CN213145601U - River course rivers lead and transfer pipeline installation device - Google Patents
River course rivers lead and transfer pipeline installation device Download PDFInfo
- Publication number
- CN213145601U CN213145601U CN202022051175.9U CN202022051175U CN213145601U CN 213145601 U CN213145601 U CN 213145601U CN 202022051175 U CN202022051175 U CN 202022051175U CN 213145601 U CN213145601 U CN 213145601U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixed
- arc
- splint
- installation device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a river course rivers lead and transfer pipe installation device relates to the piping erection field, comprising a base plate, two fixed plates that distribute side by side of the upper surface middle part fixedly connected with of bottom plate, the top of fixed plate is provided with the fly leaf, the arc wall has all been seted up to one side that fly leaf and fixed plate are close to each other, be provided with first splint in the arc wall on the fixed plate, the lower surface of first splint is connected with the tank bottom of arc wall through a plurality of compression spring that are equidistant arc distribution. The utility model discloses a be provided with first splint and second splint between fixed plate and fly leaf, first splint and the cooperation of second splint can be spacing with the pipeline centre gripping, and compression spring on the first splint has played the effect that compresses tightly and protect simultaneously, avoids pressure too big to cause the pipeline to collapse, has played certain guard action to the pipeline when improving pipeline installation stability.
Description
Technical Field
The utility model relates to a pipe installation field, in particular to river course rivers draw transfers pipe-line installation device.
Background
For field irrigation, a method for building a high and large barrage is generally adopted to obtain high water level for irrigation at present, the method can achieve good effects in many places, but the high and large barrage cannot be built in some places due to the limitation of terrains, so that the utilization of water resources is very difficult, and the labor capacity is increased for people. So current field irrigation generally carries out diversion irrigation through leading water pipe and suction pump, and general leading water pipe generally is direct to fix at the bottom of a river through the semi-ring mount, and this kind of fixed mode stability is relatively poor, loosens easily under the impact of rivers and takes off, influences the efficiency of leading water. Therefore, it is necessary to provide a river water flow guiding and adjusting pipeline installation device to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a river course rivers are drawn and are transferred pipe-line installation device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a river course rivers lead transfers pipe installation device, includes the bottom plate, two fixed plates that distribute side by side of the upper surface middle part fixedly connected with of bottom plate, the top of fixed plate is provided with the fly leaf, the arc wall has all been seted up to one side that fly leaf and fixed plate are close to each other, be provided with first splint in the arc wall on the fixed plate, the lower surface of first splint is connected with the tank bottom of arc wall through a plurality of pressure spring that are equidistant arc distribution, be provided with second splint in the arc wall on the fly leaf, the equal adhesive connection in one side that second splint and first splint are close to each other has the rubber layer, the thread groove has been seted up at arc wall tank bottom middle part on the fly leaf, the inside through connection of thread groove has the threaded rod, bearing and second splint swing joint are passed through.
Preferably, the equal fixedly connected with connecting plate in lower surface both ends middle part of fly leaf, the spread groove with the connecting plate looks adaptation is all seted up in the upper surface both ends middle part of fixed plate, the bottom of connecting plate inserts in the spread groove.
Preferably, the equal fixedly connected with mounting panel in the lower surface both ends outside of fly leaf, the inboard of mounting panel is connected with the laminating of the both ends upper portion of fixed plate, and the lower extreme through connection of mounting panel has fixed knob, the spacing groove has all been seted up on the both ends upper portion of fixed plate, spacing groove and fixed knob looks adaptation.
Preferably, two the equal fixedly connected with in one side both ends that the fixed plate kept away from each other strengthens the backup pad, strengthen the backup pad and keep away from the one end of fixed plate and the last fixed surface of bottom plate and be connected, just strengthen the backup pad and set up to the slope structure.
Preferably, two through a plurality of connecting rods fixed connection between the fixed plate, it is a plurality of the connecting rod is along arc-shaped groove and is equidistant arc distribution.
Preferably, the equal fixedly connected with guide bar in upper surface both ends of second splint, the guide way with guide bar looks adaptation is all seted up at the arc wall tank bottom both ends on the fly leaf, the inside of guide way is inserted to the upper end of guide bar.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a be provided with first splint and second splint between fixed plate and fly leaf, first splint and the cooperation of second splint can be spacing with the pipeline centre gripping, and compression spring on the first splint has played the effect that compresses tightly and protect simultaneously, avoids pressure too big to cause the pipeline to collapse, has played certain guard action to the pipeline when improving pipeline installation stability.
2. The utility model discloses a be provided with connecting plate and spread groove between fixed plate and fly leaf, improved fixed plate and fly leaf joint strength and stability, the mounting panel on the fixed plate passes through fixed knob and spacing groove to be connected with the fly leaf, and the spacing groove is provided with a plurality ofly for the pipeline of different models size can be installed to this device, has improved the application range of this device.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic sectional view of the overall structure of the present invention.
Fig. 3 is a schematic side view of the overall structure of the present invention.
In the figure: 1. a base plate; 2. a fixing plate; 3. a movable plate; 4. an arc-shaped slot; 5. a first splint; 6. a compression spring; 7. a second splint; 8. a rubber layer; 9. a thread groove; 10. a threaded rod; 11. a connecting plate; 12. connecting grooves; 13. mounting a plate; 14. fixing the knob; 15. a limiting groove; 16. reinforcing the support plate; 17. a connecting rod; 18. a guide bar; 19. a guide groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a river water flow guiding and adjusting pipeline installation device as shown in figures 1-3, as shown in figures 1 and 2, the river water flow guiding and adjusting pipeline installation device comprises a bottom plate 1, the middle part of the upper surface of the bottom plate 1 is fixedly connected with two fixed plates 2 which are distributed side by side, a movable plate 3 is arranged above the fixed plates 2, arc-shaped grooves 4 are arranged at the mutually close sides of the movable plate 3 and the fixed plates 2, first clamping plates 5 are arranged in the arc-shaped grooves 4 on the fixed plates 2, the lower surface of the first clamping plates 5 is connected with the groove bottoms of the arc-shaped grooves 4 through a plurality of compression springs 6 which are distributed in an arc shape at equal intervals, second clamping plates 7 are arranged in the arc-shaped grooves 4 on the movable plate 3, the second clamping plates 7 are matched with the first clamping plates 5 to clamp and limit pipelines, a rubber layer 8 is bonded and connected with the mutually close sides of the second clamping, meanwhile, the rigid contact between the first clamping plate 5 and the second clamping plate 7 and the pipeline can be avoided, the middle part of the bottom of the arc-shaped groove 4 on the movable plate 3 is provided with a threaded groove 9, the threaded groove 9 is internally connected with a threaded rod 10 in a penetrating manner, the bottom end of the threaded rod 10 is movably connected with the second clamping plate 7 through a bearing, the threaded rod 10 is matched with the threaded groove 9 to drive the second clamping plate 7 to move up and down, the middle parts of the two ends of the lower surface of the movable plate 3 are fixedly connected with connecting plates 11, the middle parts of the two ends of the upper surface of the fixed plate 2 are provided with connecting grooves 12 matched with the connecting plates 11, the bottom end of the connecting plates 11 is inserted into the connecting grooves 12, the connecting plates 11 are matched with the connecting grooves 12 to play a role in guiding and limiting for the movable plate 3 to keep the movable plate 3 moving up and down vertically, meanwhile, the connecting strength between, the upper end of the guide rod 18 is inserted into the guide groove 19, and the guide rod 18 is matched with the guide groove 19 to play a role in guiding and limiting the second clamping plate 7, so that the second clamping plate 7 keeps vertically moving up and down.
As shown in FIG. 3, the outer sides of both ends of the lower surface of the movable plate 3 are fixedly connected with mounting plates 13, the inner sides of the mounting plates 13 are attached to the upper parts of both ends of the fixed plate 2, the lower end of the mounting plates 13 is connected with a fixing knob 14 in a penetrating manner, the upper parts of both ends of the fixed plate 2 are respectively provided with a plurality of spacing grooves 15 which are vertically distributed at equal intervals, the spacing grooves 15 are matched with the fixing knob 14, the fixed plate 2 and the movable plate 3 can be fixedly connected, meanwhile, the arrangement of the plurality of spacing grooves 15 enables the device to be matched with pipelines with different models and sizes, the application range of the device is improved, both ends of one side, away from each other, of the two fixed plates 2 are respectively and fixedly connected with a reinforcing support plate 16, one end, away from the fixed plate 2, of the reinforcing support plate 16 is fixedly connected, through a plurality of connecting rods 17 fixed connection between two fixed plates 2, a plurality of connecting rods 17 are equidistant arc distribution along arc wall 4, and the setting of a plurality of connecting rods 17 has improved the joint strength between two fixed plates 2.
The utility model discloses the theory of operation:
this device is when the installation, at first run through the space between two arc walls 4 with the pipeline, then push down fly leaf 3, it is spacing with the pipeline centre gripping until second splint 7 on fly leaf 3 and the cooperation of first splint 5 on the fixed plate 2, then it is fixed with fixed plate 2 and fly leaf 3 through fixed knob 14 and spacing groove 15 cooperation, screw rod 10 is twisted afterwards, screw rod 10 drives screw rod 10 downstream with the cooperation of thread groove 9, screw rod 10 drives second splint 7 downstream, make second splint 7 compress tightly the pipeline, the pipeline drives first splint 5 downstream, make pressure spring 6 compression atress, certain guard action has been played to the pipeline, it is spacing to stabilize the pipeline simultaneously, pipeline installation's stability has been improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (6)
1. The utility model provides a river course rivers lead transfers pipe-line installation device, includes bottom plate (1), its characterized in that: the upper surface middle part of the bottom plate (1) is fixedly connected with two fixed plates (2) which are distributed side by side, a movable plate (3) is arranged above the fixed plates (2), one sides of the movable plate (3) and the fixed plates (2) which are close to each other are respectively provided with an arc-shaped groove (4), a first clamping plate (5) is arranged in the arc-shaped groove (4) on the fixed plates (2), the lower surface of the first clamping plate (5) is connected with the groove bottom of the arc-shaped groove (4) through a plurality of compression springs (6) which are distributed in an arc shape at equal intervals, a second clamping plate (7) is arranged in the arc-shaped groove (4) on the movable plate (3), one sides of the second clamping plate (7) and the first clamping plate (5) which are close to each other are respectively connected with a rubber layer (8) in a bonding manner, the middle part of the groove bottom of the arc-shaped groove (4) on, the bottom end of the threaded rod (10) is movably connected with the second clamping plate (7) through a bearing.
2. The river water flow diversion pipeline installation device of claim 1, wherein: the equal fixedly connected with connecting plate (11) in middle part in lower surface both ends of fly leaf (3), spread groove (12) with connecting plate (11) looks adaptation are all seted up in middle part in the upper surface both ends of fixed plate (2), insert in spread groove (12) the bottom of connecting plate (11).
3. The riverway water flow guiding and adjusting pipeline installation device as claimed in claim 2, wherein: the equal fixedly connected with mounting panel (13) in the lower surface both ends outside of fly leaf (3), the inboard of mounting panel (13) is connected with the laminating of the both ends upper portion of fixed plate (2), and the lower extreme through connection of mounting panel (13) has fixed knob (14), spacing groove (15) have all been seted up on the both ends upper portion of fixed plate (2), spacing groove (15) and fixed knob (14) looks adaptation.
4. The riverway water flow guiding and adjusting pipeline installation device as claimed in claim 3, wherein: two equal fixedly connected with in one side both ends that fixed plate (2) kept away from each other strengthens backup pad (16), strengthen backup pad (16) and keep away from the one end of fixed plate (2) and the last fixed surface of bottom plate (1) and be connected, just strengthen backup pad (16) and set up to the slope structure.
5. The river water flow diversion pipeline installation device of claim 4, wherein: two through a plurality of connecting rods (17) fixed connection between fixed plate (2), it is a plurality of connecting rod (17) are the equidistant arc distribution along arc wall (4).
6. The river water flow diversion pipeline installation device of claim 5, wherein: the equal fixedly connected with guide bar (18) in upper surface both ends of second splint (7), guide way (19) with guide bar (18) looks adaptation are all seted up at arc wall (4) tank bottom both ends on fly leaf (3), the inside of guide way (19) is inserted to the upper end of guide bar (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022051175.9U CN213145601U (en) | 2020-09-17 | 2020-09-17 | River course rivers lead and transfer pipeline installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022051175.9U CN213145601U (en) | 2020-09-17 | 2020-09-17 | River course rivers lead and transfer pipeline installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213145601U true CN213145601U (en) | 2021-05-07 |
Family
ID=75718294
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022051175.9U Active CN213145601U (en) | 2020-09-17 | 2020-09-17 | River course rivers lead and transfer pipeline installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213145601U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175585A (en) * | 2021-06-04 | 2021-07-27 | 王素缓 | Petroleum pipeline split hoop device |
CN113404934A (en) * | 2021-08-18 | 2021-09-17 | 四川川油工程技术勘察设计有限公司 | Pipeline supporting device and application thereof |
CN114321504A (en) * | 2021-12-06 | 2022-04-12 | 吉林松江河水力发电有限责任公司 | Fixing device for water conservancy and hydropower buried pipe |
CN114413072A (en) * | 2022-01-04 | 2022-04-29 | 合肥天秤检测科技有限公司 | Accurate positioning device |
-
2020
- 2020-09-17 CN CN202022051175.9U patent/CN213145601U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175585A (en) * | 2021-06-04 | 2021-07-27 | 王素缓 | Petroleum pipeline split hoop device |
CN113404934A (en) * | 2021-08-18 | 2021-09-17 | 四川川油工程技术勘察设计有限公司 | Pipeline supporting device and application thereof |
CN114321504A (en) * | 2021-12-06 | 2022-04-12 | 吉林松江河水力发电有限责任公司 | Fixing device for water conservancy and hydropower buried pipe |
CN114321504B (en) * | 2021-12-06 | 2024-04-12 | 吉林松江河水力发电有限责任公司 | Fixing device for water conservancy and hydropower buried pipe |
CN114413072A (en) * | 2022-01-04 | 2022-04-29 | 合肥天秤检测科技有限公司 | Accurate positioning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213145601U (en) | River course rivers lead and transfer pipeline installation device | |
CN211315491U (en) | Protection device for pressure pipeline | |
CN110873247A (en) | Hydraulic engineering is with pipeline of convenient concatenation | |
CN213039956U (en) | Municipal administration water supply line fixing device | |
CN208538601U (en) | A kind of body pressing plate increase oil guide groove | |
CN209603257U (en) | A kind of high-building construction drainage pipeline connection structure | |
CN212361022U (en) | A pipeline installation support base for hydraulic engineering | |
CN212056120U (en) | Pipeline protector for assembly type building | |
CN210318814U (en) | Fixing structure of drain pipe for hydraulic engineering to different pipe diameters | |
CN211007096U (en) | Impact-resistant PVC (polyvinyl chloride) profile | |
CN208024647U (en) | A kind of double containment inserted valve | |
CN108735440A (en) | A kind of device body pressing plate increase oil guide groove | |
CN211875347U (en) | Valve connecting device convenient to installation | |
CN215172845U (en) | Pipeline positioning support for water supply and drainage engineering | |
CN212868848U (en) | Be used for pipeline connecting device for hydraulic engineering | |
CN217653370U (en) | Hydraulic engineering pipeline fixing equipment | |
CN217383311U (en) | Heater with four spliced petals | |
CN217955972U (en) | Liquid cooling battery box with damping function | |
CN218441061U (en) | Anti-aging device for PPR (polypropylene random) pipe | |
CN220228318U (en) | Water supply and drainage pipeline plugging device | |
CN219386693U (en) | Building waterproof board for sponge city planning construction | |
CN217312314U (en) | Single-flow mechanical filter | |
CN217030245U (en) | Pipeline through-wall hole filling and sealing mechanism for building water supply and drainage | |
CN212657430U (en) | Fixing device for water conservancy and hydropower buried pipe | |
CN210484198U (en) | Low pressure heater drainage pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |