CN213087099U - Better fire prevention steel construction for building of security - Google Patents

Better fire prevention steel construction for building of security Download PDF

Info

Publication number
CN213087099U
CN213087099U CN202021627145.1U CN202021627145U CN213087099U CN 213087099 U CN213087099 U CN 213087099U CN 202021627145 U CN202021627145 U CN 202021627145U CN 213087099 U CN213087099 U CN 213087099U
Authority
CN
China
Prior art keywords
steel construction
fixed mounting
main part
pipe
fire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021627145.1U
Other languages
Chinese (zh)
Inventor
张毅
张红军
向兵
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Qingxiu Yinghuan Industrial Co ltd
Original Assignee
Chongqing Qingxiu Yinghuan Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Qingxiu Yinghuan Industrial Co ltd filed Critical Chongqing Qingxiu Yinghuan Industrial Co ltd
Priority to CN202021627145.1U priority Critical patent/CN213087099U/en
Application granted granted Critical
Publication of CN213087099U publication Critical patent/CN213087099U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a better fire prevention steel construction for building of security, including steel construction main part, one side fixed mounting of steel construction main part has the water inlet, steel construction main part's inside fixed mounting has the retaining pipe, one side fixed mounting of steel construction main part has the water pump, the broken fixed mounting of clavicle department of water pump has the connecting pipe, the one end movable mounting of connecting pipe has the fire control shower nozzle, steel construction main part's inside fixed mounting has the heat absorption pipe, one side fixed mounting of steel construction main part has fire-retardant layer, one side fixed mounting of steel construction main part has the anticorrosive coating. The utility model discloses, this better for building fire prevention steel construction of security is in interior installation retaining pipe, has installed the fire control shower nozzle, and when the conflagration breaing out around the steel construction, the inside water of heat absorption pipe of steel construction is the heat absorption earlier, and when the heat absorption pipe can't absorb heat after the temperature rises, the temperature is sensed to the fire control shower nozzle, and the water in the blowout retaining pipe dispels the heat.

Description

Better fire prevention steel construction for building of security
Technical Field
The utility model relates to a fire prevention steel technical field specifically is a better fire prevention steel construction for building of security.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets.
After the steel construction met high temperature, take place deformation easily, and can't resume some shapes after the deformation, very easily cause danger like this, so will prevent fires to the steel construction, and common steel construction fire prevention is scribbled fire protection coating on the surface of steel construction, and along with the time lapse, fire protection coating's fire protection nature reduces, causes the problem that fire protection performance can not be durable.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a better fire prevention steel construction for building of security to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a better fire prevention steel construction for building of security, includes steel structure main body, one side fixed mounting of steel structure main body has the water inlet, steel structure main body's inside fixed mounting has the retaining pipe, one side fixed mounting of steel structure main body has the water pump, the broken fixed mounting of clavicle department of water pump has the connecting pipe, the one end movable mounting of connecting pipe has the fire control shower nozzle, steel structure main body's inside fixed mounting has the heat absorption pipe, one side fixed mounting of steel structure main body has fire-retardant layer, one side fixed mounting of steel structure main body has the anticorrosive coating.
Preferably, one side of the water inlet is connected with a water storage pipe, and one end of the water storage pipe is connected with the output end of the water pump.
Preferably, the heat absorption pipe is connected with the water storage pipe, and the heat absorption pipe is fixedly arranged on the inner wall of the steel structure main body.
Preferably, the flame-retardant layer is a fire-retardant coating, and the thickness of the fire-retardant coating is five millimeters.
Preferably, the number of the fire-fighting spray heads is six, and one side of the six fire-fighting spray heads is fixedly arranged on the connecting pipe.
Preferably, the number of the heat absorption pipes is two, and the two heat absorption pipes are symmetrically and fixedly arranged on the inner wall of the steel structure main body.
Compared with the prior art, the beneficial effects of the utility model are that: this better fire prevention steel construction for building of security, when the conflagration takes place around the steel construction, the inside water of heat absorption pipe of steel construction absorbs heat earlier, and when the unable heat absorption of heat absorption pipe after the temperature rises, the temperature is sensed to the fire control shower nozzle, and the water in the blowout water storage pipe dispels the heat, and the internally mounted of steel construction has the anticorrosive coating simultaneously, and fire prevention coating, double-deck protection steel construction are installed to the outer wall.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is the schematic diagram of the main structure of the steel structure of the present invention.
In the figure: 1. a steel structural body; 2. a water inlet; 3. a water storage pipe; 4. a water pump; 5. a connecting pipe; 6. a fire sprinkler; 7. a heat absorbing tube; 8. a flame retardant layer; 9. and (4) an anticorrosive layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: a fireproof steel structure for buildings with better safety comprises a steel structure main body 1, a water inlet 2 is fixedly installed on one side of the steel structure main body 1, one side of the water inlet 2 is connected with a water storage pipe 3, one end of the water storage pipe 3 is connected with the output end of a water pump 4, the water storage pipe 3 is fixedly installed inside the steel structure main body 1, the water pump 4 is fixedly installed on one side of the steel structure main body 1, a connecting pipe 5 is fixedly installed at the position of a clavicle of the water pump 4 in a broken mode, a fire-fighting nozzle 6 is movably installed at one end of the connecting pipe 5, the number of the fire-fighting nozzles 6 is six, one sides of the six fire-fighting nozzles 6 are fixedly installed on the connecting pipe 5, heat absorption pipes 7 are fixedly installed inside the steel structure main body 1, the number of the heat absorption pipes 7 is two, the two heat absorption pipes 7 are fixedly installed on the inner wall of, one side fixed mounting of steel structure main part 1 has fire-retardant layer 8, and fire-retardant layer 8 is fire retardant coating, and fire retardant coating's thickness is five millimeters, and fire retardant layer 8's material is fire retardant coating, has effects such as rust-resistant, waterproof, anticorrosive and wear-resisting, and one side fixed mounting of steel structure main part 1 has anticorrosive coating 9, installs the heat absorption pipe after anticorrosive coating 9 has been installed to the inner wall of steel structure main part 1.
The working principle is as follows: 1 outer wall of steel structure main part scribbles fire-retardant layer 8, the material on fire-retardant layer 8 is fire retardant coating, it is rust-resistant to have, it is waterproof, efficiency such as anticorrosive and wear-resisting, rivers get into water storage pipe 3 from water inlet 2, do preliminary cooling to steel structure main part 1 in reacing heat-absorbing pipe 7 again, prevent to take place deformation, when steel structure main part 1's ambient temperature continues to rise, rivers pass through water pump 4 and get into 6 blowout cooling of fire control shower nozzle from connecting pipe 5, the fire-retardant layer 8 of 1 outer wall of steel structure main part increases fire behavior, inside anticorrosive coating 9 prevents that the water pipe from breaking inside water gets into steel structure main part 1, corrode steel structure.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or scope of the present invention. Accordingly, the embodiments of the present invention are exemplary, and not limiting. The scope of the invention is indicated by the appended claims rather than by the foregoing description, and all changes that come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a better fire prevention steel construction for building of security, includes steel structure main part (1), its characterized in that: one side fixed mounting of steel construction main part (1) has water inlet (2), the inside fixed mounting of steel construction main part (1) has water storage pipe (3), one side fixed mounting of steel construction main part (1) has water pump (4), the broken fixed mounting of clavicle department of water pump (4) has connecting pipe (5), the one end movable mounting of connecting pipe (5) has fire control shower nozzle (6), the inside fixed mounting of steel construction main part (1) has heat absorption pipe (7), one side fixed mounting of steel construction main part (1) has fire-retardant layer (8), one side fixed mounting of steel construction main part (1) has anticorrosive coating (9).
2. The fireproof steel structure for building of claim 1, wherein: one side of the water inlet (2) is connected with the water storage pipe (3), and one end of the water storage pipe (3) is connected with the output end of the water pump (4).
3. The fireproof steel structure for building of claim 1, wherein: the heat absorption pipe (7) is connected with the water storage pipe (3), and the heat absorption pipe (7) is fixedly arranged on the inner wall of the steel structure main body (1).
4. The fireproof steel structure for building of claim 1, wherein: the flame-retardant layer (8) is a fireproof coating, and the thickness of the fireproof coating is five millimeters.
5. The fireproof steel structure for building of claim 1, wherein: the number of the fire-fighting nozzles (6) is six, and one side of each of the fire-fighting nozzles (6) is fixedly installed on the connecting pipe (5).
6. The fireproof steel structure for building of claim 1, wherein: the number of the heat absorption pipes (7) is two, and the two heat absorption pipes (7) are symmetrically and fixedly arranged on the inner wall of the steel structure main body (1).
CN202021627145.1U 2020-08-06 2020-08-06 Better fire prevention steel construction for building of security Expired - Fee Related CN213087099U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021627145.1U CN213087099U (en) 2020-08-06 2020-08-06 Better fire prevention steel construction for building of security

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021627145.1U CN213087099U (en) 2020-08-06 2020-08-06 Better fire prevention steel construction for building of security

Publications (1)

Publication Number Publication Date
CN213087099U true CN213087099U (en) 2021-04-30

Family

ID=75628926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021627145.1U Expired - Fee Related CN213087099U (en) 2020-08-06 2020-08-06 Better fire prevention steel construction for building of security

Country Status (1)

Country Link
CN (1) CN213087099U (en)

Similar Documents

Publication Publication Date Title
RU2182025C2 (en) Fire-proofing device
PL223537B1 (en) Self extinguishing sandwich panel
CN213087099U (en) Better fire prevention steel construction for building of security
WO2020103841A1 (en) Fire door easy to escape
CN203400446U (en) Fire extinguishing system for ensuring fire rescue by means of outdoor dry-type spraying system
CN210263469U (en) Profiled steel structure with fire prevention function
CN213926501U (en) Outdoor ground-type fire hydrant with anti-freezing function
CN212078307U (en) Interior spraying type fire prevention plate type node structure
CN209384436U (en) A kind of water proof thermal insulation wall structure
CN214657946U (en) Building steel structure wall
CN115613722A (en) Effective method for fire prevention of high-rise steel structure building
CN210947228U (en) Energy-conserving fire prevention steel construction of green building
CN218346464U (en) Fire prevention heat preservation safety type steel construction
CN108360765B (en) Anti-falling system penetrating out of roof hole and processing method thereof
CN111321818A (en) Internal-external connection spray-repair reinforced fireproof plate type node structure and using method
CN213038621U (en) Fireproof building steel structure
CN111321817A (en) Use method of inner spray type fireproof plate type node structure
CN216304923U (en) Fireproof steel structure column
CN214497850U (en) Fire prevention heat preservation safety type steel construction
CN214006075U (en) Fireproof heat-preservation steel structure
CN112049234B (en) Fireproof steel structure for building based on self-temperature-adjusting technology
CN214785282U (en) Steel construction of fire prevention
CN213760288U (en) Fire control is with thin water smoke cage
CN219128091U (en) Special fire-extinguishing fine water mist spray head for ancient building
CN212613136U (en) Fireproof steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210430

CF01 Termination of patent right due to non-payment of annual fee