CN213175086U CN202020583370.3U CN202020583370U CN213175086U CN 213175086 U CN213175086 U CN 213175086U CN 202020583370 U CN202020583370 U CN 202020583370U CN 213175086 U CN213175086 U CN 213175086U
Authority
CN
China
Prior art keywords
hole site
fixing hole
engineering
guardrail
mobile jib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020583370.3U
Other languages
Chinese (zh)
Inventor
潘正伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Bozhi Engineering Consulting Co ltd
Original Assignee
Jiangsu Bozhi Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Bozhi Engineering Consulting Co ltd filed Critical Jiangsu Bozhi Engineering Consulting Co ltd
Priority to CN202020583370.3U priority Critical patent/CN213175086U/en
Application granted granted Critical
Publication of CN213175086U publication Critical patent/CN213175086U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a guardrail for engineering, including supporting mobile jib, connecting rod, rain lap and unable adjustment base, support mobile jib bottom embedded being connected with unable adjustment base in surface, the upper portion surface of supporting the mobile jib is pegged graft and is had the rain lap, supports mobile jib middle part surface butt and has been had the bearing annular, support mobile jib middle part surface cup jointed the solid fixed cylinder post, gu fixed cylinder bottom embedded in the bearing annular in surface, realized swift installation, have firm supporting role simultaneously, have safe protection, realized in the process of loading and unloading, play and improve the efficiency of construction, save more manpower and materials.

Description

Guardrail for engineering
Technical Field
The utility model relates to a guardrail for engineering belongs to engineering equipment technical field.
Background
The guardrail for engineering is used for playing the roles of protection and blocking and playing the roles of safety protection and warning, but the guardrail for engineering at the present stage is complicated in assembly steps, is particularly installed by using screws, is easy to rust and dirty in long-time use, is not easy to assemble and disassemble, or is easy to loosen in long-time use, and is not beneficial to the use problem of safety protection.
SUMMERY OF THE UTILITY MODEL
To the problem that above-mentioned prior art exists, the utility model provides a guardrail for engineering has realized swift installation, has firm supporting role simultaneously, has safe protection, has realized playing improvement efficiency of construction on the in-process of loading and unloading, saves more manpower and materials.
In order to achieve the above object, the utility model discloses a following technical scheme realizes: a guardrail for engineering comprises a supporting main rod, a connecting rod, a rain drop and a fixed base, wherein the fixed base is embedded and connected on the bottom surface of the supporting main rod, the rain drop is inserted and connected on the upper surface of the supporting main rod, a bearing ring groove is abutted and connected on the middle surface of the supporting main rod, a fixed cylinder column is sleeved and connected on the middle surface of the supporting main rod, the bottom surface of the bottom of the fixed cylinder column is embedded and connected in the bearing ring groove, inserting cylinder rods are symmetrically and fixedly connected on the surfaces of the two transverse sides of the fixed cylinder column, a clamping groove is formed in the bottom surface of each inserting cylinder rod, a first fixed hole position is respectively formed in the surfaces of the two sides of the clamping groove, a second fixed hole position is formed in the surface of the two upper sides of the connecting rod, a third fixed hole position is formed in the surface of the two lower sides of the connecting rod, a side surface of the connecting rod is inserted and connected in the inserting cylinder, the bottom fixedly connected with joint board of stand, joint integrated circuit board buckle connect in the joint inslot.
The left and right sides and bottom surface paste in the grafting section of thick bamboo pole have the intermediate layer to fill up, grafting section of thick bamboo pole in upper portion both sides surface paste have the fixed bolster, intermediate layer fill up and fixed bolster all with connecting rod surface butt.
The upper surface of the inside of the inserting cylinder rod is fixedly connected with two limiting cylinders, and the top ends of the upright posts are inserted into the limiting cylinders.
And the second fixing hole site and the third fixing hole site are symmetrically arranged.
The limiting cylinder and the first fixing hole sites are consistent in quantity and are two, and the central points of the limiting cylinder and the first fixing hole sites are on the same vertical line.
And the distance between the first fixing hole sites, the distance between the third fixing hole sites and the distance between the second fixing hole sites are consistent.
And the second fixing hole site and the third fixing hole site are symmetrically arranged.
To sum up, the utility model provides a guardrail for engineering has realized swift installation, has firm supporting role simultaneously, has safe protection, has realized on the in-process of loading and unloading, plays and improves the efficiency of construction, saves more manpower and materials.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the connection and analysis structure among the main support rod, the bearing ring groove and the fixed cylinder of the present invention;
FIG. 3 is a schematic view of the connection structure between the insertion cylinder rod, the connecting rod, the upright post and the clamping plate in FIG. 1;
FIG. 4 is a schematic view of the second and third fixing holes on the connecting rod of FIG. 1;
in the figure: the supporting main rod 1, the connecting rod 2, the second fixing hole 21, the third fixing hole 22, the rain fly 3, the fixed base 4, the bearing ring groove 5, the fixed cylinder column 6, the inserting cylinder rod 7, the clamping groove 71, the first fixing hole 72, the interlayer pad 73, the fixed pad 74, the limiting cylinder 75, the stand column 8 and the clamping plate 9.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
As shown in fig. 1 to 4, the utility model relates to a guardrail for engineering, which comprises a supporting main rod 1, a connecting rod 2, a rain fly 3 and a fixed base 4, wherein the fixed base 4 is embedded and connected on the bottom surface of the supporting main rod 1, the rain fly 3 is inserted and connected on the upper surface of the supporting main rod 1, the bearing ring groove 5 is abutted and connected on the middle surface of the supporting main rod 1, the fixed cylinder column 6 is sleeved and connected on the middle surface of the supporting main rod 1, the bottom surface of the fixed cylinder column 6 is embedded and connected in the bearing ring groove 5, the inserting cylinder rods 7 are symmetrically and fixedly connected on the two lateral side surfaces of the fixed cylinder column 6, the bottom surface of the inserting cylinder rod 7 is provided with a clamping groove 71, the two side surfaces of the clamping groove 71 are respectively provided with a first fixed hole site 72, the two upper side surfaces of the connecting rod 2 are provided with a plurality of second fixed hole sites 21, the two lower side surfaces of, the connecting rod 2 is characterized in that the surface of one side is inserted into the insertion cylinder rod 7, the first fixing hole site 72, the third fixing hole site 22 and the second fixing hole site 21 are sequentially inserted and fixed through the upright post 8 from bottom to top, the bottom end of the upright post 8 is fixedly connected with the clamping plate 9, and the clamping plate 9 is connected in the clamping groove 71 in a clamping mode.
The left and right sides and bottom surface in grafting section of thick bamboo pole 7 paste and have intermediate layer pad 73, grafting section of thick bamboo pole 7 in upper portion both sides surface paste have fixed bolster 74, intermediate layer pad 73 and fixed bolster 74 all with connecting rod 2 surface butt.
Two limiting cylinders 75 are fixedly connected to the inner upper surface of the inserting cylinder rod 7, and the top ends of the upright posts 8 are inserted into the limiting cylinders 75.
The second fixing hole site 21 and the third fixing hole site 22 are symmetrically arranged.
The number of the limiting cylinders 75 is the same as that of the first fixing hole sites 72, the two limiting cylinders 75 are two, and the central points of the limiting cylinders 75 and the central points of the first fixing hole sites 72 are on the same vertical line.
The distance between the first fixing hole sites 72, the distance between the second fixing hole sites 21 and the distance between the third fixing hole sites 22 are the same.
The second fixing hole site 21 and the third fixing hole site 22 are symmetrically arranged.
To sum up, the utility model provides a guardrail for engineering has realized swift installation, has firm supporting role simultaneously, has safe protection, has realized playing and has improved the efficiency of construction on the in-process of loading and unloading, saves more manpower and materials.

Claims (7)

1. The utility model provides a guardrail for engineering, includes support mobile jib (1), connecting rod (2), rain and take (3) and unable adjustment base (4), its characterized in that, support mobile jib (1) bottom surface embedded be connected with unable adjustment base (4), the upper portion surface grafting of support mobile jib (1) has rain to take (3), support mobile jib (1) middle part surface butt joint has bearing annular (5), support mobile jib (1) middle part surface cup jointed fixed cylinder post (6), fixed cylinder post (6) bottom surface embedded in bearing annular (5), fixed cylinder post (6) horizontal both sides surface symmetry fixedly connected with grafting section of thick bamboo pole (7), the bottom surface of grafting section of thick bamboo pole (7) open and have joint groove (71), the both sides surface of joint groove (71) opens fixed hole site one (72) respectively, the upper portion both sides surface of connecting rod (2) open and have a plurality of fixed hole site two (21), the lower part both sides surface of connecting rod (2) is opened has a plurality of fixed hole site three (22), connecting rod (2) one side surface peg graft inside grafting section of thick bamboo pole (7), fixed hole site one (72), fixed hole site three (22) and fixed hole site two (21) through stand (8) from supreme grafting in proper order down fixed, the bottom fixedly connected with joint board (9) of stand (8), joint board (9) buckle connect in joint groove (71).
2. The guardrail for engineering as claimed in claim 1, wherein interlayer pads (73) are adhered to the inner left side, the inner right side and the bottom surface of the insertion cylinder rod (7), fixing pads (74) are adhered to the inner upper side surfaces of the insertion cylinder rod (7), and the interlayer pads (73) and the fixing pads (74) are both in surface abutment with the connecting rod (2).
3. The guardrail for engineering as claimed in claim 2, wherein the inner upper surface of the inserting cylinder rod (7) is fixedly connected with two limiting cylinders (75), and the top ends of the upright columns (8) are inserted into the limiting cylinders (75).
4. The guardrail for engineering as claimed in claim 1, wherein the second fixing hole site (21) and the third fixing hole site (22) are symmetrically arranged.
5. The guardrail for engineering as claimed in claim 3, wherein the number of the limiting cylinder (75) and the first fixing hole site (72) is the same, and the two limiting cylinders (75) and the first fixing hole site (72) have the same central point on the same vertical line.
6. An engineering guardrail according to claim 1, wherein the distance between the first fixing hole sites (72), the distance between the second fixing hole sites (21) and the distance between the third fixing hole sites (22) are the same.
7. The guardrail for engineering as claimed in claim 6, wherein the second fixing hole site (21) and the third fixing hole site (22) are symmetrically arranged.
CN202020583370.3U 2020-04-20 2020-04-20 Guardrail for engineering Active CN213175086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020583370.3U CN213175086U (en) 2020-04-20 2020-04-20 Guardrail for engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020583370.3U CN213175086U (en) 2020-04-20 2020-04-20 Guardrail for engineering

Publications (1)

Publication Number Publication Date
CN213175086U true CN213175086U (en) 2021-05-11

Family

ID=75765386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020583370.3U Active CN213175086U (en) 2020-04-20 2020-04-20 Guardrail for engineering

Country Status (1)

Country Link
CN (1) CN213175086U (en)

Similar Documents

Publication Publication Date Title
CN207260338U (en) Pseudo-classic architecture wood sets of brackets on top of the columns roofing and concrete main body frame connecting structure
CN202745397U (en) Lifting device for large-span space truss
CN213175086U (en) Guardrail for engineering
CN210216726U (en) Steel construction building is a roof beam
CN213806755U (en) Civil engineering construction support
CN215166940U (en) Self-balancing system glass curtain wall
CN209747081U (en) Support device of advertising board for outdoor curtain wall
CN210186407U (en) Support frame structure for ski platforms
CN211899983U (en) Quick assembly type wind-proof camping tent based on porous mounting seat
CN210459528U (en) Node in bamboo recombined material structure beam column
CN218520885U (en) Steel mesh frame integrally lifting support frame
CN220415016U (en) Tent bottom structure of tent
CN217556952U (en) Support structure for maintaining stable stress of lattice column
CN217509046U (en) Novel 5G signal base station
CN215442377U (en) Cross type high stability steel construction
CN211201130U (en) Upright post and connecting structure attached to lifting scaffold
CN113494154B (en) Concrete beam and construction method thereof
CN220318756U (en) Beam column structure connecting piece capable of realizing multidirectional overhanging on same plane
CN219261736U (en) Support frame for profiled steel sheet
CN214195011U (en) Mounting structure between net frame and steel upright post
CN217300600U (en) First-spliced unit assembling, positioning and fixing system for steel net rack
CN211948841U (en) Tower outer frame column structure
CN212201915U (en) Anti-toppling device for derrick production
CN214170074U (en) Factory building steel construction beam column
CN210636445U (en) Building supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant