CN213168148U - Air entrainment piece handling device for building engineering construction - Google Patents
Air entrainment piece handling device for building engineering construction Download PDFInfo
- Publication number
- CN213168148U CN213168148U CN202021452274.1U CN202021452274U CN213168148U CN 213168148 U CN213168148 U CN 213168148U CN 202021452274 U CN202021452274 U CN 202021452274U CN 213168148 U CN213168148 U CN 213168148U
- Authority
- CN
- China
- Prior art keywords
- base
- block
- building engineering
- engineering construction
- handling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Vibration Prevention Devices (AREA)
Abstract
The utility model discloses a building engineering construction is with piece handling device that adds gas belongs to construction auxiliary assembly technical field. The utility model provides a building engineering construction is with piece handling device that adds gas, the on-line screen storage device comprises a base, base bottom surface bilateral symmetry is equipped with two connecting plates, the symmetry is equipped with two connecting blocks around the connecting plate lower part, connecting block bottom surface bilateral symmetry is equipped with two spring A, connecting block lower part cover is equipped with the installation body, the connecting block lower part is equipped with the connecting axle, both ends symmetry is equipped with two wheels around the connecting axle, the base right side is equipped with baffle A, the symmetry is equipped with two handles around the baffle A left side, base upper portion left side is equipped with baffle B, base surface four corners department all is equipped with the guide arm, the utility model discloses a set up spring A between connecting block and installation body and slow down the vibration that the device produced in the operation, through the fixed block, spring B and slider A slow down the.
Description
Technical Field
The utility model relates to a construction auxiliary assembly technical field, more specifically say, relate to a building engineering construction is with piece handling device that adds gas.
Background
The air-entraining block is a light porous novel building material, the air-entraining block produced by air-entraining block equipment has the advantages of light volume weight, high heat preservation efficiency, good sound absorption and processability, and can be made into products such as wall building blocks, heat preservation blocks, press plates, floor slabs, wall plates, heat preservation pipes and the like, the air-entraining block is already widely used in bearing or non-bearing structures and pipeline heat preservation in industrial and civil buildings in China and becomes an important component of the novel building material, the patent document with the prior patent publication No. CN111055893A provides an air-entraining block carrying device for building engineering construction, which comprises a conveying mechanism, a heightening mechanism and a discharging mechanism, wherein one side of the conveying mechanism, which is far away from the sealing mechanism, is movably connected with the discharging mechanism, one side of the carriage is fixedly connected with a carriage handle, and one side of the bottom of the carriage, which is close to the carriage handle, is fixedly connected with supporting legs, the end, far away from the supporting legs, of the bottom of the carriage is fixedly connected with the limiting rod, the device has the following problems although the beneficial effects are numerous, and vibration is easily generated due to uneven road surfaces in the transportation process, so that the air-entraining blocks are damaged, and waste is caused.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
An object of the utility model is to provide a building engineering is aerated block handling device for construction to solve the problem that proposes in the above-mentioned background art.
2. Technical scheme
An air-entraining block carrying device for building engineering construction comprises a base, wherein two connecting plates are symmetrically arranged on the left and right of the bottom surface of the base, two connecting blocks are symmetrically arranged on the front and back of the lower part of each connecting plate, two springs A are symmetrically arranged on the left and right of the bottom surface of each connecting block, an installation body is sleeved on the lower part of each connecting block, a connecting shaft is arranged on the lower part of each connecting block, two wheels are symmetrically arranged at the front end and the back end of each connecting shaft, a baffle A is arranged on the right side of the base, two handles are symmetrically arranged on the front and back of the left side of the baffle A, a baffle B is arranged on the left side of the upper part of the base, guide rods are arranged at four corners of the surface of the base, a sliding chute A is arranged on the, the lower part of the fixed block is provided with a fixed frame, the front and the back of the bottom surface of the fixed block are symmetrically provided with two springs B, and the front and the back of the fixed block are symmetrically provided with two sliding blocks A.
Preferably, two sliding chutes B are symmetrically formed in the front side and the rear side of the top surface of the base, sliding blocks B are arranged in the sliding chutes B, the sliding blocks B are fixedly connected with a guide rod on the left side, and the sliding chutes B are in sliding fit with the sliding blocks B.
Preferably, the spring B is fixedly connected with a fixed frame, the sliding block A is in sliding fit with the fixed frame, and the fixed frame is fixedly connected with the base.
Preferably, the spring A is fixedly connected with the mounting body.
Preferably, the guardrail is formed by hinging a plurality of connecting rods, the connecting rods at the lowest ends of the left side and the right side of the guardrail are rotatably connected with the sliding groove A, and the connecting rods at the left side and the right side of the guardrail are in sliding fit with the sliding groove A.
Preferably, the mounting body is rotatably connected with the connecting shaft, and the baffle B is in sliding fit with the base.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
1. the utility model discloses a set up spring A between connecting block and installation body and slow down the vibration that the device produced at the operation in-process, slow down the vibration that receives in the air entrainment piece transportation through fixed block, spring B and slider A and mount sliding fit, prevent that the air entrainment piece from damaging, the utility model discloses simple structure can effectively reduce the vibration that the air entrainment piece received in the transportation, makes the air entrainment piece not fragile.
2. The utility model discloses utilize slider B to slide in spout B and make the guide arm remove along spout B, because the guardrail comprises a plurality of connecting rods are articulated, consequently promote the guide arm to the right side and make the guardrail shrink to the right side, be convenient for load and unload the gassing piece.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a left side view of the present invention;
FIG. 3 is a schematic view of the connection structure of the connection plate and the mounting body of the present invention;
FIG. 4 is a schematic view of the connection structure of the support plate of the present invention;
fig. 5 is a schematic view of the fixing block and the fixing frame of the present invention;
the reference numbers in the figures illustrate: 1. a base; 2. a connecting plate; 3. connecting blocks; 4. a spring A; 5. an installation body; 6. a connecting shaft; 7. a wheel; 8. a baffle A; 9. a handle; 10. a baffle B; 11. a guide bar; 12. a chute A; 13. a guardrail; 14. a support plate; 15. a stopper; 16. a fixed block; 17. a fixed mount; 18. a spring B; 19. a slide block A; 20. and a chute B.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides a technical solution:
an air-entraining block carrying device for constructional engineering construction comprises a base 1, wherein two connecting plates 2 are symmetrically arranged on the left and right of the bottom surface of the base 1, two connecting blocks 3 are symmetrically arranged on the front and back of the lower part of each connecting plate 2, two springs A4 are symmetrically arranged on the left and right of the bottom surface of each connecting block 3, an installation body 5 is sleeved on the lower part of each connecting block 3, a connecting shaft 6 is arranged on the lower part of each connecting block 3, two wheels 7 are symmetrically arranged at the front and back ends of each connecting shaft 6, a baffle A8 is arranged on the right side of the base 1, two handles 9 are symmetrically arranged on the front and back of the left side of the baffle A8, a baffle B10 is arranged on the left side of the upper part of the base 1, guide rods 11 are arranged at the four corners of the surface of the base 1, sliding chutes A12, 16 lower parts of fixed block are equipped with mount 17, and 16 bottom surfaces of fixed block symmetry around are equipped with two spring B18, and 16 front and back bilateral symmetry of fixed block are equipped with two slider A19, the utility model discloses a set up spring A4 between connecting block 3 and installation body 5 and slow down the vibration that the device produced at the operation in-process, through setting up fixed block 16 between base 1 and place board 14, mount 17, and spring B18, compression spring B18 when making fixed block 16 receive pressure, slider A19 is along the vertical removal of mount 17 to slow down the vibration that receives in the air entrainment piece transportation.
Specifically, two sliding grooves B20 are symmetrically formed in the front side and the rear side of the top surface of the base 1, a sliding block B is arranged in the sliding groove B20, the sliding block B is fixedly connected with the guide rod 11 located on the left side, the sliding groove B20 is in sliding fit with the sliding block B, and the sliding block B slides in the sliding groove B20 to enable the guide rod 11 to move along the sliding groove B20.
Further, spring B18 is connected fixedly with mount 17, and slider A19 and mount 17 sliding fit, mount 17 are connected fixedly with base 1, slow down the vibration that adds the gas block transportation in-process and produce through spring B18 and slider A19 and mount 17 sliding fit, prevent to add the gas block damage.
Still further, a spring a4 is fixedly connected to the mounting body 5, and the vibration generated during the movement of the device is damped by the spring a 4.
Furthermore, the guardrail 13 is formed by hinging a plurality of connecting rods, the lowest connecting rod at the left side and the right side of the guardrail 13 is rotatably connected with the sliding groove A12, and the connecting rods at the left side and the right side of the guardrail 13 are in sliding fit with the sliding groove A12, so that the guide rod 11 is pushed to enable the guardrail 13 to be contracted conveniently.
In addition, the mounting body 5 is rotatably connected with the connecting shaft 6, and the baffle B10 is in sliding fit with the base 1, so that the baffle B10 can be conveniently inserted into the base 1.
The working principle is as follows: when the device is used, the baffle B10 is drawn out and taken down to the front side, the left guide rod 11 slides towards the right side, the guardrail 13 is formed by hinging a plurality of connecting rods, the connecting rods at two sides are in sliding connection with the guide rods 11, therefore, the guide rods 11 and the guardrail 13 are pushed towards the right side to contract, the air-adding block is placed on the placing plate 14, the left guide rod 11 slides towards the right side after the air-adding block is placed, the bottom of the baffle B10 is inserted into the upper part of the base 1 and is inserted into the right side of the stop block 15, the device is pushed to move by using the handle 9, the vibration generated in the running process of the wheel 7 is reduced by arranging the spring A4 between the connecting block 3 and the mounting body 5, the fixing block 16, the fixing frame 17 and the spring B18 are arranged between the base 1 and the placing plate 14, the spring B18 is compressed when the fixing.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a building engineering construction is with aerated block handling device, includes base (1), its characterized in that: the base is characterized in that two connecting plates (2) are symmetrically arranged on the left and right of the bottom surface of the base (1), two connecting blocks (3) are symmetrically arranged on the front and back of the lower portion of each connecting plate (2), two springs A (4) are symmetrically arranged on the left and right of the bottom surface of each connecting block (3), an installation body (5) is sleeved on the lower portion of each connecting block (3), a connecting shaft (6) is arranged on the lower portion of each connecting block (3), two wheels (7) are symmetrically arranged on the front and back of each connecting shaft (6), a baffle A (8) is arranged on the right side of the base (1), two handles (9) are symmetrically arranged on the front and back of the left side of the baffle A (8), a baffle B (10) is arranged on the left side of the upper portion of the base (1), guide rods (11) are arranged on the four corners, base (1) top surface bilateral symmetry is equipped with two guardrail (13), base (1) upper portion is equipped with backup pad (14), backup pad (14) bottom surface four corners department all is equipped with fixed block (16), fixed block (16) lower part is equipped with mount (17), fixed block (16) bottom surface bilateral symmetry is equipped with two spring B (18) around, fixed block (16) front and back bilateral symmetry is equipped with two slider A (19).
2. The air entrainment piece handling device for building engineering construction according to claim 1, characterized in that: two sliding chutes B (20) are symmetrically formed in the front side and the rear side of the top surface of the base (1), sliding blocks B are arranged in the sliding chutes B (20), the sliding blocks B are fixedly connected with a guide rod (11) located on the left side, and the sliding chutes B (20) are in sliding fit with the sliding blocks B.
3. The air entrainment piece handling device for building engineering construction according to claim 2, characterized in that: the spring B (18) is fixedly connected with the fixed frame (17), the sliding block A (19) is in sliding fit with the fixed frame (17), and the fixed frame (17) is fixedly connected with the base (1).
4. The air entrainment piece handling device for building engineering construction of claim 3, characterized in that: the spring A (4) is fixedly connected with the mounting body (5).
5. The air entrainment piece handling device for building engineering construction of claim 4, characterized in that: guardrail (13) are articulated to be formed by a plurality of connecting rods, guardrail (13) left and right sides lower extreme connecting rod rotates with spout A (12) to be connected, guardrail (13) left and right sides connecting rod and spout A (12) sliding fit.
6. The air entrainment piece handling device for building engineering construction according to claim 5, characterized in that: the mounting body (5) is rotatably connected with the connecting shaft (6), and the baffle B (10) is in sliding fit with the base (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021452274.1U CN213168148U (en) | 2020-07-22 | 2020-07-22 | Air entrainment piece handling device for building engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021452274.1U CN213168148U (en) | 2020-07-22 | 2020-07-22 | Air entrainment piece handling device for building engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213168148U true CN213168148U (en) | 2021-05-11 |
Family
ID=75794462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021452274.1U Expired - Fee Related CN213168148U (en) | 2020-07-22 | 2020-07-22 | Air entrainment piece handling device for building engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213168148U (en) |
-
2020
- 2020-07-22 CN CN202021452274.1U patent/CN213168148U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211568061U (en) | A protection device for transporting glass handicraft | |
CN213168148U (en) | Air entrainment piece handling device for building engineering construction | |
CN211995678U (en) | Aerated concrete is laid bricks and is used transfer device | |
CN210392013U (en) | Fixing frame for transporting ceramic tiles | |
CN211686056U (en) | Engineering plate conveying, vibration damping and storage support | |
CN213502383U (en) | Building materials construction material handling device | |
CN211442421U (en) | Transfer device for building material manufacturing | |
CN209587044U (en) | A kind of adjustable damping base for building | |
CN219077853U (en) | Autoclaved fly ash brick holding rack | |
CN213863405U (en) | Transfer device is used in diluent production | |
CN214728915U (en) | Hydraulic lifting shock-absorbing transport cart | |
CN219154534U (en) | Door plant transportation equipment that steel entrance door processing was used | |
CN215400402U (en) | Novel wooden packing box | |
CN219257386U (en) | Screen printing plate turnover trolley | |
CN215753644U (en) | Autoclaved fly ash brick tray | |
CN214875005U (en) | Handling device is used in computer lab construction | |
CN217477326U (en) | Air entrainment piece handling device for building engineering construction | |
CN214028676U (en) | Novel SMT material transfer car (buggy) | |
CN220299328U (en) | Safety device of sulfuric acid storage tank | |
CN219077260U (en) | Toughened glass protection handling device | |
CN219948226U (en) | Sheet metal part carrying device | |
CN221914314U (en) | Material transfer device is used in intelligence manufacturing | |
CN216328201U (en) | Movable stirrup transportation and strorage device | |
CN215971683U (en) | Anti-seismic glass carrier for carrying warehouse logistics | |
CN213434976U (en) | A unloading pipeline for ball mill feed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210511 Termination date: 20210722 |