CN213174842U - Heavy prefabricated section anchor clamps - Google Patents
Heavy prefabricated section anchor clamps Download PDFInfo
- Publication number
- CN213174842U CN213174842U CN202021525405.4U CN202021525405U CN213174842U CN 213174842 U CN213174842 U CN 213174842U CN 202021525405 U CN202021525405 U CN 202021525405U CN 213174842 U CN213174842 U CN 213174842U
- Authority
- CN
- China
- Prior art keywords
- handle
- rotating shaft
- clamp
- fixedly connected
- clamp head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a heavy precast block clamp, which comprises two clamping rod assemblies and a rotating shaft, wherein the middle parts of the two clamping rod assemblies are hinged together; the clamping rod assembly comprises a clamp head, a short upright post fixedly connected with the upper part of the clamp head, a hinged rod with one end fixedly connected with the short upright post and a handle fixedly connected with the other end of the hinged rod; the middle part of the hinged rod is rotatably connected with the rotating shaft. The beneficial effects of the utility model are that through two supporting rod assemblies around the pivot setting, through lever principle, can press from both sides the prefabricated section to transport mounted position, simple structure convenient to use.
Description
Technical Field
The utility model relates to a construction tool field specifically is a heavy prefabricated section anchor clamps.
Background
With the development of society, in the building field, people increasingly like to use larger bricks or prefabricated blocks to build buildings, because the bricks are larger and heavier, one worker cannot clamp the bricks to carry away by using a common brick clamp, if two people directly carry or lift the bricks, the long-time waist bending and rising operation are easy to fatigue, the efficiency is low, and the serious influence is also caused on the human health; meanwhile, the construction site has complex environment and inconvenient traffic, and accidents are very easy to happen, so that constructors are sprained or bricks are crushed.
In order to avoid the above problems, a new manual clamp has been developed, which can minimize the above problems and bring greater convenience to the work of people, and is a technical problem to be solved.
Therefore, how to design a heavy precast block clamp becomes a problem to be solved currently.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a heavy prefabricated section anchor clamps, precast concrete piece that transports that can convenient and fast.
In order to solve the problems, the utility model adopts the following technical proposal,
a heavy precast block clamp comprises two clamping rod assemblies and a rotating shaft, wherein the middle parts of the two clamping rod assemblies are hinged together; the clamping rod assembly comprises a clamp head, a short upright post fixedly connected with the upper part of the clamp head, a hinged rod with one end fixedly connected with the short upright post, and a handle fixedly connected with the other end of the hinged rod; the middle lower part of the hinge rod is rotationally connected with the rotating shaft; the clamp head is provided with a force application surface a, and the force application surface a is vertical to the length direction of the handle; and when viewed from the direction parallel to the force application surface a, the distance between the force application surface a of the clamp head and the rotating shaft is b, the distance between the rotating shaft and the end part of the handle is c, and the distance c is greater than the distance b.
Furthermore, a rubber plate is arranged on one surface clamped by the clamp head.
Further, the rubber plate is provided with a groove.
Further, the handle is provided with a handle sleeve.
The utility model has the advantages that:
1. the handle sleeve designed on the handle can prevent hands from sweating and slipping, so that the safety is higher;
2. the rubber plate arranged on the clamp head can prevent the precast block from being in hard contact with the clamp head, so that the precast block is easy to damage and waste products are caused;
3. the contact area between the precast block and the clamp head can be increased through the grooves formed in the rubber plate, so that the clamping is more stable;
4. through the hinging of the two clamping rod assemblies, the large precast block can be easily lifted by two people by utilizing the lever principle, so that the condition that the work injury is caused by the half-way falling force due to the fact that one person carries the precast block too heavy is avoided, and the work injury caused by the fact that the individual precast block is broken when the quality is poor due to the use of a clamp is also avoided;
5. the device has the advantages of simple structure, strong practicability, easy popularization and suitability for the current complex and changeable construction site.
Drawings
Fig. 1 is a schematic structural diagram of the present invention 1;
FIG. 2 is a schematic view of the present invention in use;
fig. 3 is a schematic structural view of a clamp head according to embodiment 2 of the present invention;
fig. 4 is a schematic structural view of a handle according to embodiment 2 of the present invention;
FIG. 5 is a schematic view of the clamping bar assembly.
The reference numbers in the figures illustrate:
1-handle, 10-handle sleeve, 2-rotating shaft, 3-clamp rod, 4-short upright post, 5-clamp head, 50-rubber plate and 51-groove.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; but not all embodiments, are based on the embodiments of the invention; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", left and right. The positional or orientational relationships indicated before, after, etc. are based on the positional or orientational relationships shown in the drawings and are merely for convenience of description and simplicity of description, and are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the invention. Furthermore, the terms "first," "second," "one end," and "the other end" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "disposed", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
As shown in fig. 1-2:
a heavy precast block clamp comprises two clamping rod assemblies and a rotating shaft 2, wherein the middle lower parts of the two clamping rod assemblies are hinged together; the clamping rod assembly comprises a clamp head 5, a short upright post 4 fixedly connected with the upper part of the clamp head 5, a hinged rod 3 with one end fixedly connected with the short upright post 4, and a handle 1 fixedly connected with the other end of the hinged rod 3; the middle lower part of the hinge rod 3 is rotationally connected with the rotating shaft 2; the clamp head 5 is provided with a force application surface a, and the force application surface a is vertical to the length direction of the handle 1; when viewed from the direction parallel to the force application surface a, the distance between the force application surface a of the clamp head and the rotating shaft 2 is b, the distance between the rotating shaft 2 and the end part of the handle 1 is c, the distance c is greater than the distance b, and the distance c is greater than the distance b.
The corner excess materials of the materials such as angle steel, steel pipes and the like commonly used in construction sites can be selected for manufacturing the device, independent purchase is not needed, the materials are saved, and the purpose of green construction is achieved.
The use process of the device is as follows:
when the device is needed to be used, the clamp heads are placed on two sides of an object to be clamped (as shown in figure 2), two persons hold the handles and simultaneously make force upwards, the object to be clamped (such as bricks, prefabricated blocks and the like) can be clamped, and the object to be clamped is lifted to a position needing to be installed, so that the device is simple and convenient.
Example 2
As shown in fig. 3-4
This embodiment has substantially the same structure as embodiment 1, except that,
and a rubber plate 50 is arranged on one surface clamped by the clamp head 5.
The rubber plate 50 is provided with a groove 51.
The handle 1 is provided with a handle sleeve 10.
The clamp head 5 is provided with the rubber plate 50, the groove 51 is formed in the outer surface (the surface contacted with the clamped object) of the rubber plate 50, the contact area of the clamped object and the clamp head 5 can be increased, the friction resistance is increased, and heavy objects can be better clamped.
The handle 1 is provided with the handle sleeve 10, so that people can not easily slip when gripping the handle, and the safety of workers is guaranteed.
The working principle of this embodiment is the same as that of embodiment 1, and the description will not be repeated.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.
Claims (4)
1. A heavy prefabricated section anchor clamps which characterized in that: comprises two clamping rod assemblies and a rotating shaft (2), the middle parts of which are hinged together; the clamping rod assembly comprises a clamp head (5), a short upright post (4) fixedly connected with the upper part of the clamp head (5), a hinged rod (3) with one end fixedly connected with the short upright post (4), and a handle (1) fixedly connected with the other end of the hinged rod (3); the middle lower part of the hinge rod (3) is rotationally connected with the rotating shaft (2); the clamp head (5) is provided with a force application surface a, and the force application surface a is vertical to the length direction of the handle (1); and viewed from the direction parallel to the force application surface a, the distance from the force application surface a to the rotating shaft (2) is b, the distance from the rotating shaft (2) to the end part of the handle (1) is c, and the distance c is greater than the distance b.
2. The heavy preform block clamp of claim 1, wherein: and a rubber plate (50) is arranged on one surface clamped by the clamp head (5).
3. The heavy preform block clamp of claim 2, wherein: the rubber plate is provided with a groove (51).
4. The heavy preform block clamp of claim 1, wherein: the handle (1) is provided with a handle sleeve (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021525405.4U CN213174842U (en) | 2020-07-29 | 2020-07-29 | Heavy prefabricated section anchor clamps |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021525405.4U CN213174842U (en) | 2020-07-29 | 2020-07-29 | Heavy prefabricated section anchor clamps |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213174842U true CN213174842U (en) | 2021-05-11 |
Family
ID=75796411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021525405.4U Active CN213174842U (en) | 2020-07-29 | 2020-07-29 | Heavy prefabricated section anchor clamps |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213174842U (en) |
-
2020
- 2020-07-29 CN CN202021525405.4U patent/CN213174842U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211192317U (en) | Section bar cutting device for building site | |
CN213174842U (en) | Heavy prefabricated section anchor clamps | |
CN210500861U (en) | Concrete slab drilling equipment for building construction | |
CN211666682U (en) | Blowout preventer turnover equipment with stable turnover function | |
CN214749351U (en) | Building pile foundation static load detection device | |
CN216205867U (en) | Pavement thickness detection device | |
CN208467388U (en) | A kind of convenient and fast reinforcing bar pincers of operation | |
CN218443662U (en) | Portable wire rope diameter measuring tool | |
CN214446179U (en) | Building engineering is with constituteing formula strutting arrangement | |
CN217236683U (en) | Reinforcing bar size detection device for job site | |
CN220621057U (en) | External member for construction square timber | |
CN210833346U (en) | Steel bar diameter detection device for building engineering detection | |
CN211031344U (en) | Brush head flatting mill | |
CN213714190U (en) | Section steel post measures positioner | |
CN217126682U (en) | Steel truss girder assembled steel lug device | |
CN213318596U (en) | Positioning and fixing device for welding steel ring on telegraph pole | |
CN218027064U (en) | Make things convenient for industry workman to install anchor clamps of road curbstone | |
CN216181728U (en) | Portable cutting tool for aerated concrete block bricks | |
CN216502513U (en) | Drilling and shifting equipment for super-huge steel member | |
CN212530978U (en) | Building site is with manual brick device of removing | |
CN214568200U (en) | Brick clamp for building construction | |
CN218860252U (en) | Civil engineering uses supplementary crane | |
CN214882791U (en) | Be used for town road side flat stone construction anchor clamps | |
CN215714468U (en) | Pavement brick paving auxiliary device | |
CN214323245U (en) | Multifunctional hammer for constructional engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |