CN213087450U - Prefabricated formula concrete placement frame for building - Google Patents
Prefabricated formula concrete placement frame for building Download PDFInfo
- Publication number
- CN213087450U CN213087450U CN202020304784.8U CN202020304784U CN213087450U CN 213087450 U CN213087450 U CN 213087450U CN 202020304784 U CN202020304784 U CN 202020304784U CN 213087450 U CN213087450 U CN 213087450U
- Authority
- CN
- China
- Prior art keywords
- frame
- run
- post
- penetrating
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000001503 joint Anatomy 0.000 claims abstract description 54
- 230000000149 penetrating effect Effects 0.000 claims abstract description 26
- 238000010276 construction Methods 0.000 claims description 11
- 238000005266 casting Methods 0.000 claims description 7
- 238000010030 laminating Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 6
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a prefabricated concrete pouring frame for building, which relates to the technical field of building, comprising a frame, wherein a support rod is arranged in the frame, the upper end and the lower end of the support rod are connected with side columns in a penetrating way, the middle part of the support rod is connected with a penetrating column in a penetrating way, the outer side of the support rod is connected with a sleeving ring in a sleeving way, the outer side of the sleeving ring is provided with a connecting rod, one end of the connecting rod close to the penetrating column is provided with a scarf joint frame which is provided with the sleeving ring, so that the sleeving ring can be manually sleeved on the outer, the penetrating column penetrates into the frame, and the connecting rods are respectively embedded into the embedding grooves through the embedding frames, so that the effect of quickly connecting the penetrating column with the supporting rods is achieved, the connecting rods and the supporting rods are triangular, and the inboard butt-joint plate of scarf joint frame can further laminate with the rigging board for can further increase the bracing piece through the butt-joint plate and pass through the leakproofness between the post.
Description
Technical Field
The utility model relates to a building technical field, more specifically relates to a prefabricated formula concrete placement frame for building.
Background
The construction mainly adopts a mode of in-situ concrete pouring construction, namely, the construction from scaffold erection, template erection and reinforcement binding to concrete pouring;
the pouring frame is usually bound by steel bars and concrete is poured, so that the existing pouring frame needs to be butted for a long time, the existing pouring frame cannot be butted quickly, and the construction time is long.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving in the background and having the current frame of pouring and can't dock fast, the longer problem of engineering time to a prefabricated formula concrete placement frame for building is provided.
In order to achieve the above object, the utility model provides a following technical scheme: a prefabricated concrete pouring frame for a building comprises a frame, wherein a supporting rod is arranged in the frame, the upper end and the lower end of the supporting rod are connected with side columns in a penetrating mode, and the middle of the supporting rod is connected with a penetrating column in a penetrating mode;
the utility model discloses a support pole, including bracing piece, edge post, connecting rod, scarf joint frame, scarf joint plate, edge post and the inboard of running through the post, the outside of bracing piece cup joints and is connected with the scarf joint ring, the connecting rod is installed in the outside of scarf joint ring, the connecting rod is close to the one end that runs through the post and installs the scarf joint frame, the internally mounted of scarf joint frame has the butt plate, the edge post all runs through with the inboard that runs through the post and has run through the groove, it has the scarf joint groove to run through the post and be close to four side embeddings that run through the groove.
Preferably, the penetrating rod penetrates and extends to the inside of the side column in the vertical direction, the connecting rod and the supporting rod are arranged in a triangular shape, and the inside of the side column penetrates through the connecting rod and the penetrating rod matched interface.
Preferably, the connecting rods are all arranged on four sides of the sleeving ring in an inclined manner of 45 degrees, the inside of the embedding frame is arranged in a concave manner, and the embedding frame and the embedding groove are in embedded connection in the vertical direction.
Preferably, the butt joint plates are arranged in the horizontal direction in an amount of 2-3, the inside shape of the scarf joint groove is matched with the butt joint plates and the scarf joint frame, and the attaching plates are closely attached to the butt joint plates in the vertical direction through the scarf joint frame.
Preferably, the muff-coupling ring is that the vertical direction cup joints and is provided with two, and the muff-coupling ring sets up with the bracing piece is supporting.
Preferably, the side column is connected with the penetrating column through a connecting rod, and the penetrating column is connected with the supporting rod through a sleeving ring.
Preferably, the support rods are arranged in the horizontal direction and provided with a plurality of support rods, the support rods penetrate through the inner sides of the through grooves respectively, and the side columns and the through columns penetrate through and extend to the outer sides of the frame.
The utility model provides a prefabricated formula concrete placement frame for building has following beneficial effect:
1. the prefabricated concrete pouring frame for the building is provided with the sleeving ring, so that the sleeving ring can be sleeved on the outer side of the supporting rod manually, the penetrating column penetrates into the frame, the connecting rod is embedded into the embedding groove through the embedding frame respectively, the effect of quickly connecting the penetrating column and the supporting rod is achieved, the connecting rod and the supporting rod are triangular, the butt joint plate on the inner side of the embedding frame can be further attached to the attaching plate, the fastening performance of the supporting rod between the penetrating columns can be further improved through the butt joint plate, the existing building pouring frame can be quickly butted, and the construction time of the existing pouring frame is greatly shortened;
2. this kind of prefabricated formula concrete placement frame for building is provided with and runs through the pole for the accessible runs through the pole and runs through to the side post inside respectively, makes the accessible side post increase run through the pole and is connected between running through the post, has improved the side post and has run through the steadiness between the post, and makes this kind of pouring frame can fix the side post with running through the post fast through the bracing piece.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the overall three-dimensional cross-sectional structure of the present invention.
Fig. 3 is a schematic view of the cross-sectional structure of the socket ring of the present invention.
Fig. 4 is a schematic view of the local structure of the through column of the present invention.
In FIGS. 1-4: 1-frame, 101-support rod, 102-side column, 103-through column, 2-sleeve ring, 201-connecting rod, 202-through rod, 203-scarf joint frame, 204-butt plate, 3-through groove, 301-scarf joint groove, 302-joint plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, in an embodiment of the present invention, a prefabricated concrete casting frame for a building includes a frame 1, a support rod 101 is installed inside the frame 1, side columns 102 are connected to upper and lower ends of the support rod 101 in a penetrating manner, and a penetrating column 103 is connected to a middle portion of the support rod 101 in a penetrating manner;
the outside of bracing piece 101 is cup jointed and is connected with cup joint ring 2, connecting rod 201 is installed in the outside of cup joint ring 2, connecting rod 201 is close to the one end that runs through post 103 and installs scarf joint frame 203, the internally mounted of scarf joint frame 203 has butt plate 204, side post 102 all runs through with the inboard that runs through post 103 and has run through groove 3, it has scarf joint groove 301 to run through four side embeddings that post 103 is close to run through groove 3, the internally mounted of scarf joint groove 301 has rigging board 302, connecting rod 201 is close to the one end of side post 102 and installs and runs through pole 202.
In this embodiment: run through pole 202 and be the inside that the vertical direction runs through and extend to side column 102, connecting rod 201 is the triangle-shaped setting with bracing piece 101, and the inside of side column 102 run through have with run through pole 202 phase-match interface, be provided with and run through pole 202, make the accessible run through pole 202 and run through to side column 102 inside respectively, make accessible side column 102 increase run through pole 202 and be connected between running through post 103, improved side column 102 and run through the steadiness between post 103, and make this kind pour the frame can be fixed side column 102 with running through post 103 fast through bracing piece 101.
In this embodiment: connecting rod 201 all is slope 45 and sets up in four sides of overlap ring 2, and the inside of scarf joint frame 203 is the concavity and sets up, and scarf joint frame 203 is vertical direction nested connection with scarf joint groove 301, through being provided with connecting rod 201 for accessible connecting rod 201 makes things convenient for scarf joint frame 203 to imbed in the both ends of running through post 103, and can form the fastening support to running through between post 103 and the bracing piece 101 through connecting rod 201.
In this embodiment: 2-3 are arranged to butt joint plate 204 for the horizontal direction, and scarf joint groove 301 inside shape sets up with butt joint plate 204 and scarf joint frame 203 are supporting, and attaching plate 302 is the inseparable laminating of vertical direction through scarf joint frame 203 and butt joint plate 204 and is connected, and through being provided with attaching plate 302, the inboard butt joint plate 204 of scarf joint frame 203 can laminate with attaching plate 302 for can further increase bracing piece 101 through butt joint plate 204 and pass through between post 103 the fastening.
In this embodiment: the cup joint ring 2 is that the vertical direction cup joints and is provided with two, and cup joint ring 2 sets up with bracing piece 101 is supporting, be provided with cup joint ring 2, make the accessible manual with cup joint ring 2 cup joint in the outside of bracing piece 101, and through running through the inside that post 103 runs through to frame 1, and imbed connecting rod 201 inside scarf joint groove 301 through scarf joint frame 203 respectively, reached and to have passed through the effect that post 103 and bracing piece 101 are connected fast, be three horn shapes through connecting rod 201 and bracing piece 101, thereby make current building frame of pouring to dock fast, the engineering time of current frame of pouring has been shortened greatly.
In this embodiment: side column 102 passes through connecting rod 201 and is connected with the post 103 that runs through, and runs through post 103 and be connected with bracing piece 101 through cup joint ring 2, through being provided with side column 102 for accessible side column 102 docks with bracing piece 101, and runs through to the inboard of side column 102 through running through pole 202, has reached and can be fast with the fixed effect of side column 102 with bracing piece 101.
In this embodiment: bracing piece 101 is the horizontal direction and arranges and be provided with many, and bracing piece 101 runs through the inboard that runs through groove 3 respectively, and limit post 102 with run through the outside that post 103 all run through and extend to frame 1 for accessible bracing piece 101 makes things convenient for limit post 102 and runs through and establish ties fixedly between the post 103.
Use the utility model relates to a during prefabricated formula concrete placement frame for building, at first be fixed in the inboard of frame 1 with bracing piece 101, it is manual respectively afterwards to run through post 103 in the inboard of bracing piece 101, be vertical direction through running through groove 3 and running through post 103 between the bracing piece 101, then the accessible is manual to cup joint ring 2 in the outside of bracing piece 101, and through the inside that runs through post 103 to frame 1, and imbed connecting rod 201 inside scarf joint groove 301 through scarf joint frame 203 respectively, reached and to have run through post 103 and bracing piece 101 fast and be connected the effect, be three horn shapes through connecting rod 201 and bracing piece 101, and scarf joint frame 203 inboard butt-plate 204 can further laminate with binding plate 302, make can further increase bracing piece 101 through butt-plate 204 and run through between post 103 the fastening nature.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.
Claims (7)
1. The utility model provides a prefabricated formula concrete placement frame for building, includes frame (1), its characterized in that: a support rod (101) is arranged in the frame (1), the upper end and the lower end of the support rod (101) are connected with side columns (102) in a penetrating mode, and the middle of the support rod (101) is connected with a penetrating column (103) in a penetrating mode;
the outside of bracing piece (101) is cup jointed and is connected with cup joint ring (2), connecting rod (201) are installed in the outside of cup joint ring (2), scarf joint frame (203) is installed near the one end that runs through post (103) in connecting rod (201), the internally mounted of scarf joint frame (203) has butt plate (204), side post (102) and the inboard that runs through post (103) all run through and have run through groove (3), it has scarf joint groove (301) to run through four side embeddings that post (103) are close to run through groove (3), the internally mounted of scarf joint groove (301) has attaching plate (302), connecting rod (201) are close to the one end of side post (102) and are installed and run through pole (202).
2. The prefabricated concrete casting frame for construction according to claim 1, wherein: run through pole (202) and be the inside that the vertical direction runs through and extend to side column (102), connecting rod (201) are triangle-shaped with bracing piece (101) and set up, and the inside of side column (102) run through have with run through pole (202) phase-match interface.
3. The prefabricated concrete casting frame for construction according to claim 1, wherein: the connecting rods (201) are all arranged on four sides of the sleeving ring (2) in an inclined angle of 45 degrees, the inside of the embedding frame (203) is arranged in a concave shape, and the embedding frame (203) is in embedded connection with the embedding groove (301) in the vertical direction.
4. The prefabricated concrete casting frame for construction according to claim 1, wherein: butt joint board (204) are 2-3 that have arranged in the horizontal direction, scarf joint groove (301) inside shape sets up with butt joint board (204) and scarf joint frame (203) are supporting, and attaching plate (302) are the inseparable laminating of vertical direction through scarf joint frame (203) and butt joint board (204) and are connected.
5. The prefabricated concrete casting frame for construction according to claim 1, wherein: the sleeve joint ring (2) is provided with two sleeves in the vertical direction, and the sleeve joint ring (2) is matched with the support rod (101).
6. The prefabricated concrete casting frame for construction according to claim 1, wherein: the side column (102) is connected with the penetrating column (103) through a connecting rod (201), and the penetrating column (103) is connected with the supporting rod (101) through a sleeving ring (2).
7. The prefabricated concrete casting frame for construction according to claim 1, wherein: the supporting rods (101) are arranged in the horizontal direction and are provided with a plurality of supporting rods, the supporting rods (101) penetrate through the inner sides of the penetrating grooves (3), and the side columns (102) and the penetrating columns (103) penetrate through and extend to the outer sides of the frames (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020304784.8U CN213087450U (en) | 2020-03-12 | 2020-03-12 | Prefabricated formula concrete placement frame for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020304784.8U CN213087450U (en) | 2020-03-12 | 2020-03-12 | Prefabricated formula concrete placement frame for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213087450U true CN213087450U (en) | 2021-04-30 |
Family
ID=75600904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020304784.8U Expired - Fee Related CN213087450U (en) | 2020-03-12 | 2020-03-12 | Prefabricated formula concrete placement frame for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213087450U (en) |
-
2020
- 2020-03-12 CN CN202020304784.8U patent/CN213087450U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103470026B (en) | Basement external wall single-face framework erecting system and construction method | |
CN103603494B (en) | A kind of ultra-thin steel truss sloping core construction method and formwork structure | |
CN217000873U (en) | Bay window assembly | |
CN214696357U (en) | Post-cast strip construction structure of coincide floor | |
CN213087450U (en) | Prefabricated formula concrete placement frame for building | |
CN212406134U (en) | Cornice plate pouring support frame for building construction | |
CN205839701U (en) | Expansion joint department concrete formwork integrated equipment | |
CN215631623U (en) | Flexible template structure for casting concrete cylinder | |
CN214423395U (en) | Assembled waterproof wall of leading | |
CN210712865U (en) | Local inner support system of deep foundation pit | |
CN209816936U (en) | Utilize anti-floating anchor rod to support basic gluten structure | |
CN212002247U (en) | Large-span concrete beam slab formwork support system | |
CN210684729U (en) | Frame beam unit for slope reinforcement and assembled frame beam | |
CN208792081U (en) | A kind of expansion gap device | |
CN106436773B (en) | A kind of bottom plate and exterior wall junction are constructed typified form bracket | |
CN201627203U (en) | Revolvable ground anchor device for single-side support form | |
CN217631258U (en) | A template system that is used for outer eaves construction of turning over structure on outer wall | |
CN212478190U (en) | Shear wall structure of construction steel bar formwork concrete | |
CN213329680U (en) | Grouting sealing steel bushing for box girder prestressed duct | |
CN215168091U (en) | Bracing fixed knot constructs and aluminum alloy template bracing device | |
CN207761296U (en) | Detachable concrete pump pipe support structure | |
CN216340340U (en) | Laminated plate without ribs | |
CN214005722U (en) | Simple to operate's column foundation | |
CN217678539U (en) | Reinforced concrete arch structure | |
CN209837034U (en) | Building foundation slab template support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210430 |