CN213115359U - Construction waste transportation device - Google Patents

Construction waste transportation device Download PDF

Info

Publication number
CN213115359U
CN213115359U CN202021240124.4U CN202021240124U CN213115359U CN 213115359 U CN213115359 U CN 213115359U CN 202021240124 U CN202021240124 U CN 202021240124U CN 213115359 U CN213115359 U CN 213115359U
Authority
CN
China
Prior art keywords
construction waste
construction
pipe
transport
transport device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021240124.4U
Other languages
Chinese (zh)
Inventor
杨泽豪
马宏伟
巴金龙
万姗姗
邵渊
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN202021240124.4U priority Critical patent/CN213115359U/en
Application granted granted Critical
Publication of CN213115359U publication Critical patent/CN213115359U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model provides a construction waste conveyer, this construction waste conveyer includes: a transport pipe; the feeding guide piece is arranged at a feeding port of the conveying pipe and used for guiding the construction waste to be guided into the conveying pipe; and the discharging buffer piece is arranged at the discharging opening of the conveying pipe. The utility model discloses a feeding guide that transport pipe feed inlet set up to guide construction waste, make it lead to in the transport pipe, the setting of feeding guide reduces personnel and is facing limit entrance to a cave construction, reduces and faces limit entrance to a cave operation, has improved the efficiency of construction; through the ejection of compact bolster that the transport pipe discharge gate set up, lead to building rubbish so that its slope is leading-in to the waste transport vechicle in to cushion building rubbish, avoid building rubbish to the stress concentration and the damage of waste transport vechicle, and can avoid personnel's secondary to transport, reduce operation personnel's work load, improved construction cost and efficiency of construction.

Description

Construction waste transportation device
Technical Field
The utility model relates to a construction waste transports technical field particularly, relates to a construction waste conveyer.
Background
The construction site construction waste transportation has not formed the regularization, the device system of instrumentization yet, along with the development of building construction technology, under the background of advocating and carrying out green construction vigorously simultaneously, the requirement of green construction is unsatisfied to original construction mode, for the maximize that makes the resource benefit, prevent the wasting of resources, improve resource utilization, make some fixed assets of job site repeatedly have enough to meet the need the use, alleviate operating personnel's intensity of labour, satisfy the dustproof requirement of making an uproar that falls of construction site, carry out green construction. At present, construction site construction waste is cleaned by construction enterprise operators in a trolley or a bag or a people and goods elevator, and the construction enterprise operators are transported to the ground to dispose the construction waste, a large amount of manpower and material resources are wasted, the construction is not beneficial to green construction and environmental protection of a construction site, a large amount of resources are wasted, the construction cost is high, the benefit is low, and the civilized construction level is generally low.
Disclosure of Invention
In view of this, the utility model provides a construction waste conveyer aims at solving the problem that current construction waste handles and wastes time and energy.
The utility model provides a construction waste conveyer, this construction waste conveyer includes: a transport pipe; the feeding guide piece is arranged at a feeding port of the conveying pipe and used for guiding the construction waste to be guided into the conveying pipe; and the discharging buffer piece is arranged at the discharging port of the conveying pipe and used for guiding the construction waste so as to enable the construction waste to be obliquely guided into the waste conveying vehicle and buffering the construction waste.
Further, above-mentioned construction waste conveyer, ejection of compact bolster slope sets up the discharge gate department of conveying pipe.
Further, according to the construction waste conveying device, the included angle between the discharging buffer piece and the conveying pipe is 45-80 degrees.
Further, above-mentioned construction waste conveyer, the bottom of ejection of compact bolster is equipped with the support frame, is used for right ejection of compact bolster supports.
Further, according to the construction waste transportation device, the support frame is of a scaffold structure formed by welding steel pipes.
Further, according to the construction waste transportation device, the transportation pipe is detachably connected to the window or the lighting well constructional column through a connecting piece.
Further, according to the construction waste conveying device, the number of the connecting pieces is multiple, and the connecting pieces are arranged side by side and at intervals along the length direction of the conveying pipe.
Further, above-mentioned construction waste conveyer, the discharge gate of ejection of compact bolster is equipped with the shielding plate.
Further, according to the construction waste transportation device, the feeding guide piece is of a trapezoidal box structure or a horn-shaped structure.
Further, according to the construction waste conveying device, the conveying pipe is a double-wall corrugated pipe.
The utility model provides a construction waste conveyer, through the feeding guide piece that the conveying pipe feed inlet set up to guide construction waste, make it lead to in the conveying pipe, the setting of feeding guide piece reduces personnel and is facing limit entrance to a cave construction, reduces and faces limit entrance to a cave operation, has improved the efficiency of construction; through the ejection of compact bolster that transport pipe discharge gate set up, lead to building rubbish so that its slope is leading-in to the waste transport vechicle in, and cushion building rubbish, avoid building rubbish to the stress concentration and the damage of waste transport vechicle, and can avoid personnel's secondary to transport, reduce operation personnel's work load, construction cost and efficiency of construction have been improved, safety factor has been improved greatly, reach green construction, the purpose of civilized construction, promote on-the-spot civilized standardization and green construction level. In addition, the transportation device has the advantages of convenient material taking, low material cost, labor saving, convenient installation, easy dismantling, no pollution, convenient operation, convenient and flexible use and construction and installation time saving.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a left side view of a construction waste transportation device according to an embodiment of the present invention;
fig. 2 is a top view of a construction waste transportation device provided by an embodiment of the present invention;
fig. 3 is a left side view of the feed guide and elbow provided by an embodiment of the present invention;
fig. 4 is a front view of the feeding guide and the elbow pipe according to an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1 to 2, a preferred structure of a construction waste transportation device according to an embodiment of the present invention is shown. As shown in the drawings, the construction waste transport device includes: the device comprises a conveying pipe 1, a feeding guide part 2 and a discharging buffer part 3; wherein the content of the first and second substances,
the feeding guide 2 is disposed at a feeding port (an upper end as shown in fig. 1) of the transport pipe 1 to guide the construction waste into the transport pipe 1. Specifically, the transport pipe 1 is detachably connected to the window or the lighting well constructional column 51 of the main building 5, that is, the transport pipe 1 is disposed in the vertical direction and detachably connected to the window or the lighting well constructional column 51, so that the construction waste is free to fall under the action of gravity; preferably, the transport pipe 1 may be fixed to the window or production well construction post 51 by means of a connection 6 to ensure the stability of the transport pipe 1; further preferably, the connecting member 6 may be a plurality of connecting members, which are arranged side by side and at intervals along the length direction of the transport pipe 1, to further ensure the stability of the transport pipe 1. The feeding guide 2 may be provided on the top wall of the uppermost floor top plate 52 of the main building 5 to support and fix the feeding guide 2 through the floor top plate 52; in order to facilitate the connection and communication between the feeding guide 2 and the conveying pipe 1, preferably, as shown in fig. 3, an elbow pipe 7 is provided between the feeding guide 2 and the conveying pipe 1 for communicating the vertically arranged conveying pipe 1 and the horizontally arranged feeding guide 2; the feeding guide 2 may be a horn-shaped structure, or may be other structures, such as a trapezoidal box structure shown in fig. 4, i.e., a structure with a trapezoidal cross section, and may be fixed on the floor top plate 52 by bolts or the like, so as to guide the construction waste into the transport pipe 1. Wherein, the transport pipe 1 can be a double-wall corrugated pipe, and the outer wall of the transport pipe can be provided with a fixing ring to realize the fixation of the transport pipe 1; the connecting piece 6 can be an iron wire or the like to realize the binding and fixing of the conveying pipe 1.
The discharging buffer member 3 is disposed at a discharging port (a lower end as shown in fig. 1) of the transport pipe 1, and is used for guiding the construction waste to be obliquely guided into the waste transport vehicle 4 and buffering the construction waste. Specifically, the discharging buffer member 3 can be obliquely arranged at the discharging port of the conveying pipe 1 to guide the construction waste into the waste conveying vehicle 4; the discharging buffer member 3 can be arranged in a downward inclination manner from the end part connected to the discharging port of the conveying pipe 1 to the end part far away from the discharging port of the conveying pipe 1, so that the construction waste can slide downwards to the discharging port (the left end shown in fig. 1) of the discharging buffer member 3; preferably, the inclination angle of the discharging buffer member 3, namely the included angle between the discharging buffer member and the conveying pipe 1, is 45-80 degrees, so that the construction waste is directly guided onto the waste conveying vehicle 4, and secondary transportation of the construction waste is avoided; in order to reduce the dust of the construction waste, preferably, a discharge hole of the discharge buffer member 3 is provided with a shielding plate 8 to avoid the dust in the construction waste cleaning process, so that the purposes of green construction and civilized construction are achieved; in order to ensure the stability of the discharging buffer member 3, the bottom of the discharging buffer member is preferably provided with a support frame 9 for supporting the discharging buffer member 3; wherein, ejection of compact bolster 3 can be the box structure of both ends open-ended of plank sheathing concatenation, and support frame 9 can be for relevant bearing structure such as scaffold frame that steel pipe welding formed, also can be other bearing structure, does not do any restriction to it in this embodiment.
In summary, the construction waste transportation device provided by the embodiment guides the construction waste to the transportation pipe 1 through the feeding guide part 2 arranged at the feeding hole of the transportation pipe 1, and the arrangement of the feeding guide part 2 reduces the construction of personnel at the edge opening, reduces the operation at the edge opening and improves the construction efficiency; through the ejection of compact bolster 3 that transport pipe 1 discharge gate set up, lead to building rubbish so that its slope is leading-in to rubbish transport vechicle 4 in to cushion building rubbish, avoid building rubbish to rubbish transport vechicle 4 stress concentration and damage, and can avoid personnel's secondary to transport, reduce operation personnel's work load, improved construction cost and efficiency of construction, greatly reduced factor of safety, reach the purpose of green construction, civilized construction. In addition, the transportation device has the advantages of convenient material taking, low material cost, labor saving, convenient installation, easy dismantling, no pollution, convenient operation, convenient and flexible use and construction and installation time saving.
It should be noted that in the description of the present invention, the terms of direction or positional relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. A construction waste transport device, comprising:
a transport pipe (1);
the feeding guide piece (2) is arranged at the feeding port of the conveying pipe (1) and used for guiding the construction waste to be guided into the conveying pipe (1);
and the discharging buffer piece (3) is arranged at the discharging opening of the conveying pipe (1) and used for guiding the construction waste to enable the construction waste to be obliquely guided into the waste conveying vehicle (4) and buffering the construction waste.
2. Construction waste transport device according to claim 1, characterized in that the discharge buffer (3) is arranged obliquely at the discharge opening of the transport pipe (1).
3. The construction waste transportation device according to claim 2, wherein an included angle between the discharging buffer member (3) and the transportation pipe (1) is 45-80 °.
4. Construction waste transport device according to any one of claims 1 to 3,
the bottom of ejection of compact bolster (3) is equipped with support frame (9), is used for right ejection of compact bolster (3) support.
5. Construction waste transport device according to claim 4, characterized in that the support frame (9) is a scaffold structure formed by welding steel tubes.
6. Construction waste transport device according to any of claims 1 to 3, characterized in that the transport pipe (1) is detachably connected to a window or a lighting well construction column by means of a connection piece (6).
7. Construction waste transport device according to claim 6,
the connecting pieces (6) are arranged in a plurality of numbers, and are arranged side by side and at intervals along the length direction of the conveying pipe (1).
8. Construction waste transport device according to any of claims 1 to 3, characterized in that the discharge opening of the discharge buffer (3) is provided with a shutter (8).
9. Construction waste transport device according to any of claims 1 to 3, characterized in that the feed guide (2) is of trapezoidal box construction or horn construction.
10. Construction waste transport device according to any of claims 1 to 3, characterized in that the transport pipe (1) is a double-walled corrugated pipe.
CN202021240124.4U 2020-06-30 2020-06-30 Construction waste transportation device Active CN213115359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021240124.4U CN213115359U (en) 2020-06-30 2020-06-30 Construction waste transportation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021240124.4U CN213115359U (en) 2020-06-30 2020-06-30 Construction waste transportation device

Publications (1)

Publication Number Publication Date
CN213115359U true CN213115359U (en) 2021-05-04

Family

ID=75673860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021240124.4U Active CN213115359U (en) 2020-06-30 2020-06-30 Construction waste transportation device

Country Status (1)

Country Link
CN (1) CN213115359U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115573579A (en) * 2022-10-31 2023-01-06 中交第三公路工程局有限公司 Waste material transfer device and method for house construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115573579A (en) * 2022-10-31 2023-01-06 中交第三公路工程局有限公司 Waste material transfer device and method for house construction
CN115573579B (en) * 2022-10-31 2023-08-15 中交第三公路工程局有限公司 Waste material transfer device and transfer method for house construction

Similar Documents

Publication Publication Date Title
CN213115359U (en) Construction waste transportation device
CN210858024U (en) Discharging platform with liftable hole part
CN213087334U (en) Building rubbish clearing device
CN210459879U (en) In-floor garbage transportation system
CN112538948A (en) High-rise building rubbish transport pipe way
CN209889693U (en) Combined steel pipe transportation tool
US20090242553A1 (en) Construction waste removal container
CN215168139U (en) Concrete overhead hoist
CN205918136U (en) Novel metal roofing feeding system
CN214110929U (en) Connect material chute and concrete feeding system
CN218205481U (en) Perpendicular pipeline transportation device of building rubbish
CN211392627U (en) Unloading elephant trunk
CN212271519U (en) Garbage fast channel
CN217175513U (en) Assembled garbage channel for high-rise building
WO2020038339A1 (en) Integrated material returning crushing system with multiple vertically arranged towers and crushing process thereof
CN206571106U (en) A kind of floor building waste clears up passage
CN215803319U (en) Template is handling device for supporting material
CN217760127U (en) High-efficient transfer device of building interior frame material
CN215907296U (en) Garbage transport pipe suitable for high-rise building
CN214730839U (en) Modularized transportation support for machine body piping pipelines
CN218374950U (en) Floor garbage channel for newly-built building structure
CN218374949U (en) Vertical transportation device for construction waste
CN220411672U (en) Building slag conveyer
CN217975217U (en) Garbage clearing device for high-rise building construction
CN216945064U (en) Clinker falls back buffer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant