected with, be convenient for hanging a plurality of electrophoresis application's work piece, rack plate 8, The mounting plate 9 and the hanging blocks 10 are welded together, the frame plate 8 is easy to operate when the mounting plate 9 and the hanging blocks 10 are connected, the integral connecting strength is high, the stability during connection is good, the service life is long, the frame plate 8 is coated with waterproof paint on the mounting plate 9 and the hanging blocks 10, the frame plate 8 is convenient to increase, the waterproofness of the frame plate 8 and the mounting plate 9 and the hanging blocks 10 is improved, a workpiece for driving electrophoretic coating for a long time is not easy to rust when entering water for operation, so that the frame plate 8 is convenient to increase, the service lives of the mounting plate 9 and the hanging blocks 10 are prolonged, the hanging plate 2, the hanging plate 3, the clamp, the mounting plate 7 and the mounting plate 9 are respectively provided with fixed screw holes, the fixed screws 11 are screwed in the fixed screw holes, the fixed screws 11 are provided with fixing nuts 15 in threaded connection, the stability of the fixed screws 11 in threaded connection inside the fixed screw holes is convenient to increase, through the screw-thread fit of fixing bolt 11 and fixed screw, be convenient for between hanger plate 2 and the anchor clamps, between anchor clamps and the link plate 3, mounting panel 7 with install between the board 9 and a plurality of install between the board 9 can dismantle the connection additional, thereby be convenient for be connected and dismantle between anchor clamps and the link plate 3, be connected and dismantle between hoist body 1 and the link plate 3, be connected and dismantle between mounting panel 7 and the stores pylon and a plurality of stores pylon, therefore be convenient for adjust the position of each position according to the in-service use condition, quantity, direction and height etc, the use limitation is lower, and be convenient for carry out the dismouting, produce after damaging change the part that damages can, maintenance cost is lower, the practicality is higher.
In summary, the working principle and working process of the batch electrophoresis hanger are that, when in use, the positions of the J-shaped hooks 5 in the different hanging grooves 4 can be changed by changing the positions of the plurality of hangers, the plurality of J-shaped hooks 5 can be hung in the plurality of hanging grooves 4, so that the plurality of hangers can be hung conveniently, the plurality of hangers can be directly connected to the lower sides of the J-shaped hooks 5, the hanging rods 6 and the mounting plate 7 through the fixing bolts 11 for use, the plurality of J-shaped hooks 5 can be continuously hung on the hanging rods 6, so that more hangers can be hung conveniently, the use directions of the plurality of hangers can be changed conveniently, meanwhile, the plurality of hangers can be connected and combined for use through the fixing bolts 11, so that the height of electrophoresis treatment operation can be conveniently adjusted, the number of hung electrophoresis coated workpieces can be conveniently adjusted, the hanging plates 2 and the clamps, the clamps and the hanging plates 3 can be conveniently connected and combined for use, Mounting panel 7 with install between the board 9 additional and a plurality of install between the board 9 additional all can dismantle the connection, thereby be convenient for connect and dismantle between anchor clamps and the link plate 3, be connected and dismantle between hoist body 1 and the link plate 3, be connected between mounting panel 7 and the stores pylon and dismantle with being connected and dismantling between a plurality of stores pylons, therefore be convenient for adjust the position of each position according to the in-service use condition, quantity, direction and height etc, the use limitation is lower, and tear out fixing bolt from fixed screw and can carry out each partial dismantlement, be convenient for carry out the dismouting, and comparatively rapidly during the dismouting and convenient, produce after damaging directly change the part that damages can, need not to change whole, maintenance cost is lower, the practicality is higher.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a batch electrophoresis hoist, includes a plurality of hoist bodies (1), equal fixedly connected with hanger plate (2), its characterized in that on a plurality of hoist bodies (1): still include a plurality of hanging put device and a plurality of connecting device, it includes link plate (3) to hang to put the device, be connected with two sets of anchor clamps on link plate (3), and link plate (3) are gone up and have been seted up a plurality of grooves of hanging (4), connecting device includes J type couple (5) and a plurality of stores pylon, J type couple (5) are hung and are put in groove of hanging (4), and the bottom of J type couple (5) is connected with peg (6), the bottom fixedly connected with mounting panel (7) of peg (6), the stores pylon includes frame plate (8), the top of frame plate (8) and the equal fixedly connected with in bottom add dress board (9), and a plurality of hanging of the hanging of top fixedly connected with of frame plate (8) put piece (10), hanger plate (2), link plate (3), anchor clamps, fixed screw has all been seted up on mounting panel (7) and add dress board (9), and interior screw of fixed screw is equipped with fixing bolt (11.
2. A batch electrophoresis spreader according to claim 1, characterized in that: the fixture comprises two clamping plates (12), the two clamping plates (12) are respectively arranged at the front end and the rear end of the hanging plate (3), and a plurality of connecting plates (13) are fixedly connected between the two clamping plates (12).
3. A batch electrophoresis spreader according to claim 2, characterized in that: the top end of the hanging rod (6) is fixedly connected with a plurality of limiting rods (14).
4. A batch electrophoresis spreader according to claim 3, wherein: the J-shaped hook (5), the hanging rod (6) and the mounting plate (7) are welded.
5. A batch electrophoresis spreader according to claim 4, wherein: the rack plate (8), the additional mounting plate (9) and the hanging blocks (10) are welded.
6. A batch electrophoresis spreader according to claim 5, wherein: and the fixing bolt (11) is in threaded connection with a fixing nut (15).
7. A batch electrophoresis spreader according to claim 6, wherein: and the outer part of the J-shaped hook (5) is fixedly connected with an anti-slip pad (16).
8. A batch electrophoresis spreader according to claim 7, wherein: waterproof paint is sprayed on the frame plate (8), the additional mounting plate (9) and the hanging blocks (10).
CN202021559107.7U 2020-07-31 2020-07-31 Batch electrophoresis hoist Active CN213203251U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021559107.7U CN213203251U (en) 2020-07-31 2020-07-31 Batch electrophoresis hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021559107.7U CN213203251U (en) 2020-07-31 2020-07-31 Batch electrophoresis hoist

Publications (1)

Publication Number Publication Date
CN213203251U true CN213203251U (en) 2021-05-14

Family

ID=75836392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021559107.7U Active CN213203251U (en) 2020-07-31 2020-07-31 Batch electrophoresis hoist

Country Status (1)

Country Link
CN (1) CN213203251U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114505198A (en) * 2022-02-16 2022-05-17 重庆鑫益聚机电设备有限公司 Gantry type spraying equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114505198A (en) * 2022-02-16 2022-05-17 重庆鑫益聚机电设备有限公司 Gantry type spraying equipment

Similar Documents

Publication Publication Date Title
CN213203251U (en) Batch electrophoresis hoist
CN205995691U (en) A kind of electrostatic spraying hanger
CN214004820U (en) Anodic oxidation hanger
CN105649316A (en) Wall-bridging rack of hanging basket
CN201711251U (en) Novel hanging tool for cleaning and paint-spray of car bumper
CN213388938U (en) Novel electrophoresis hanger
CN211057256U (en) Anodic oxidation hanging tool for cylindrical workpiece
CN209052789U (en) A kind of hardware tubing Hanging device for electro plating
CN209829711U (en) High-efficient floated cleaning jig and cleaning system
CN220900730U (en) Corrosion-resistant aluminum profile production line spraying hanger
CN201217709Y (en) Self-weight locking type chemical self-electrophoretic plating universal hanging rack
CN211488219U (en) Hanging clamp capable of hanging multiple I-shaped workpieces
CN218310043U (en) Panel wash rack
CN217497562U (en) Aluminum profile transportation hanging device
CN209348897U (en) Baking vanish drop in beam
CN216549210U (en) Lifting appliance for small piece coating assembly line
CN205949136U (en) Circulation system sprays paint
CN104624441A (en) Detachable hanger device of coating line
CN216234489U (en) Anode plate hanger
CN208136373U (en) A kind of Electropolating hangers
CN220364602U (en) Hanger for machining vehicle accessories with adjustable distance
CN204080166U (en) A kind of cooling body of screw block electroplanting device
CN210215504U (en) Hanger frame convenient to galvanized fitting hangs material fast
CN219664112U (en) Shock absorber electrostatic spraying frock
CN217646813U (en) Special frame for drying aluminum profiles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant