CN213065013U CN202021713526.1U CN202021713526U CN213065013U CN 213065013 U CN213065013 U CN 213065013U CN 202021713526 U CN202021713526 U CN 202021713526U CN 213065013 U CN213065013 U CN 213065013U
Authority
CN
China
Prior art keywords
installation
groove
fixed
connecting rod
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021713526.1U
Other languages
Chinese (zh)
Inventor
桐一凯
李旭
李璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jingyuan Metal Products Co ltd
Original Assignee
Tianjin Jingyuan Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Jingyuan Metal Products Co ltd filed Critical Tianjin Jingyuan Metal Products Co ltd
Priority to CN202021713526.1U priority Critical patent/CN213065013U/en
Application granted granted Critical
Publication of CN213065013U publication Critical patent/CN213065013U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a laborsaving novel larynx hoop of installation relates to larynx hoop field, including larynx hoop body, the top side fixed mounting of larynx hoop body has fixed block and installation piece, and one side fixed mounting of fixed block has the connecting rod, and the mounting hole has been seted up to one side of installation piece, and the one end activity of connecting rod runs through the mounting hole, the standing groove has all been seted up on the both sides inner wall of mounting hole. The utility model discloses in, two stirring boards of outside pulling can drive two regulation poles and remove to when driving a plurality of compressing rods and removing to the standing groove in, run through the mounting hole with the one end activity of connecting rod, until behind the chucking pipe fitting, loosen the stirring board, under compression spring's spring action, can drive a plurality of compressing rods and remove to corresponding a plurality of fixed orificess in, it is fixed to be convenient for carry out the chucking with the connecting rod after the chucking, thereby it is fixed to be convenient for carry out the chucking with the pipe fitting, the installation is comparatively simple and laborsaving, it is also comparatively convenient to use.

Description

Novel throat hoop with labor-saving installation
Technical Field
The utility model relates to a larynx hoop technical field especially relates to a laborsaving novel larynx hoop of installation.
Background
The hose clamp is a fastener at the joint of the hose and the hard tube, solves the problem that the hose and the hard tube in the prior art have dead angles when being used for connecting the hose and the hard tube with small diameter and generate liquid and gas leakage, has small friction force of the worm, is suitable for connecting the parts of middle-high grade vehicle types or anticorrosive materials, has wide application range, torsion resistance and pressure resistance, balanced torsional moment of the hose clamp, firm and tight locking and large adjustment range, is suitable for the fastener for connecting the hose and the hard tube with the diameter of more than 30mm, and has attractive appearance after being assembled.
The hose clamp is carrying out the use, when traditional hose clamp is installed, need adopt the bolt, the staff fixes the one end of bolt, then screw up the nut from the opposite side, it just can screw up it to rotate many times, the labour is stronger, it is comparatively hard, the mode of screwing up hard carries out the pipe fitting and fixes, the installation is all comparatively loaded down with trivial details with demolising, the staff's of being not convenient for construction, if demolising the in-process, the problem that needs the smooth silk of bolt is, it is difficult to demolish the hose clamp from the pipeline, consequently, need a laborsaving novel hose clamp of installation to satisfy people's demand.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a laborsaving novel larynx hoop of installation to solve the larynx hoop and being carrying out the use, when traditional larynx hoop installation, need adopt the bolt, the staff fixes the one end of bolt, then screw up the nut from the opposite side, it just can screw up it to rotate many times, the labour is stronger, it is comparatively hard, the mode of screwing up hard carries out the pipe fitting fixed, it is all comparatively loaded down with trivial details with demolising all, the staff's of being not convenient for construction, if demolising the in-process, the problem that needs the smooth silk of bolt is, will hardly demolish the problem of larynx hoop from the pipeline.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a laborsaving novel hose clamp of installation, includes hose clamp body, the top side fixed mounting of hose clamp body has fixed block and installation piece, and one side fixed mounting of fixed block has the connecting rod, and the mounting hole has been seted up to one side of installation piece, and the one end activity of connecting rod runs through the mounting hole, all seted up the standing groove on the both sides inner wall of mounting hole, equal movable mounting has the regulation pole in two standing grooves, and two equal fixed mounting of one end that adjust the pole and be close to each other have the regulating plate, and one side fixed mounting of regulating plate has a plurality of compressing rods, and the one end of a plurality of compressing rods all with connecting rod looks adaptation, the groove of stirring has all been seted up to the both sides of installation piece, has seted up the regulation hole on one side inner wall of standing groove, and the regulation hole communicates.
Preferably, a stretching groove is formed in the top side of the mounting block, a pulling rod is movably mounted above the stretching groove, two clamping blocks are fixedly mounted on the bottom side of the pulling rod, and the two clamping blocks are respectively matched with the two pulling rods.
Preferably, a fixed column is fixedly mounted on the inner wall of the top side of the stretching groove, a telescopic rod is movably mounted on the fixed column, and the top end of the telescopic rod is fixedly mounted on the bottom side of the pulling rod.
Preferably, the top of fixed column has seted up flexible groove, and the bottom of telescopic link extends to in the flexible groove and fixed mounting has expanding spring's top, and expanding spring's bottom fixed mounting is on the bottom side inner wall in flexible groove.
Preferably, the top side of the poking plate is provided with a clamping groove, and the bottom side of the clamping block extends into the clamping groove.
Preferably, a plurality of fixed orificess have been seted up to one side of connecting rod, and a plurality of fixed orificess all with a plurality of compressing tightly pole looks adaptation, a plurality of compressing tightly poles extend to in a plurality of fixed orificess corresponding.
Preferably, one end of a compression spring is fixedly installed on one side of the toggle plate, the other end of the compression spring is fixedly installed on the inner wall of one side of the toggle groove, and the compression spring is movably sleeved on the adjusting rod.
The utility model has the advantages that:
the utility model discloses in, place the pipe fitting that will install in the hose clamp body, two stirring plates are outwards pulled, can drive two regulation poles and move, when regulation pole removal can drive a plurality of compressing rods and move to the standing groove, run through the mounting hole with the one end activity of connecting rod, then pull to the connecting rod, after the chucking pipe fitting, loosen the stirring plate, under the spring action of compression spring, can drive the stirring plate and move, stirring plate removes and drives the regulation pole and move, thereby drive a plurality of compressing rods and move to corresponding a plurality of fixed orificess, be convenient for carry out the chucking with the connecting rod after the chucking and fix, thereby be convenient for carry out the chucking with the pipe fitting and fix, the installation is comparatively simple and laborsaving, it is also comparatively convenient to use;
the utility model discloses in, loosen the pulling rod, under expanding spring's spring action, can drive the telescopic link and move down to drive the pulling rod and move down, and drive two chucking pieces and move down to two corresponding chucking inslots, can fix a position the position of the stirring board after the removal, thereby effectively prevent that the pipe fitting after fixing breaks away from or not hard up problem.
Drawings
FIG. 1 is a schematic structural view of a novel labor-saving throat hoop;
fig. 2 is a schematic structural view of a local three-dimensional structure of a novel labor-saving mounting hose clamp provided by the utility model;
fig. 3 is a schematic structural view of a sectional view of a novel labor-saving throat hoop of the present invention;
fig. 4 is a schematic structural view of the novel throat hoop with labor saving in installation.
In the figure: 1. a hose clamp body; 2. a fixed block; 3. mounting blocks; 4. a connecting rod; 5. mounting holes; 6. a fixing hole; 7. a placement groove; 8. adjusting a rod; 9. an adjusting plate; 10. a hold down bar; 11. an adjustment hole; 12. a poking groove; 13. a poking plate; 14. a drawing tank; 15. fixing a column; 16. a telescopic groove; 17. a telescopic rod; 18. pulling a rod; 19. a clamping block; 20. and (4) clamping the groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a laborsaving novel larynx hoop of installation, including larynx hoop body 1, the top side fixed mounting of larynx hoop body 1 has fixed block 2 and installation piece 3, one side fixed mounting of fixed block 2 has connecting rod 4, mounting hole 5 has been seted up to one side of installation piece 3, the one end activity of connecting rod 4 runs through mounting hole 5, standing groove 7 has all been seted up on the both sides inner wall of mounting hole 5, equal movable mounting has regulation pole 8 in two standing grooves 7, the equal fixed mounting of one end that two regulation poles 8 are close to each other has regulating plate 9, one side fixed mounting of regulating plate 9 has a plurality of compressing rods 10, the one end of a plurality of compressing rods 10 all with connecting rod 4 looks adaptation, toggle groove 12 has all been seted up to the both sides of installation piece 3, regulation hole 11 has been seted up on the inner wall of one side of standing groove 7, regulation hole 11 is linked together with toggle groove 12, the one end activity of adjusting rod.
The utility model discloses in, tensile groove 14 has been seted up to the top side of installation piece 3, and the top movable mounting in tensile groove 14 has a pulling rod 18, and the bottom side fixed mounting that the pulling rod 18 has two chucking pieces 19, and two chucking pieces 19 respectively with two pulling rod 18 looks adaptations, pulling rod 18 removes, is convenient for drive chucking piece 19 and removes.
The utility model discloses in, fixed mounting has fixed column 15 on the top side inner wall of tensile groove 14, and movable mounting has telescopic link 17 on the fixed column 15, and telescopic link 17's top fixed mounting is on the bottom side of pulling pole 18.
The utility model discloses in, flexible groove 16 has been seted up on the top of fixed column 15, and the bottom of telescopic link 17 extends to in the flexible groove 16 and fixed mounting has expanding spring's top, and expanding spring's bottom fixed mounting is on the bottom side inner wall of flexible groove 16, and the pulling rod 18 removes and can drive telescopic link 17 and remove in flexible groove 16, removes the back, can reset under expanding spring's spring action.
The utility model discloses in, the chucking groove 20 has been seted up to the top side of stirring board 13, and in the bottom side of chucking piece 19 extended to chucking groove 20, two chucking pieces 19 move down to two corresponding chucking grooves 20, can fix a position the position of stirring board 13 after the removal to effectively prevent that the pipe fitting after fixing breaks away from or not hard up problem.
The utility model discloses in, a plurality of fixed orificess 6 have been seted up to one side of connecting rod 4, and a plurality of fixed orificess 6 all with a plurality of compressing tightly 10 looks adaptations, in a plurality of compressing tightly 10 extended to a plurality of corresponding fixed orificess 6, drive a plurality of compressing tightly 10 and remove to a plurality of corresponding fixed orificess 6 in, be convenient for carry out the chucking with connecting rod 4 after the chucking fixed to it is fixed to be convenient for carry out the chucking with the pipe fitting.
The utility model discloses in, one side fixed mounting of stirring board 13 has pressure spring's one end, and pressure spring's other end fixed mounting is on stirring one side inner wall of groove 12, and the pressure spring activity cup joints on adjusting pole 8, and stirring board 13 removes the back, can reset under pressure spring's elastic action.
This practical theory of operation:
in the utility model, when the pipe fitting is required to be connected by the hose clamp body 1, the pipe fitting to be installed is placed in the hose clamp body 1, then the pulling rod 18 is pulled upwards, the pulling rod 18 moves to drive the telescopic rod 17 to move in the telescopic slot 16, the pulling rod 18 moves to drive the clamping block 19 to move upwards and break away from the clamping slot 20, then the two shifting plates 13 are pulled outwards, the two shifting plates 13 move to respectively drive the two adjusting rods 8 to move, the shifting plates 13 move to stretch the compression spring, the adjusting rods 8 move to drive the adjusting plate 9 to move, when the adjusting plate 9 moves to drive the plurality of compression rods 10 to move to the placing slot 7, one end of the connecting rod 4 movably penetrates through the mounting hole 5 and then is pulled to the connecting rod 4 until the pipe fitting is clamped, the shifting plates 13 are loosened, under the elastic action of the compression spring, the shifting plates 13 can be driven to move, the shifting plates 13 move to, thereby drive a plurality of compressing tightly pole 10 and remove to corresponding a plurality of fixed orificess 6 in, it is fixed to be convenient for carry out the chucking with connecting rod 4 after the chucking, thereby it is fixed to be convenient for carry out the chucking with the pipe fitting, the installation is comparatively simple and laborsaving, it is also comparatively convenient to use, after the installation, loosen pulling rod 18, under expanding spring's spring action, can drive telescopic link 17 downstream, thereby drive pulling rod 18 downstream, and drive two chucking piece 19 downstream to two corresponding chucking inslots 20, can fix a position the position of the stirring board 13 after removing, thereby effectively prevent the pipe fitting after fixing and break away from or not hard up the problem, high durability and convenient use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a laborsaving novel hose clamp of installation, includes hose clamp body (1), its characterized in that: the throat hoop comprises a throat hoop body (1), wherein a fixed block (2) and an installation block (3) are fixedly installed on the top side of the throat hoop body (1), a connecting rod (4) is fixedly installed on one side of the fixed block (2), an installation hole (5) is formed in one side of the installation block (3), one end of the connecting rod (4) movably penetrates through the installation hole (5), standing grooves (7) are formed in the inner walls of the two sides of the installation hole (5), adjusting rods (8) are movably installed in the two standing grooves (7), an adjusting plate (9) is fixedly installed at the end, close to each other, of the two adjusting rods (8), a plurality of pressing rods (10) are fixedly installed on one side of the adjusting plate (9), one ends of the plurality of pressing rods (10) are matched with the connecting rod (4), shifting grooves (12) are formed in the two sides of the installation block (3), adjusting holes (11) are formed in the inner wall of one side of, one end of the adjusting rod (8) movably penetrates through the adjusting hole (11) and is fixedly provided with a poking plate (13).
2. The novel throat hoop with labor saving in installation according to claim 1, is characterized in that: the top side of the mounting block (3) is provided with a stretching groove (14), a pulling rod (18) is movably mounted above the stretching groove (14), two clamping blocks (19) are fixedly mounted at the bottom side of the pulling rod (18), and the two clamping blocks (19) are respectively matched with the two pulling rods (18).
3. The novel throat hoop with labor saving in installation according to claim 2, is characterized in that: a fixed column (15) is fixedly mounted on the inner wall of the top side of the stretching groove (14), a telescopic rod (17) is movably mounted on the fixed column (15), and the top end of the telescopic rod (17) is fixedly mounted on the bottom side of the pulling rod (18).
4. The novel throat hoop with labor saving in installation according to claim 3, is characterized in that: the top of the fixed column (15) is provided with a telescopic groove (16), the bottom end of the telescopic rod (17) extends into the telescopic groove (16) and is fixedly provided with the top end of a telescopic spring, and the bottom end of the telescopic spring is fixedly arranged on the inner wall of the bottom side of the telescopic groove (16).
5. The novel throat hoop with labor saving in installation according to claim 1, is characterized in that: the top side of the poking plate (13) is provided with a clamping groove (20), and the bottom side of the clamping block (19) extends into the clamping groove (20).
6. The novel throat hoop with labor saving in installation according to claim 1, is characterized in that: a plurality of fixed orificess (6) have been seted up to one side of connecting rod (4), and a plurality of fixed orificess (6) all with a plurality of compressing tightly pole (10) looks adaptation, a plurality of compressing tightly pole (10) extend to in a plurality of corresponding fixed orificess (6).
7. The novel throat hoop with labor saving in installation according to claim 1, is characterized in that: one end of a compression spring is fixedly installed on one side of the poking plate (13), the other end of the compression spring is fixedly installed on the inner wall of one side of the poking groove (12), and the compression spring is movably sleeved on the adjusting rod (8).
CN202021713526.1U 2020-08-17 2020-08-17 Novel throat hoop with labor-saving installation Expired - Fee Related CN213065013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021713526.1U CN213065013U (en) 2020-08-17 2020-08-17 Novel throat hoop with labor-saving installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021713526.1U CN213065013U (en) 2020-08-17 2020-08-17 Novel throat hoop with labor-saving installation

Publications (1)

Publication Number Publication Date
CN213065013U true CN213065013U (en) 2021-04-27

Family

ID=75583613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021713526.1U Expired - Fee Related CN213065013U (en) 2020-08-17 2020-08-17 Novel throat hoop with labor-saving installation

Country Status (1)

Country Link
CN (1) CN213065013U (en)

Similar Documents

Publication Publication Date Title
CN111842712A (en) Steel bar bending machine
CN213332911U (en) Pipe end connecting piece of petroleum pipeline
CN213065013U (en) Novel throat hoop with labor-saving installation
CN201159224Y (en) Connection device for two vertical members
CN203879107U (en) Fence structure
CN214402331U (en) External wall curtain wall for villa decoration
CN211875211U (en) Valve convenient to disassemble and assemble
CN216152264U (en) Special tool for disassembling valve core of hydraulic cartridge valve
CN207509116U (en) A kind of tubing connects bundled device
CN216519996U (en) Pipeline installation device for hydraulic engineering
CN214999828U (en) Wall-mounted gas pipeline mounting pipe hoop
CN221097740U (en) Intelligent water supply pipeline installation equipment
CN214331143U (en) Flange nut with fastening connecting piece
CN218758786U (en) Building outer wall construction die carrier structure
CN221258290U (en) Hydraulic support rod convenient to install
CN217557687U (en) Easy dismouting of construction template is put
CN219413914U (en) Pipe connecting device for ice rink
CN217927544U (en) Copper pipe fixer of refrigeration plant
CN211597055U (en) Steel structure crossbeam mounting structure
CN210288456U (en) Assembled steel mould for foundation bearing platform of house building engineering
CN216986423U (en) Waste water sedimentation tank and waste water pipeline coupling assembling
CN219617595U (en) Pipeline connection auxiliary mechanism
CN221221821U (en) Flange convenient to dismantle and change
CN220022187U (en) Protective sleeve for cable
CN219957220U (en) Steel construction hardness detection device