CN213115128U - Green energy-saving building curtain wall convenient to installation is adjusted - Google Patents

Green energy-saving building curtain wall convenient to installation is adjusted Download PDF

Info

Publication number
CN213115128U
CN213115128U CN202021569262.7U CN202021569262U CN213115128U CN 213115128 U CN213115128 U CN 213115128U CN 202021569262 U CN202021569262 U CN 202021569262U CN 213115128 U CN213115128 U CN 213115128U
Authority
CN
China
Prior art keywords
connecting block
block
curtain wall
main part
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021569262.7U
Other languages
Chinese (zh)
Inventor
任明坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yidan Tianrenheyi Decoration Design Engineering Co ltd
Original Assignee
Shenzhen Yidan Tianrenheyi Decoration Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yidan Tianrenheyi Decoration Design Engineering Co ltd filed Critical Shenzhen Yidan Tianrenheyi Decoration Design Engineering Co ltd
Priority to CN202021569262.7U priority Critical patent/CN213115128U/en
Application granted granted Critical
Publication of CN213115128U publication Critical patent/CN213115128U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model relates to a building structure technical field, concretely relates to green energy-conserving building curtain convenient to installation is adjusted, including main part mechanism, coupling mechanism and fixed establishment, main part mechanism includes curtain main part, first connecting block, second connecting block and rack, the first connecting block of right side fixedly connected with of curtain main part, and the right side both ends of first connecting block all are connected with the second connecting block, one side that the curtain main part is close to first connecting block is fixed with the rack, the right side surface connection of rack has coupling mechanism, coupling mechanism includes connector, spline housing, integral key shaft, stopper, first spring, third connecting block and gear. The utility model discloses be provided with main part mechanism and coupling mechanism, make the curtain main part transversely between the small gap that exists fill, improved the installation flexibility of curtain main part, conveniently change the curtain main part of single damage through the connecting rod, easy operation and be convenient for change the maintenance.

Description

Green energy-saving building curtain wall convenient to installation is adjusted
Technical Field
The utility model relates to a building structure technical field specifically is a green energy-saving building curtain convenient to installation is adjusted.
Background
With the continuous development of society, the curtain wall is an outer wall enclosure structure of a building, is a light wall with a decorative effect commonly used by modern large-scale and high-rise buildings, and has high building density and wider application range along with the continuous intensification of urbanization.
When current curtain is installed, the whole piece installation of curtain, can have little gap to be difficult to fill between the curtain is horizontal, and the curtain is difficult to adjust the position as required, thereby make the use flexibility of curtain reduce, simultaneously through bolt fixed mounting between curtain and the wall body, when single curtain appears damaging and needs to be changed, the curtain of damage is difficult to dismantle as required, complex operation and the change maintenance of being not convenient for, consequently, need for a green energy-conserving building curtain convenient to install and adjust to solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green energy-conserving building curtain convenient to installation is adjusted to the curtain that proposes in solving above-mentioned background art is difficult to adjust the position as required and the problem that single curtain damage is difficult to change.
In order to achieve the above object, the utility model provides a following technical scheme: a green energy-saving building curtain wall convenient to install and adjust comprises a main body mechanism, a connecting mechanism and a fixing mechanism, wherein the main body mechanism comprises a curtain wall main body, a first connecting block, a second connecting block and a rack, the right side of the curtain wall main body is fixedly connected with the first connecting block, the two ends of the right side of the first connecting block are connected with the second connecting block, the rack is fixed on one side, close to the first connecting block, of the curtain wall main body, the connecting mechanism is connected to the surface of the right side of the rack, the connecting mechanism comprises a connecting body, a spline housing, a spline shaft, a limiting block, a first spring, a third connecting block and a gear, the spline housing is installed inside the connecting body through a bearing, the gear is fixed on the surface of the spline housing, the spline shaft is inserted inside the top end of the spline housing, the first spring is sleeved on the surface of the spline shaft, the right side both ends of connector are connected with fixed establishment, fixed establishment includes fourth connecting block, connecting rod, adapter sleeve, fixture block, baffle, fixed block and second spring, the adapter sleeve has been cup jointed on the surface of fourth connecting block, and the top of adapter sleeve is fixed with the connecting rod, the right side surface of fourth connecting block articulates there is the fixture block, and the inboard of fixture block is connected with the second spring, the surface of fixture block is inconsistent with the surface of baffle, and baffle fixed mounting is on the inner wall of fixed block.
Preferably, the second connecting blocks are arranged in two groups, the second connecting blocks are symmetrically distributed on the two side surfaces of the first connecting block, and the second connecting blocks and the first connecting block form a T-shaped structure.
Preferably, the right side surface of the rack is engaged with the surface of the gear, and the gear is provided with two sets.
Preferably, a circular hole is formed in the inner wall of one side, close to the third connecting block, of the connecting body, and a limiting block is inserted into the circular hole.
Preferably, the upper surface of the third connecting block is provided with a hexagonal groove, and the two sides of the top end of the third connecting block are both fixed with limiting blocks.
Preferably, the fourth connecting block is a hexagonal cylindrical structure, and the fourth connecting block is matched with the connecting sleeve for use.
Compared with the prior art, the beneficial effects of the utility model are that: this green energy-conserving building curtain convenient to installation is adjusted is provided with main part mechanism and coupling mechanism, makes the curtain main part horizontal between the small gap that exists fill, has improved the installation flexibility of curtain main part, conveniently changes the curtain main part of single damage through the connecting rod, easy operation and be convenient for change the maintenance.
(1) The device is provided with main part mechanism and coupling mechanism, and the position that makes the integral key shaft can correspond the regulation rack through rack and integral key shaft meshing to can adjust the position of curtain main part, make the curtain main part horizontal between the small gap that exists fill, improve the aesthetic property of curtain main part, make the curtain main part can adjust the position as required through rack and integral key shaft, improve the installation flexibility of curtain main part, thereby increased the application range of curtain main part.
(2) Thereby the device makes things convenient for the direction of change fixture block through the direction of the convenient rotatory fourth connecting block of connecting rod, makes things convenient for separation between main part mechanism and the wall body, conveniently changes the curtain main part of single damage, and the curtain main part of damage can be dismantled as required, easy operation and be convenient for change the maintenance.
Drawings
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
FIG. 3 is a schematic front view of the structure of the present invention;
fig. 4 is a schematic top view of the structure of the present invention;
fig. 5 is a schematic front sectional view of the fixing mechanism of the present invention;
fig. 6 is a schematic side view of the connecting rod and connecting sleeve structure of the present invention.
In the figure: 100. a main body mechanism; 110. a curtain wall main body; 120. a first connection block; 130. a second connecting block; 140. a rack; 200. a connecting mechanism; 210. a linker; 220. a spline housing; 230. a spline shaft; 240. a limiting block; 250. a first spring; 260. a third connecting block; 270. a gear; 300. a fixing mechanism; 310. a fourth connecting block; 320. a connecting rod; 330. connecting sleeves; 340. a clamping block; 350. a baffle plate; 360. a fixed block; 370. a second spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides an embodiment:
the utility model provides a green energy-conserving building curtain convenient to installation is adjusted, including main body mechanism 100, coupling mechanism 200 and fixed establishment 300, main body mechanism 100 includes curtain main part 110, first connecting block 120, second connecting block 130 and rack 140, the first connecting block 120 of right side fixedly connected with of curtain main part 110, and the right side both ends of first connecting block 120 all are connected with second connecting block 130, second connecting block 130 is provided with two sets ofly, and second connecting block 130 symmetric distribution is on the both sides surface of first connecting block 120, second connecting block 130 constitutes "T" shape structure with first connecting block 120, second connecting block 130 is the elastic rubber material, make things convenient for first connecting block 120 directly to drag out, thereby change curtain main part 110, first connecting block 120 can slide in the inside of connector 210.
A rack 140 is fixed to a side of the curtain wall main body 110 adjacent to the first connection block 120, a right side surface of the rack 140 is engaged with a surface of the gear 270, and two sets of gears 270 are provided, the gears 270 rotate to drive the racks 140 to move, so that the positions of the racks 140 and the curtain wall main body 110 are conveniently adjusted, the right side surface of the racks 140 is connected with the connecting mechanism 200, the connecting mechanism 200 comprises a connecting body 210, a spline housing 220, a spline shaft 230, a limiting block 240, a first spring 250, a third connecting block 260 and the gears 270, the spline housing 220 is installed inside the connecting body 210 through a bearing, a circular hole is formed in the inner wall of one side of the connecting body 210 close to the third connecting block 260, and the round hole interpolation is equipped with stopper 240, and after the position regulation of curtain main part 110, stopper 240 inserts and establishes and can restrict stopper 240 and obtain the position in the round hole, thereby prevent that spline housing 220 from rotating the position that changes curtain main part 110.
The surface of the spline housing 220 is fixed with a gear 270, a spline shaft 230 is inserted into the top end of the spline housing 220, a first spring 250 is sleeved on the surface of the spline shaft 230, a third connecting block 260 is fixed on the top end of the spline shaft 230, a hexagonal groove is formed in the upper surface of the third connecting block 260, limiting blocks 240 are fixed on both sides of the top end of the third connecting block 260, the third connecting block 260 can be driven to rotate by a corresponding tool, fixing mechanisms 300 are connected to both ends of the right side of the connecting body 210, each fixing mechanism 300 comprises a fourth connecting block 310, a connecting rod 320, a connecting sleeve 330, a clamping block 340, a baffle 350, a fixing block 360 and a second spring 370, a connecting sleeve 330 is sleeved on the surface of the fourth connecting block 310, the connecting rod 320 is fixed on the top end of the connecting sleeve 330, and the left side of the fourth connecting block 310 is.
Fourth connecting block 310 is hexagon cylindricality structure, and fourth connecting block 310 and adapter sleeve 330 cooperate and use, adapter sleeve 330 card is on the surface of fourth connecting block 310, connecting rod 320 and adapter sleeve 330 are rotatory can drive fourth connecting block 310 rotational position, make things convenient for fixture block 340 to take out from the inside of fixed block 360, the right side surface of fourth connecting block 310 articulates there is fixture block 340, and the inboard of fixture block 340 is connected with second spring 370, the surface of fixture block 340 is inconsistent with the surface of baffle 350, and baffle 350 fixed mounting is on the inner wall of fixed block 360.
The working principle is as follows: when the device is used, the curtain wall main body 110 enables the second connecting block 130 and the first connecting block 120 to be inserted into the connecting body 210 through the elastic structure of the second connecting block 130, the surface of the rack 140 is meshed with the surface of the gear 270, the two groups of clamping blocks 340 are pinched to insert the clamping blocks 340 and the fourth connecting block 310 into the fixing block 360, the latch 340 passes through the position of the blocking plate 350 to the right by the curvature of the right side surface of the latch 340, the latch 340 is opened and latches the stop 350, the fourth connecting block 310 and the connecting mechanism 200 under the elastic force of the second spring 370, and when the parts are disassembled, the connecting rod 320 is inserted between the two groups of connecting bodies 210, the connecting rod 320 is manually rotated to drive the fourth connecting block 310 to rotate, the fourth connecting block 310 drives the fixture block 340 to rotate, so that the fixture block 340 rotates out from the side edge of the baffle 350, the fourth connecting block 310, the connecting mechanism 200 and the like can be directly drawn out, and the operation is simple and rapid.
When the position of the curtain wall main body 110 needs to be adjusted, a tool used by matching with a groove in the third connecting block 260 is inserted into the third connecting block 260, the third connecting block 260 is pressed downwards, the third connecting block 260 moves downwards to enable the limiting block 240 to be drawn out from a circular hole in the connecting body 210, a manual rotating tool drives the spline shaft 230 to rotate, the spline shaft 230 drives the spline housing 220 to rotate so as to drive the gear 270 to rotate, the gear 270 drives the rack 140 to move so as to enable the position of the curtain wall main body 110 to be adjusted, after the position of the curtain wall main body 110 is adjusted, the tool is taken out, the third connecting block 260 moves upwards under the elastic force of the first spring 250, the limiting block 240 is inserted into the circular hole corresponding to the inner wall of the connecting body 210, so as to fix the positions of the spline housing 220 and the curtain wall main body 110, the curtain wall main body 110 fills up a gap, after the curtain wall main body 110 is installed, the curtain wall main body 110 is installed on the upper layer in the same way, and the curtain wall main body 110 is installed from bottom to top.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a green energy-conserving building curtain convenient to installation is adjusted which characterized in that: the curtain wall comprises a main body mechanism (100), a connecting mechanism (200) and a fixing mechanism (300), wherein the main body mechanism (100) comprises a curtain wall main body (110), a first connecting block (120), a second connecting block (130) and a rack (140), the first connecting block (120) is fixedly connected to the right side of the curtain wall main body (110), the second connecting block (130) is connected to two ends of the right side of the first connecting block (120), the rack (140) is fixed to one side, close to the first connecting block (120), of the curtain wall main body (110), the connecting mechanism (200) is connected to the surface of the right side of the rack (140), the connecting mechanism (200) comprises a connecting body (210), a spline sleeve (220), a spline shaft (230), a limiting block (240), a first spring (250), a third connecting block (260) and a gear (270), the spline sleeve (220) is installed inside the connecting body (210) through a bearing, and the surface of the spline housing (220) is fixed with a gear (270), the top end of the spline housing (220) is internally inserted with a spline shaft (230), the surface of the spline shaft (230) is sleeved with a first spring (250), the top end of the spline shaft (230) is fixed with a third connecting block (260), the right side two ends of the connector (210) are connected with a fixing mechanism (300), the fixing mechanism (300) comprises a fourth connecting block (310), a connecting rod (320), a connecting sleeve (330), a clamping block (340), a baffle plate (350), a fixing block (360) and a second spring (370), the surface of the fourth connecting block (310) is sleeved with the connecting sleeve (330), the top end of the connecting sleeve (330) is fixed with the connecting rod (320), the right side surface of the fourth connecting block (310) is hinged with the clamping block (340), and the inner side of the clamping block (340) is connected with the, the surface of the clamping block (340) is abutted against the surface of the baffle plate (350), and the baffle plate (350) is fixedly arranged on the inner wall of the fixing block (360).
2. The green energy-saving building curtain wall convenient to install and adjust as claimed in claim 1, wherein: the two groups of second connecting blocks (130) are arranged, the second connecting blocks (130) are symmetrically distributed on the surfaces of the two sides of the first connecting block (120), and the second connecting blocks (130) and the first connecting block (120) form a T-shaped structure.
3. The green energy-saving building curtain wall convenient to install and adjust as claimed in claim 1, wherein: the right side surface of the rack (140) is engaged with the surface of the gear (270), and two sets of gears (270) are provided.
4. The green energy-saving building curtain wall convenient to install and adjust as claimed in claim 1, wherein: a circular hole is formed in the inner wall of one side, close to the third connecting block (260), of the connecting body (210), and a limiting block (240) is inserted into the circular hole.
5. The green energy-saving building curtain wall convenient to install and adjust as claimed in claim 1, wherein: the upper surface of the third connecting block (260) is provided with a hexagonal groove, and the two sides of the top end of the third connecting block (260) are both fixed with limiting blocks (240).
6. The green energy-saving building curtain wall convenient to install and adjust as claimed in claim 1, wherein: the fourth connecting block (310) is of a hexagonal cylindrical structure, and the fourth connecting block (310) is matched with the connecting sleeve (330) for use.
CN202021569262.7U 2020-08-02 2020-08-02 Green energy-saving building curtain wall convenient to installation is adjusted Active CN213115128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021569262.7U CN213115128U (en) 2020-08-02 2020-08-02 Green energy-saving building curtain wall convenient to installation is adjusted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021569262.7U CN213115128U (en) 2020-08-02 2020-08-02 Green energy-saving building curtain wall convenient to installation is adjusted

Publications (1)

Publication Number Publication Date
CN213115128U true CN213115128U (en) 2021-05-04

Family

ID=75682580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021569262.7U Active CN213115128U (en) 2020-08-02 2020-08-02 Green energy-saving building curtain wall convenient to installation is adjusted

Country Status (1)

Country Link
CN (1) CN213115128U (en)

Similar Documents

Publication Publication Date Title
CN213115128U (en) Green energy-saving building curtain wall convenient to installation is adjusted
CN211714913U (en) Strip penetrating type heat insulation aluminum profile
CN213710009U (en) Keel supporting device for mounting building curtain wall
CN113760051B (en) Visual customization software research and development equipment of assembled building
CN215485499U (en) Double-layer ventilation glass curtain wall with waterproof and dustproof functions
CN211775923U (en) Support convenient to installation frosted glass
CN115262818A (en) Interlayer fireproof solar photoelectric curtain wall
CN212109969U (en) Protection mechanism of flywheel surface flatness intelligent detector
CN212562054U (en) Building glass curtain wall convenient to combination
CN217541098U (en) Hanging stove convenient to installation
CN220504251U (en) Steel-aluminum combined glass curtain wall
CN213653903U (en) Glass curtain wall with good heat insulation effect
CN221627370U (en) Novel design structure of building curtain wall
CN220681599U (en) Bending assistor for hydropower installation
CN221150448U (en) High-speed transmission connector
CN215442587U (en) Aluminum alloy warm edge hollow glass curtain wall with connecting structure
CN219177304U (en) Wall-mounted installation structure of access control machine
CN215982814U (en) Copper-aluminum composite radiator convenient to install
CN220787910U (en) Attached structure of lifter in construction interference environment
CN215369511U (en) Civil air defense door convenient to construction installation
CN219453099U (en) Drainage pipeline assembly
CN211815512U (en) Steel construction bridge connection protection structure
CN209959151U (en) Multifunctional rolling curtain for lifting type fireproof window
CN113914750B (en) Bridge-cut-off aluminum alloy sliding window with abrasion-proof sliding mechanism
CN212927371U (en) Door handle with replaceable decorative sheet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant