CN213141335U - Water heating pipeline erection bracing frame for building - Google Patents

Water heating pipeline erection bracing frame for building Download PDF

Info

Publication number
CN213141335U
CN213141335U CN202021441087.3U CN202021441087U CN213141335U CN 213141335 U CN213141335 U CN 213141335U CN 202021441087 U CN202021441087 U CN 202021441087U CN 213141335 U CN213141335 U CN 213141335U
Authority
CN
China
Prior art keywords
fixedly connected
pipeline
water heating
mounting
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021441087.3U
Other languages
Chinese (zh)
Inventor
王以江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021441087.3U priority Critical patent/CN213141335U/en
Application granted granted Critical
Publication of CN213141335U publication Critical patent/CN213141335U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model relates to a pipeline supports technical field, specifically is a hot-water heating pipeline erection bracing frame for building, including the bottom sprag board, the bottom sprag board the bottom install the universal wheel, the first mounting panel of top fixedly connected with of bottom sprag board, the first hydraulic telescoping rod of top fixedly connected with of first mounting panel, the top fixedly connected with connecting plate of first hydraulic telescoping rod, two reinforcing plates of top fixedly connected with of connecting plate. The utility model has the advantages that: this kind of building water heating pipeline erection bracing frame through being provided with the pipeline support frame, does benefit to the special shape of V type frame and supports the pipeline, can be used for supporting the pipeline of different diameters, can also prevent that the pipeline from making a round trip to rock, through being provided with the layer board, the layer board is located the inside of V type frame, and the layer board can the up-motion jack-up pipeline, avoids the pipeline card in V type frame, and it is comparatively convenient to use, has improved the device's practicality greatly.

Description

Water heating pipeline erection bracing frame for building
Technical Field
The utility model relates to a pipeline supports technical field, especially a building water heating pipe erection bracing frame.
Background
A pipeline is a device for transporting a gas, liquid or fluid with solid particles, connected by pipes, pipe couplings, valves, etc. Generally, a fluid is pressurized by a blower, a compressor pump, a boiler, or the like, and then flows from a high pressure portion to a low pressure portion of a pipe, or is transported by the pressure or gravity of the fluid itself. At present, in the hot-water heating field, need install hot-water heating pipeline usually, because the pipe diameter of partial pipeline is big, and weight is big, constructor has great difficulty in the work progress, and the construction strength is high, needs a plurality of constructors to accomplish hot-water heating pipeline's installation in tandem, consequently, needs design a hot-water heating pipeline installation support frame.
Disclosed in chinese patent CN206767584U is a water heating pipe erection bracing frame, which can realize the lifting of water heating pipes by the action of hydraulic jack, and can make the constructors stand on the supporting station board to install the water heating pipes, thereby reducing the construction strength, but which also has the following disadvantages in the concrete using process:
because the horizontal pipe bracket is arc-shaped, the pipeline is easy to shake back and forth in the horizontal pipe bracket in the moving process, and the use is inconvenient.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a hot-water heating pipeline erection bracing frame for building.
The purpose of the utility model is realized through the following technical scheme: a supporting frame for mounting a water heating pipeline for a building comprises a bottom supporting plate, universal wheels are mounted at the bottom of the bottom supporting plate, a first mounting plate is fixedly connected to the top of the bottom supporting plate, a first hydraulic telescopic rod is fixedly connected to the top of the first mounting plate, a connecting plate is fixedly connected to the top of the first hydraulic telescopic rod, two reinforcing plates are fixedly connected to the top of the connecting plate, and a pipeline supporting frame is fixedly connected between the two reinforcing plates; the pipeline supporting frame comprises a V-shaped frame, a transverse plate, a movable through hole and an anti-skid rubber strip, wherein the transverse plate is fixedly connected to the bottom of the V-shaped frame, the movable through hole is formed in the transverse plate, and the anti-skid rubber strip is fixedly connected to the inner wall of the V-shaped frame;
the top of connecting plate be located fixedly connected with second hydraulic stretching pole between two reinforcing plates, the output of second hydraulic stretching pole run through diaphragm fixedly connected with layer board through the activity through-hole, the layer board be located the inside of V type frame.
Optionally, the top of the bottom support plate is fixedly connected with a second mounting plate, and the top of the second mounting plate is fixedly connected with a ladder.
Optionally, an arc-shaped groove is formed in the supporting plate.
Optionally, the width of the supporting plate is smaller than that of the transverse plate.
Optionally, the number of the anti-skid rubber strips is a plurality, and the anti-skid rubber strips are uniformly distributed on the inner wall of the V-shaped frame.
Optionally, the top of the bottom supporting plate is fixedly connected with a box body, and a balancing weight is arranged inside the box body.
Optionally, the ladder is made of aluminum alloy.
Optionally, the two pipeline support frames have the same size and are parallel to each other, and the two pipeline support frames are arranged at symmetrical positions of the bottom support plate.
Optionally, the first mounting plate and the second mounting plate are both fixedly connected with the bottom support plate through bolts.
The utility model has the advantages of it is following:
this kind of hot-water heating pipeline erection bracing frame for building, in the use, through being provided with the pipeline support frame, the pipeline support frame includes V type frame, the diaphragm, activity through-hole and anti-skidding rubber strip, wherein, do benefit to the special shape of V type frame and support the pipeline, can be used for supporting the pipeline of different diameters, can also prevent that the pipeline from making a round trip to rock, through fixing a plurality of anti-skidding rubber strip at the inner wall of V type frame, still can prevent that the hot-water heating pipeline from rocking, can also effectually protect the surface of pipeline, through being provided with the layer board, the layer board is located the inside of V type frame, the layer board can the upward movement jack-up pipeline, avoid the pipe card in V type frame, it is comparatively convenient to use, the device's practicality has been improved greatly.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is a top view of the present invention;
fig. 4 is a side view of the present invention;
fig. 5 is a schematic structural view of the pipeline supporting frame of the present invention;
fig. 6 is a cross-sectional view of the pipe support of the present invention.
In the figure: 1-bottom support plate, 2-universal wheel, 3-universal wheel, 4-first hydraulic telescopic rod, 5-connecting plate, 6-two reinforcing plates, 7-pipeline support frame, 701-V-shaped frame, 702-transverse plate, 703-movable through hole, 704-anti-skid rubber strip, 8-second hydraulic telescopic rod, 9-supporting plate, 10-second mounting plate and 11-ladder.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-6, a support frame for mounting a water heating pipeline for a building comprises a bottom support plate 1, universal wheels 2 are mounted at the bottom of the bottom support plate 1, a first mounting plate 3 is fixedly connected to the top of the bottom support plate 1, a first hydraulic telescopic rod 4 is fixedly connected to the top of the first mounting plate 3, a connecting plate 5 is fixedly connected to the top of the first hydraulic telescopic rod 4, two reinforcing plates 6 are fixedly connected to the top of the connecting plate 5, a pipeline support frame 7 is fixedly connected between the two reinforcing plates 6, and the first hydraulic telescopic rod 4 and a second hydraulic telescopic rod 8 are of existing mature structures and are well-known technologies of persons in the art, and are not described herein;
the pipeline supporting frame 7 comprises a V-shaped frame 701, a transverse plate 702, a movable through hole 703 and an anti-slip rubber strip 704, the transverse plate 702 is fixedly connected to the bottom of the V-shaped frame 701, the movable through hole 703 is formed in the transverse plate 702, and the anti-slip rubber strip 704 is fixedly connected to the inner wall of the V-shaped frame 701 and can play a role in anti-slip;
the top of the connecting plate 5 is positioned between two reinforcing plates 6 and is fixedly connected with a second hydraulic telescopic rod 8, the output end of the second hydraulic telescopic rod 8 penetrates through a transverse plate 702 through a movable through hole 703 and is fixedly connected with a supporting plate 9, the supporting plate 9 is positioned inside a V-shaped frame 701 and is used for jacking a pipeline from the bottom, the top of a bottom supporting plate 1 is fixedly connected with a second mounting plate 10, the top of the second mounting plate 10 is fixedly connected with a ladder 11 which is convenient for workers to climb, an arc-shaped groove is formed inside the supporting plate 9 and can be more attached to the pipeline and also prevent the pipeline from rolling off after being jacked up, the use is safer, the width of the supporting plate 9 is smaller than that of the transverse plate 702, the supporting plate 9 is prevented from influencing the pipeline with smaller support of the device, the number of the anti-skid rubber strips 704 is a plurality of the anti-skid rubber strips 704, and the anti, the friction force between the pipeline and the V-shaped frame 701 can be increased, the pipeline is prevented from shaking, the device is enabled to move more stably, in addition, the antiskid rubber strips 704 are made of rubber, the rubber has certain elasticity, can play a certain role in buffering, can protect the pipeline and prevent the outer surface of the pipeline from being scraped, the top of the bottom supporting plate 1 is fixedly connected with a box body, the box body is internally provided with a plurality of counter weights, the number of the counter weights can be taken out of the box body, set up as required, the balancing weight can make the device more stable when using, and ladder 11's material is the aluminum alloy, and the aluminum alloy material is sturdy and durable, wholly lighter, is convenient for remove, and two pipeline support frames 7 size equals and be parallel to each other, and two pipeline support frames 7 set up in the symmetric position of bottom sprag board 1, and first mounting panel 3 and second mounting panel 10 are all through bolt and 1 fixed connection of bottom sprag board.
The working process of the utility model is as follows: the water heating pipeline is placed on two pipeline supporting frames 7 which are symmetrical to each other by an operator, so that the water heating pipeline is parallel to the ground, then the operator moves the position of the device to a proper position through the universal wheel, in the moving process, the water heating pipeline is positioned in the pipeline supporting frames 7, the water heating pipeline can be prevented from shaking violently by the mutual matching of the gravity of the water heating pipeline and the supporting force of the pipeline supporting frames 7 on the water heating pipeline, in addition, the anti-skid rubber strip 704 fixedly connected to the inner wall of the V-shaped frame 701 can play a role in buffering, the shaking of the water heating pipeline is reduced, the use is facilitated, the universal wheel is a locking universal wheel with a foot brake, then the height of the pipeline supporting frames 7 is adjusted by adjusting the first hydraulic telescopic rod 4 to meet the requirement, when the water heating pipeline needs to be taken down, the water heating pipeline can bear certain, at this time, the height of the supporting plate 9 is adjusted by adjusting the second hydraulic telescopic rod 8, so that the supporting plate 9 can move upwards to jack up the water heating pipeline, the water heating pipeline can be taken out conveniently, the pipeline installation is facilitated, the use is convenient, the ladder 11 is installed at the top of the bottom supporting plate 1, the pipeline installation is facilitated when a worker climbs up, in addition, a box body is arranged, a balancing weight is arranged in the box body, the balancing weight is positioned in the center of the device, the stability of the device is facilitated, the tilting of the device is prevented, in the using process, the pipeline supporting frame 7 comprises a V-shaped frame 701, a transverse plate 702, a movable through hole 703 and an anti-slip rubber strip 704, wherein the pipeline is supported by the special shape of the V-shaped frame 701, the pipeline can be used for supporting pipelines with different diameters, the pipeline can be prevented from shaking back and forth, and the anti-slip rubber strips 704 are fixed on the, still can prevent that hot-water heating pipeline from rocking, can also effectually protect the surface of pipeline, through being provided with layer board 9, layer board 9 is located the inside of V type frame 701, and layer board 9 can the up motion jack-up pipeline, avoids the pipeline card in V type frame 701, and it is comparatively convenient to use, has improved the device's practicality greatly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a hot-water heating pipeline erection bracing frame for building, includes bottom sprag board (1), its characterized in that: the universal wheel (2) is installed at the bottom of the bottom supporting plate (1), the first mounting plate (3) is fixedly connected to the top of the bottom supporting plate (1), the first hydraulic telescopic rod (4) is fixedly connected to the top of the first mounting plate (3), the connecting plate (5) is fixedly connected to the top of the first hydraulic telescopic rod (4), the two reinforcing plates (6) are fixedly connected to the top of the connecting plate (5), and the pipeline supporting frame (7) is fixedly connected between the two reinforcing plates (6);
the pipeline supporting frame (7) comprises a V-shaped frame (701), a transverse plate (702), a movable through hole (703) and an anti-skid rubber strip (704), the transverse plate (702) is fixedly connected to the bottom of the V-shaped frame (701), the movable through hole (703) is formed in the transverse plate (702), and the anti-skid rubber strip (704) is fixedly connected to the inner wall of the V-shaped frame (701);
the top of connecting plate (5) be located fixedly connected with second hydraulic stretching pole (8) between two reinforcing plates (6), the output of second hydraulic stretching pole (8) run through diaphragm (702) fixedly connected with layer board (9) through activity through-hole (703), layer board (9) be located the inside of V type frame (701).
2. A support frame for mounting a water heating pipe for construction according to claim 1, characterized in that: the top fixedly connected with second mounting panel (10) of bottom sprag board (1), the top fixedly connected with ladder (11) of second mounting panel (10).
3. A support frame for mounting a water heating pipe for construction according to claim 1, characterized in that: an arc-shaped groove is formed in the supporting plate (9).
4. A support frame for mounting a water heating pipe for construction according to claim 1, characterized in that: the width of the supporting plate (9) is smaller than that of the transverse plate (702).
5. A support frame for mounting a water heating pipe for construction according to claim 1, characterized in that: the number of the anti-skid rubber strips (704) is a plurality, and the anti-skid rubber strips (704) are uniformly distributed on the inner wall of the V-shaped frame (701).
6. A support frame for mounting a water heating pipe for construction according to claim 1, characterized in that: the top of bottom sprag board (1) fixedly connected with box, the inside of box is provided with the balancing weight.
7. A support frame for mounting a water heating pipe for construction according to claim 2, characterized in that: the ladder (11) is made of aluminum alloy.
8. A support frame for mounting a water heating pipe for construction according to claim 1, characterized in that: the two pipeline support frames (7) are equal in size and parallel to each other, and the two pipeline support frames (7) are arranged at the symmetrical positions of the bottom support plate (1).
9. A support frame for mounting a water heating pipe for construction according to claim 1, characterized in that: the first mounting plate (3) and the second mounting plate (10) are fixedly connected with the bottom support plate (1) through bolts.
CN202021441087.3U 2020-07-21 2020-07-21 Water heating pipeline erection bracing frame for building Expired - Fee Related CN213141335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021441087.3U CN213141335U (en) 2020-07-21 2020-07-21 Water heating pipeline erection bracing frame for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021441087.3U CN213141335U (en) 2020-07-21 2020-07-21 Water heating pipeline erection bracing frame for building

Publications (1)

Publication Number Publication Date
CN213141335U true CN213141335U (en) 2021-05-07

Family

ID=75733310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021441087.3U Expired - Fee Related CN213141335U (en) 2020-07-21 2020-07-21 Water heating pipeline erection bracing frame for building

Country Status (1)

Country Link
CN (1) CN213141335U (en)

Similar Documents

Publication Publication Date Title
CN208650862U (en) A kind of anti-collapse suspension device of constructing tunnel
CN210395777U (en) Curtain wall unit body combined installation device
CN104878916A (en) Detachable simple four-wheel moving operating platform with building material lifting function
CN213141335U (en) Water heating pipeline erection bracing frame for building
CN210127676U (en) Hydraulic supporting device for concrete replacement of building shear wall
CN205955171U (en) Fall to ground scaffold collet device
CN105155833B (en) Automatic lifting scaffold
CN217376984U (en) Precast concrete culvert pipe hoist device
CN106698242B (en) Support frame for pipeline installation
CN215907510U (en) A consolidate bearing structure for building engineering
CN211201120U (en) Attached lifting scaffold bottom truss
CN208884948U (en) A kind of operating platform
CN204661108U (en) Two-layer twin columns lifting working platform
CN204661109U (en) Two-layer single-column lifting working platform
CN208981355U (en) A kind of packaged type scaffold
CN204661110U (en) The two-layer single-column lifting working platform of two-stage
CN218375029U (en) Storage tank construction auxiliary device that can walk
CN219673488U (en) Interior pipeline installation dolly of wearing
US8366123B2 (en) Buggy jack
CN209799851U (en) movable construction ladder
CN221682452U (en) Wall-attached support of liftable climbing frame
CN212176516U (en) Attached type lifting scaffold wall-attached support for floor slab
CN210973548U (en) Scaffold pipe hoisting frame for civil engineering construction
CN218780033U (en) Construction support
CN212475947U (en) Hydraulic jack convenient to remove and fix

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210507

CF01 Termination of patent right due to non-payment of annual fee