CN213062704U - Novel multi-use architecture railing - Google Patents

Novel multi-use architecture railing Download PDF

Info

Publication number
CN213062704U
CN213062704U CN202021751245.5U CN202021751245U CN213062704U CN 213062704 U CN213062704 U CN 213062704U CN 202021751245 U CN202021751245 U CN 202021751245U CN 213062704 U CN213062704 U CN 213062704U
Authority
CN
China
Prior art keywords
railing
groove
post
railing post
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021751245.5U
Other languages
Chinese (zh)
Inventor
马志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021751245.5U priority Critical patent/CN213062704U/en
Application granted granted Critical
Publication of CN213062704U publication Critical patent/CN213062704U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of building railings, in particular to a novel multifunctional building railing, which comprises a railing post, wherein the bottom of the railing post is fixedly connected with a base; a through groove penetrating through the top and the bottom of the railing post is formed in the railing post, a clamping groove communicated with the through groove is formed in one side of the railing post, and a threaded sleeve is fixedly connected to the top of the railing post; the other side fixedly connected with horizontal pole of railing post, one side of horizontal pole is seted up at the one end department that is close to the horizontal pole and is pushed up the groove. The utility model has the advantages that: the arrangement of the railing post, the through groove, the clamping groove, the cross rod, the jacking groove and the mounting part in a matching manner can improve the mounting speed of the railing and solve the problem that the conventional railing is slow in mounting speed; through the cooperation setting of railing post, logical groove, draw-in groove, horizontal pole, top groove and installed part, can make the convenient installation railing of staff, solved the inconvenient big condition of work load of current building railing installation.

Description

Novel multi-use architecture railing
Technical Field
The utility model relates to a building railing technical field, especially a novel multi-use architecture railing.
Background
The railing is called appendix in China and also called appendix, and is a safety facility on bridges and buildings. The railing plays a role in separation and guide in use, so that the boundary of the divided area is clear and definite, and the designed railing has decorative significance. The gift box seat is provided with a component similar to a railing. The Chinese generation uses the horizontal lattice type railing as the most. The six-direction prevailing hook sheet is hooked. The angle of the balustrade can be found in the groggy grotto and Dunhuang mural. The clear wooden handrails are thin and thin, while the stone handrails gradually separate from the wooden handrails and tend to be thick and heavy. After the end of the work, the western classical scale, dimension and decorated railing form entered china. Modern railings are made of more various materials and shapes. The existing building railings are mostly made of metal, and most railings are welded.
The prior building railing has the following defects:
1. the connection between the railings is mostly realized by welding and connecting the railings at the inner sides of the railings by using bolts, and the installation speed is slow;
2. the existing building handrail is inconvenient to install and has large workload.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a novel multi-use architecture railing.
The purpose of the utility model is realized through the following technical scheme: a novel multifunctional building rail comprises a rail post, wherein the bottom of the rail post is fixedly connected with a base;
a through groove penetrating through the top and the bottom of the railing post is formed in the railing post, a clamping groove communicated with the through groove is formed in one side of the railing post, and a threaded sleeve is fixedly connected to the top of the railing post;
the other side of the railing post is fixedly connected with a cross rod, and one end of the cross rod, close to the cross rod, is provided with a jacking groove;
the top of railing post is pegged graft and is had the installed part with the shape looks adaptation that leads to the groove, the top fixedly connected with mounting panel of installed part, the through-hole has been seted up at the top of mounting panel, the top of mounting panel is pegged graft and is had the fixing bolt with screw sleeve threaded connection.
Optionally, the height of the through groove is the same as the height of the railing post, and the cross section of the through groove is in a reverse L shape.
Optionally, the cross section of the clamping groove is rectangular, and the inner side of the clamping groove is attached to the outer side of the cross bar.
Optionally, the threaded sleeve corresponds to the through hole in position, and the threaded sleeve is located right below the through hole.
Optionally, the mounting part comprises a main block and a projection fixedly connected to one side of the main block, and the projection of the mounting part is matched with the shape of the jacking groove.
Optionally, mounting panel fixed connection is at the top of main piece and lug, the bottom of mounting panel is laminated mutually with the top of railing post, fixing bolt run through the mounting panel and with the threaded sleeve threaded connection at railing post top.
The utility model has the advantages of it is following:
1. the novel multifunctional building railing is characterized in that one side of each railing post is provided with a clamping groove communicated with the through groove, the cross rod of the other railing post is directly inserted into the clamping groove when being installed, the bottom and the other two side surfaces of the cross rod are all attached to the inner sides of the clamping grooves, thereby quickly positioning another railing post, then inserting the mounting piece from the top of the railing post, the mounting piece is matched with the shape of the through groove of the railing post, the convex block of the mounting piece is clamped into the top groove of the cross rod, then connecting the mounting piece and the railing post through the fixing bolt, thereby locking the cross rod and connecting the two railing posts, thus the installation does not need welding, the positioning speed is high, the installation structure is simple, the installation speed is high, through the cooperation setting of railing post, logical groove, draw-in groove, horizontal pole, top income groove and installed part, can improve the installation rate of improvement railing, solved the slow condition of current railing installation rate.
2. This novel multifunctional building railing, through set up the draw-in groove that is linked together with leading to the groove in one side of railing post, the horizontal pole of another railing post disect insertion draw-in groove when the installation, the bottom of horizontal pole, bottom and two other sides all laminate with the inboard of draw-in groove mutually, thereby fix a position first railing post fast, later insert the installed part from the top of railing post, the installed part is with the shape looks adaptation in the logical groove of railing post, the lug card of installed part is gone into in the top groove of horizontal pole, later connect installed part and railing post through fixing bolt, thereby lock the horizontal pole, thereby connect two railing posts, the installation need not weld like this, positioning speed is fast, the staff can be from the top installation fixing bolt of railing post under the state of standing, be convenient for staff's operation, the work load is less, and convenient for installation, through the railing post, lead to the groove, the draw-in groove, the cooperation setting of top groove and installed part can make the convenient installation railing of staff, has solved the inconvenient big condition of work load of current building railing installation.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the balustrade of the present invention;
FIG. 3 is a schematic structural view of the mounting member of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1-railing post, 2-base, 3-through groove, 4-clamping groove, 5-threaded sleeve, 6-cross bar, 7-jacking groove, 8-mounting piece, 9-mounting plate, 10-through hole and 11-fixing bolt.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-4, a novel multifunctional building rail comprises a rail post 1, wherein the bottom of the rail post 1 is fixedly connected with a base 2; a through groove 3 penetrating through the top and the bottom of the railing post 1 is formed in the railing post 1, a clamping groove 4 communicated with the through groove 3 is formed in one side of the railing post 1, and a threaded sleeve 5 is fixedly connected to the top of the railing post 1; the other side of the railing post 1 is fixedly connected with a cross rod 6, and one end of the cross rod 6, which is close to the cross rod 6, is provided with a jacking groove 7; the top of railing post 1 is pegged graft and is had the installed part 8 with the shape looks adaptation that leads to groove 3, and the top fixedly connected with mounting panel 9 of installed part 8, through-hole 10 has been seted up at the top of mounting panel 9, and the top of mounting panel 9 is pegged graft and is had the fixing bolt 11 with threaded sleeve 5 threaded connection.
As an optimal technical solution of the utility model: the guardrail post 1 is fixedly connected to the middle of the top of the base 2, the vertical section of the base 2 is trapezoidal, the height of the through groove 3 is the same as that of the guardrail post 1, the cross section of the through groove 3 is reverse L-shaped, the cross section of the clamping groove 4 is rectangular, the inner side of the clamping groove 4 is attached to the outer side of the cross rod 6, the cross rod 6 of the other guardrail post 1 is directly inserted into the clamping groove 4 when being installed, and the bottom, the bottom and the other two side surfaces of the cross rod 6 are attached to the inner side of the clamping groove 4, so that the other guardrail post 1 is quickly positioned;
the threaded sleeve 5 corresponds to the through hole 10, the threaded sleeve 5 is arranged right below the through hole 10, the mounting part 8 comprises a main block and a convex block fixedly connected to one side of the main block, the convex block of the mounting part 8 is matched with the shape of the jacking groove 7, the mounting plate 9 is fixedly connected to the tops of the main block and the convex block, the bottom of the mounting plate 9 is attached to the top of the railing column 1, the fixing bolt 11 penetrates through the mounting plate 9 and is in threaded connection with the threaded sleeve 5 at the top of the railing column 1, the mounting part 8 is inserted into the top of the railing column 1, the mounting part 8 is matched with the shape of the through groove 3 of the railing column 1, the convex block of the mounting part 8 is clamped into the jacking groove 7 of the cross rod 6, then the mounting part 8 and the railing column 1 are connected through the fixing bolt 11, so as to lock the cross rod 6, so as to connect the two railing columns 1, so that welding is not needed during installation, a worker can install the, the operation of staff is convenient, and the work load is less.
The working process of the utility model is as follows: install a railing post 1 earlier, later at the horizontal pole 6 of another railing post 1 when the time disect insertion draw-in groove 4, the bottom of horizontal pole 6, bottom and two other sides all laminate mutually with the inboard of draw-in groove 4, thereby fix a position another railing post 1 fast, later insert installed part 8 from the top of railing post 1, installed part 8 and railing post 1 lead to groove 3's shape looks adaptation, the lug card of installed part 8 is gone into in the top income groove 7 of horizontal pole 6, later connect installed part 8 and railing post 1 through fixing bolt 11, thereby locking horizontal pole 6, thereby connect two railing posts 1, the installation of completion railing.
To sum up, when the novel multifunctional building railing is used, the clamping groove 4 communicated with the through groove 3 is formed in one side of the railing post 1, the cross rod 6 of another railing post 1 is directly inserted into the clamping groove 4 when being installed, the bottom and the other two side surfaces of the cross rod 6 are attached to the inner side of the clamping groove 4, so that the first railing post 1 is quickly positioned, the installation part 8 is inserted into the top of the railing post 1, the installation part 8 is matched with the through groove 3 of the railing post 1 in shape, the convex block of the installation part 8 is clamped into the jacking groove 7 of the cross rod 6, the installation part 8 and the railing post 1 are connected through the fixing bolt 11, so that the cross rod 6 is locked, so that the two railing posts 1 are connected, welding is not needed when the novel multifunctional building railing is installed, the positioning speed is high, the installation structure is simple, the installation speed is high, the railing posts 1, the through grooves 3, the clamping grooves 4, the cross rods 6, the jacking, the installation speed of the handrail can be improved, and the problem that the existing handrail is slow in installation speed is solved; through offer the draw-in groove 4 that is linked together with logical groove 3 in one side of railing post 1, another railing post 1's horizontal pole 6 when the installation in the disect insertion draw-in groove 4, the bottom of horizontal pole 6, bottom and other two sides all laminate with the inboard of draw-in groove 4 mutually, thereby another railing post 1 has been fixed a position fast, later insert installed part 8 from the top of railing post 1, installed part 8 and the logical shape looks adaptation of groove 3 of railing post 1, the lug card of installed part 8 is gone into in the top of horizontal pole 6 goes into groove 7, later connect installed part 8 and railing post 1 through fixing bolt 11, thereby locking horizontal pole 6, thereby two railing posts 1 have been connected, so the installation need not weld, the positioning speed is fast, the staff can be from the top installation fixing bolt 11 of railing post 1 under the state of standing, the staff's operation of being convenient for, the work load is less, and easy installation, through railing post 1, Lead to groove 3, draw-in groove 4, horizontal pole 6, the cooperation setting of going into groove 7 and installed part 8 on the top, can make the convenient installation railing of staff, solved the inconvenient big condition of work load of current building railing installation.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A novel multi-use architecture railing, its characterized in that: the guardrail comprises a guardrail post (1), wherein the bottom of the guardrail post (1) is fixedly connected with a base (2);
a through groove (3) penetrating through the top and the bottom of the railing post (1) is formed in the railing post (1), a clamping groove (4) communicated with the through groove (3) is formed in one side of the railing post (1), and a threaded sleeve (5) is fixedly connected to the top of the railing post (1);
the other side of the railing post (1) is fixedly connected with a cross rod (6), and one end of one side of the cross rod (6) close to the cross rod (6) is provided with a jacking groove (7);
the top of railing post (1) is pegged graft and is had installed part (8) with the shape looks adaptation that leads to groove (3), the top fixedly connected with mounting panel (9) of installed part (8), through-hole (10) have been seted up at the top of mounting panel (9), the top of mounting panel (9) is pegged graft and is had fixing bolt (11) with threaded sleeve (5) threaded connection.
2. The novel multi-purpose building balustrade of claim 1, wherein: the guardrail post (1) is fixedly connected to the middle of the top of the base (2), and the vertical section of the base (2) is trapezoidal.
3. The novel multi-purpose building balustrade of claim 1, wherein: the height of the through groove (3) is the same as that of the railing post (1), and the cross section of the through groove (3) is in a reverse L shape.
4. The novel multi-purpose building balustrade of claim 1, wherein: the cross section of the clamping groove (4) is rectangular, and the inner side of the clamping groove (4) is attached to the outer side of the cross rod (6).
5. The novel multi-purpose building balustrade of claim 1, wherein: the threaded sleeve (5) corresponds to the through hole (10), and the threaded sleeve (5) is arranged right below the through hole (10).
6. The novel multi-purpose building balustrade of claim 1, wherein: the mounting part (8) comprises a main block and a convex block fixedly connected to one side of the main block, and the convex block of the mounting part (8) is matched with the shape of the jacking groove (7).
7. The novel multi-purpose building balustrade of claim 1, wherein: mounting panel (9) fixed connection is at the top of main piece and lug, the bottom of mounting panel (9) is laminated mutually with the top of railing post (1), fixing bolt (11) run through mounting panel (9) and with threaded sleeve (5) threaded connection at railing post (1) top.
CN202021751245.5U 2020-08-20 2020-08-20 Novel multi-use architecture railing Active CN213062704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021751245.5U CN213062704U (en) 2020-08-20 2020-08-20 Novel multi-use architecture railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021751245.5U CN213062704U (en) 2020-08-20 2020-08-20 Novel multi-use architecture railing

Publications (1)

Publication Number Publication Date
CN213062704U true CN213062704U (en) 2021-04-27

Family

ID=75554005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021751245.5U Active CN213062704U (en) 2020-08-20 2020-08-20 Novel multi-use architecture railing

Country Status (1)

Country Link
CN (1) CN213062704U (en)

Similar Documents

Publication Publication Date Title
CN212924026U (en) Novel aluminum alloy well structure for elevator
CN210238772U (en) Adopt high strength bolted connection's concrete beam column connected node
CN213062704U (en) Novel multi-use architecture railing
CN210947477U (en) High strength guardrail modelled after an antique
CN213269008U (en) Non-destructive installation stair bench faces frontier defense guardrail
CN214615043U (en) Prefabricated component reserved steel bar positioning and correcting device
CN113463913A (en) Masonry T-shaped constructional column formwork reinforcing device and construction method
CN214034464U (en) Handrail convenient to dismantle
CN201381599Y (en) Guardrail movable connecting piece
CN112376992A (en) Railing is assembled with assembled to building decoration
CN110578402A (en) Tool type outer hanging rack installation method for prefabricated wall with sun shield
CN220598960U (en) Railing system capable of being assembled rapidly
CN220318757U (en) Assembled elevator shaft beam column
CN113756232B (en) Rapidly-disassembled and assembled pedestrian rail and assembling and mounting method thereof
CN218622619U (en) A assembled building frame for in construction
CN209081189U (en) A kind of connection structure of the wear-resisting rail brackets of elevator special environment protection
CN210592368U (en) Scaffold convenient to disassemble and assemble for ship repair
CN220300085U (en) Elevator car wall structure
CN216305332U (en) Guide rail upright post for building construction
CN214220549U (en) Novel but fix even scaffold frame I-steel that encorbelments of roof beam
CN212295400U (en) Prefabricated stair rail guard that building engineering used
CN220469382U (en) Scaffold frame height big formwork is detained to dish
CN112282343B (en) Dual self-lifting type external climbing frame for super high-rise building
CN214246378U (en) Steel construction stair
CN218881394U (en) Railing structure convenient to glass installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant