CN213149009U - Multifunctional mobile high-voltage test bed - Google Patents

Multifunctional mobile high-voltage test bed Download PDF

Info

Publication number
CN213149009U
CN213149009U CN202021693490.5U CN202021693490U CN213149009U CN 213149009 U CN213149009 U CN 213149009U CN 202021693490 U CN202021693490 U CN 202021693490U CN 213149009 U CN213149009 U CN 213149009U
Authority
CN
China
Prior art keywords
test
test bed
main body
test bench
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021693490.5U
Other languages
Chinese (zh)
Inventor
吴定亮
龙翱翔
孙承祥
石磊
杨茶
代康为
吴定芳
杨慢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021693490.5U priority Critical patent/CN213149009U/en
Application granted granted Critical
Publication of CN213149009U publication Critical patent/CN213149009U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a multi-functional portable high voltage test bench, including the test bench main part, the upper surface of test bench main part is provided with the knocker, and one side of test bench main part is provided with rotatory door handle, and the inside of test bench main part is provided with upper bearing plate, heating plate, lower floor's bearing plate, and one side of test bench main part is provided with the cable drum, and one side of test bench main part is provided with socket, dustproof heating panel, intelligent temperature and humidity controller and ground connection copper bar. The utility model discloses a only need 1 people can accomplish the transportation of common test article, greatly improved the conveying efficiency of heavy test instrument, manual utensil, do not unload test instrument in addition and can take the power, connect the ground connection copper bar, the test wire connects the testee, alleviateed tester's intensity of labour, this test bench can reduce instrument transport and unload the number of times, shorten experimental whole time, be favorable to more fast compound electricity, guarantee personnel safety and electric wire netting safety, reliable operation.

Description

Multifunctional mobile high-voltage test bed
Technical Field
The utility model relates to an electric power field, in particular to multi-functional portable high-voltage test platform.
Background
A large number of tested products need to be tested every year, and when going out to operate at every turn, all need carry 3 test instruments, multiplexer utensil, file data etc. at least, the test task is many, and it is heavy to carry thing, comes and goes many times transport, and is consuming time hard, this greatly increased experimenter's manpower burden and safety risk. In addition, some test instruments need to be frequently used, are heavy in weight and are far away from a test instrument storage room, so the test instruments are generally temporarily stored on a vehicle or in a nearby warehouse, the storage conditions are not standard, and the aging of equipment is easy to accelerate. The tester stands or squats to record the calculation data, has no comfortable impetus, is easy to cause physical fatigue after long-term use, and encourages the majority of workers to stand on the job and participate in technical innovation according to the opinion on deep promotion of worker technical innovation work (southern power grid technology [ 2017 ] No. 4), so that the subjective initiative is exerted, the labor is simplified, and the difficult problem in work is solved practically.
In the existing high-voltage test bed, a large number of test instruments, tools and files are used in the test process, the test instruments, the tools and the files need to be carried repeatedly, time and labor are consumed, the efficiency is low, the test instruments are difficult to orderly place on site, the test instruments are inconvenient to take and use, in addition, the test transformers, the dielectric loss instruments and the like have the weight of more than 20kg, and the test instruments are carried by hands and easily hurt the instruments; the tester is required to be stored in an environment with relative humidity of less than 80% and less dust, and the frequently used tester is difficult to have the storage condition and is easy to accelerate the aging of the tester; the tester is directly placed on the ground, and the tester does not have a comfortable stress point when recording and calculating data, so that the tester is easy to fatigue.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, provide a multi-functional portable high-voltage test platform, possible simple, safe, reliable.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a multi-functional portable high-voltage test platform, including the test bench main part, the upper surface of test bench main part is provided with the knocker, the shallow handle is installed to one side of test bench main part, one side of test bench main part is provided with storing bag and couple, one side of test bench main part is provided with rotatory door handle, the inside of test bench main part is provided with upper bearing plate, heating plate, lower floor's bearing plate, the braking universal wheel is installed to the bottom of test bench main part, one side of test bench main part is provided with the drawer, one side of test bench main part is provided with the cable drum, one side of test bench main part is provided with socket, dustproof heating panel, intelligent temperature and humidity controller and ground connection copper bar.
As a preferred technical scheme of the utility model, the ground connection copper bar passes through the bare copper line and is connected with the transformer substation's grounding body, and the opposite side passes through the earth connection and links to each other with the earthing part of each test instrument.
As the utility model discloses a preferred technical scheme, the socket has short-circuit protection and earth leakage protection, and higher level links to each other with the cable drum on test bench right side, and the subordinate is connected with each test instrument and heating plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model can transport the common test articles by only 1 person, greatly improving the transport efficiency of heavy test instruments and manual tools, and can take the power supply, connect the grounding copper bar and test wires to connect the tested articles without disassembling the test instruments, thereby building a safe, simple and labor-saving test bed and reducing the labor intensity of the test personnel; the test bed can classify test articles in order, is convenient to take and use, and improves the working standardization; through writing drawer and folding chair, data processing personnel can feel more comfortable, the man-machine work efficiency is optimized, the purpose of removing numerous and simple can be well achieved, good social image of power supply enterprises is established, the test instrument can be effectively prevented from falling off in the transportation process and injuring people and can be stored under standard conditions, the aging of the instrument is delayed, the preparation time of test work can be reduced, 1-8 ten thousand yuan of RMB can be saved for the enterprises every year, the test bench can reduce the carrying and dismounting times of the instrument, the whole test time is shortened, the quick power restoration is facilitated, and the safety of personnel and the safe and reliable operation of a power grid are guaranteed.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a partial structural schematic diagram of the present invention;
in the figure: 1. a door catch; 2. a cart handle; 3. a storage bag; 4. rotating the door handle; 5. hooking; 6. Braking the universal wheel; 7. a lower bearing plate; 8. a drawer; 9. an upper layer bearing plate; 10. a heating plate; 11. A cable reel; 12. a socket; 13. a dustproof heat dissipation plate; 14. an intelligent temperature and humidity controller; 15. a ground copper bar; 16. the test bed main body.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Wherein like reference numerals refer to like parts throughout.
In addition, if a detailed description of the known art is not necessary to show the features of the present invention, it is omitted. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
Example 1
As shown in fig. 1-2, the utility model provides a multi-functional portable high-voltage test platform, including test bench main part 16, the upper surface of test bench main part 16 is provided with knocker 1, shallow handle 2 is installed to one side of test bench main part 16, one side of test bench main part 16 is provided with storing bag 3 and couple 5, one side of test bench main part 16 is provided with revolving door handle 4, the inside of test bench main part 16 is provided with upper bearing plate 9, heating plate 10, lower floor's bearing plate 7, braking universal wheel 6 is installed to the bottom of test bench main part 16, one side of test bench main part 16 is provided with drawer 8, one side of test bench main part 16 is provided with cable drum 11, one side of test bench main part 16 is provided with socket 12, dustproof heating panel 13, intelligent temperature and humidity controller 14 and ground connection copper bar 15.
Furthermore, the grounding copper bar 15 is connected with the transformer substation grounding body through a bare copper wire, and the other side of the grounding copper bar is connected with the grounding part of each test instrument through a grounding wire, so that the simple operation and the safe grounding are realized.
The socket 12 is provided with short-circuit protection and leakage protection, the upper level is connected with the cable reel 11 on the right side of the test bed, and the lower level is connected with each test instrument and the heating sheet 10, so that the safe power supply function is realized.
Specifically, in the use process, the test bed main body 16 is divided into an upper layer and a lower layer, the upper layer, the front layer and the back layer of the upper layer can be opened by the door buckle 1 and the revolving door handle 4, the front surface and the back surface of the lower layer can be opened by the revolving door handle 4, the bottom part is provided with the braking universal wheel 6, the right side is provided with the trolley handle 2, 4-6 test instruments can be safely transported, stored and placed, and the requirements of a conventional test can be completely met, after the back doors of the layers are opened, the test bed main body 16 can be connected with a tested object through a test line, the function of testing without disassembling the test instrument can be realized, the middle part is a writing drawer 8, the right surface of the test bed main body 16 is provided with a hook 5 for hanging a folding chair, in the test process, a tester can disassemble the folding chair, pull out the writing drawer 8, sit the chair, and rest hands on the writing drawer to record and calculate test data, thereby, avoid causing fatigue, the right side of the test bed main body 16 is provided with a storage bag 3 which can be used for placing small articles such as operation instruction books, wrenches, universal meters, alcohol and the like which are commonly used, and classifying and transporting complicated articles at one time without carrying the articles back and forth for many times by manpower, the phenomenon of messy test site placement can not occur, the taking is convenient, simple and rapid, the left side of each layer is provided with a heating plate 10, when the test bed main body 16 is used for storing a test instrument, if the humidity is higher, the heating function can be automatically started through an intelligent temperature and humidity controller 14 at the rear part of the test bed, so that the humidity is kept below 80 percent, the storage condition of the instrument is met, the aging of the equipment is delayed, the upper layer and the lower layer of the test bed main body are provided with a grounding copper bar 15, an intelligent digital display temperature and humidity controller 14 and a socket 12 in sequence from left to right, one side of, the opposite side passes through the earth connection and links to each other with each test instrument's ground connection part, realize easy operation and safe ground connection, intelligence digital display temperature and humidity control appearance can show the inside humiture of test bench in real time, the automatic control heating plate, when the test bench is used for preserving test instrument, if humidity is greater than 80%, can automatic start heater in order to realize the heating function, socket 12 has short-circuit protection and earth leakage protection, higher level links to each other with cable drum 11 on test bench right side, the subordinate is connected with each test instrument and heating plate, realize safe power supply function, upper and lower two-layer all has dustproof heating panel 13, both can effectively prevent foreign matter such as dust from invading inside the test bench, can play the guiding air again, to the radiating effect of test instrument.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (3)

1. The multifunctional movable high-voltage test bed comprises a test bed main body (16) and is characterized in that a door buckle (1) is arranged on the upper surface of the test bed main body (16), a cart handle (2) is installed on one side of the test bed main body (16), a storage bag (3) and a hook (5) are arranged on one side of the test bed main body (16), a rotating door handle (4) is arranged on one side of the test bed main body (16), an upper bearing plate (9), a heating sheet (10) and a lower bearing plate (7) are arranged in the test bed main body (16), a brake universal wheel (6) is installed at the bottom of the test bed main body (16), a drawer (8) is arranged on one side of the test bed main body (16), a cable tray (11) is arranged on one side of the test bed main body (16), and a socket (12) and a cable tray (11) are arranged on one side of the test bed main body (, Dustproof heating panel (13), intelligent temperature and humidity control appearance (14) and ground copper bar (15).
2. The multifunctional mobile high-voltage test bed according to claim 1, characterized in that the grounding copper bar (15) is connected with the grounding body of the transformer substation through a bare copper wire, and the other side is connected with the grounding part of each test instrument through a grounding wire.
3. A multifunctional mobile high-voltage test bench according to claim 1, characterized in that the socket (12) is provided with short-circuit protection and earth leakage protection, the upper stage is connected with the cable reel (11) on the right side of the test bench, and the lower stage is connected with the test instruments and the heating plate (10).
CN202021693490.5U 2020-08-14 2020-08-14 Multifunctional mobile high-voltage test bed Expired - Fee Related CN213149009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021693490.5U CN213149009U (en) 2020-08-14 2020-08-14 Multifunctional mobile high-voltage test bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021693490.5U CN213149009U (en) 2020-08-14 2020-08-14 Multifunctional mobile high-voltage test bed

Publications (1)

Publication Number Publication Date
CN213149009U true CN213149009U (en) 2021-05-07

Family

ID=75737618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021693490.5U Expired - Fee Related CN213149009U (en) 2020-08-14 2020-08-14 Multifunctional mobile high-voltage test bed

Country Status (1)

Country Link
CN (1) CN213149009U (en)

Similar Documents

Publication Publication Date Title
CN107329063B (en) Electric power safety tool removes test car
CN203888836U (en) Multifunctional relay protection test vehicle
CN112624007A (en) Comprehensive testing platform for substation equipment
CN204124861U (en) A kind of finished product pig delivers loading apparatus for sale
CN213149009U (en) Multifunctional mobile high-voltage test bed
CN214706852U (en) Multifunctional secondary scaffold for transformer substation
CN112886449B (en) Multifunctional secondary construction vehicle for main control room of transformer substation
CN104442519A (en) Movable type overhauling working table
CN206012642U (en) Folding go-cart
CN205363815U (en) Multifunctional protector examines workstation surely
CN208209424U (en) A kind of cable peeling device
CN214276087U (en) Fault detection device based on air conditioner maintenance
CN206527715U (en) A kind of product design typesetting workbench
CN207192615U (en) A kind of tensile testing machine lifts by crane turnover device
CN207263774U (en) High-potting job platform
CN209126645U (en) A kind of vehicle-mounted rush repair tool place apparatus
CN112886448A (en) Multifunctional secondary construction vehicle for transformer substation
CN112952640A (en) Multifunctional substation secondary cable construction tool chair
CN210182901U (en) GCS series draw-out type switch cabinet for power distribution management
CN207036966U (en) A kind of radiation monitoring device for transformer station
CN205149934U (en) Device of taking one's place is removed on level land suitable for join in marriage electrical room equipment
CN202728274U (en) Multifunctional test car for maintaining relaying protection device
CN217787186U (en) Integrated AC/DC withstand voltage test device trolley
CN205986523U (en) Pony reaches metal dististyle crimping device
CN206116886U (en) Novel portable measurement cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210507