CN213038211U - Operation platform for bridge construction - Google Patents

Operation platform for bridge construction Download PDF

Info

Publication number
CN213038211U
CN213038211U CN202021523896.9U CN202021523896U CN213038211U CN 213038211 U CN213038211 U CN 213038211U CN 202021523896 U CN202021523896 U CN 202021523896U CN 213038211 U CN213038211 U CN 213038211U
Authority
CN
China
Prior art keywords
bridge
bolted connection
construction
walking support
constructor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021523896.9U
Other languages
Chinese (zh)
Inventor
毛凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021523896.9U priority Critical patent/CN213038211U/en
Application granted granted Critical
Publication of CN213038211U publication Critical patent/CN213038211U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge construction is used as industry platform, including bridge, walking support and storage tank, bridge upper end both sides are provided with the supporting shoe, there is the track supporting shoe upper end through bolted connection, sliding connection has on the track walking support, there is the middle part support frame walking support middle part through bolted connection, there is the link middle part support frame one side through bolted connection, there is the bottom plate link middle part one side through bolted connection, there is the storage tank through bolted connection on the bottom plate. Has the advantages that: the utility model discloses a set up bottom plate and storage tank, can store article for the construction, guarantee that the job site is clean and tidy, make things convenient for constructor construction operation, improve the efficiency of construction, through setting up the roof, can provide shady and cool place, the constructor of being convenient for has a rest, improves constructor operational environment, reduces constructor work burden.

Description

Operation platform for bridge construction
Technical Field
The utility model relates to a bridge construction technical field, concretely relates to bridge construction is as industry platform.
Background
The bridge construction is a process of building a bridge according to design contents, mainly refers to the contents of bridge construction technology, construction organization, construction management, construction quality and the like, and generally needs a construction operation platform in the bridge construction detection process so as to meet construction requirements.
And current operation platform for bridge construction is when using, and the instrument that need use is more for it is in disorder to place the ratio on-the-spot, causes the influence to constructor easily, reduces the practicality of device, and current operation platform for bridge construction is mostly formed through the support concatenation in addition, and the clearance is great, can not provide the shady and cool place for the staff, makes the staff have a rest inconveniently, and operational environment is poor, increases staff's work burden.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome the prior art not enough, present a bridge construction and used as industry platform, solved current for bridge construction operation platform when using, the instrument that need use is more for it is in disorder to place on the scene, causes the influence to the constructor easily, reduces the problem of the practicality of device.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides a bridge construction is used as industry platform, including bridge, walking support and storage tank, bridge upper end both sides are provided with the supporting shoe, there is the track supporting shoe upper end through bolted connection, sliding connection has on the track walking support, there is the middle part support frame walking support middle part through bolted connection, there is the link middle part support frame one side through bolted connection, there is the bottom plate link middle part one side through bolted connection, there is the storage tank through bolted connection on the bottom plate.
Furthermore, the upper end of the walking support is connected with an upper supporting rod through a bolt, and one side of the upper supporting rod is connected with a hanging rod through a bolt.
Through adopting above-mentioned technical scheme, can make walking support along the track slides, and then right the bridge is under construction, through the middle part support frame can strengthen walking support's intensity and stability improve device's result of use, the bottom plate can give the storage tank provides the outrigger, through storage tank stores up article, guarantees that the job site is clean and tidy, makes things convenient for constructor construction work, improves the efficiency of construction.
Further, a lower supporting plate is arranged on one side of the bottom end of the bridge, a lifting rope is wound on the connecting frame and the hanging rod, and the lifting rope is connected with the lower supporting plate through a hook.
By adopting the technical scheme, the lower supporting plate can be lifted, and then cement can be poured on the bridge, so that construction is facilitated.
Furthermore, a balancing weight is arranged on one side, far away from the hanging rod, of the upper end of the walking support, and the balancing weight is connected with the walking support through a bolt.
By adopting the technical scheme, the weight of the walking bracket can be increased, and the stability of the walking bracket is ensured.
Furthermore, the upper end of the upper supporting rod is connected with a top plate through a bolt.
Through adopting above-mentioned technical scheme, can provide the shady and cool place, the constructor of being convenient for has a rest, improves constructor operational environment, reduces constructor work burden.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1. in order to solve the problems that when the existing operation platform for bridge construction is used, more tools need to be used, so that the site placement is messy, the influence on constructors is easily caused, and the practicability of the device is reduced, the utility model can store articles for construction by arranging the bottom plate and the storage box, ensure the construction site to be clean and tidy, facilitate the construction operation of the constructors and improve the construction efficiency;
2. for solving current operation platform for bridge construction mostly forms through the support concatenation, the clearance is great, can not provide cool and shady place for the staff has a rest inconveniently, and operational environment is poor, increases the problem of staff's work burden, the utility model discloses a set up the roof, can provide cool and shady place, the constructor of being convenient for has a rest, improves constructor operational environment, reduces constructor work burden.
Drawings
FIG. 1 is a schematic structural view of an operation platform for bridge construction according to the present invention;
FIG. 2 is a right side view of a service platform for bridge construction according to the present invention;
fig. 3 is a top view of the utility model relates to a work platform for bridge construction.
The reference numerals are explained below:
1. a bridge; 2. a support block; 3. a track; 4. a balancing weight; 5. a walking bracket; 6. a middle support frame; 7. an upper support rod; 8. a boom; 9. a storage box; 10. a base plate; 11. a lifting rope; 12. a lower support plate; 13. A top plate; 14. and a connecting frame.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1-3, the working platform for bridge construction in this embodiment comprises a bridge 1, a walking frame 5 and a storage box 9, wherein two sides of the upper end of the bridge 1 are provided with supporting blocks 2, the upper end of each supporting block 2 is connected with a rail 3 through a bolt, the rail 3 is provided with a stable support through the supporting block 2, the walking frame 5 is slidably connected on the rail 3, the middle part of the walking frame 5 is connected with a middle supporting frame 6 through a bolt, one side of the middle supporting frame 6 is connected with a connecting frame 14 through a bolt, the walking frame 5 can slide along the rail 3, the bridge 1 is constructed, the strength and stability of the walking frame 5 can be enhanced through the middle supporting frame 6, the using effect of the device is improved, one side of the middle part of the connecting frame 14 is connected with a bottom plate 10 through a bolt, the storage box 9 is connected on the, store up article through storage tank 9, guarantee that the job site is clean and tidy, make things convenient for constructor construction work, improve the efficiency of construction, 5 upper ends of walking support are kept away from jib 8 one side and are provided with balancing weight 4, and balancing weight 4 passes through bolted connection with walking support 5, can increase walking support 5's weight, ensures walking support 5's stability.
As shown in fig. 1-3, in this embodiment, the upper end of the traveling support 5 is connected with an upper support rod 7 through a bolt, one side of the upper support rod 7 is connected with a suspender 8 through a bolt, one side of the bottom end of the bridge 1 is provided with a lower support plate 12, a connecting frame 14 and the suspender 8 are respectively wound with a lifting rope 11, the lifting rope 11 is connected with the lower support plate 12 through a hook, the lower support plate 12 can be lifted, and then cement is poured on the bridge 1, so that construction is facilitated.
As shown in fig. 1 to 3, in this embodiment, the top plate 13 is connected to the upper end of the upper support rod 7 through a bolt, so that a cool and shady place can be provided, the rest of the constructors can be facilitated, the working environment of the constructors can be improved, and the workload of the constructors can be reduced.
The specific implementation process of this embodiment is as follows: when the construction, can make walking support 5 slide along track 3, and then construct bridge 1, can strengthen walking support 5's intensity and stability through middle part support frame 6, improve the result of use of device, can increase walking support 5's weight through balancing weight 4, ensure walking support 5's stability, bottom plate 10 can provide the outrigger for storage tank 9, store up article through storage tank 9, it is clean and tidy to guarantee the job site, make things convenient for constructor construction operation, improve the efficiency of construction, can provide the shady and cool place through roof 13, the constructor of being convenient for has a rest, improve constructor operational environment, reduce constructor work burden.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.

Claims (5)

1. The utility model provides a bridge construction is as industry platform which characterized in that: including bridge (1), walking support (5) and storage tank (9), bridge (1) upper end both sides are provided with supporting shoe (2), there is track (3) supporting shoe (2) upper end through bolted connection, sliding connection has on track (3) walking support (5), there is middle part support frame (6) walking support (5) middle part through bolted connection, there is link (14) middle part support frame (6) one side through bolted connection, there is bottom plate (10) link (14) middle part one side through bolted connection, there is storage tank (9) through bolted connection on bottom plate (10).
2. The service platform for bridge construction according to claim 1, wherein: the walking support is characterized in that the upper end of the walking support (5) is connected with an upper supporting rod (7) through a bolt, and one side of the upper supporting rod (7) is connected with a hanging rod (8) through a bolt.
3. The service platform for bridge construction according to claim 2, wherein: bridge (1) bottom one side is provided with bottom suspension fagging (12), link (14) with all twine lifting rope (11) on jib (8), lifting rope (11) with bottom suspension fagging (12) are connected through the couple.
4. The service platform for bridge construction according to claim 2, wherein: and a balancing weight (4) is arranged on one side, far away from the suspender (8), of the upper end of the walking support (5), and the balancing weight (4) is connected with the walking support (5) through a bolt.
5. The service platform for bridge construction according to claim 1, wherein: the upper end of the upper supporting rod (7) is connected with a top plate (13) through a bolt.
CN202021523896.9U 2020-07-28 2020-07-28 Operation platform for bridge construction Active CN213038211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021523896.9U CN213038211U (en) 2020-07-28 2020-07-28 Operation platform for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021523896.9U CN213038211U (en) 2020-07-28 2020-07-28 Operation platform for bridge construction

Publications (1)

Publication Number Publication Date
CN213038211U true CN213038211U (en) 2021-04-23

Family

ID=75528862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021523896.9U Active CN213038211U (en) 2020-07-28 2020-07-28 Operation platform for bridge construction

Country Status (1)

Country Link
CN (1) CN213038211U (en)

Similar Documents

Publication Publication Date Title
CN204281108U (en) A kind of transfer crane
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN111717798A (en) Multi-machine cooperative hoisting system and process for box girder of over-built railway cutting highway bridge
CN110155886B (en) Adjustable construction crane
CN217350492U (en) Novel lifting device for bridge deck installation
CN213038211U (en) Operation platform for bridge construction
CN211034964U (en) Hoisting mechanism of steel reinforcement cage
CN217350385U (en) Adjustable compensating beam hoist reaches bridge deck crane including this hoist
CN209010984U (en) A kind of Bridge Erector hoisting system and Bridge Erector suitable for low headroom condition
CN207862788U (en) It is a kind of to be connected to the outstanding stretch-draw jack hanging apparatus filled on Hanging Basket
CN203095397U (en) Trial run cradle of heavy-duty crane
CN215756039U (en) Walking gantry crane
CN213387509U (en) Box girder jig hoisting truss
CN212315299U (en) Anti-swing device of hoisting equipment
CN2666873Y (en) Gantry crane with automatic clamping antiswinging lifting device
CN208293434U (en) Gallus-type large-tonnage box beam hanger structure
CN206827933U (en) The overhead explosion-proof crane of robot type cutting machine
CN200955003Y (en) Large fork-lift-track lower-cabin combined tool
CN202164058U (en) Full circle girder erecting crane
CN220766256U (en) Folding lifting appliance
CN216918369U (en) Quick positioning and mounting tool for large-diameter porous anchorage device
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN107188045A (en) The overhead explosion-proof crane of robot type cutting machine
CN108657964A (en) A kind of double cucurbit gantry cranes
CN216512496U (en) Single-boom bridge crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant