CN213177059U - A quick installation component for green building construction - Google Patents

A quick installation component for green building construction Download PDF

Info

Publication number
CN213177059U
CN213177059U CN202021763322.9U CN202021763322U CN213177059U CN 213177059 U CN213177059 U CN 213177059U CN 202021763322 U CN202021763322 U CN 202021763322U CN 213177059 U CN213177059 U CN 213177059U
Authority
CN
China
Prior art keywords
fixedly connected
rectangular
rods
backup pad
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021763322.9U
Other languages
Chinese (zh)
Inventor
周新
赵伟
罗蜀苹
蔡东哲
宁立文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Jianlian Construction Engineering Co ltd
Original Assignee
Zhongtian Jianlian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Jianlian Construction Engineering Co ltd filed Critical Zhongtian Jianlian Construction Engineering Co ltd
Priority to CN202021763322.9U priority Critical patent/CN213177059U/en
Application granted granted Critical
Publication of CN213177059U publication Critical patent/CN213177059U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a quick installation component for green building construction belongs to building installation component technical field, including fixed plate and backup pad, the vertical draw-in groove of seting up T type structure in left side of fixed plate, the lateral wall of backup pad passes through round hole fixedly connected with connecting rod, round hole and fixedly connected with circle piece are passed to the one end of connecting rod, the circle piece cooperatees with the draw-in groove, the diameter of connecting rod is the same with the notch width of draw-in groove, one side fixedly connected with limiting plate of backup pad, the lateral wall of limiting plate has a plurality of evenly distributed's bolt through screw hole threaded connection, one side of backup pad through a plurality of circles mouthful respectively with a plurality of bolt sliding connection. The utility model discloses, can adjust the direction and the position of installation component according to the installation demand of actual building construction, the installation component can lock by oneself and be difficult not hard up when hoisting the pipeline simultaneously, and the workman of being convenient for uses the installation component fast to carry out the construction.

Description

A quick installation component for green building construction
Technical Field
The utility model relates to a building installation component technical field especially relates to a quick installation component for green building construction.
Background
Along with the enhancement of energy-saving and environment-friendly consciousness of people, green construction becomes the core competitiveness of construction enterprises in the building industry, the image of the construction enterprises is favorably improved, the construction energy consumption of the enterprises is favorably reduced, the construction quality is controlled, and good social benefits, economic benefits and environmental benefits are realized.
At present, when installing various pipelines in the piping lane, the overall arrangement of traditional triangle-shaped support is fairly simple, has certain limitation during the use, and the workman still need change the structure of support when necessary, and the installation component on the support can be fixed the pipeline, but when hanging in midair the installation pipeline, needs many people to cooperate and just can fix the installation component on the support, has reduced construction's speed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art traditional support and having certain limitation, the workman still need change the structure of support when necessary, and the installation component on the support though can fix the pipeline, but when hanging in midair the installation pipeline, need many people to cooperate and just can fix the installation component on the support, reduced the problem of construction speed, and the quick installation component who is used for green building construction who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a quick installation component for green building construction, includes fixed plate and backup pad, the vertical draw-in groove of seting up T type structure in left side of fixed plate, the lateral wall of backup pad passes through round hole fixedly connected with connecting rod, round hole and fixedly connected with circle piece are passed to the one end of connecting rod, the circle piece cooperatees with the draw-in groove, the diameter of connecting rod is the same with the notch width of draw-in groove, one side fixedly connected with limiting plate of backup pad, the lateral wall of limiting plate has a plurality of evenly distributed's bolt through screw hole threaded connection, one side of backup pad through a plurality of circles mouthful respectively with a plurality of bolt sliding connection, the right side fixedly connected with diaphragm of backup pad, the upper end of diaphragm is connected with a plurality of evenly distributed.
Preferably, the fixing mechanism comprises a plurality of arc-shaped rods arranged above the transverse plate, the arc-shaped rods are arranged on the transverse plate, the two ends of each arc-shaped rod are vertically fixedly connected with rectangular rods, a plurality of fixing rods are fixedly connected to the upper end of the transverse plate, the fixing rods are arranged on the upper ends of the fixing rods, the blind holes of the rectangular structures are formed in the upper ends of the fixing rods, the fixing rods are adjacent to each other, the fixing rods are sleeved with the two rectangular rods on the arc-shaped rods in a sliding mode through the blind holes, the lead screws are sleeved with the lower ends of the fixing rods in a sliding mode through the.
Preferably, there is the rectangular block one side of dead lever through rectangle through-hole sliding connection, vertically set up a plurality of evenly distributed's constant head tank on the pole wall of rectangular rod, the one end of rectangular block extends to one of them in the constant head tank and seted up the inclined plane, the pin has been cup jointed through the bar through-hole slip in one side of rectangular block, the both ends of pin are respectively with the both sides fixed connection that the rectangle through-hole is relative, one side fixedly connected with elastic plate of dead lever, the lower extreme of elastic plate and one side sliding connection of rectangular block.
Preferably, the upper end fixedly connected with of diaphragm has a plurality of evenly distributed's cushion, and is a plurality of the arc logical groove has all been seted up to the upper end of cushion, the cushion is located the below of arc pole.
Preferably, the lower end of the transverse plate is fixedly connected with a supporting rod in an inclined mode, and one end, far away from the transverse plate, of the supporting rod is fixedly connected with the lower side of the right end of the supporting plate.
Preferably, the front end and the rear end of the fixing plate are fixedly connected with two connecting blocks, and the side walls of the two connecting blocks are provided with mounting holes.
Compared with the prior art, the utility model provides a quick installation component for green building construction possesses following beneficial effect:
1. this a quick installation component for green building construction, backup pad through being equipped with, expansion bolts cooperation connecting block fixes the installation component at the wall, then with the position of hand pulling backup pad adjustment diaphragm, circle piece and the limiting plate of setting on the connecting rod can carry out the connection that stabilizes to the backup pad, after the position control of diaphragm, use the spanner to twist and move the round mouth that the bolt passed in the backup pad and contact with the fixed plate and crowd tightly, thereby can make the installation component structure after the adjustment comparatively firm, and fixed establishment direction and position on the diaphragm all can be according to actual installation demand adjustment, convenient and fast.
2. This a quick installation component for green building construction, through the arc pole that is equipped with, when needs hoist, insert two rectangle poles on the arc pole in the blind hole on the dead lever, and make the lead screw on the rectangle pole pass the through-hole, the elastic plate promotes rectangle piece and constant head tank joint this moment, make rectangle piece and pin cooperation carry on spacingly to the rectangle pole, prevent that the rectangle pole from slipping off in the blind hole, thereby can make when hoist and mount the pipeline difficult not hard up with the arc pole of pipeline contact, the workman of being convenient for uses the installation component to carry out the construction fast.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses, can adjust the direction and the position of installation component according to the installation demand of actual building construction, the installation component can lock by oneself and be difficult for not hard up when hoisting the pipeline simultaneously, and the workman of being convenient for uses the installation component to carry out the construction fast.
Drawings
Fig. 1 is a schematic structural view of a quick installation assembly for green building construction according to the present invention;
fig. 2 is a schematic structural view of a quick mounting assembly fixing mechanism for green building construction according to the present invention;
fig. 3 is an enlarged view of a structure at a in fig. 2.
In the figure: the device comprises a transverse plate 1, a fixing rod 2, a cushion block 3, an arc-shaped rod 4, a rectangular rod 5, a limiting plate 6, a bolt 7, a connecting rod 8, a round block 9, a fixing plate 10, a connecting block 11, a clamping groove 12, a positioning groove 13, a screw rod 14, an elastic plate 15, a rectangular block 16, a pin 17, a supporting rod 18 and a supporting plate 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a quick mounting assembly for green building construction comprises a fixing plate 10 and a supporting plate 19, wherein a clamping groove 12 with a T-shaped structure is vertically formed in the left side of the fixing plate 10, a connecting rod 8 is fixedly connected to the side wall of the supporting plate 19 through a circular hole, one end of the connecting rod 8 penetrates through the circular hole and is fixedly connected with a round block 9, the round block 9 is matched with the clamping groove 12, the diameter of the connecting rod 8 is the same as the width of the notch of the clamping groove 12, a limiting plate 6 is fixedly connected to one side of the supporting plate 19, the side wall of the limiting plate 6 is in threaded connection with a plurality of uniformly distributed bolts 7 through threaded holes, one side of the supporting plate 19 is respectively in sliding connection with the plurality of bolts 7 through a plurality of round holes, a transverse plate 1 is fixedly connected to the right side of the supporting plate 19, the upper end of diaphragm 1 is connected with a plurality of evenly distributed's fixed establishment, two connecting blocks 11 of the equal fixedly connected with in both ends around fixed plate 10, and the mounting hole has all been seted up to the lateral wall of two connecting blocks 11.
The fixing mechanism comprises a plurality of arc-shaped rods 4 arranged above a transverse plate 1, rectangular rods 5 are vertically and fixedly connected to two ends of each arc-shaped rod 4, a plurality of fixing rods 2 are fixedly connected to the upper end of the transverse plate 1, blind holes of a rectangular structure are formed in the upper ends of the fixing rods 2, two adjacent fixing rods 2 are slidably sleeved with the two rectangular rods 5 on the arc-shaped rods 4 through the blind holes, a lead screw 14 is slidably sleeved at the lower end of each fixing rod 2 through a through hole, the upper end of the lead screw 14 penetrates through the through hole and is fixedly connected with the lower end of each rectangular rod 5, a rectangular block 16 is slidably connected to one side of each fixing rod 2 through the rectangular through hole, a plurality of positioning grooves 13 which are uniformly distributed are vertically formed in the rod wall of each rectangular rod 5, one end of each rectangular block 16 extends into one positioning groove 13 and is provided with an inclined plane, the both ends of pin 17 respectively with the relative both sides fixed connection of rectangle through-hole, one side fixedly connected with elastic plate 15 of dead lever 2, the lower extreme of elastic plate 15 and one side sliding connection of rectangular block 16, a plurality of evenly distributed's of upper end fixedly connected with cushion 3 of diaphragm 1, the logical groove of arc has all been seted up to the upper end of a plurality of cushions 3, cushion 3 is located the below of arc pole 4.
In the utility model, when in use, the mounting component is fixed on the wall by using the expansion bolt to match the connecting block 11, then the supporting plate 19 is pulled by hand to adjust the position of the transverse plate 1, the round block 9 and the limiting plate 6 arranged on the connecting rod 8 can stably connect the supporting plate 19, after the position of the transverse plate 1 is adjusted, the bolt 7 is screwed by a wrench to pass through the round opening on the supporting plate 19 to be tightly contacted with the fixed plate 10, thereby the adjusted mounting component structure is more stable, the direction and the position of the fixing mechanism on the transverse plate 1 can be adjusted according to the actual mounting requirement, the operation is convenient and rapid, when in need of hoisting, two rectangular rods 5 on the arc-shaped rod 4 are inserted into blind holes on the fixed rod 2, and lead screws 14 on the rectangular rods 5 pass through holes, at the moment, the elastic plate 15 pushes the rectangular block 16 to be clamped with the positioning groove 13, so that the rectangular block 16, prevent that rectangular pole 5 from slipping in the blind hole to can make installation component can the auto-lock when hoisting the pipeline, make the arc pole 4 difficult not hard up with the pipeline contact, the workman of being convenient for uses installation component to carry out construction fast.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a quick installation component for green building construction, includes fixed plate (10) and backup pad (19), its characterized in that, draw-in groove (12) of T type structure are vertically seted up in the left side of fixed plate (10), the lateral wall of backup pad (19) passes through round hole fixedly connected with connecting rod (8), the one end of connecting rod (8) passes round hole and fixedly connected with disk (9), disk (9) cooperatees with draw-in groove (12), the diameter of connecting rod (8) is the same with the notch width of draw-in groove (12), one side fixedly connected with limiting plate (6) of backup pad (19), the lateral wall of limiting plate (6) has a plurality of evenly distributed's bolt (7) through screw hole threaded connection, one side of backup pad (19) respectively with a plurality of bolt (7) sliding connection through a plurality of round mouths, the right side fixedly connected with diaphragm (1) of backup pad (19), the upper end of the transverse plate (1) is connected with a plurality of uniformly distributed fixing mechanisms.
2. The quick mounting assembly for green building construction is characterized in that the fixing mechanism comprises a plurality of arc-shaped rods (4) arranged above a transverse plate (1), both ends of the arc-shaped rods (4) are vertically and fixedly connected with rectangular rods (5), the upper end of the transverse plate (1) is fixedly connected with a plurality of fixing rods (2), the upper ends of the fixing rods (2) are provided with blind holes of rectangular structures, two adjacent fixing rods (2) are slidably sleeved with the two rectangular rods (5) on the arc-shaped rods (4) through the blind holes, the lower ends of the fixing rods (2) are slidably sleeved with a screw rod (14) through a through hole, and the upper end of the screw rod (14) penetrates through the through hole and is fixedly connected with the lower ends of the rectangular rods (5).
3. The quick mounting assembly for the green building construction as claimed in claim 2, wherein one side of the fixing rod (2) is slidably connected with a rectangular block (16) through a rectangular through hole, a plurality of positioning grooves (13) uniformly distributed are vertically formed in the rod wall of the rectangular rod (5), one end of the rectangular block (16) extends into one of the positioning grooves (13) and is provided with an inclined surface, a pin (17) is slidably sleeved on one side of the rectangular block (16) through a strip-shaped through hole, two ends of the pin (17) are fixedly connected with two opposite sides of the rectangular through hole respectively, one side of the fixing rod (2) is fixedly connected with an elastic plate (15), and the lower end of the elastic plate (15) is slidably connected with one side of the rectangular block (16).
4. The quick mounting assembly for the green building construction is characterized in that a plurality of evenly distributed cushion blocks (3) are fixedly connected to the upper end of the transverse plate (1), arc-shaped through grooves are formed in the upper ends of the cushion blocks (3), and the cushion blocks (3) are located below the arc-shaped rods (4).
5. The quick mounting assembly for green building construction according to claim 1 is characterized in that a support rod (18) is fixedly connected to the lower end of the transverse plate (1) in an inclined manner, and one end of the support rod (18) far away from the transverse plate (1) is fixedly connected with the lower side of the right end of the support plate (19).
6. The quick mounting assembly for green building construction according to claim 1, wherein two connecting blocks (11) are fixedly connected to the front end and the rear end of the fixing plate (10), and mounting holes are formed in the side walls of the two connecting blocks (11).
CN202021763322.9U 2020-08-21 2020-08-21 A quick installation component for green building construction Expired - Fee Related CN213177059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021763322.9U CN213177059U (en) 2020-08-21 2020-08-21 A quick installation component for green building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021763322.9U CN213177059U (en) 2020-08-21 2020-08-21 A quick installation component for green building construction

Publications (1)

Publication Number Publication Date
CN213177059U true CN213177059U (en) 2021-05-11

Family

ID=75766479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021763322.9U Expired - Fee Related CN213177059U (en) 2020-08-21 2020-08-21 A quick installation component for green building construction

Country Status (1)

Country Link
CN (1) CN213177059U (en)

Similar Documents

Publication Publication Date Title
CN206829422U (en) A kind of two-sided dried hanging hang structure wall of indoor facing plate
CN210685093U (en) Quick installation mechanism of curtain
CN213177059U (en) A quick installation component for green building construction
CN213115489U (en) Novel formwork support device for building construction
CN209339385U (en) A kind of cladding glass fixture
CN219863544U (en) Connection structure of building curtain wall
CN209991181U (en) Wall hanging device for television
CN216380202U (en) Joint formula steel sheet fossil fragments furred ceiling structure
CN203129395U (en) Fast-assembled hoisting piece for suspended ceiling auxiliary keel
CN214658433U (en) Hanging part system
CN213239748U (en) Glass curtain wall bearing capacity detection device
CN211080873U (en) Double-curved-surface stone dry-hanging structure for hall
CN112942720A (en) Hanging part system
CN203947648U (en) A kind of Skeleton hanging part structure
CN215886019U (en) U-shaped clamp for hoisting square tube
CN112647634B (en) Nested formula back of body is tied stone material furred ceiling structure
CN219388848U (en) Electromechanical installation antidetonation hoist and mount frame
CN213868524U (en) Integrated roof PC component
CN210395815U (en) Single-leaf hanging piece suspension strip for ceiling
CN220168776U (en) Laboratory pipeline fixed bolster mechanism
CN209874534U (en) Glass curtain wall reinforcing apparatus
CN211899117U (en) Hyperboloid aluminum curtain wall installation mechanism
CN214615182U (en) Adjusting hanging head
CN210372760U (en) Projector convenient to install
CN212200972U (en) Light steel keel easy to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210511