CN213137160U - Preparation device of refractory bricks - Google Patents

Preparation device of refractory bricks Download PDF

Info

Publication number
CN213137160U
CN213137160U CN202021437757.4U CN202021437757U CN213137160U CN 213137160 U CN213137160 U CN 213137160U CN 202021437757 U CN202021437757 U CN 202021437757U CN 213137160 U CN213137160 U CN 213137160U
Authority
CN
China
Prior art keywords
plate
base
groove
fixing plate
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021437757.4U
Other languages
Chinese (zh)
Inventor
侯书章
侯志远
魏方方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Jinlong New Material Co ltd
Original Assignee
Zhengzhou Jinlong New Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Jinlong New Material Co ltd filed Critical Zhengzhou Jinlong New Material Co ltd
Priority to CN202021437757.4U priority Critical patent/CN213137160U/en
Application granted granted Critical
Publication of CN213137160U publication Critical patent/CN213137160U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The utility model discloses a refractory brick preparation device, which comprises a base and a top plate arranged above the base, wherein the base is connected with the top plate through four support rods, a hydraulic cylinder is arranged at the top of the top plate, one end of the hydraulic cylinder penetrates through the top plate to be provided with a pressing plate, both sides of the pressing plate are provided with cylinders arranged at the bottom of the top plate, one end of each cylinder is provided with a template for refractory brick production, the middle part of each template is provided with a die groove corresponding to the pressing plate, the left side of the base is provided with a first fixing plate, and a material pushing assembly is arranged above the first; the pushing assembly comprises a fixed seat, an electric telescopic rod and a push plate; the fixing base is installed at the top of first fixed plate, and electric telescopic handle installs on the fixing base. The utility model discloses a push away the material subassembly and can solve the problem that firebrick needs manual operation inconvenient to take after resistant firebrick production, realize that electric operation collects resistant firebrick, the effectual production efficiency who has improved resistant firebrick.

Description

Preparation device of refractory bricks
Technical Field
The utility model relates to a resistant firebrick production technical field, concretely relates to resistant firebrick's preparation facilities.
Background
Refractory materials are generally divided into two categories, namely unshaped refractory and shaped refractory. The unshaped refractory material, also called as casting material, is a mixed powder granule composed of various aggregates or aggregates and one or more kinds of adhesives, and when in use, the unshaped refractory material must be matched with one or more kinds of liquids to be stirred uniformly, and has stronger fluidity. The shaped refractory material is generally a refractory brick, the shape of which has standard rules and can be temporarily added when being built and cut as required.
At present, after the existing refractory bricks are produced, the existing refractory bricks need to be manually taken down from a refractory brick preparation device to carry the refractory bricks, and the labor intensity of the pressed refractory bricks can be increased under the manual long-time repeated carrying, so that the production efficiency of the refractory bricks is reduced, and therefore, the refractory brick preparation device is provided for solving the problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a firebrick's preparation facilities to the firebrick of accomplishing of the suppression that proposes in solving above-mentioned background art can increase intensity of labour under the artifical transport repeatedly for a long time, thereby reduces the problem of the production efficiency of nai firebrick.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a refractory brick preparation device comprises a base and a top plate arranged above the base, wherein the base is connected with the top plate through four support rods, a hydraulic cylinder is arranged at the top of the top plate, one end of the hydraulic cylinder penetrates through the top plate and is provided with a pressing plate, air cylinders arranged at the bottom of the top plate are arranged on two sides of the pressing plate, a template used for refractory brick production is arranged at one end of each air cylinder, a die groove corresponding to the pressing plate is formed in the middle of the template, a first fixing plate is arranged on the left side of the base, and a material pushing assembly is arranged above the first fixing plate;
the pushing assembly comprises a fixed seat, an electric telescopic rod and a push plate;
the fixed seat is arranged at the top of the first fixed plate, the electric telescopic rod is arranged on the fixed seat, and the push plate is arranged at one end of the electric telescopic rod and is positioned between the two support rods;
the bottom of first fixed plate is provided with the expansion bracket, the spacing groove that is used for the expansion bracket to fix is seted up to the left side wall of base.
Further, one side of base is installed and is connect the flitch, the right side top of base is seted up and is connect the notch that the flitch corresponds, connect flitch and notch all to be smooth form.
Furthermore, the push plate, the die cavity, the material receiving plate and the notch are located on the same horizontal straight line.
Further, the base and the first fixing plate are connected through a connecting assembly, and the connecting assembly comprises a mounting block and a connecting rod;
the mounting block is mounted at the top of the left side of the base, a rectangular groove matched with the mounting block is formed in the middle of the right end of the first fixing plate, the connecting rod is mounted in the rectangular groove, and the connecting rod is arranged in a circular groove formed in the middle of the mounting block.
Furthermore, a placing groove for placing the telescopic frame is formed below the first fixing plate.
Further, the expansion bracket comprises a sleeve and an ejector rod, the ejector rod is inserted into the sleeve, the top end of the sleeve is installed in the placing groove through a pin shaft, the low end of the ejector rod is arranged in the limiting groove, and the sleeve and the ejector rod are connected through a clamping assembly.
Furthermore, the clamping assembly comprises a limiting block, a second fixing plate, two compression springs and two clamping blocks;
the limiting block is arranged in the sleeve and connected with the top end of the ejector rod, the second fixing plate is arranged in a mounting groove formed in the middle of the limiting block, the two compression springs are arranged in the mounting groove and connected with the second fixing plate, the fixture block is arranged in the mounting groove and connected with the compression springs, and a clamping groove used for limiting the fixture block is formed in the lower end of the sleeve.
The utility model has the advantages that:
1. the utility model discloses a push away the material subassembly and can solve the problem that firebrick needs manual operation inconvenient to take after resistant firebrick production, realize that electric operation collects resistant firebrick, the effectual production efficiency who has improved resistant firebrick.
2. The utility model discloses a telescopic bracket can be fixed first fixed plate with the cooperation of spacing groove, increases the stability of first fixed plate, can make base and first fixed plate rotate through coupling assembling, reduces the area occupied of preparation dress device.
Drawings
Fig. 1 is a schematic perspective view of the structure of the present invention;
FIG. 2 is a schematic top view of the base structure of the present invention;
fig. 3 is a schematic cross-sectional view of a first fixing plate structure of the present invention;
fig. 4 is a schematic sectional view of the telescopic frame structure of the present invention.
In the figure: 1. a base; 2. a top plate; 3. a support bar; 4. a hydraulic cylinder; 5. pressing a plate; 6. a cylinder; 7. a template; 8. a die cavity; 9. a first fixing plate; 10. a fixed seat; 11. an electric telescopic rod; 12. pushing the plate; 13. a telescopic frame; 14. a limiting groove; 15. a material receiving plate; 16. a notch; 17. mounting blocks; 18. a rectangular groove; 19. a connecting rod; 20. a placement groove; 21. a sleeve; 22. a top rod; 23. a limiting block; 24. a second fixing plate; 25. a compression spring; 26. a clamping block; 27. a clamping groove.
Detailed Description
The following describes embodiments of the present invention with reference to the accompanying drawings.
The utility model discloses a concrete embodiment of a device for preparing refractory bricks under the title of the utility model, as shown in figures 1 to 4, comprising a base 1 and a top plate 2 arranged above the base 1, the base 1 is connected with the top plate 2 through four support rods 3, a hydraulic cylinder 4 is arranged on the top of the top plate 2, one end of the hydraulic cylinder 4 penetrates through the top plate 2 to be provided with a pressing plate 5, both sides of the pressing plate 5 are provided with air cylinders 6 arranged at the bottom of the top plate 2, one end of each air cylinder 6 is provided with a template 7 used for refractory brick production, four corners of the template 7 are provided with through holes matched with the support rods 3, the middle part of the template 7 is provided with a die groove 8 corresponding to the pressing plate 5, the left side of the base 1 is provided with a first fixing plate 9, a material pushing component is arranged above the first fixing plate 9, the material pushing component can solve the problem, the production efficiency of the refractory brick is effectively improved;
the pushing assembly comprises a fixed seat 10, an electric telescopic rod 11 and a push plate 12;
the fixed seat 10 is arranged at the top of the first fixed plate 9, the electric telescopic rod 11 is arranged on the fixed seat 10, and the push plate 12 is arranged at one end of the electric telescopic rod 11 and is positioned between the two support rods 3;
the bottom of first fixed plate 9 is provided with expansion bracket 13, and the left side wall of base 1 is offered and is used for expansion bracket 13 fixed spacing groove 14, and expansion bracket 13 can be fixed first fixed plate 9 with spacing groove 14's cooperation, increases first fixed plate 9's stability.
In this embodiment, one side of base 1 is installed and is connect flitch 15, and base 1's right side top is seted up and is connect the notch 16 that flitch 15 corresponds, connects flitch 15 and notch 16 and all is smooth form, can reduce resistant firebrick and connect the frictional force between flitch 15, the notch 16.
In this embodiment, the push plate 12, the die cavity 8, the material receiving plate 15 and the notch 16 are located on the same horizontal straight line.
In this embodiment, the base 1 and the first fixing plate 9 are connected through a connecting assembly, the connecting assembly includes a mounting block 17 and a connecting rod 19, and the connecting assembly can enable the base 1 and the first fixing plate 9 to rotate, so that the occupied area of the preparation device is reduced;
the installation block 17 is installed at the top of the left side of the base 1, the middle part of the right end of the first fixing plate 9 is provided with a rectangular groove 18 matched with the installation block 17, the connecting rod 19 is installed in the rectangular groove 18, and the connecting rod 19 is arranged in a circular groove formed in the middle part of the installation block 17.
In this embodiment, a placing groove 20 for placing the expansion bracket 13 is formed below the first fixing plate 9.
In this embodiment, the telescopic frame 13 includes a sleeve 21 and a top rod 22, the top rod 22 is inserted into the sleeve 21, the top end of the sleeve 21 is installed in the placement groove 20 through a pin shaft, the lower end of the top rod 22 is arranged in the limit groove 14, and the sleeve 21 and the top rod 22 are connected through a clamping assembly.
In this embodiment, the clamping assembly includes a limiting block 23, a second fixing plate 24, two compression springs 25 and two clamping blocks 26, and the clamping assembly can facilitate the contraction or extension of the telescopic frame 13;
the limiting block 23 is arranged in the sleeve 21 and connected with the top end of the ejector rod 22, the second fixing plate 24 is arranged in a mounting groove formed in the middle of the limiting block 23, the two compression springs 25 are arranged in the mounting groove and connected with the second fixing plate 24, the fixture block 26 is arranged in the mounting groove and connected with the compression springs 25, and the lower end of the sleeve 21 is provided with a clamping groove 27 for limiting the fixture block 26.
This practical theory of operation:
firstly, refractory brick materials are filled into a die cavity 8 in a template 7, a hydraulic cylinder 4 is started to drive a pressing plate 5 to enter the die cavity 8, the refractory brick materials are extruded and formed, then the cylinder 6 is started to drive the template 7 to move upwards, the refractory bricks in the die cavity 8 on the template 7 stay on the base 1 due to gravity, finally the electric telescopic rod 11 works to drive the push plate 12 to push the refractory bricks to move, the refractory bricks are pushed to the receiving plate 15 from the notch 16, then the cylinder 6 drives the template 7 to reset to be in contact with the base 1, the circulation work effectively solves the problem that the refractory bricks are inconvenient to take after production is finished, improves the production efficiency of the refractory bricks, after the refractory bricks are produced, the expansion bracket 13 is removed from the limiting groove 14, the expansion bracket 13 is contracted into the placing groove 20 through the fixture blocks 26, and the first fixing plate 9 is rotated and contracted, so that the occupied area of the preparation device is reduced.

Claims (7)

1. A firebrick preparation device is characterized in that: the fireproof brick production device comprises a base (1) and a top plate (2) arranged above the base (1), wherein the base (1) is connected with the top plate (2) through four support rods (3), a hydraulic cylinder (4) is installed at the top of the top plate (2), one end of the hydraulic cylinder (4) penetrates through the top plate (2) to be installed with a pressing plate (5), air cylinders (6) installed at the bottom of the top plate (2) are arranged on two sides of the pressing plate (5), a template (7) used for fireproof brick production is installed at one end of each air cylinder (6), a die groove (8) corresponding to the pressing plate (5) is formed in the middle of the template (7), a first fixing plate (9) is installed on the left side of the base (1), and a material pushing assembly is arranged above the first fixing plate (;
the pushing assembly comprises a fixed seat (10), an electric telescopic rod (11) and a push plate (12);
the fixed seat (10) is arranged at the top of the first fixed plate (9), the electric telescopic rod (11) is arranged on the fixed seat (10), and the push plate (12) is arranged at one end of the electric telescopic rod (11) and is positioned between the two support rods (3);
the bottom of first fixed plate (9) is provided with expansion bracket (13), spacing groove (14) that are used for expansion bracket (13) to fix are seted up to the left side wall of base (1).
2. The apparatus for manufacturing a refractory brick according to claim 1, wherein: connect flitch (15) is installed to one side of base (1), notch (16) that correspond with connecing flitch (15) are seted up at the right side top of base (1), connect flitch (15) and notch (16) all to be smooth form.
3. The apparatus for manufacturing a refractory brick as claimed in claim 2, wherein: the push plate (12), the die cavity (8), the material receiving plate (15) and the notch (16) are located on the same horizontal straight line.
4. The apparatus for manufacturing a refractory brick according to claim 1, wherein: the base (1) is connected with the first fixing plate (9) through a connecting assembly, and the connecting assembly comprises a mounting block (17) and a connecting rod (19);
the mounting block (17) is mounted at the top of the left side of the base (1), a rectangular groove (18) matched with the mounting block (17) is formed in the middle of the right end of the first fixing plate (9), the connecting rod (19) is mounted in the rectangular groove (18), and the connecting rod (19) is arranged in a circular groove formed in the middle of the mounting block (17).
5. The apparatus for manufacturing a refractory brick according to claim 1, wherein: a placing groove (20) for placing the telescopic frame (13) is formed below the first fixing plate (9).
6. The apparatus for manufacturing a refractory brick according to claim 1, wherein: the telescopic frame (13) comprises a sleeve (21) and an ejector rod (22), the ejector rod (22) is inserted into the sleeve (21), the top end of the sleeve (21) is installed in the placing groove (20) through a pin shaft, the lower end of the ejector rod (22) is arranged in the limiting groove (14), and the sleeve (21) and the ejector rod (22) are connected through a clamping component.
7. The apparatus for manufacturing a refractory brick as claimed in claim 6, wherein: the clamping assembly comprises a limiting block (23), a second fixing plate (24), two compression springs (25) and two clamping blocks (26);
the limiting block (23) is arranged in the sleeve (21) and connected with the top end of the ejector rod (22), the second fixing plate (24) is arranged in a mounting groove formed in the middle of the limiting block (23), the two compression springs (25) are arranged in the mounting groove and connected with the second fixing plate (24), the clamping block (26) is arranged in the mounting groove and connected with the compression springs (25), and a clamping groove (27) used for limiting the clamping block (26) is formed in the lower end of the sleeve (21).
CN202021437757.4U 2020-07-21 2020-07-21 Preparation device of refractory bricks Active CN213137160U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021437757.4U CN213137160U (en) 2020-07-21 2020-07-21 Preparation device of refractory bricks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021437757.4U CN213137160U (en) 2020-07-21 2020-07-21 Preparation device of refractory bricks

Publications (1)

Publication Number Publication Date
CN213137160U true CN213137160U (en) 2021-05-07

Family

ID=75732116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021437757.4U Active CN213137160U (en) 2020-07-21 2020-07-21 Preparation device of refractory bricks

Country Status (1)

Country Link
CN (1) CN213137160U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115592770A (en) * 2022-09-29 2023-01-13 新沂新世纪高科耐火材料有限公司(Cn) Baking-free refractory brick production device based on industrial waste production and recycling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115592770A (en) * 2022-09-29 2023-01-13 新沂新世纪高科耐火材料有限公司(Cn) Baking-free refractory brick production device based on industrial waste production and recycling

Similar Documents

Publication Publication Date Title
CN112171851B (en) Manufacturing method of high-strength heat-preservation concrete block
CN213137160U (en) Preparation device of refractory bricks
CN113547629B (en) Automatic pouring device for aerated concrete building blocks
CN111119471A (en) Reinforced concrete beam column pouring support template
CN210011126U (en) Concrete prefabricated part pouring mold
CN213496361U (en) Casting is with stable and efficient molding machine
CN214722305U (en) Machining center clamp for preventing die casting from deforming
CN109249517B (en) Double-station rapid switching forming method for refractory bricks
CN209887803U (en) Pressing die for producing brick body with groove on surface
CN210450968U (en) Material taking manipulator for powder metallurgy forming device
CN210210796U (en) Ladle slag line brick mould capable of automatically demoulding
CN113152789A (en) High-strength building concrete column pouring construction method
CN220198020U (en) Quick demoulding structure of alumina lining brick
CN220052196U (en) Groove type thin-wall brick forming device
CN216968789U (en) Multifunctional stripper
CN220763001U (en) Quick-forming concrete aerated brick mold
CN214561727U (en) Ceramic structure spare dry pressing make-up machine
CN217967528U (en) Floor tile mold for antique building
CN219766756U (en) Brake drum casting forming device
CN220075000U (en) Forming equipment for processing asphalt concrete
CN219276789U (en) Powder pressing tool
CN219924535U (en) Silicon carbide mould stripping tool
CN216341155U (en) Assembled constructional column for building reinforcement
CN219338008U (en) Magnesia carbon brick blank extrusion molding device
CN217761607U (en) Lid compression fittings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant