CN213115207U - Shaped column for building steel structure - Google Patents

Shaped column for building steel structure Download PDF

Info

Publication number
CN213115207U
CN213115207U CN201922241223.8U CN201922241223U CN213115207U CN 213115207 U CN213115207 U CN 213115207U CN 201922241223 U CN201922241223 U CN 201922241223U CN 213115207 U CN213115207 U CN 213115207U
Authority
CN
China
Prior art keywords
base
meshing
plate
steel structure
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922241223.8U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Huanchu Installation Engineering Co ltd
Original Assignee
Fujian Huanchu Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Huanchu Installation Engineering Co ltd filed Critical Fujian Huanchu Installation Engineering Co ltd
Priority to CN201922241223.8U priority Critical patent/CN213115207U/en
Application granted granted Critical
Publication of CN213115207U publication Critical patent/CN213115207U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a profile post for building steel structure, which comprises a base, wherein the upper surface of the base is provided with an arc-shaped footstock, the upper surface of the footstock is tightly jointed with an adjusting base, the top end of the base and four corners of the adjusting base are screwed with adjusting bolts, the utility model provides an adjustable profile post for building steel structure with a base with an anchor frame and an adjusting base, when in use, after the base is fixed in a foundation pit, the base is fixed by pouring concrete, after the fixing is finished, the adjusting base is placed on the upper surface of the footstock, then an adjusting screw rod is used for penetrating through a sleeve hole and being screwed together, when a steel structure upright post at the top is installed, the level degree of an engaging plate is adjusted according to a level ruler or a level gauge, thereby effectively solving the problem that the slight change generated after concrete is dried and combined can drive a connecting part to deform after the existing integrated foundation profile post is poured, therefore, the installation is troublesome when the steel structure is constructed.

Description

Shaped column for building steel structure
Technical Field
The utility model relates to a steel construction technical field specifically is a shaped column for building steel construction.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets. Because of its dead weight is lighter, and the construction is simple and convenient, wide application in large-scale factory building, venues, fields such as super high-rise, before current steel construction, all need pour the location back to the ground type post of steel construction, again with steel construction stand rather than connection location, the slight change that current integral type ground type post produced after concreting is dried can drive connecting portion and take place deformation, consequently can't be to hole or the great problem of hole site frictional force when causing the framework steel construction very easily, lead to the installation very troublesome, in view of above problem, specially provide a type post for building steel construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a shaped column for building steel construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a shaped column for building steel construction, includes the base, the upper surface of base is equipped with curved footstock, the upper surface of footstock closely laminates and has the regulation base, the top of base and the four corners department spiro union of adjusting the base have adjusting bolt, adjusting bolt's nut bottom is equipped with second meshing ball, adjusting bolt's bottom is equipped with first meshing ball.
Preferably, the base includes the anchor plate, the upper surface of anchor plate is equipped with the stock, the surface of stock evenly is equipped with the anchor piece, the upper surface of stock is equipped with the fixed plate.
Preferably, the edge of the fixing plate is provided with a first trepan boring.
Preferably, the adjusting base comprises a meshing plate, a meshing groove is formed in the lower surface of the meshing plate, the inner surface of the meshing groove is sleeved on the upper surface of the top seat, a second sleeve hole is formed in the edge of the meshing plate, a connecting screw rod is assembled on the upper surface of the meshing plate, a connecting plate is sleeved on the upper surface of the connecting screw rod, an i-shaped steel is welded on the upper surface of the connecting plate, and a nut is screwed on the connecting screw rod through the connecting plate.
Preferably, the top end and the bottom end of the inner surfaces of the first trepan boring and the second trepan boring are provided with arc grooves.
Preferably, the adjusting bolt includes a fixing screw, a bottom end of the fixing screw is fitted to an upper surface of the first engaging ball, a lower surface of the first engaging ball is fitted with a first flange column, a top end of the fixing screw is screwed to an inner surface of the second engaging ball, and the upper surface of the second engaging ball is fitted with a second flange column.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a but adjustable section post of building steel construction that has base and regulation base of anchor frame, when using, through fixing the base in ground foundation ditch after, fix through concreting, after the fixed completion, place the regulation base on the upper surface of footstock, use adjusting bolt to run through the trepanning and the spiro union is in the same place afterwards, when the steel construction stand at top is installed, adjust the horizontal degree of meshing board according to the horizon rule or spirit level, the adjustment process is adjusted through proofreading or loosening adjusting bolt, after adjusting and accomplishing, pass through the I-steel of stand and connecting plate after the surface of connecting screw rod and fix through the nut, finally after the steel construction frame is accomplished, proofread adjusting bolt one by one, the slight change that effectively solved current integral type ground section post and produced after concreting the dry knot can drive connecting portion and take place the deformation, therefore, the installation is troublesome when the steel structure is constructed.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an assembly schematic diagram of the present invention.
Fig. 3 is the assembly diagram of the adjusting base of the present invention.
Fig. 4 is the utility model discloses adjust the base and dissect the structure sketch map.
Fig. 5 is a schematic view of the adjusting bolt structure of the present invention.
In the figure: 1. the adjustable bolt comprises a base, 11, an anchor plate, 12, an anchor rod, 13, an anchor sheet, 14, a fixing plate, 15, a first sleeve hole, 16, a top seat, 2, an adjusting base, 21, an engaging plate, 22, an engaging groove, 23, a second sleeve hole, 24, a connecting screw rod, 25, a connecting plate, 26, a nut, 27, I-steel, 3, an adjusting bolt, 31, a fixing screw rod, 32, a first engaging ball, 33, a first flange column, 34, a second engaging ball, 35 and a second flange column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a profiled pole for a building steel structure comprises a base 1, wherein an arc-shaped top seat 16 is assembled on the upper surface of the base 1, an adjusting base 2 is tightly attached to the upper surface of the top seat 16, adjusting bolts 3 are screwed at the top end of the base 1 and the four corners of the adjusting base 2, second meshing balls 34 are assembled at the bottom ends of nuts of the adjusting bolts 3, and first meshing balls 32 are assembled at the bottom ends of the adjusting bolts 3;
the utility model provides an adjustable section post of building steel structure with a base 1 with an anchor frame and an adjusting base 2, when in use, after the base 1 is fixed in a foundation pit, the fixing is carried out through concreting, after the fixing is finished, the adjusting base 2 is placed on the upper surface of a top seat 16, then an adjusting bolt 3 is used for penetrating a sleeve hole and is screwed together, when a steel structure upright post at the top is installed, the horizontal degree of an engagement plate 21 is adjusted according to a horizontal ruler or a gradienter, the adjusting process is adjusted through tightening or loosening the adjusting bolt 3, after the adjusting is finished, an I-shaped steel 27 and a connecting plate 25 of the upright post are penetrated on the outer surface of a connecting screw 24 and are fixed through a nut 26, finally, after the steel structure frame is finished, the adjusting bolt 3 is tightened one by one, the problem that the fine change generated after the concrete is dried after the pouring of the existing integrated foundation section post can drive the connecting part to deform is effectively solved, therefore, the installation is troublesome when the steel structure is constructed.
Specifically, the base 1 includes the anchor plate 11, and the upper surface of anchor plate 11 is equipped with the stock 12, and the surface of stock 12 evenly is equipped with anchor sheet 13, and the upper surface of stock 12 is equipped with fixed plate 14, improves the area of contact of anchor frame and concrete through structures such as stock 12 and anchor plate 11, anchor sheet 13 to improve the structural strength of ground type post.
Specifically, a first hole 15 is opened at an edge of the fixing plate 14.
Particularly, adjust base 2 and include meshing board 21, meshing groove 22 has been seted up to the lower surface of meshing board 21, the internal surface of meshing groove 22 cup joints the upper surface at footstock 16, second trepanning 23 has been seted up at the edge of meshing board 21, the upper surface of meshing board 21 is equipped with connecting screw 24, connecting screw 24's upper surface has cup jointed connecting plate 25, connecting plate 25's last surface welding has I-steel 27, connecting screw 24 runs through connecting plate 25 spiro union and has nut 26, meshing effect through footstock 16 and meshing groove 22, make things convenient for meshing board 21 to rotate, thereby conveniently adjust, and can guarantee sufficient holding power.
Particularly, arc-shaped grooves are formed in the top ends and the bottom ends of the inner surfaces of the first sleeve hole 15 and the second sleeve hole 23, the outer surface of the meshing ball is sleeved through the arc-shaped grooves, meshing is facilitated when the rotation is adjusted, and the connection strength is improved.
Particularly, adjusting bolt 3 includes fixing screw 31, fixing screw 31's bottom assembly is at the upper surface of first meshing ball 32, the lower surface of first meshing ball 32 is equipped with first flange post 33, fixing screw 31's top spiro union is at the internal surface of second meshing ball 34, the upper surface of second meshing ball 34 is equipped with second flange post 35, make things convenient for adjusting bolt 3's rotation through the flange post to adjust, adjusting bolt 3 has increased two meshing ball quotas and the inside recess of trepanning and has formed the convenient for regulation pivoted structure equivalently to ordinary bolt, when guaranteeing the regulation effect, improve area of contact, increase joint strength.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a shaped column for building steel construction, includes base (1), its characterized in that: the upper surface of base (1) is equipped with curved footstock (16), the upper surface of footstock (16) is closely laminated and is adjusted base (2), the top of base (1) and the four corners department spiro union of adjusting base (2) have adjusting bolt (3), the nut bottom of adjusting bolt (3) is equipped with second meshing ball (34), the bottom of adjusting bolt (3) is equipped with first meshing ball (32).
2. The profiled pole for the construction steel structure as claimed in claim 1, wherein: base (1) includes anchor plate (11), the upper surface of anchor plate (11) is equipped with stock (12), the surface of stock (12) evenly is equipped with anchor piece (13), the upper surface of stock (12) is equipped with fixed plate (14).
3. The profiled pole for the construction steel structure as claimed in claim 2, wherein: the edge of the fixing plate (14) is provided with a first trepan boring (15).
4. The profiled pole for the construction steel structure as claimed in claim 3, wherein: the adjusting base (2) comprises a meshing plate (21), a meshing groove (22) is formed in the lower surface of the meshing plate (21), the inner surface of the meshing groove (22) is sleeved on the upper surface of the top seat (16), a second trepanning hole (23) is formed in the edge of the meshing plate (21), a connecting screw rod (24) is assembled on the upper surface of the meshing plate (21), a connecting plate (25) is sleeved on the upper surface of the connecting screw rod (24), I-shaped steel (27) is welded on the upper surface of the connecting plate (25), and a nut (26) is screwed on the connecting screw rod (24) in a penetrating mode through the connecting plate (25).
5. The profiled pole for the construction steel structure as claimed in claim 4, wherein: arc-shaped grooves are formed in the top ends and the bottom ends of the inner surfaces of the first trepanning (15) and the second trepanning (23).
6. The profiled pole for the construction steel structure of claim 5, wherein: the adjusting bolt (3) comprises a fixing screw rod (31), the bottom end of the fixing screw rod (31) is assembled on the upper surface of a first meshing ball (32), the lower surface of the first meshing ball (32) is assembled with a first flange column (33), the top end of the fixing screw rod (31) is screwed on the inner surface of a second meshing ball (34), and the upper surface of the second meshing ball (34) is assembled with a second flange column (35).
CN201922241223.8U 2019-12-15 2019-12-15 Shaped column for building steel structure Active CN213115207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922241223.8U CN213115207U (en) 2019-12-15 2019-12-15 Shaped column for building steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922241223.8U CN213115207U (en) 2019-12-15 2019-12-15 Shaped column for building steel structure

Publications (1)

Publication Number Publication Date
CN213115207U true CN213115207U (en) 2021-05-04

Family

ID=75642083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922241223.8U Active CN213115207U (en) 2019-12-15 2019-12-15 Shaped column for building steel structure

Country Status (1)

Country Link
CN (1) CN213115207U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016607A (en) * 2021-11-05 2022-02-08 赣州博泰钢结构工程有限公司 Steel structure with high stability and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016607A (en) * 2021-11-05 2022-02-08 赣州博泰钢结构工程有限公司 Steel structure with high stability and use method thereof
CN114016607B (en) * 2021-11-05 2022-11-25 赣州博泰钢结构工程有限公司 Steel structure with high stability and use method thereof

Similar Documents

Publication Publication Date Title
CN213115207U (en) Shaped column for building steel structure
CN109898652A (en) Steel part connection structure and attaching method thereof
CN204282530U (en) Adopt the industrial premises frame construction of prefabricated concrete column structure
CN211446992U (en) Steel construction building supporting component
CN107587610A (en) A kind of H profile steel post splicing apparatus and its construction method
CN211899266U (en) House building upright post structure
CN215329313U (en) Structure with additional steel structure group nails for uniformly bearing shearing force
CN208733817U (en) A kind of assembling type steel structure building Special-Shaped Column
CN213979288U (en) Assembled building steel structure that stability is good
CN113482155A (en) Assembly type building node connection structure
CN207453132U (en) A kind of H profile steel column splicing apparatus
CN210238767U (en) Prefabricated assembled beam column node adopting pressure-bearing steel plate
CN210289235U (en) Assembly type shearing and pulling integrated hollow shear pin structure triangular bracket
CN207761052U (en) A kind of girder steel and steel column connecting node
CN207700389U (en) It is a kind of abnormity steel column and beam column connection structure
CN206829360U (en) It is a kind of to be easy to fixed lightweight beam column of steel structure
CN215291634U (en) Supporting structure for assembly type building construction
CN215630651U (en) Connecting device for steel structure nodes
CN204590650U (en) The flexible reinforcing construction of steam-pressing aero-concrete wall body door or window hole
CN214302198U (en) Vertically adjustable shock absorption steel structure
CN218492703U (en) Support-free layered assembly type steel structure
CN213114977U (en) Shaped column for building steel structure
CN218061034U (en) Reinforced foundation concrete pump type steel upright post structure
CN211395971U (en) Steel construction assembly type structure
CN212671176U (en) Floor board bearing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant