CN213134425U - Steel slag hot-braising dust collecting device - Google Patents

Steel slag hot-braising dust collecting device Download PDF

Info

Publication number
CN213134425U
CN213134425U CN202021016383.9U CN202021016383U CN213134425U CN 213134425 U CN213134425 U CN 213134425U CN 202021016383 U CN202021016383 U CN 202021016383U CN 213134425 U CN213134425 U CN 213134425U
Authority
CN
China
Prior art keywords
dust
blowing
air
air suction
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021016383.9U
Other languages
Chinese (zh)
Inventor
高旭亮
王彦海
杨振宏
余金
安彦周
张雪咏
孙建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxing Hebei Engineering Technology Co Ltd
Original Assignee
Xinxing Hebei Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxing Hebei Engineering Technology Co Ltd filed Critical Xinxing Hebei Engineering Technology Co Ltd
Priority to CN202021016383.9U priority Critical patent/CN213134425U/en
Application granted granted Critical
Publication of CN213134425U publication Critical patent/CN213134425U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a slag heat smoldering dust arrester installation, including the heat smoldering pond, one side in heat smoldering pond is provided with the cover support that induced drafts, the opposite side is equipped with first wind gap support, be equipped with the suction mechanism on the cover support that induced drafts, be equipped with the mechanism of blowing on the first wind gap support of blowing, the suction mechanism links to each other with dust pelletizing system. During the steel slag hot stewing treatment process, dust generated during slag dumping and dust-containing steam generated during water spraying and temperature reduction before hot stewing are collected by a customized blowing and sucking type dust collecting device, and then the dust-containing steam is conveyed to a subsequent dust removing system through an air suction pipe under the combined action of a blowing mechanism and an air suction mechanism, so that the dust-containing gas is effectively prevented from being diffused.

Description

Steel slag hot-braising dust collecting device
Technical Field
The utility model relates to a slag processing technology field especially relates to a slag heat braising dust arrester installation.
Background
The steel slag is waste slag generated in the metallurgical industry, the generation rate of the steel slag is 8% -15% of the yield of crude steel, and the problem of resource utilization of the steel slag is more and more emphasized along with the development of the steel industry. The steel slag hot braising is a common steel slag treatment method. The temperature of the high-temperature steel slag is very high when the high-temperature steel slag is poured into the hot stewing pool, and the temperature needs to be reduced to below a certain temperature before the hot stewing, so that water needs to be sprayed into the pool, the water is quickly vaporized, and ash content in the steel slag is mixed with the water and is always raised into a workshop; a great deal of dust can also be generated when the steel slag is dumped. In the existing industrial production, dust-containing steam generated in the process is hardly treated, or a roof cover is arranged on the top of a factory building to collect dust. However, the dust-containing steam which does not rise to the roof of the factory cannot be collected and treated, so that a large amount of dust-containing steam can be diffused in the factory, and the working environment is deteriorated.
The reason why the dust-containing steam cannot be collected is that a crane transversely runs above the hot stewing pond, a crane longitudinally runs when deslagging is carried out, an excavator works when slag is removed, and a bracket cannot be arranged beside the pond when a swing arm runs left and right. Due to the reasons, an effective dust collecting device cannot be installed above the hot stewing pool, and the difficulty in treating the dust-containing steam is increased.
Disclosure of Invention
The utility model aims at solving the defects existing in the prior art and providing a steel slag hot braising dust collecting device with high dust collecting efficiency.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a slag hot braising dust arrester installation, includes the hot braising pond, one side in the hot braising pond is provided with the cover support that induced drafts, and the opposite side is equipped with first blowing opening support, be equipped with the suction mechanism on the cover support that induced drafts, be equipped with the mechanism of blowing on the first blowing opening support, the suction mechanism links to each other with dust pelletizing system.
Preferably, the blowing mechanism comprises a blower, a blowing pipe is connected to the air outlet end of the blower, and the tail end of the blowing pipe extends to the first blowing port support.
Preferably, a second blowing port support is arranged on one side of the first blowing port support side by side, and the tail end of the blowpipe extends to the second blowing port support.
Preferably, the air suction mechanism comprises a suction fan, an air suction end of the suction fan is connected with an air suction pipe, a valve is installed in the air suction pipe, an air suction cover connected with the air suction pipe is installed at the upper end of the air suction cover support, an air outlet end of the suction fan is connected with an air outlet pipe, and the air outlet pipe is connected with a dust removal system.
Compared with the prior art, the utility model, its beneficial effect does:
during the steel slag hot stewing treatment process, dust generated during slag dumping and dust-containing steam generated during water spraying and temperature reduction before hot stewing are collected by a customized blowing and sucking type dust collecting device, and then the dust-containing steam is conveyed to a subsequent dust removing system through an air suction pipe under the combined action of a blowing mechanism and an air suction mechanism, so that the dust-containing gas is effectively prevented from being diffused.
Drawings
FIG. 1 is a schematic system diagram of a steel slag thermal-braising dust collector of the utility model;
FIG. 2 is a schematic sectional view at A-A of a steel slag thermal-braising dust collector of the present invention;
FIG. 3 is an enlarged schematic view of a structure at the position B-B of the steel slag hot-braising dust collector of the utility model;
in the figure: 1 pool cover, 2 air suction covers, 3 air suction cover brackets, 4 heat braising pools, 5 second air blowing port brackets, 6 first air blowing port brackets, 7 air blowers, 8 valves and 9 air suction fans.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Referring to fig. 1-3, the steel slag hot stewing dust collecting device comprises a hot stewing pool 4 with a pool cover 1, wherein one side of the hot stewing pool 4 is provided with an air suction cover bracket 3, the other side of the hot stewing pool is provided with a first air blowing port bracket 6, the air suction cover bracket 3 is provided with an air suction mechanism, the first air blowing port bracket 6 is provided with an air blowing mechanism, and the air suction mechanism is connected with a dust removing system. The blowing mechanism comprises an air blower 7, a blowing pipe is connected to the air outlet end of the air blower 7, and the tail end of the blowing pipe extends to the first blowing port support 6. And a second blowing port support 5 is arranged on one side of the first blowing port support 6 side by side, and the tail end of the blowpipe extends to the second blowing port support 5. The air suction mechanism comprises a suction fan 9, an air suction end of the suction fan 9 is connected with an air suction pipe, a valve 8 is installed in the air suction pipe, an air suction cover 2 connected with the air suction pipe is installed at the upper end of an air suction cover support 3, an air outlet end of the suction fan 9 is connected with an air outlet pipe, and the air outlet pipe is connected with a dust removal system.
During construction, an excavator is positioned at one side of the hot stewing pool 4, steel slag is pulled to a slag treatment workshop by a slag tanker, the average temperature is usually above 850 ℃, the steel slag is poured into the hot stewing pool 4 by a crown block, and a large amount of dust is raised when the steel slag is poured, and the dust is directly dispersed in the workshop. Before the thermal braising is started, the temperature is generally required to be lower than a certain temperature, so that water is required to be directly sprayed on the red slag, and evaporated water is raised along with a large amount of dust.
The steel slag hot stewing pond 4 is a device for generating dust-containing steam, and is generally recycled by a plurality of hot stewing ponds, and each hot stewing pond 4 generates a large amount of dust-containing steam before hot stewing. As the crane can transversely and longitudinally travel on the upper part of the pool, a dust collection cover cannot be arranged on the upper part of the pool, and a blowing-sucking type gas collection dust collection cover is adopted. In order to prevent the left and right swing arms of the excavator from impacting the blowing and sucking cover bracket in the slag removal process, the bracket is in an overhanging form, the bracket avoids the working radius range of the excavator, and the base and the support of the blowing cover bracket 3 and the second blowing port bracket 5 are arranged near the left side of the thermal stewing pool 4 as shown in the attached drawing 2.
When the steel slag is poured into the hot stewing pond 4, a large amount of dust can be generated, and then when water is sprayed, the water is vaporized into steam and rises, and a large amount of dust can be carried. And when the air flow speed in the air curtain is higher than the rising speed of the dusty steam or the raised dust at the same height and is higher than 1m/s, the dusty steam or the raised dust can be effectively intercepted and enter the suction hood 2, and then enter a subsequent dust removal system through the suction fan 9.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution and the inventive concept of the present invention within the technical scope of the present invention.

Claims (4)

1. The utility model provides a slag heat smoldering dust arrester installation, is including having heat smoldering pond (4) of pond lid (1), its characterized in that: one side of the heat stewing pond (4) is provided with an air suction cover support (3), the other side of the heat stewing pond is provided with a first air blowing opening support (6), an air suction mechanism is arranged on the air suction cover support (3), an air blowing mechanism is arranged on the first air blowing opening support (6), and the air suction mechanism is connected with a dust removal system.
2. The steel slag hot-braising dust collecting device according to the claim 1, which is characterized in that: the blowing mechanism comprises an air blower (7), the air outlet end of the air blower (7) is connected with a blowing pipe, and the tail end of the blowing pipe extends to the first blowing port support (6).
3. The steel slag hot-braising dust collecting device according to the claim 2, which is characterized in that: and a second blowing port support (5) is arranged on one side of the first blowing port support (6) side by side, and the tail end of the blowpipe extends to the second blowing port support (5).
4. The steel slag hot-braising dust collecting device according to the claim 1, which is characterized in that: the air suction mechanism comprises a suction fan (9), an air suction end of the suction fan (9) is connected with an air suction pipe, a valve (8) is installed in the air suction pipe, an air suction cover (2) connected with the air suction pipe is installed at the upper end of an air suction cover support (3), an air outlet pipe is connected with an air outlet end of the suction fan (9), and the air outlet pipe is connected with a dust removal system.
CN202021016383.9U 2020-06-05 2020-06-05 Steel slag hot-braising dust collecting device Active CN213134425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021016383.9U CN213134425U (en) 2020-06-05 2020-06-05 Steel slag hot-braising dust collecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021016383.9U CN213134425U (en) 2020-06-05 2020-06-05 Steel slag hot-braising dust collecting device

Publications (1)

Publication Number Publication Date
CN213134425U true CN213134425U (en) 2021-05-07

Family

ID=75724349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021016383.9U Active CN213134425U (en) 2020-06-05 2020-06-05 Steel slag hot-braising dust collecting device

Country Status (1)

Country Link
CN (1) CN213134425U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113893627A (en) * 2021-10-15 2022-01-07 航天环境工程有限公司 Dust treatment system and method in slag dumping and dragging process of steel slag hot-stewing pool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113893627A (en) * 2021-10-15 2022-01-07 航天环境工程有限公司 Dust treatment system and method in slag dumping and dragging process of steel slag hot-stewing pool

Similar Documents

Publication Publication Date Title
CN213134425U (en) Steel slag hot-braising dust collecting device
CN106621724A (en) Flue gas desulfurization and dust-whitening integrated device
CN204494473U (en) The anti-blocking apparatus for ash of air pre-heater with rotary heating surface
CN205747929U (en) A kind of cleaning cleaner of electric arc furnace
CN206519023U (en) The white dirt integrated apparatus of flue gas desulfurization
CN205127612U (en) High temperature dust -laden flue gas dust removal device
CN111773860B (en) Steel slag hot-braising and dedusting process and device
CN210663945U (en) Water quenching slag discharging device of boiling chlorination furnace
CN103981325B (en) Blowing and drawing type converter secondary flue gas capturing device
CN209820185U (en) Smoke dust treatment device
CN210550379U (en) Dedusting cooling polishing room
CN208501027U (en) A kind of blast furnace discharge yard efficiently traps petticoat pipe
CN204933181U (en) Automatic temperature-control tier-framework building smoke eliminator
CN203923255U (en) Novel blowing and drawing type converter secondary flue gas capturing device
CN216523171U (en) Dust removal system for preventing dust raising in micro-carbon ferrochrome workshop
CN211885844U (en) Intelligent adjustment's dust pelletizing system
CN218855150U (en) Environment-friendly dedusting system for steel slag hot-braising production
CN204891826U (en) Catalyst pulverization recovery unit in synthetic gas system ethylene glycol technology
CN210356378U (en) Secondary recovery workshop for smelting electric furnace
CN114713811B (en) Ferroalloy casting smoke dust recycling device and recycling method
CN211612207U (en) Double-channel flue gas denitration reactor
CN204063996U (en) There are high-temperature smelting pan and the agitating device of getter cover
CN214193383U (en) Oil fume collecting device used after steel ball quenching
CN217031227U (en) Energy-saving dust removal device of deslagging system
CN220311276U (en) Dust hood

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant