CN213201850U - Pay-off is used in water and electricity construction - Google Patents

Pay-off is used in water and electricity construction Download PDF

Info

Publication number
CN213201850U
CN213201850U CN202022277106.XU CN202022277106U CN213201850U CN 213201850 U CN213201850 U CN 213201850U CN 202022277106 U CN202022277106 U CN 202022277106U CN 213201850 U CN213201850 U CN 213201850U
Authority
CN
China
Prior art keywords
handle
fixedly connected
pay
movable block
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022277106.XU
Other languages
Chinese (zh)
Inventor
王宗元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Chumengyuan Installation And Decoration Engineering Co ltd
Original Assignee
Hubei Chumengyuan Installation And Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Chumengyuan Installation And Decoration Engineering Co ltd filed Critical Hubei Chumengyuan Installation And Decoration Engineering Co ltd
Priority to CN202022277106.XU priority Critical patent/CN213201850U/en
Application granted granted Critical
Publication of CN213201850U publication Critical patent/CN213201850U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manipulator (AREA)

Abstract

The utility model discloses a pay-off is used in water and electricity construction, including bottom plate, riser, handle, first spring, movable block, handle, inserted bar, connecting rod, stopper, pivot, carousel, fixed plate, handle, second spring, gag lever post and actinobacillus wheel. The utility model discloses simple structure, convenient operation, through setting up the handle convenience control when paying out wire, be favorable to paying off according to the length of needs electric wire, avoid the problem that the paying off overlength is difficult for the construction to appear, can realize the fixed of handle when lasting the paying off, conveniently operate; the utility model discloses a demountable design of actinobacillus wheel is convenient to be changed after using the completion, and the support of spacing convenient actinobacillus wheel through the gag lever post reduces constructor's the operation degree of difficulty, is favorable to improving the efficiency of construction.

Description

Pay-off is used in water and electricity construction
Technical Field
The utility model relates to a pay-off specifically is a pay-off is used in water and electricity construction belongs to water and electricity construction application technical field.
Background
The hydropower construction comprises building water supply and drainage construction and building electrical construction, the hydropower construction is carried out after the layout of the specific structure and position of a water supply system, a drainage system, electrical equipment, the trend of an electric wire and a lighting system in a house is carried out according to a construction drawing, and a hydropower plan is compiled for tools, various pipes and line pipes required by the project according to the required amount and time periods of each sub part during the hydropower construction, is closely matched with civil engineering constructors, and positions of the pipes, the pipelines, the rainwater wells, the inspection wells and the pump wells; the method ensures that hydropower and civil engineering are not wrong, ensures that the construction progress plan is smoothly pushed, and simultaneously performs the water closing acceptance check work of the installed pipeline, water supply and drainage system; and the installation work of each project is made according to the requirements of construction specifications, and the system is responsible for plan implementation of safety, quality and cost, and technical implementation, inspection and rechecking of safety, quality and construction methods.
The water and electricity construction is the general name of building plumbing construction and building electrical construction, need carry out the unwrapping wire to the electric wire during water and electricity construction, is unfavorable for carrying out the receive and release of cable when the operation, leads to the difficult problem of constructing because of the unwrapping wire overlength easily, is unfavorable for placing of new electric wire after the cable is used and is accomplished, reduces the efficiency of construction, increases constructor's operating load. Therefore, a pay-off device for hydropower construction is proposed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a pay-off is used in water and electricity construction in order to solve above-mentioned problem.
The utility model realizes the purpose through the following technical proposal, a pay-off device for hydropower construction, which comprises a vertical plate arranged at the top of a bottom plate, a limiting mechanism and a placing mechanism;
the limiting mechanism comprises a handle, a first spring and a movable block, the handle is fixedly connected with the top of the vertical plate, the top end of the handle is fixedly connected with the movable block through the first spring, the movable blocks are fixedly connected with each other through a handle, the middle of each movable block is connected with the handle in a penetrating manner, one side of each movable block is inserted into the corresponding insertion rod, the bottom end of each movable block is fixedly connected with a connecting rod, and the bottom end of each connecting rod is fixedly connected with a limiting block;
the placing mechanism comprises a rotating shaft, a rotating disc and a fixing plate, the rotating shaft is connected with the middle of the vertical plate in a rotating mode, two ends of the rotating shaft are fixedly connected with the rotating disc and the fixing plate respectively, one end portion of the rotating shaft is fixedly connected with a handle, the fixing plate is fixedly connected with a limiting rod through a second spring, and the limiting rod is connected with the side wall of the pay-off wheel in a clamping mode.
Preferably, the number of the vertical plates is two, the two vertical plates are respectively positioned at two sides of the bottom plate, the two vertical plates are fixedly connected with the U-shaped structure handle, and the handle is connected with the two movable blocks in a sliding manner.
Preferably, the inserted bar is L-shaped structure, the end of the inserted bar extends to the inside of the L-shaped clamping groove formed in the handle, the inserted bar is connected with the movable block in a sliding manner, and the movable block is provided with an opening for placing the inserted bar.
Preferably, the turntable and the fixing plate are respectively located on two sides of the vertical plate, a plurality of clamping teeth which are uniformly distributed are arranged on the edge of the turntable, and the clamping teeth are clamped with the limiting blocks.
Preferably, the rotating shaft between the fixed plate and the vertical plate is rotatably connected with the four limiting rods, the four rotating rods are of bent structures, and each rotating rod is fixedly connected with the second spring.
Preferably, the paying-off wheel is located between the fixing plates, and grooves used for embedding the limiting rods are formed in the two sides of the paying-off wheel.
The utility model has the advantages that:
1. the utility model discloses simple structure, convenient operation, through setting up the handle convenience control when paying out wire, be favorable to paying off according to the length of needs electric wire, avoid the problem that the paying off overlength is difficult for the construction to appear, can realize the fixed of handle when lasting the paying off, conveniently operate;
2. the utility model discloses a demountable design of actinobacillus wheel is convenient to be changed after using the completion, and the support of spacing convenient actinobacillus wheel through the gag lever post reduces constructor's the operation degree of difficulty, is favorable to improving the efficiency of construction.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the side view of the inside of the present invention;
fig. 3 is a schematic diagram of the side view structure of the utility model.
In the figure: 1. the base plate, 2, riser, 3, handle, 4, first spring, 5, movable block, 6, handle, 7, inserted bar, 8, connecting rod, 9, stopper, 10, pivot, 11, carousel, 12, fixed plate, 13, handle, 14, second spring, 15, gag lever post, 16, actinobacillus wheel.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the embodiments described below are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Referring to fig. 1-3, a pay-off device for hydropower construction comprises a vertical plate 2 arranged on the top of a bottom plate 1, a limiting mechanism and a placing mechanism;
the limiting mechanism comprises a handle 3, a first spring 4 and movable blocks 5, the handle 3 is fixedly connected with the top of the vertical plate 2, the top ends of the handle 3 are fixedly connected with the movable blocks 5 through the first spring 4, the movable blocks 5 are fixedly connected through handles 6, the middle parts of the movable blocks 5 are connected with the handle 3 in a penetrating manner, one sides of the movable blocks 5 are spliced with insertion rods 7, the bottom ends of the movable blocks 5 are fixedly connected with connecting rods 8, and the bottom ends of the connecting rods 8 are fixedly connected with limiting blocks 9;
the placing mechanism comprises a rotating shaft 10, a rotating disc 11 and a fixing plate 12, the rotating shaft 10 is rotatably connected with the middle of the vertical plate 2, two ends of the rotating shaft 10 are fixedly connected with the rotating disc 11 and the fixing plate 12 respectively, a handle 13 is fixedly connected with one end of the rotating shaft 10, the fixing plate 12 is fixedly connected with a limiting rod 15 through a second spring 14, and the limiting rod 15 is clamped with the side wall of the paying-off wheel 16.
The number of the vertical plates 2 is two, the two vertical plates 2 are respectively positioned on two sides of the bottom plate 1, the two vertical plates 2 are fixedly connected with a U-shaped structure handle 3, and the handle 3 is connected with the two movable blocks 5 in a sliding manner; the inserting rod 7 is of an L-shaped structure, the end part of the inserting rod 7 extends into an L-shaped clamping groove formed in the handle 3, the inserting rod 7 is connected with the movable block 5 in a sliding mode, and the movable block 5 is provided with an opening for placing the inserting rod 7; the turntable 11 and the fixing plate 12 are respectively positioned at two sides of the vertical plate 2, a plurality of clamping teeth which are uniformly distributed are arranged at the edge of the turntable 11, and the clamping teeth are clamped with the limiting block 9; the rotating shaft 10 between the fixed plate 12 and the vertical plate 2 is rotatably connected with four limiting rods 15, the four rotating rods are all of a bent structure, and each rotating rod is fixedly connected with a second spring 14; the paying-off wheel 16 is located between the fixing plates 12, and grooves used for embedding the limiting rods 15 are formed in two sides of the paying-off wheel 16.
When the utility model is used, the paying-off wheel 16 is placed between the fixed plates 12, the end part of the limiting rod 15 is embedded on the side wall of the paying-off wheel 16 to fix the paying-off wheel 16, the elasticity of the second spring 14 is used for clamping the paying-off wheel 16, the use and the replacement are convenient, when the paying-off is carried out, the handle 6 is lifted and pulled after the handle 3 is lifted, the handle 6 drives the movable block 5 to move at two sides of the handle 3, the handle 3 drives the connecting rod 8 and the limiting block 9 to move simultaneously when moving, the limiting block 9 is separated from the turntable 11, the handle 13 is rotated, the handle 13 drives the rotating shaft 10 to drive the limiting rod 15 and the paying-off wheel 16 to rotate simultaneously to realize the paying-off, when the paying-off is required to be continuously carried out, the inserting rod 7 corresponds to the clamping groove on the handle 3 when the handle 6 is tightly held, the inserting rod 7 is moved to the inside of the clamping, realize stopper 9 and 11 separation of carousel, conveniently last the unwrapping wire, improve the convenience of use.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (6)

1. The utility model provides a pay-off is used in water and electricity construction which characterized in that: comprises a vertical plate (2) arranged on the top of a bottom plate (1), a limiting mechanism and a placing mechanism;
the limiting mechanism comprises a handle (3), a first spring (4) and a movable block (5), the handle (3) is fixedly connected with the top of the vertical plate (2), the top end of the handle (3) is fixedly connected with the movable block (5) through the first spring (4), the movable blocks (5) are fixedly connected through a handle (6), the middle part of the movable block (5) is connected with the handle (3) in a penetrating manner, one side of the movable block (5) is inserted into an insertion rod (7), a connecting rod (8) is fixedly connected to the bottom end of the movable block (5), and a limiting block (9) is fixedly connected to the bottom end of the connecting rod (8);
place the mechanism and include pivot (10), carousel (11) and fixed plate (12), pivot (10) rotate with riser (2) middle part and are connected, pivot (10) both ends respectively with carousel (11) and fixed plate (12) fixed connection, one of them pivot (10) tip rigid coupling has handle (13), fixed plate (12) are through second spring (14) and gag lever post (15) fixed connection, and gag lever post (15) and actinobacillus wheel (16) lateral wall joint.
2. The pay-off device for hydropower construction as claimed in claim 1, wherein: the number of the vertical plates (2) is two, the two vertical plates (2) are respectively positioned at two sides of the bottom plate (1), the two vertical plates (2) are fixedly connected with the U-shaped structure lifting handle (3), and the lifting handle (3) is connected with the two movable blocks (5) in a sliding mode.
3. The pay-off device for hydropower construction as claimed in claim 1, wherein: inserted bar (7) are L shape structure, inside the L shape draw-in groove that inserted bar (7) tip extended to handle (3) and seted up, inserted bar (7) and movable block (5) sliding connection, and movable block (5) offer the opening that is used for inserted bar (7) to place.
4. The pay-off device for hydropower construction as claimed in claim 1, wherein: carousel (11) and fixed plate (12) are located riser (2) both sides respectively, a plurality of evenly distributed's latch is seted up at carousel (11) edge, and latch and stopper (9) joint.
5. The pay-off device for hydropower construction as claimed in claim 1, wherein: the rotating shaft (10) between the fixed plate (12) and the vertical plate (2) is rotatably connected with four limiting rods (15), the four rotating rods are of bent structures, and each rotating rod is fixedly connected with the second spring (14).
6. The pay-off device for hydropower construction as claimed in claim 1, wherein: the paying-off wheel (16) is located between the fixing plates (12), and grooves used for embedding the limiting rods (15) are formed in the two sides of the paying-off wheel (16).
CN202022277106.XU 2020-10-13 2020-10-13 Pay-off is used in water and electricity construction Active CN213201850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022277106.XU CN213201850U (en) 2020-10-13 2020-10-13 Pay-off is used in water and electricity construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022277106.XU CN213201850U (en) 2020-10-13 2020-10-13 Pay-off is used in water and electricity construction

Publications (1)

Publication Number Publication Date
CN213201850U true CN213201850U (en) 2021-05-14

Family

ID=75826076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022277106.XU Active CN213201850U (en) 2020-10-13 2020-10-13 Pay-off is used in water and electricity construction

Country Status (1)

Country Link
CN (1) CN213201850U (en)

Similar Documents

Publication Publication Date Title
CN102437535A (en) Steel stranded wire bender
CN213231292U (en) Pipe conveying device for municipal water supply and drainage
CN112152177B (en) Electric power iron tower overhead line wire cable link
CN213201850U (en) Pay-off is used in water and electricity construction
CN215478793U (en) Power transmission and transformation engineering cable strutting arrangement
CN210041141U (en) Adjustable turning guide device for cable laying
CN111636753A (en) Construction method for laying, installing and constructing power engineering line
CN208293613U (en) A kind of city integrated piping lane Quick Release die set device of running type
CN114725834A (en) Construction method for laying, installing and constructing power engineering line
CN202343811U (en) Bending device for steel stranded wires
CN211368730U (en) Novel support device based on old city foundation ditch
CN209298851U (en) Actinobacillus device suitable for carrying out electric power maintenance cable duct
CN215854336U (en) Cable traction auxiliary device
CN115680276A (en) Cast-in-place concrete stand decorative plate integral formwork structure and construction method thereof
CN113096928B (en) Overhead installation method of three-phase transformer
CN208904541U (en) A kind of cable laying wire rod sorting device
CN221353693U (en) Overhauling device for cable laying
CN216399576U (en) Municipal drainage pipeline thermoplasticity is restoreed and is used lifting support
CN221850714U (en) Wall surface ditching device for decoration construction
CN215564250U (en) Prefabricated stair embedded bolt mounting and positioning device
CN217552043U (en) High-efficient fluting equipment for architectural decoration
CN220813889U (en) Formwork device for wellhead inner wall construction
CN220202695U (en) Excavation supporting device for foundation pit
CN217027907U (en) High-rise residential building electrical shaft structure capable of improving working efficiency of pipeline penetration
CN115306160B (en) Steel-concrete composite beam installation method

Legal Events

Date Code Title Description
GR01 Patent grant