CN213087449U - Concrete hopper for building civil engineering - Google Patents

Concrete hopper for building civil engineering Download PDF

Info

Publication number
CN213087449U
CN213087449U CN202021151646.7U CN202021151646U CN213087449U CN 213087449 U CN213087449 U CN 213087449U CN 202021151646 U CN202021151646 U CN 202021151646U CN 213087449 U CN213087449 U CN 213087449U
Authority
CN
China
Prior art keywords
fixedly connected
hopper
concrete
civil engineering
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021151646.7U
Other languages
Chinese (zh)
Inventor
廉德广
杜福婷
范作磊
张洪伟
邓少明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021151646.7U priority Critical patent/CN213087449U/en
Application granted granted Critical
Publication of CN213087449U publication Critical patent/CN213087449U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete hopper for building civil engineering, including connecing the hopper, connect the lower extreme fixedly connected with blowing hopper of hopper, the front end of blowing hopper and the equal a set of connecting plate of fixedly connected with in rear end, the connecting plate sets up to two and all be bilateral symmetry distribution in every group, four the equal fixedly connected with backup pad of lower extreme of connecting plate, four the equal fixedly connected with roll mechanism in upper portion of backup pad, four the equal fixedly connected with locking mechanism in lower part of backup pad, connect on the left end face of hopper and the right-hand member face on equal fixedly connected with connecting rod a set of. A concrete hopper for building civil engineering, through setting up the gyro wheel, can make things convenient for this concrete hopper to remove in the template, labour saving and time saving makes the roof top in the template through adjusting No. two screw rods, is in the same place this concrete hopper is fixed with the template, can prevent that the concrete hopper upset from toppling, has avoided the waste of concrete, and the practicality is strong.

Description

Concrete hopper for building civil engineering
Technical Field
The utility model relates to a building civil engineering equipment technical field, in particular to concrete hopper for building civil engineering.
Background
In the process of pouring the building beam with concrete, firstly assembling a template, then placing a concrete hopper in a beam groove, carrying out concrete assembling and concrete pouring, and pouring out the building beam; in the concrete hopper use, because the building roof beam is mostly longer, the position of the concrete hopper that so needs continuous manual adjustment, this consuming time and wasting force has reduced concrete placement's efficiency, simultaneously, at the pouring concrete in-process, because the concrete has great momentum, and does not have effectual fixed again between concrete hopper and the template, lead to the concrete hopper upset easily and topple over, lead to concrete to the outside, cause the waste of concrete. Therefore, we propose a concrete hopper for building and civil engineering.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a concrete hopper for building civil engineering can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a concrete hopper for building civil engineering, is including connecing the hopper, connect the lower extreme fixedly connected with blowing hopper of hopper, the front end of blowing hopper and a set of connecting plate of the equal fixedly connected with in rear end, the connecting plate sets up to two of every group and all is bilateral symmetry and distributes, four the equal fixedly connected with backup pad in lower extreme of connecting plate, four the equal fixedly connected with roll mechanism in upper portion of backup pad, four the equal fixedly connected with locking mechanism in lower part of backup pad, connect equal fixedly connected with a set of connecting rod on the left end face of hopper and on the right-hand member face, a connecting rod sets up to two of every group and all is bilateral symmetry and distributes, four the equal fixedly connected with connecting rod No. two of lower extreme of a connecting rod, four equal fixedly connected with holding rod on the outside terminal surface of No. two connecting rods.
Preferably, the upper portion of backup pad has seted up the through-hole No. one, the lower part of backup pad has seted up the through-hole No. two, the lower terminal surface of backup pad extends to the below of blowing fill.
Preferably, the rolling mechanism includes a screw rod, threaded connection has an adjusting nut on the screw rod, the rear end fixedly connected with spliced pole of a screw rod, the anterior fixedly connected with limiting plate that alternates of surface of spliced pole, the surface rear portion of spliced pole alternates swing joint and has the gyro wheel, the preceding terminal surface of gyro wheel and the rear end face swing joint of limiting plate, the front end fixedly connected with regulating block of a screw rod.
Preferably, the locking mechanism comprises a second screw rod, the second screw rod is connected with a second adjusting nut in a threaded manner, the rear end of the second screw rod is fixedly connected with a top plate, and the front end of the second screw rod is fixedly connected with a second adjusting block.
Preferably, the first adjusting nut corresponds to the first through hole in position, the rear end of the first adjusting nut is fixedly connected with the front end of the supporting plate, the rear portion of the first screw rod penetrates through the first through hole, and the diameter of the first screw rod is smaller than the first through hole.
Preferably, the position of No. two adjusting nut and No. two through-holes corresponds, No. two adjusting nut's rear end and the front end fixed connection of backup pad, No. two through-holes are passed to the rear portion of No. two screws, No. two screw diameter is less than No. two through-holes.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. in the utility model, the rollers are arranged, so that the concrete hopper can be conveniently moved on the template, and time and labor are saved; through adjusting a screw rod, the distance between two opposite idler wheels is enlarged or reduced, so that the concrete hopper can adapt to concrete pouring of building beams with different widths.
2. The utility model discloses in, through adjusting No. two screw rods, make the roof top in the template, be in the same place this concrete hopper is fixed with the template, can prevent effectively that the concrete hopper upset from toppling, avoided the waste of concrete.
3. The utility model discloses in, this concrete hopper simple structure easily makes, and the practicality is strong.
Drawings
FIG. 1 is a schematic view of the overall structure of a concrete hopper for civil engineering construction of the present invention;
FIG. 2 is a schematic view of the whole structure of a support plate of the concrete hopper for civil engineering construction of the present invention;
FIG. 3 is a schematic view of the overall structure of the rolling mechanism of the concrete hopper for civil engineering construction of the present invention;
fig. 4 is the utility model relates to a locking mechanism's for building civil engineering overall structure sketch map of concrete hopper.
In the figure: 1. a receiving hopper; 2. a discharge hopper; 3. a connecting plate; 4. a support plate; 5. a rolling mechanism; 6. a locking mechanism; 7. a first connecting rod; 8. a second connecting rod; 9. a holding rod; 41. a first through hole; 42. a second through hole; 51. a first screw rod; 52. a first adjusting nut; 53. connecting columns; 54. a limiting plate; 55. a roller; 56. a first adjusting block; 61. a second screw; 62. a second adjusting nut; 63. a top plate; 64. and a second adjusting block.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, a concrete hopper for building and civil engineering, including connecing hopper 1, connect hopper 1's lower extreme fixedly connected with blowing hopper 2, the equal fixedly connected with a set of connecting plate 3 in front end and the rear end of blowing hopper 2, connecting plate 3 sets up to two and all be bilateral symmetry distribution in every group, the equal fixedly connected with backup pad 4 of lower extreme of four connecting plate 3, the equal fixedly connected with rolling mechanism 5 in upper portion of four backup pad 4, the equal fixedly connected with locking mechanism 6 in lower part of four backup pad 4, connect a set of connecting rod 7 of equal fixedly connected with on hopper 1's the left end face and on the right-hand member face, connecting rod 7 sets up to two and all be bilateral symmetry distribution in every group, the equal fixedly connected with connecting rod 8 No. two of lower extreme of four connecting rod 7, equal fixedly connected with on four connecting rod 8's the outside terminal surface holds pole.
A through hole 41 is opened on the upper portion of backup pad 4, and No. two through holes 42 are opened to the lower part of backup pad 4, and the lower terminal surface of backup pad 4 extends to the below of blowing fill 2, when this hopper does not use, can play the effect of supporting this hopper.
Rolling mechanism 5 includes screw rod 51 No. one, threaded connection has an adjusting nut 52 on screw rod 51, screw rod 51's rear end fixedly connected with spliced pole 53, spliced pole 53's the anterior fixedly connected with limiting plate 54 that alternates of surface, spliced pole 53's the surface rear portion alternates swing joint and has gyro wheel 55, gyro wheel 55's preceding terminal surface and limiting plate 54's rear end face swing joint, screw rod 51's front end fixedly connected with regulating block 56 No. one, upper end contact through gyro wheel 55 and template, can make this hopper remove on the template, can the position of this hopper of quick adjustment, the convenience is used in different positions, concrete pouring speed has been improved.
Locking mechanism 6 includes No. two screw rods 61, and threaded connection has No. two adjusting nut 62 on No. two screw rods 61, No. two rear end fixedly connected with roof 63 of screw rods 61, and No. two front end fixedly connected with regulating block 64 of screw rods 61 pushes up roof 63 on the side of template through rotating No. two screw rods 61 to together this hopper and template are fixed, prevent that this hopper will adorn the upset of taking place in the concrete process, thereby improve concrete placement's convenience.
The first adjusting nut 52 corresponds to the first through hole 41 in position, the rear end of the first adjusting nut 52 is fixedly connected with the front end of the support plate 4, the rear portion of the first screw rod 51 penetrates through the first through hole 41, and the diameter of the first screw rod 51 is smaller than that of the first through hole 41, so that the first screw rod 51 can be conveniently adjusted.
No. two adjusting nut 62 corresponds with the position of No. two through-holes 42, and No. two adjusting nut 62's rear end and the front end fixed connection of backup pad 4, No. two through-holes 42 are passed at No. two screw rod 61's rear portion, and No. two screw rod 61's diameter is less than No. two through-holes 42, can play the effect of being convenient for adjust No. two screw rod 61.
It should be noted that, the utility model relates to a concrete hopper for building civil engineering, when using, put this concrete hopper to the template that the pouring building roof beam was used, then, adjust screw rod 51 No. one, make gyro wheel 55 and the up end contact of plank and make gyro wheel 55 roll on the up end of template, then, adjust screw rod 61 No. two, make roof 63 push up on the template, fix this concrete hopper and template together, carry on the concrete pouring operation of building roof beam again; when the concrete hopper needs to be moved, the second screw 61 is rotated reversely, the top plate 63 is separated from the template, the roller 55 can freely roll on the upper end face of the template, the holding rod 9 is held by hands, the concrete hopper is moved to a new position, then the second screw 61 is rotated, the top plate 63 is jacked on the template again, and the movement and the fixation of the concrete hopper are completed.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a concrete hopper for building civil engineering, is including connecing hopper (1), its characterized in that: the lower end of the receiving hopper (1) is fixedly connected with a discharging hopper (2), the front end and the rear end of the discharging hopper (2) are both fixedly connected with a group of connecting plates (3), the two connecting plates (3) are arranged in each group and are symmetrically distributed left and right, the lower ends of the four connecting plates (3) are fixedly connected with supporting plates (4), the upper parts of the four supporting plates (4) are fixedly connected with rolling mechanisms (5), the lower parts of the four supporting plates (4) are fixedly connected with locking mechanisms (6), a group of first connecting rods (7) are fixedly connected on the left end surface and the right end surface of the receiving hopper (1), connecting rod (7) set up to two and all be bilateral symmetry in every group and distribute, four the equal fixedly connected with connecting rod (8) of lower extreme of connecting rod (7), four equal fixedly connected with holding rod (9) on the outside terminal surface of connecting rod (8) No. two.
2. The concrete hopper for civil engineering and construction of claim 1, wherein: a through hole (41) is opened on the upper portion of the supporting plate (4), a second through hole (42) is opened on the lower portion of the supporting plate (4), and the lower end face of the supporting plate (4) extends to the lower portion of the discharging hopper (2).
3. The concrete hopper for civil engineering and construction of claim 1, wherein: roll mechanism (5) including a screw rod (51), threaded connection has an adjusting nut (52) on screw rod (51), the rear end fixedly connected with spliced pole (53) of a screw rod (51), the surface front portion of spliced pole (53) alternates fixedly connected with limiting plate (54), the surface rear portion of spliced pole (53) alternates swing joint and has gyro wheel (55), the preceding terminal surface of gyro wheel (55) and the rear end face swing joint of limiting plate (54), the front end fixedly connected with regulating block (56) of a screw rod (51).
4. The concrete hopper for civil engineering and construction of claim 1, wherein: locking mechanism (6) are including No. two screw rods (61), threaded connection has No. two adjusting nut (62) on No. two screw rods (61), the rear end fixedly connected with roof (63) of No. two screw rods (61), the front end fixedly connected with regulating block (64) No. two of screw rods (61).
5. The concrete hopper for civil engineering construction according to claim 3, wherein: the position of a regulating nut (52) corresponds to that of a through hole (41), the rear end of the regulating nut (52) is fixedly connected with the front end of the supporting plate (4), the rear part of the first screw rod (51) penetrates through the through hole (41), and the diameter of the first screw rod (51) is smaller than that of the through hole (41).
6. The concrete hopper for building and civil engineering as claimed in claim 4, wherein: no. two adjusting nut (62) correspond with the position of No. two through-hole (42), the rear end of No. two adjusting nut (62) and the front end fixed connection of backup pad (4), No. two through-hole (42) are passed to the rear portion of No. two screw rod (61), the diameter of No. two screw rod (61) is less than No. two through-hole (42).
CN202021151646.7U 2020-06-19 2020-06-19 Concrete hopper for building civil engineering Expired - Fee Related CN213087449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021151646.7U CN213087449U (en) 2020-06-19 2020-06-19 Concrete hopper for building civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021151646.7U CN213087449U (en) 2020-06-19 2020-06-19 Concrete hopper for building civil engineering

Publications (1)

Publication Number Publication Date
CN213087449U true CN213087449U (en) 2021-04-30

Family

ID=75621225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021151646.7U Expired - Fee Related CN213087449U (en) 2020-06-19 2020-06-19 Concrete hopper for building civil engineering

Country Status (1)

Country Link
CN (1) CN213087449U (en)

Similar Documents

Publication Publication Date Title
CN213087449U (en) Concrete hopper for building civil engineering
CN218205925U (en) Aluminum template supporting structure
CN114182616B (en) Box girder template for road bridge construction
CN217353650U (en) Variable cross-section space angle steel member assembling precision control system
CN109914795A (en) A kind of building template assembly
CN110005061B (en) Single-fulcrum inclined plane truss steel column group installation method and supporting device thereof
CN211895688U (en) Box girder external mold hoisting device
CN210177688U (en) Supporting device for single-pivot inclined plane truss steel column group
CN113787587A (en) Integral stair pouring mold and stair pouring construction method
CN220226231U (en) Cast-in-situ beam template supporting structure
CN219840204U (en) Steel connection structure
CN214740047U (en) Jig frame for welding ball
CN212897559U (en) Template supporting beam device for building engineering
CN221167952U (en) Pile body structure foundation defect reinforcing equipment
CN217420574U (en) Prefabricated component of assembled building with remove function
CN211143503U (en) Single pin frame of timber column or timber structure support device that falls to position
CN219410566U (en) Support unloading device
CN219445071U (en) Reinforcing steel bar storage and fixing device for building construction
CN220451457U (en) Concrete floor carrier plate transportation transfer device
CN116498095B (en) Supporting mechanism for assisting installation of building conversion truss
CN221031313U (en) Indoor scaffold for building construction
CN217028063U (en) Device for supporting truss plate in steel structure
CN217736488U (en) Electromechanical pipeline indent auxiliary device
CN217601221U (en) Embrace post structure of rectangular frame post
CN214026220U (en) Building prefabricated part mold suitable for precise prefabrication

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210430