CN213177398U - Concrete tester for civil engineering - Google Patents

Concrete tester for civil engineering Download PDF

Info

Publication number
CN213177398U
CN213177398U CN202021860221.3U CN202021860221U CN213177398U CN 213177398 U CN213177398 U CN 213177398U CN 202021860221 U CN202021860221 U CN 202021860221U CN 213177398 U CN213177398 U CN 213177398U
Authority
CN
China
Prior art keywords
magnet
fixedly connected
base
fixed
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021860221.3U
Other languages
Chinese (zh)
Inventor
周祥军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021860221.3U priority Critical patent/CN213177398U/en
Application granted granted Critical
Publication of CN213177398U publication Critical patent/CN213177398U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model belongs to the technical field of civil engineering, especially, be a concrete tester for civil engineering, the on-line screen storage device comprises a base, the fixed surface of base is connected with adjusting part, the fixed surface of adjusting part top is connected with a supporting bench, the fixed surface of supporting bench is connected with first magnet, first magnet surface swing joint has second magnet, the fixed surface of second magnet is connected with concrete thickness appearance, the fixed surface of second magnet is connected with the spirit level, the fixed surface of second magnet is connected with the theodolite; the utility model discloses, through setting up first magnet and second magnet, when people used the device to survey and draw at the job site, through the activity of control second magnet, with first magnet and the separation of second magnet, will survey and draw required place suitable position together, the magnetism of second magnet can be fixed surveying instrument at first magnet upper surface, prevents that surveying instrument from appearing the phenomenon of colliding with.

Description

Concrete tester for civil engineering
Technical Field
The utility model belongs to the technical field of civil engineering, concretely relates to concrete tester for civil engineering.
Background
Civil engineering refers to the applied materials, equipment, the technical activities of surveying, designing, constructing, maintaining, repairing and the like, and the objects of engineering construction, namely, various engineering facilities which are constructed on the ground or underground or on land and directly or indirectly serve human life, production, military and scientific research, such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, harbors, power stations, airports, ocean platforms, water supply and drainage, protection engineering and the like, and civil engineering refers to the engineering which is carried out for the various technical works of new construction, reconstruction or extension of various engineering buildings, structures, related supporting facilities and the like and the engineering entities which are completed during the construction process of civil engineering, need carry out a large amount of survey and drawing test jobs, need with most kind of professional instruments, current survey and drawing test instrument all is an independent instrument, in the course of the work, need carry many instruments, uses different instruments to carry out the survey and drawing test, and the process is very loaded down with trivial details, can not carry out multiple operation simultaneously effectively, uses comparatively inconveniently, and work efficiency is comparatively low, for this reason, we have proposed a concrete tester for civil engineering.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a concrete tester for civil engineering has characteristics such as portable function and facilitate the use.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete tester for civil engineering comprises a base, wherein an adjusting component is fixedly connected to the upper surface of the base, a supporting table is fixedly connected to the top of the adjusting component, a first magnet is fixedly connected to the upper surface of the supporting table, a second magnet is movably connected to the surface of the first magnet, the number of the second magnets is three, a concrete thickness gauge is fixedly connected to the upper surface of the second magnet, a level gauge is fixedly connected to the upper surface of the second magnet, and a theodolite is fixedly connected to the upper surface of the second magnet;
the bin door comprises a supporting table, and is characterized in that a first hinge is fixedly connected to the side face of the supporting table, a baffle is fixedly connected to the other end of the first hinge, a second hinge is fixedly connected to the upper surface of the baffle, a bin door is fixedly connected to the other end of the second hinge, the number of the baffles is four, the baffles surround the supporting table, a handle is fixedly connected to the upper surface of the bin door, a hook is fixedly connected to the side face of the bin door, a hanging ring is fixedly connected to the side face of the baffle, and the hook is.
Preferably, the baffle side fixedly connected with first bracing piece, first bracing piece fixed surface is connected with the rubber strip, the through-hole has been seted up on the rubber strip surface, baffle fixed surface is connected with the second bracing piece, the second bracing piece is worn to establish in the through-hole, the base lower surface has been seted up the second recess, be provided with electric putter in the second recess, electric putter other end fixedly connected with wheel.
Preferably, the wheels are four in number and arranged on the lower surface of the base in a rectangular mode, the lower surface of the base is fixedly connected with the base, the bases are four in number and fixedly connected to the lower surface of the base in a rectangular mode, an energy storage bin is arranged in the base, a storage battery is arranged in the energy storage bin, and a control panel is arranged on the surface of the base.
Preferably, the adjusting component comprises a first groove, the first groove is formed in the upper surface of the base, a motor is arranged in the first groove, the other end of the output shaft of the motor is fixedly connected with a first rotating shaft, the surface of the first rotating shaft is fixedly connected with a first bevel gear, the side surface of the first bevel gear is meshed with a second bevel gear, the surface of the second bevel gear penetrates through a second rotating shaft, and the side surface of the second rotating shaft is fixedly connected with a threaded column.
Preferably, the base upper surface fixedly connected with first fixed block, first activity groove has been seted up on first fixed block surface, first fixed block has the support frame through round pin axle swing joint, first fixed block is total two, and arranges at the base upper surface, support frame fixed surface is connected with the support column, threaded hole is seted up on the support column surface.
Preferably, the threaded column is worn to establish in the threaded hole, the threaded column is total two, and fixed connection is at second pivot both ends respectively, the support frame other end has the second fixed block through round pin axle swing joint, the second activity groove has been seted up on second fixed block surface, the total two of second fixed block, and respectively through round pin axle and support frame swing joint, the support frame is total two, and fixed connection is at the support column both ends respectively.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through setting up first magnet and second magnet, when people use the device to survey and draw at the job site, through controlling the activity of second magnet, separate first magnet and second magnet, will survey and draw required placing suitable position together, the magnetism of second magnet can fix surveying instrument on first magnet upper surface, prevent surveying instrument from appearing the phenomenon of colliding with, through setting up adjusting part, when people adjust surveying instrument's height, through control panel control motor operation, drive the rotation of first pivot simultaneously, under the cooperation of first conical gear, second conical gear and second pivot, drive the screw thread post and rotate, under the cooperation of support column, drive the support frame shrink, thereby people can adjust surveying instrument's height, through setting up the wheel, the wheel can help people to move the device to the job site, the manual carrying construction site of people is avoided, and the labor intensity of surveying and mapping workers is reduced.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic front view of the structure of the present invention;
fig. 3 is a schematic perspective view of a support table according to the present invention;
fig. 4 is a schematic front sectional view of the adjusting assembly of the present invention;
fig. 5 is a schematic front view of the adjusting assembly of the present invention;
in the figure: 1. a base; 2. an adjustment assembly; 201. a first groove; 202. a motor; 203. a first rotating shaft; 204. a first bevel gear; 205. a second bevel gear; 206. a second rotating shaft; 207. a threaded post; 208. a first fixed block; 209. a first movable slot; 210. a support frame; 211. a support pillar; 212. a threaded hole; 213. a second fixed block; 214. a second movable slot; 3. a support table; 4. a first hinge; 5. a baffle plate; 6. a second hinge; 7. a bin gate; 8. a first magnet; 9. a second magnet; 10. a concrete thickness gauge; 11. a level gauge; 12. a theodolite; 13. a handle; 14. hooking; 15. hanging a ring; 16. A first support bar; 17. a rubber strip; 18. a through hole; 19. a second support bar; 20. a second groove; 21. An electric push rod; 22. a wheel; 23. a base; 24. an energy storage bin; 25. a storage battery; 26. a control panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides the following technical solutions: a concrete tester for civil engineering comprises a base 1, wherein an adjusting component 2 is fixedly connected to the upper surface of the base 1, a supporting table 3 is fixedly connected to the top of the adjusting component 2, a first magnet 8 is fixedly connected to the upper surface of the supporting table 3, a second magnet 9 is movably connected to the surface of the first magnet 8, by arranging the first magnet 8 and the second magnet 9, when people use the device to survey and draw on a construction site, the first magnet 8 and the second magnet 9 are separated by controlling the movement of the second magnet 9, the concrete tester is placed at a proper position together required by surveying and drawing, the magnetic property of the second magnet 9 can fix the surveying and drawing instrument on the upper surface of the first magnet 8, so that the phenomenon of collision of the surveying and drawing instrument is prevented, the number of the second magnets 9 is three, a concrete thickness gauge 10 is fixedly connected to the upper surface of the second magnet 9, a leveling gauge 11 is fixedly connected to the upper surface of the second magnet 9, the upper surface of the second magnet 9 is fixedly connected with a theodolite 12;
3 sides of supporting bench fixedly connected with first hinge 4, 4 other end fixedly connected with baffles 5 of first hinge, 5 last fixed surface of baffles are connected with second hinge 6, 6 other end fixedly connected with door 7 of second hinge, 5 total four baffles, and encircle supporting bench 3 all around, 7 last fixed surface of door are connected with handle 13, 7 sides fixedly connected with couple 14 of door, 5 sides fixedly connected with link 15 of baffle, couple 14 and link 15 phase-match.
Specifically, 5 first bracing pieces 16 of fixedly connected with in side of baffle, 16 fixed surface of first bracing piece is connected with rubber strip 17, through-hole 18 has been seted up on rubber strip 17 surface, 5 fixed surface of baffle are connected with second bracing piece 19, second bracing piece 19 is worn to establish in through-hole 18, second recess 20 has been seted up to base 1 lower surface, be provided with electric putter 21 in the second recess 20, electric putter 21 other end fixedly connected with wheel 22, through setting up wheel 22, wheel 22 can help people to remove the device to the job site, has avoided people's manual handling job site, has reduced survey and drawing staff's intensity of labour.
Specifically, the wheels 22 are four in total and are arranged on the lower surface of the base 1 in a rectangular manner, the base 23 is fixedly connected to the lower surface of the base 1, the bases 23 are four in total and are fixedly connected to the lower surface of the base 1 in a rectangular manner, the energy storage bin 24 is formed in the base 1, the storage battery 25 is arranged in the energy storage bin 24, and the surface of the base 1 is provided with the control panel 26.
Specifically, the adjusting assembly 2 includes a first groove 201, the first groove 201 is provided on the upper surface of the base 1, a motor 202 is provided in the first groove 201, the other end of the output shaft of the motor 202 is fixedly connected with a first rotating shaft 203, the surface of the first rotating shaft 203 is fixedly connected with a first bevel gear 204, the side surface of the first bevel gear 204 is engaged with a second bevel gear 205, the surface of the second bevel gear 205 is provided with a second rotating shaft 206 in a penetrating manner, and the side surface of the second rotating shaft 206 is fixedly connected with a threaded column 207.
Specifically, the first fixed block 208 of fixed surface is connected with on base 1, first movable groove 209 has been seted up on first fixed block 208 surface, first fixed block 208 has support frame 210 through round pin axle swing joint, first fixed block 208 is total two, and arranges at the base 1 upper surface, support frame 210 fixed surface is connected with support column 211, through setting up adjusting part 2, when people adjust surveying instrument's height, through control panel 26 control motor 202 operation, it is rotatory to drive first pivot 203 simultaneously, under the cooperation of first conical gear 204, second conical gear 205 and second pivot 206, it is rotatory to drive threaded post 207, under the cooperation of support column 211, drives support frame 210 shrink to people can adjust surveying instrument's height, threaded hole 212 has been seted up on support column 211 surface.
Specifically, threaded post 207 wears to establish in screw hole 212, threaded post 207 is total two, and fixed connection is at second pivot 206 both ends respectively, the support frame 210 other end has second fixed block 213 through round pin axle swing joint, second movable groove 214 has been seted up on second fixed block 213 surface, second fixed block 213 is total two, and respectively through round pin axle and support frame 210 swing joint, support frame 210 is total two, and fixed connection is at support column 211 both ends respectively.
The utility model discloses a theory of operation and use flow: the utility model discloses, when using, at first remove the device to suitable position, through control panel 26 control electric putter 21 operation, drive electric putter 21 shrink simultaneously, drive the upwards directional activity of wheel 22, until base 23 contacts ground, thereby people can fix the device, through separating couple 14 and link 15, break away from rubber strip 17 simultaneously second bracing piece 19, thereby surveying instrument can expose in people's field of vision scope, through control panel 26 control motor 202 operation, drive first pivot 203 rotation simultaneously, under the cooperation of first conical gear 204, second conical gear 205 and second pivot 206, drive screw thread post 207 rotation, under the cooperation of support column 211, drive support frame 210 shrink, thereby people can adjust surveying instrument to suitable height, through controlling the activity of second magnet 9, separate first magnet 8 and second magnet 9, the instrument required for surveying is placed at a proper position, the magnetism of the second magnet 9 can fix the surveying instrument on the upper surface of the first magnet 8, and then, one can perform surveying and mapping test using the corresponding surveying instrument.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a concrete tester for civil engineering, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with an adjusting component (2), the top of the adjusting component (2) is fixedly connected with a supporting table (3), the upper surface of the supporting table (3) is fixedly connected with a first magnet (8), the surface of the first magnet (8) is movably connected with a second magnet (9), the number of the second magnets (9) is three, the upper surface of the second magnet (9) is fixedly connected with a concrete thickness gauge (10), the upper surface of the second magnet (9) is fixedly connected with a leveling instrument (11), and the upper surface of the second magnet (9) is fixedly connected with a theodolite (12);
supporting bench (3) side fixedly connected with first hinge (4), first hinge (4) other end fixedly connected with baffle (5), fixed surface is connected with second hinge (6) on baffle (5), second hinge (6) other end fixedly connected with door (7), baffle (5) are total four, and encircle supporting bench (3) all around, fixed surface is connected with handle (13) on door (7), door (7) side fixedly connected with couple (14), baffle (5) side fixedly connected with link (15), couple (14) and link (15) phase-match.
2. The concrete tester for civil engineering as claimed in claim 1, wherein: baffle (5) side fixedly connected with first bracing piece (16), first bracing piece (16) fixed surface is connected with rubber strip (17), through-hole (18) have been seted up on rubber strip (17) surface, baffle (5) fixed surface is connected with second bracing piece (19), second bracing piece (19) are worn to establish in through-hole (18), second recess (20) have been seted up to base (1) lower surface, be provided with electric putter (21) in second recess (20), electric putter (21) other end fixedly connected with wheel (22).
3. The concrete tester for civil engineering as claimed in claim 2, wherein: the utility model discloses a bicycle wheel, including base (1), wheel (22), base (1) lower surface fixed connection has base (23), base (23) are total four, and are rectangle fixed connection at base (1) lower surface, energy storage storehouse (24) have been seted up in base (1), be provided with battery (25) in energy storage storehouse (24), base (1) surface is provided with control panel (26).
4. The concrete tester for civil engineering as claimed in claim 1, wherein: adjusting part (2) includes first recess (201), first recess (201) are seted up at base (1) upper surface, be provided with motor (202) in first recess (201), the output shaft other end fixedly connected with first pivot (203) of motor (202), first pivot (203) fixed surface is connected with first conical gear (204), first conical gear (204) side meshing has second conical gear (205), second conical gear (205) surface is worn to be equipped with second pivot (206), second pivot (206) side fixedly connected with screw thread post (207).
5. The concrete tester for civil engineering according to claim 4, characterized in that: fixed surface is connected with first fixed block (208) on base (1), first movable groove (209) have been seted up on first fixed block (208) surface, first fixed block (208) have support frame (210) through round pin axle swing joint, first fixed block (208) are total two, and arrange at base (1) upper surface, support frame (210) fixed surface is connected with support column (211), threaded hole (212) have been seted up on support column (211) surface.
6. The concrete tester for civil engineering according to claim 5, characterized in that: threaded post (207) are worn to establish in screw hole (212), threaded post (207) are total two, and fixed connection is at second pivot (206) both ends respectively, support frame (210) other end has second fixed block (213) through round pin axle swing joint, second movable groove (214) have been seted up on second fixed block (213) surface, second fixed block (213) are total two, and respectively through round pin axle and support frame (210) swing joint, support frame (210) are total two, and respectively fixed connection at support column (211) both ends.
CN202021860221.3U 2020-08-31 2020-08-31 Concrete tester for civil engineering Expired - Fee Related CN213177398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021860221.3U CN213177398U (en) 2020-08-31 2020-08-31 Concrete tester for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021860221.3U CN213177398U (en) 2020-08-31 2020-08-31 Concrete tester for civil engineering

Publications (1)

Publication Number Publication Date
CN213177398U true CN213177398U (en) 2021-05-11

Family

ID=75768793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021860221.3U Expired - Fee Related CN213177398U (en) 2020-08-31 2020-08-31 Concrete tester for civil engineering

Country Status (1)

Country Link
CN (1) CN213177398U (en)

Similar Documents

Publication Publication Date Title
CN210003211U (en) drilling equipment for geotechnical engineering investigation
CN210032534U (en) Civil engineering construction support
CN213177398U (en) Concrete tester for civil engineering
CN209912342U (en) Simulation live-action sand table used in building planning management construction
CN213651651U (en) Road and bridge construction tool rapid lifting equipment based on civil engineering
CN212562371U (en) Civil engineering construction support
CN211775573U (en) Support is used in civil engineering construction
CN210217076U (en) Civil engineering safety scaffold
CN212931952U (en) A soil sampling device for civil engineering
CN208105828U (en) A kind of civil construction operation frame
CN112475140A (en) Steel bar cutting device for building construction
CN213568819U (en) Civil engineering building unwrapping wire equipment
CN212836608U (en) Civil engineering construction support
CN211666212U (en) Scaffold for civil engineering
CN215820151U (en) Drawing device for civil engineering
CN215168103U (en) Building templates connects steelframe for civil engineering
CN216196871U (en) Strutting arrangement for civil engineering
CN213650539U (en) Large-scale engineering pipe fitting rack of building
CN212053866U (en) Road and bridge engineering protector
CN211691376U (en) Cantilever device for building engineering construction
CN214124666U (en) Support frame for civil engineering construction
CN211547395U (en) Road and bridge engineering that facilitates use is with protection frame
CN220366211U (en) Surveying and mapping device for civil engineering construction
CN213621146U (en) Civil engineering pipeline placing frame
CN217053377U (en) Supporting and reinforcing structure for foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210511

CF01 Termination of patent right due to non-payment of annual fee