CN213054799U - Prefabricated external wall insulation board job site piling bin - Google Patents
Prefabricated external wall insulation board job site piling bin Download PDFInfo
- Publication number
- CN213054799U CN213054799U CN202022110462.2U CN202022110462U CN213054799U CN 213054799 U CN213054799 U CN 213054799U CN 202022110462 U CN202022110462 U CN 202022110462U CN 213054799 U CN213054799 U CN 213054799U
- Authority
- CN
- China
- Prior art keywords
- external wall
- insulation board
- plate
- wall insulation
- vertical frames
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a piling bin for a prefabricated external wall insulation board construction site, which comprises two first vertical frames symmetrically arranged on the left side and two second vertical frames symmetrically arranged on the right side, wherein a bottom plate is fixedly arranged below the two first vertical frames and the two second vertical frames, a fixing mechanism is arranged above the two first vertical frames and the two second vertical frames, and a lifting mechanism is arranged inside the fixing mechanism; the utility model relates to a piling bin technical field. This prefabricated external wall insulation board job site piling bin, through setting up fixed establishment, utilize the hydraulic stem to drive the clamp plate and reciprocate, can stack at the heated board and fix it behind the bottom plate, avoid the heated board unstability to drop, the fixed establishment of cooperation setting can be when needs take out the heated board of intermediate layer, light lifts the heated board on upper strata, conveniently takes out the heated board of intermediate layer, avoided traditional manpower to lift and get the process, not only labour saving and time saving, work efficiency is higher moreover.
Description
Technical Field
The utility model relates to a piling bin technical field specifically is a prefabricated external wall insulation board job site piling bin.
Background
The heat insulation board is a board for heat insulation of a building, which is popular and easy to understand; the heat-insulating board is a hard foamed plastic board made up by using polystyrene resin as raw material, adding other raw auxiliary materials and polymer, heating, mixing and simultaneously injecting catalyst, then extruding and forming, and has the functions of resisting moisture and resisting water, and can reduce the thickness of exterior enclosure structure of building so as to increase indoor use area.
When current prefabricated external wall insulation board stacks, adopt comparatively simple rack, cause the heated board to drop easily when the heated board stacks too high, stability is relatively poor to when the heated board of intermediate layer need be taken out, need lift the process of getting with the help of the manpower, not only waste time and energy, work efficiency is lower, for this reason, the utility model provides a prefabricated external wall insulation board job site piling bin.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a prefabricated external wall insulation board job site piling bin has solved current prefabricated external wall insulation board and has stacked, and stability is relatively poor to when needing to take out the heated board of intermediate layer, need lift the problem of getting the process with the help of the manpower.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a piling bin for a prefabricated external wall insulation board construction site comprises two first vertical frames symmetrically arranged on the left side and two second vertical frames symmetrically arranged on the right side, wherein a bottom plate is fixedly arranged below the space between the two first vertical frames and the second vertical frames, a fixing mechanism is arranged above the space between the two first vertical frames and the second vertical frames, and a lifting mechanism is arranged inside the fixing mechanism; the fixing mechanism comprises a top plate fixed between two first vertical frames and a second vertical frame, a hydraulic rod is fixedly mounted at the top of the top plate, the output end of the hydraulic rod penetrates through the top plate and extends to the outside of the top plate, two pressing plates are movably connected between the first vertical frames and the second vertical frames and located right above the bottom plate, and the tops of the pressing plates are fixedly connected with the output end of the hydraulic rod.
Preferably, the sliding grooves are formed in the surfaces of the two first vertical frames and the surface of the second vertical frame, the sliding blocks are connected to the inner surfaces of the sliding grooves in a sliding mode, and one side of each sliding block is fixedly connected with one side of the corresponding pressing plate.
Preferably, the lifting mechanism comprises moving grooves formed in two sides of the pressing plate, and moving plates are connected to the inner surfaces of the two moving grooves in a sliding mode.
Preferably, one side of the moving plate is fixedly connected with a limiting strip, and one side of the moving plate is fixedly connected with a lifting handle.
Preferably, the bottom of movable plate has been seted up and has been led to the groove, and the inner wall joint that leads to the groove has the picture peg, the surface integrated into one piece of picture peg has the lifting plate.
Preferably, one side of the inserting plate is fixedly connected with a pull rope, and one end of the pull rope is fixedly connected with the inner wall of the through groove.
Advantageous effects
The utility model provides a prefabricated external wall insulation board job site piling bin. Compared with the prior art, the method has the following beneficial effects:
(1) this prefabricated external wall insulation board job site piling bin, below fixed mounting through between two first perpendicular framves and the second perpendicular frame has the bottom plate, top between two first perpendicular framves and the second perpendicular frame is provided with fixed establishment, and fixed establishment's inside is provided with hoist mechanism, through setting up fixed establishment, utilize the hydraulic stem to drive the clamp plate and reciprocate, can stack at the heated board and fix it behind the bottom plate, avoid the heated board unstability to drop, the fixed establishment that the cooperation set up, can be when the heated board of intermediate level takes out in needs, light lifts the heated board on upper strata, the convenient heated board to intermediate level takes out, traditional manpower has been avoided lifting the process of getting, time saving and labor saving not only, and work efficiency is higher.
(2) This prefabricated external wall insulation board job site piling bin has all seted up the spout through erecting the surface of frame at two first perpendicular framves and second, and the internal surface sliding connection of spout has the slider, and one side of slider and one side fixed connection of clamp plate through erecting frame at first perpendicular frame and second and setting up spout and slider, utilize slider and clamp plate fixed, stability that can effectual reinforcing clamp plate remove.
Drawings
Fig. 1 is a perspective view of the external structure of the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is a perspective view of the present invention with a partial structure.
In the figure: 1-a first vertical frame, 2-a second vertical frame, 3-a bottom plate, 4-a fixed mechanism, 41-a top plate, 42-a hydraulic rod, 43-a pressing plate, 5-a lifting mechanism, 51-a moving groove, 52-a moving plate, 53-a limiting strip, 54-a lifting handle, 55-a through groove, 56-a plug board, 57-a lifting plate, 58-a pull rope, 6-a sliding groove and 7-a sliding block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a piling bin for a prefabricated external wall insulation board construction site comprises two first vertical frames 1 symmetrically arranged on the left side and two second vertical frames 2 symmetrically arranged on the right side, sliding grooves 6 are formed in the surfaces of the two first vertical frames 1 and the surfaces of the two second vertical frames 2, sliding blocks 7 are connected to the inner surfaces of the sliding grooves 6 in a sliding mode, the sliding grooves 6 and the sliding blocks 7 are arranged, the moving stability of a pressing plate 43 can be enhanced, one side of each sliding block 7 is fixedly connected with one side of the pressing plate 43, a bottom plate 3 is fixedly installed below the space between the two first vertical frames 1 and the second vertical frames 2, a fixing mechanism 4 is arranged above the space between the two first vertical frames 1 and the second vertical frames 2, and a lifting mechanism 5 is arranged inside the fixing mechanism 4; fixing mechanism 4 is including fixing roof 41 in the top between two first perpendicular framves 1 and the second perpendicular frame 2, and the top fixed mounting of roof 41 has hydraulic stem 42, hydraulic stem 42 and external power source electric connection, and the output of hydraulic stem 42 runs through roof 41 and extends to the outside of roof 41, and swing joint has clamp plate 43 directly over just being located bottom plate 3 between two first perpendicular framves 1 and the second perpendicular frame 2, and the top of clamp plate 43 and the output fixed connection of hydraulic stem 42.
Referring to fig. 1-3, the lifting mechanism 5 includes moving grooves 51 formed on both sides of the pressing plate 43, the inner surfaces of the two moving grooves 51 are slidably connected with a moving plate 52, one side of the moving plate 52 is fixedly connected with a limiting strip 53, the limiting strip 53 prevents the moving plate 52 from completely separating from the moving grooves 51, one side of the moving plate 52 is fixedly connected with a lifting handle 54, the bottom of the moving plate 52 is provided with a through groove 55, the inner wall of the through groove 55 is provided with a slot matched with the inserting plate 56, the inner wall of the through groove 55 is clamped with the inserting plate 56, the surface of the inserting plate 56 is integrally formed with a lifting plate 57, one side of the inserting plate 56 is fixedly connected with a pulling rope 58, and one end of the pulling rope 58 is fixedly connected with the inner wall of the through groove 55, by providing the fixing mechanism 4, the pressing plate 43 is driven by the hydraulic rod 42, the fixed establishment 5 that the cooperation set up can be when the heated board of intermediate level takes out in needs, and the light heated board with the upper strata lifts by crane, conveniently takes out the heated board of intermediate level, has avoided traditional manpower to lift and has got the process, and labour saving and time saving not only, work efficiency is higher moreover.
And those not described in detail in this specification are well within the skill of those in the art.
When the prefabricated external wall insulation board lifting device works, firstly, the prefabricated external wall insulation board is placed on the bottom plate 3, the hydraulic rod 42 is started after the stacking is finished, the pressing plate 43 moves downwards through the hydraulic rod 42, meanwhile, the sliding block 7 moves downwards in the sliding groove 6, the prefabricated external wall insulation board is fastened by the pressing plate 43, and the hydraulic rod 42 is closed, so that the prefabricated external wall insulation board can be effectively prevented from unstably falling down in the process, when the insulation board of the middle layer needs to be taken out, the lifting handle 54 is firstly pulled, the lifting handle 54 is pulled, so that the moving plate 52 is taken out from the moving groove 51, then the inserting plate 56 is taken out from the through groove 55, the lifting plate 57 is inserted at the top of the prefabricated external wall insulation board needing to be taken out after the inserting plate 56 is taken out, the hydraulic rod 42 is started, the pressing plate 43 is lifted through the hydraulic rod 42, the pressing plate 43 is lifted up, so that the whole, the traditional manpower lifting process is avoided, time and labor are saved, the working efficiency is higher, the initial state can be recovered through reverse operation, and the working principle of the stacking frame on the construction site of the prefabricated external wall insulation board is realized.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a prefabricated external wall insulation board job site piling bin, includes that two symmetries set up at left first perpendicular frame (1) and two symmetries set up second perpendicular frame (2) on the right side, two below fixed mounting between first perpendicular frame (1) and the second perpendicular frame (2) has bottom plate (3), its characterized in that: a fixing mechanism (4) is arranged above the space between the two first vertical frames (1) and the second vertical frame (2), and a lifting mechanism (5) is arranged in the fixing mechanism (4);
fixed establishment (4) are including fixing roof (41) in the top between two first perpendicular framves (1) and the second perpendicular frame (2), the top fixed mounting of roof (41) has hydraulic stem (42), the output of hydraulic stem (42) runs through roof (41) and extends to the outside of roof (41), two between first perpendicular frame (1) and the second perpendicular frame (2) and be located bottom plate (3) directly over swing joint have clamp plate (43), and the top of clamp plate (43) and the output fixed connection of hydraulic stem (42).
2. The stacking rack for the prefabricated external wall insulation board construction site according to claim 1, characterized in that: the sliding grooves (6) are formed in the surfaces of the two first vertical frames (1) and the second vertical frame (2), the sliding blocks (7) are connected to the inner surfaces of the sliding grooves (6) in a sliding mode, and one side of each sliding block (7) is fixedly connected with one side of each pressing plate (43).
3. The stacking rack for the prefabricated external wall insulation board construction site according to claim 1, characterized in that: the lifting mechanism (5) comprises moving grooves (51) formed in two sides of the pressing plate (43), and moving plates (52) are connected to the inner surfaces of the two moving grooves (51) in a sliding mode.
4. The stacking rack for the prefabricated external wall insulation board construction site according to claim 3, characterized in that: one side of the moving plate (52) is fixedly connected with a limiting strip (53), and one side of the moving plate (52) is fixedly connected with a lifting handle (54).
5. The stacking rack for the prefabricated external wall insulation board construction site according to claim 3, characterized in that: the bottom of movable plate (52) has been seted up and has been led to groove (55), and the inner wall joint that leads to groove (55) has picture peg (56), the surperficial integrated into one piece of picture peg (56) has lift plate (57).
6. The stacking rack for the prefabricated external wall insulation board construction site according to claim 5, characterized in that: one side of the inserting plate (56) is fixedly connected with a pull rope (58), and one end of the pull rope (58) is fixedly connected with the inner wall of the through groove (55).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022110462.2U CN213054799U (en) | 2020-09-23 | 2020-09-23 | Prefabricated external wall insulation board job site piling bin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022110462.2U CN213054799U (en) | 2020-09-23 | 2020-09-23 | Prefabricated external wall insulation board job site piling bin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213054799U true CN213054799U (en) | 2021-04-27 |
Family
ID=75559684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022110462.2U Active CN213054799U (en) | 2020-09-23 | 2020-09-23 | Prefabricated external wall insulation board job site piling bin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213054799U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115030596A (en) * | 2022-06-28 | 2022-09-09 | 江西天境精藏科技有限公司 | Bone ash storage rack with dovetail mortise-tenon structure |
-
2020
- 2020-09-23 CN CN202022110462.2U patent/CN213054799U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115030596A (en) * | 2022-06-28 | 2022-09-09 | 江西天境精藏科技有限公司 | Bone ash storage rack with dovetail mortise-tenon structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213054799U (en) | Prefabricated external wall insulation board job site piling bin | |
CN115627771A (en) | Foundation pit supporting structure | |
CN215106659U (en) | Finished product separation seam for roof rigid protective layer | |
CN212896304U (en) | Pressurizing drainage rod device | |
CN202450488U (en) | Hollow brick for bank revetment of riverway | |
CN211646992U (en) | Acid-resistant carbon fiber resin tile plate | |
CN207277821U (en) | A kind of non-dismantling self-heat-insulation template and its production equipment | |
CN214362970U (en) | Side wall template reinforcing apparatus of drainage box culvert | |
CN200975046Y (en) | Fire prevention vermiculite brick | |
CN217352566U (en) | Basement bottom plate with water collecting structure | |
CN215329201U (en) | Ramming device for civil engineering | |
CN220414263U (en) | Soft soil subway foundation pit underground diaphragm wall construction device | |
CN215631937U (en) | Whole plug-type closed garbage room of job site | |
CN221810667U (en) | Energy-saving heat-preserving precast concrete composite floor slab | |
CN218758390U (en) | Building waterproof material laying device | |
CN219411921U (en) | Fly ash landfill covering film pressing device and pile covering film pressing weight | |
CN221053232U (en) | Building auxiliary device that builds a wall | |
CN214170190U (en) | Convenient folded cascade rail is used in road bridge construction | |
CN216130160U (en) | Water sealing device for dewatering well of underground structure | |
CN212052833U (en) | Building foundation structure | |
CN215291502U (en) | Reinforcing bar strorage device for construction | |
CN213927368U (en) | Rapid laying structure of assembly type building floor tiles | |
CN212773102U (en) | Energy-saving environment-friendly novel aerated brick | |
CN218843340U (en) | Heat-preservation cement movable house | |
CN218433575U (en) | Automatic conveying device suitable for tile manufacturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |