CN213169768U - Brick piece handling device for water conservancy project - Google Patents

Brick piece handling device for water conservancy project Download PDF

Info

Publication number
CN213169768U
CN213169768U CN202022211168.0U CN202022211168U CN213169768U CN 213169768 U CN213169768 U CN 213169768U CN 202022211168 U CN202022211168 U CN 202022211168U CN 213169768 U CN213169768 U CN 213169768U
Authority
CN
China
Prior art keywords
base
fixedly connected
handling device
side plate
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022211168.0U
Other languages
Chinese (zh)
Inventor
卢建军
江永生
郭丽丽
黄薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022211168.0U priority Critical patent/CN213169768U/en
Application granted granted Critical
Publication of CN213169768U publication Critical patent/CN213169768U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a brick handling device for water conservancy project, concretely relates to fragment of brick handling device technical field, including base, gyro wheel, mainboard and first curb plate, the both ends of base are provided with location structure respectively, the intermediate position department swing joint respectively at base both ends has the gyro wheel, the both ends difference fixedly connected with mainboard at base top, and the one end of mainboard is provided with clamping structure respectively, the first curb plate of one side fixedly connected with on base top, and the both ends difference fixedly connected with push rod of first curb plate one side, one side activity hinge of base has the second curb plate, and the inside of second curb plate is provided with the material loading structure. The utility model discloses a be provided with location structure respectively at the both ends of base, when needing to promote or suspend the motion of this device, only need the threaded rod at light rotatory both ends, make the sliding block of its outside both sides simultaneously to both sides or central horizontal slip under the effect of gag lever post, alright realize the centre gripping and the slack of gyro wheel, it is comparatively convenient.

Description

Brick piece handling device for water conservancy project
Technical Field
The utility model relates to a fragment of brick handling device technical field specifically is a brick handling device for water conservancy project.
Background
With the development of scientific technology, people accelerate the speed of building hydraulic engineering at fresh places such as barren mountains and wild mountains, and the like, and the construction of the hydraulic engineering needs to consume a large amount of brick cement, and the construction speed is easily influenced due to the fact that the conventional brick carrying speed is too slow, so that an efficient express carrying device is urgently needed to shorten the engineering time.
In the process of implementing the present invention, the inventor finds that at least the following problems exist in the prior art and are not solved:
(1) the traditional brick block conveying device for water conservancy projects is lack of a structure for auxiliary feeding, and is often required to be manually suspended by personnel to be conveyed into a trolley, so that time and labor are wasted;
(2) the traditional brick carrying device for water conservancy projects has poor braking effect, and has the hidden trouble of sliding if the brick carrying device is stopped at an uneven part;
(3) traditional brick handling device for water conservancy project is difficult to carry out the centre gripping fixedly to the brick that inside pile, if meet jolt easily make the fragment of brick strike each other and produce the damage.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a brick handling device for water conservancy project to propose the problem that lacks the structure of supplementary material loading in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a brick carrying device for water conservancy projects comprises a base, rollers, main boards and a first side board, wherein two ends of the base are respectively provided with a positioning structure, the middle positions of the two ends of the base are respectively and movably connected with the rollers, two ends of the top of the base are respectively and fixedly connected with the main boards, one ends of the main boards are respectively provided with a clamping structure, one side of the top end of the base is fixedly connected with the first side board, two ends of one side of the first side board are respectively and fixedly connected with push rods, one side of the base is movably hinged with a second side board, and a feeding structure is arranged inside the second side board;
the feeding structure comprises an empty groove, the empty groove is formed in two ends of the inner portion of the second side plate, three groups of gears are movably connected between two ends of the inner portion of the empty groove respectively, a rack is movably connected between the gears, a rotating handle is fixedly connected to one end of each gear, three groups of movable cavities are arranged in the second side plate, rolling shafts are movably connected between two ends of the inner portions of the movable cavities, and two ends of the second side plate and one side of the main plate are movably connected with positioning bolts respectively.
Preferably, location structure comprises threaded rod, sliding block, fixing base, gag lever post and clamp splice, the fixing base is the both sides of fixed connection at the base both ends respectively, be provided with the threaded rod between the inside one side of fixing base, and the outside both sides of threaded rod swing joint have the sliding block respectively, one side fixedly connected with clamp splice of sliding block, both ends difference fixedly connected with gag lever post between fixing base one side.
Preferably, the threaded rod inlays in the inside of sliding block, and the sliding block is the concentric circles with the threaded rod and arranges.
Preferably, the clamping structure comprises pull handle, telescopic link, splint, cushion, spout and buffer spring, the spout sets up the inside in the mainboard both sides respectively, one end swing joint between the inside one side of spout has the pull handle, and fixedly connected with splint between one side of pull handle one end, both sides difference fixedly connected with buffer spring between splint and the mainboard one end, the one end fixedly connected with cushion of splint, two sets of telescopic links of fixedly connected with are distinguished to top and bottom between splint and the mainboard one end.
Preferably, the pull handle is embedded in the buffer springs, and the buffer springs are respectively and symmetrically distributed about the vertical median line of the main board.
Preferably, the diameter of the roller is smaller than the width of the interior of the movable chamber, and the roller and the movable chamber are arranged in the second side plate at equal intervals.
Compared with the prior art, the beneficial effects of the utility model are that: the brick carrying device for the water conservancy project not only realizes convenient feeding, realizes convenient parking and pushing, but also realizes clamping and fixing of internal bricks;
(1) the feeding structure is arranged in the second side plate and comprises a hollow groove, the positioning bolt is loosened, the top end of the second side plate is turned to the ground, the rotating handle at one end is rotated while the brick is pushed obliquely, the middle gear drives the other two gears and the rolling shafts connected with the gears in the same direction to rotate together through the rack, the friction resistance between the material and the second side plate can be reduced, the brick can be easily moved to the top end of the base, and time and labor are saved;
(2) the two ends of the base are respectively provided with the positioning structures, each positioning structure consists of a threaded rod, a sliding block, a fixed seat, a limiting rod and a clamping block, when the device needs to be pushed or paused, the threaded rods at the two ends are required to be slightly screwed, so that the sliding blocks at the two outer sides of the device can horizontally slide towards the two sides or the center under the action of the limiting rods, and the clamping and loosening of the roller can be realized, so that the device is more convenient;
(3) through the one end at the mainboard be provided with clamping structure respectively, clamping structure comprises pull handle, the telescopic link, splint, the cushion, spout and buffer spring, stimulates the pull handle at mainboard both ends, makes the connecting rod of its both sides slide in the inside of spout, compresses the buffer spring simultaneously and makes it drive splint and remove to one end respectively, loosens the hand of holding the pull handle after accomplishing the material loading and can rely on splint and cushion to realize fixed to the centre gripping of fragment of brick, avoids it because of striking damage mutually.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a front view of the positioning structure of the present invention;
FIG. 3 is a schematic side view of the clamping structure of the present invention;
fig. 4 is a schematic cross-sectional view of the second side plate of the present invention.
In the figure: 1. a base; 2. a positioning structure; 201. a threaded rod; 202. a slider; 203. a fixed seat; 204. a limiting rod; 205. a clamping block; 3. a roller; 4. a main board; 5. a first side plate; 6. a push rod; 7. a clamping structure; 701. pulling a handle; 702. a telescopic rod; 703. a splint; 704. a soft cushion; 705. a chute; 706. a buffer spring; 8. a second side plate; 9. positioning the bolt; 10. a movable chamber; 11. a roller; 12. a rack; 13. a gear; 14. turning a handle; 15. and (4) emptying the groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1: referring to fig. 1-4, a brick carrying device for water conservancy projects comprises a base 1, rollers 3, a main plate 4 and a first side plate 5, wherein two ends of the base 1 are respectively provided with a positioning structure 2, the rollers 3 are respectively and movably connected at the middle positions of the two ends of the base 1, the two ends of the top of the base 1 are respectively and fixedly connected with the main plate 4, one end of the main plate 4 is respectively provided with a clamping structure 7, one side of the top end of the base 1 is fixedly connected with the first side plate 5, two ends of one side of the first side plate 5 are respectively and fixedly connected with push rods 6, one side of the base 1 is movably hinged with a second side plate 8, and a feeding structure is arranged inside the second side plate;
referring to fig. 1-4, the brick carrying device for the water conservancy project further comprises a feeding structure, the feeding structure comprises an empty groove 15, the empty groove 15 is arranged at two ends inside the second side plate 8, three groups of gears 13 are movably connected between two ends inside the empty groove 15 respectively, a rack 12 is movably connected between the gears 13, one end of each gear 13 is fixedly connected with a rotating handle 14, three groups of movable chambers 10 are arranged inside the second side plate 8, a rolling shaft 11 is movably connected between two ends inside the movable chambers 10, and two ends between the second side plate 8 and one side of the main plate 4 are movably connected with a positioning bolt 9 respectively;
the diameter of the roller 11 is smaller than the inner width of the movable chamber 10, and the roller 11 and the movable chamber 10 are arranged in the second side plate 8 at equal intervals;
specifically, as shown in fig. 1 and 4, the positioning bolt 9 is loosened, the top end of the second side plate 8 is turned to the ground, the turning handle 14 at one end is turned while obliquely pushing bricks, the middle gear 13 drives the other two gears 13 and the rolling shafts 11 connected with the two gears in the same direction to rotate together through the rack 12, so that the frictional resistance between the material and the second side plate 8 can be reduced, the bricks can be easily moved to the top end of the base 1, and time and labor are saved.
Example 2: the positioning structure 2 is composed of a threaded rod 201, a sliding block 202, a fixed seat 203, a limiting rod 204 and a clamping block 205, the fixed seat 203 is fixedly connected to two sides of two ends of the base 1 respectively, the threaded rod 201 is arranged between one sides inside the fixed seat 203, the sliding block 202 is movably connected to two sides outside the threaded rod 201 respectively, one side of the sliding block 202 is fixedly connected with the clamping block 205, and two ends between one sides of the fixed seat 203 are fixedly connected with the limiting rod 204 respectively;
the threaded rod 201 is embedded in the sliding block 202, and the sliding block 202 and the threaded rod 201 are arranged in a concentric circle;
specifically, as shown in fig. 1 and fig. 2, when the device needs to be pushed or suspended, the threaded rods 201 at the two ends need to be slightly screwed, so that the sliding blocks 202 at the two sides of the outer portion can horizontally slide towards the two sides or the center under the action of the limiting rod 204, and the roller 3 can be clamped and loosened conveniently.
Example 3: the clamping structure 7 is composed of a pull handle 701, telescopic rods 702, clamping plates 703, cushions 704, a sliding groove 705 and buffer springs 706, the sliding groove 705 is respectively arranged inside two sides of the main plate 4, one end between one sides inside the sliding groove 705 is movably connected with the pull handle 701, the clamping plates 703 are fixedly connected between one sides of one ends of the pull handle 701, the buffer springs 706 are respectively fixedly connected between two sides between the clamping plates 703 and one end of the main plate 4, one end of the clamping plates 703 is fixedly connected with the cushions 704, and the top and the bottom between the clamping plates 703 and one end of the main plate 4 are respectively fixedly connected with two groups of telescopic rods 702;
the pull handle 701 is embedded in the buffer spring 706, and the buffer spring 706 is symmetrically distributed about the vertical middle line of the main board 4;
specifically, as shown in fig. 1 and 3, the pull handles 701 at two ends of the main plate 4 are pulled to make the connecting rods at two sides slide in the sliding grooves 705, and simultaneously the buffer springs 706 are compressed to make the clamp plates 703 move towards one end respectively, so that the clamp plates 703 and the cushion 704 can be used to clamp and fix bricks by loosening the hand holding the pull handles 701 after loading is completed, and the bricks are prevented from being damaged due to mutual impact.
The working principle is as follows: the utility model discloses when using, at first, not hard up positioning bolt 9 turns over the top of second curb plate 8 to ground, rotating the swing handle 14 of one end when the slant promotes the fragment of brick to middle gear 13 passes through rack 12 and drives all the other two gears 13 and rotates together with their syntropy connected roller bearing 11, and frictional resistance between reducible material and the second curb plate 8 makes the fragment of brick can easily move to base 1's top, labour saving and time saving.
Then, the pull handles 701 at the two ends of the main plate 4 are pulled to enable the connecting rods at the two sides to slide in the sliding grooves 705, and meanwhile, the buffer springs 706 are compressed to enable the buffer springs to drive the clamping plates 703 to move towards one end respectively, so that after the loading is completed, hands holding the pull handles 701 are loosened, clamping and fixing of bricks can be achieved through the clamping plates 703 and the soft pads 704, and the bricks are prevented from being damaged due to mutual impact.
Finally, when the movement of the device needs to be pushed or suspended, the threaded rods 201 at two ends only need to be screwed lightly, so that the sliding blocks 202 at two sides of the outer part slide towards two sides or the center horizontally under the action of the limiting rod 204, and the clamping and loosening of the roller 3 can be realized, which is convenient.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a brick handling device for hydraulic engineering, includes base, gyro wheel, mainboard and first curb plate, its characterized in that: the automatic feeding device comprises a base, a clamping structure, a first side plate, a push rod, a second side plate, a feeding structure and a feeding structure, wherein the two ends of the base are respectively provided with the positioning structures, the middle positions of the two ends of the base are respectively and movably connected with idler wheels, the two ends of the top of the base are respectively and fixedly connected with the main plate, one end of the main plate is respectively provided with the clamping structure, one side of the top end of the base is fixedly connected with the first side plate, the two ends of one side of the first side plate are respectively and fixedly;
the feeding structure comprises an empty groove, the empty groove is formed in two ends of the inner portion of the second side plate, three groups of gears are movably connected between two ends of the inner portion of the empty groove respectively, a rack is movably connected between the gears, a rotating handle is fixedly connected to one end of each gear, three groups of movable cavities are arranged in the second side plate, rolling shafts are movably connected between two ends of the inner portions of the movable cavities, and two ends of the second side plate and one side of the main plate are movably connected with positioning bolts respectively.
2. The brick handling device for water conservancy projects according to claim 1, characterized in that: the utility model discloses a fixing device for fixing a position on a base, including fixing base, sliding block, fixing base, limiting rod, clamping block, fixing base fixed connection is in the both sides at base both ends respectively, be provided with the threaded rod between the inside one side of fixing base, and the outside both sides of threaded rod swing joint have the sliding block respectively, one side fixedly connected with clamping block of sliding block, both ends difference fixedly connected with limiting rod between fixing base one side.
3. The brick handling device for water conservancy projects according to claim 2, characterized in that: the threaded rod is embedded in the sliding block, and the sliding block and the threaded rod are arranged in a concentric circle.
4. The brick handling device for water conservancy projects according to claim 1, characterized in that: the clamping structure comprises pull handle, telescopic link, splint, cushion, spout and buffer spring, the spout sets up the inside in the mainboard both sides respectively, one end swing joint between the inside one side of spout has the pull handle, and fixedly connected with splint between one side of pull handle one end, both sides difference fixedly connected with buffer spring between splint and the mainboard one end, the one end fixedly connected with cushion of splint, two sets of telescopic links of fixedly connected with are distinguished to top and bottom between splint and the mainboard one end.
5. The brick handling device for water conservancy projects according to claim 4, characterized in that: the pull handle is embedded in the buffer spring, and the buffer spring is symmetrically distributed about the vertical middle line of the main board.
6. The brick handling device for water conservancy projects according to claim 1, characterized in that: the diameter of the rolling shaft is smaller than the inner width of the movable chamber, and the rolling shaft and the movable chamber are arranged in the second side plate at equal intervals.
CN202022211168.0U 2020-10-02 2020-10-02 Brick piece handling device for water conservancy project Active CN213169768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022211168.0U CN213169768U (en) 2020-10-02 2020-10-02 Brick piece handling device for water conservancy project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022211168.0U CN213169768U (en) 2020-10-02 2020-10-02 Brick piece handling device for water conservancy project

Publications (1)

Publication Number Publication Date
CN213169768U true CN213169768U (en) 2021-05-11

Family

ID=75777969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022211168.0U Active CN213169768U (en) 2020-10-02 2020-10-02 Brick piece handling device for water conservancy project

Country Status (1)

Country Link
CN (1) CN213169768U (en)

Similar Documents

Publication Publication Date Title
CN106149754A (en) A kind of Geotechnical Engineering retaining wall intelligence builds machine
CN213169768U (en) Brick piece handling device for water conservancy project
CN210031861U (en) Fixing device is laid to civil construction side slope protection network
CN215101469U (en) Be used for hydraulic engineering river course dyke grout stone masonry block stone to remove hoisting device
CN112832533A (en) Concrete placement is with device that vibrates
CN211030661U (en) Concrete transportation device for building construction site
CN210421956U (en) Quick positioning structure for steel plate connection
CN212220309U (en) Concrete is mobile device for prefab
CN213083204U (en) Assembly type material transfer device for building with protective structure
CN211075946U (en) Precast concrete board's reinforcing apparatus
CN110206326B (en) Floor brick tiling is with handling device
CN220684494U (en) Brick stone handling device
CN214006564U (en) Transfer device for building engineering convenient to operation
CN213894397U (en) Material carrying device for accelerating tunnel construction efficiency
CN211685269U (en) Material transporting vehicle for constructional engineering
CN217954140U (en) Cement mortar compression testing machine
CN216943162U (en) Handling device is used in building engineering construction
CN213735007U (en) Movable trolley for rapidly installing and carrying curbstone
CN212892195U (en) A hopper hoisting device for mortar production line
CN213038427U (en) Special movable gallery frame suitable for pouring pipe gallery
CN221664737U (en) Side wall reinforcing device for underground engineering tunneling
CN220787403U (en) Sand and stone collecting structure for green mine construction
CN217999200U (en) Road foundation pit safety protection structure for municipal construction
CN215210445U (en) Construction marking equipment
CN221095802U (en) Integral moving device for buckling frame of tunnel main body supporting disc

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant