CN213034237U - Construction pretreatment device for building roof - Google Patents

Construction pretreatment device for building roof Download PDF

Info

Publication number
CN213034237U
CN213034237U CN202021708762.4U CN202021708762U CN213034237U CN 213034237 U CN213034237 U CN 213034237U CN 202021708762 U CN202021708762 U CN 202021708762U CN 213034237 U CN213034237 U CN 213034237U
Authority
CN
China
Prior art keywords
base
support
roof
chassis
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021708762.4U
Other languages
Chinese (zh)
Inventor
凌晓华
杨正贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pengcheng Construction Group Co ltd
Original Assignee
Pengcheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pengcheng Construction Group Co ltd filed Critical Pengcheng Construction Group Co ltd
Priority to CN202021708762.4U priority Critical patent/CN213034237U/en
Application granted granted Critical
Publication of CN213034237U publication Critical patent/CN213034237U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a building house roof construction preprocessing device belongs to building construction device field, and it includes the base, the bottom of base is provided with the gyro wheel, install the support frame on the base, the top of support frame is provided with the locating support, install the grinding roller on the locating support, the one end of grinding roller is provided with driving motor, driving motor's output shaft and the roller coaxial line connection of polishing, the support frame includes chassis and roof-rack, the chassis sets up on the base, the jack has all been seted up to the both sides of chassis, the roof-rack is inserted and is established in the jack, be provided with the setting element on the chassis, the roof-rack distributes along self length direction has a plurality of ring channels that supply the setting element card to establish. This application has the effect of being convenient for adjust in order to adapt to the not house roof of co-altitude to the height of movable support.

Description

Construction pretreatment device for building roof
Technical Field
The application relates to the field of building construction devices, in particular to a building house top wall construction pretreatment device.
Background
The house roof preprocessing is the process of polishing the roof putty in the decoration process, and currently, manual polishing is mostly adopted. The constructor has to climb to a position close to the roof by means of a ladder and then polish by holding sandpaper or a sander. This kind of mode of polishing is on the one hand work efficiency low, and on the other hand constructor is nearer apart from the dust, causes the harm to constructor's health easily.
The current chinese patent with an authorization publication number of CN206689853U discloses a house top surface polishing device, the key points of which lie in: including polisher and support frame, the middle part of polisher articulates at the support frame top and forms lever column structure, and the one end of keeping away from the abrasive disc on the polisher has hung the counter weight, makes the one end perk that makes polisher abrasive disc place upwards to make the abrasive disc hug closely the house top surface, the support frame bottom is equipped with running gear.
In view of the above-mentioned related art, the inventors consider that there is a drawback in that it is difficult to adjust the height of the support frame.
SUMMERY OF THE UTILITY MODEL
In order to facilitate the height to the support frame adjust in order to adapt to the not house roof of co-altitude, this application provides a building house roof construction preprocessing device.
The application provides a pretreatment device for construction of building roof adopts following technical scheme:
the utility model provides a building house roof construction preprocessing device, includes the base, the bottom of base is provided with the gyro wheel, install the support frame on the base, the top of support frame is provided with the locating support, install the grinding roller on the locating support, the one end of grinding roller is provided with driving motor, driving motor's output shaft and the roller coaxial line connection of polishing, the support frame includes chassis and roof-rack, the chassis sets up on the base, the jack has all been seted up to the both sides of chassis, the roof-rack is inserted and is established in the jack, be provided with the setting element on the chassis, the roof-rack distributes along self length direction has a plurality of ring channels that supply the setting element card to establish.
Through adopting above-mentioned technical scheme, through setting up the support frame into roof-rack and chassis, insert the roof-rack and establish on the chassis to realize fixing the position between roof-rack and the chassis through establishing the setting element card in the ring channel of different positions, realize the regulation to support frame overall height, thereby change the height of grinding roller, so that adapt to the not house roof of co-altitude.
Preferably, the locating piece is a locating sleeve, the locating sleeve comprises a first supporting cylinder and a second supporting cylinder, the first supporting cylinder is fixedly arranged at the top of the bottom frame, the second supporting cylinder is hinged to the first supporting cylinder, clamping flanges are arranged on the first supporting cylinder and the second supporting cylinder, and the clamping flanges are clamped in one of the annular grooves of the top frame.
Through adopting above-mentioned technical scheme, when the height of support frame needs to be adjusted, through changing the insertion amount of roof-rack on the chassis, then rotate second branch section of thick bamboo to the direction that is close to first branch section of thick bamboo to make the chucking flange card establish in the ring channel of assigned position, realize the fixed of relative position between roof-rack and the chassis, thereby realize the regulation to the whole length of support frame.
Preferably, a first lining is arranged on one side, away from the hinge point, of the first support cylinder, a fastening bolt is arranged on the first lining, a second lining is arranged on one side, away from the hinge point, of the second support cylinder, and a threaded hole for inserting the fastening bolt is formed in the second lining.
Through adopting above-mentioned technical scheme, rotate the second to first prop a section of thick bamboo to the second gasket with first gasket when laminating mutually, insert fastening bolt and establish in the threaded hole, realize propping up a section of thick bamboo and a location of a section of thick bamboo to the second to improve overall structure's stability.
Preferably, the chassis includes the fixed bolster and sets up the regulation support in the fixed bolster bottom, it includes two supporting legs to adjust the support, the supporting leg rotates the both sides that set up at the fixed bolster, the spout has been seted up on the base, the supporting leg is kept away from the one end of fixed bolster and is slided and set up in the spout.
Through adopting above-mentioned technical scheme, fix the back with the relative position of roof-rack and chassis, through the turned angle who changes the supporting leg, realize the regulation to chassis relative height to the realization is to the further regulation of grinding roller height of polishing.
Preferably, the supporting leg is kept away from the one end of fixed bolster and is rotated and be provided with the backing sheet, the bottom of backing sheet is provided with the slider, the slider slides and sets up in the spout, the both sides of backing sheet all are provided with the locating pin, the both sides that just are located the spout on the base all distribute along the length direction of spout have a plurality of locating grooves that supply the locating pin to insert the establishment.
Through adopting above-mentioned technical scheme, slide the slider setting of backing sheet bottom in the spout of base bottom, when the slider slides to the assigned position, insert the locating pin on the backing sheet and establish in the constant head tank of assigned position, realize the fixed to the angle between supporting leg and the fixed bolster to the realization is to the regulation of fixed bolster height.
Preferably, the sliding block is a T-shaped block, and the sliding groove is a T-shaped groove.
Through adopting above-mentioned technical scheme, through setting up the slider into the T-shaped piece to open the spout and establish into the T-shaped groove, so that improve the stability of slider in the slider.
Preferably, the support frame is provided with an ash receiving groove outside the positioning support, the bottom of the ash receiving groove is provided with an ash guide pipe, the base is provided with a collecting groove, the top end of the ash guide pipe is communicated with the ash receiving groove, and the bottom end of the ash guide pipe is communicated with the collecting groove.
Through adopting above-mentioned technical scheme, connect the ash groove through setting up on the support frame, when polishing the house roof, connect the ash groove to collect the dust that the process of polishing produced, then through leading into in the collecting vat of ash guide pipe to make things convenient for the staff to clear up the dust.
Preferably, the two ends of the ash guide pipe are provided with lining plates, the lining plates are provided with connecting bolts, and threaded holes for the connecting bolts to be inserted are formed in the ash receiving groove and the collecting groove.
Through adopting above-mentioned technical scheme, set up the welt through the both ends at the ash guide pipe to be connected to the welt through connecting bolt and connect on ash chute and the collecting vat, in order to conveniently take off the ash guide pipe and clear up.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the supporting frame is arranged into the top frame and the bottom frame, the top frame is inserted into the bottom frame, the positioning piece is clamped in the annular grooves at different positions to fix the positions between the top frame and the bottom frame, and the overall height of the supporting frame is adjusted, so that the height of the grinding roller is changed to adapt to roof walls of houses with different heights;
2. the clamping flange is clamped in the annular groove at the designated position, and the fastening bolt is inserted in the threaded hole, so that the second support cylinder and the first support cylinder are positioned, the relative position between the top frame and the bottom frame is fixed, and the whole length of the support frame is adjusted;
3. this application slides through the slider with backing sheet bottom and sets up in the spout of base bottom, when the slider slides to the assigned position, inserts the locating pin on the backing sheet and establishes in the constant head tank of assigned position, realizes the fixed to the angle between supporting leg and the fixed bolster to the realization is to the regulation of fixed bolster height.
Drawings
Fig. 1 is a schematic structural diagram of the present application.
Fig. 2 is an enlarged view of a portion a of fig. 1.
Fig. 3 is a schematic structural diagram of the support frame of the present application.
Fig. 4 is a schematic structural diagram of the positioning member of the present application.
Fig. 5 is a schematic view of the installation structure of the adjusting bracket on the base.
Description of reference numerals: 1. a base; 11. a roller; 12. a chute; 13. positioning a groove; 2. a support frame; 21. a chassis; 211. a positioning member; 2111. a first branch tube; 2112. a second branch tube; 2113. clamping the flange; 2114. a first liner sheet; 2115. fastening a bolt; 2116. a second liner sheet; 212. fixing a bracket; 213. adjusting the bracket; 2131. supporting legs; 2132. a support sheet; 2133. a slider; 2134. positioning pins; 22. a top frame; 221. an annular groove; 3. positioning the bracket; 4. grinding a roller; 41. a drive motor; 5. an ash receiving groove; 51. an ash guide pipe; 52. a liner plate; 53. a connecting bolt; 6. and (4) collecting the tank.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses a pretreatment device for construction of building roof. Referring to fig. 1, including base 1, gyro wheel 11 has all been welded in base 1's bottom four corners, promote base 1 with the convenience, install support frame 2 on the base 1, the top welding of support frame 2 has the backup pad, the welding has locating support 3 in the backup pad, install the roller 4 of polishing that is used for polishing the wall body on the locating support 3, the one end of roller 4 of polishing is provided with and is used for the drive to polish roller 4 pivoted driving motor 41, driving motor 41's output shaft and the roller 4 coaxial line connection of polishing, start driving motor 41, driving motor 41's output shaft drives and polishes roller 4 and rotate, the staff can make polishing roller 4 polish the processing to the house roof along base 1's moving direction at the pivoted in-process through promoting base 1 promptly.
Referring to fig. 1 and 2, an ash receiving groove 5 is formed in the supporting plate, the ash receiving groove 5 is located outside the positioning support 3 and used for collecting dust generated in the polishing process, a collecting groove 6 is formed in the base 1, an ash guide pipe 51 is connected between the collecting groove 6 and the ash receiving groove 5, the top end of the ash guide pipe 51 is communicated with the ash receiving groove 5, the bottom end of the ash guide pipe 51 is communicated with the collecting groove 6, and dust received in the ash receiving groove 5 is guided into the collecting groove 6 through the ash guide pipe 51 so as to be convenient for a worker to clean the dust after the collecting groove 6 is filled; both ends of ash guide pipe 51 all are provided with welt 52, are provided with connecting bolt 53 on the welt 52, all offer on connecing grey groove 5 and the collecting vat 6 and supply connecting bolt 53 to insert the screw hole of establishing to install and dismantle ash guide pipe 51 conveniently, thereby conveniently take off ash guide pipe 51 and clear up.
Referring to fig. 3 and 4, the supporting frame 2 includes a bottom frame 21 and a top frame 22, the bottom frame 21 is mounted on the base 1, two sides of the bottom frame 21 are respectively provided with a socket, the top frame 22 is inserted into the socket, the bottom frame 21 is provided with a positioning member 211, in this embodiment, the positioning member 211 is a positioning sleeve, the positioning sleeve includes a first support 2111 and a second support 2112, the first support 2111 is fixedly disposed at the top of the bottom frame 21, the second support 2112 is hinged to the first support 2111, the first support 2111 and the second support 2112 are respectively provided with a clamping flange 2113, the top frame 22 is distributed with a plurality of annular grooves 221 along the length direction thereof, the clamping flange 2113 is clamped in one of the annular grooves 221 of the top frame 22, one side of the first support 2111 away from the hinge point is provided with a first lining 2114, the first lining 2114 is provided with a fastening bolt 2115, one side of the second support 2112 away from the hinge point is provided with a second lining 211, the second lining 2116 is provided with a screw hole into which the fastening bolt 2115 is inserted.
When the height of the support frame 2 needs to be adjusted, the insertion amount of the top frame 22 on the bottom frame 21 is changed, then the second support tube 2112 is rotated towards the direction close to the first support tube 2111, the clamping flange 2113 is clamped in the annular groove 221 at the specified position, the second lining 2116 is attached to the first lining 2114, and then the fastening bolt 2115 is inserted in the threaded hole, so that the positioning of the second support tube 2112 and the first support tube 2111 is realized, the relative position between the top frame 22 and the bottom frame 21 is fixed, and the adjustment of the whole length of the support frame 2 is realized.
Referring to fig. 3 and 5, the base frame 21 includes a fixing bracket 212 and an adjusting bracket 213 disposed at the bottom of the fixing bracket 212, the adjusting bracket 213 includes two supporting legs 2131, the two supporting legs 2131 are respectively rotatably connected to two sides of the bottom of the fixing bracket 212, the base 1 is provided with a sliding slot 12, one end of the supporting leg 2131, which is far away from the fixing bracket 212, is rotatably provided with a supporting piece 2132, and the bottom of the supporting piece 2132 is provided with a sliding block 2133; through sliding the sliding block 2133 along the length direction of the sliding groove 12, the rotating angle of the supporting leg 2131 is changed, the height of the bottom frame 21 is adjusted, and the polishing height of the polishing roller 4 is further adjusted.
The implementation principle of the pretreatment device for construction of the top wall of the building house in the embodiment of the application is as follows: by arranging the supporting frame 2 into the top frame 22 and the bottom frame 21, the top frame 22 is inserted into the bottom frame 21, and the positioning piece 211 is clamped in the annular grooves 221 at different positions to fix the position between the top frame 22 and the bottom frame 21, so that the overall height of the supporting frame 2 is adjusted, the height of the grinding roller 4 is changed, and the supporting frame is suitable for house top walls with different heights.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a building house roof construction preprocessing device, includes base (1), the bottom of base (1) is provided with gyro wheel (11), install support frame (2) on base (1), the top of support frame (2) is provided with locating support (3), install on locating support (3) and polish roller (4), the one end of polishing roller (4) is provided with driving motor (41), the output shaft and the polishing roller (4) coaxial line of driving motor (41) are connected its characterized in that: support frame (2) include chassis (21) and roof-rack (22), chassis (21) set up on base (1), the jack has all been seted up to the both sides of chassis (21), roof-rack (22) are inserted and are established in the jack, be provided with setting element (211) on chassis (21), roof-rack (22) distribute along self length direction have a plurality of confession setting element (211) to block ring channel (221) of establishing.
2. The pretreatment device for construction of the top wall of the building house according to claim 1, wherein: the setting element (211) is the location sleeve, the location sleeve includes that first prop (2111) and second prop (2112), first prop (2111) is fixed to be set up at the top of chassis (21), second prop (2112) hinge set up on first prop (2111), all be provided with chucking flange (2113) on first prop (2111) and second prop (2112), chucking flange (2113) card is established in one of them ring channel (221) of roof-rack (22).
3. The pretreatment device for construction of the top wall of the building house according to claim 2, wherein: a first lining (2114) is arranged on one side, away from the hinge point, of the first supporting tube (2111), a fastening bolt (2115) is arranged on the first lining (2114), a second lining (2116) is arranged on one side, away from the hinge point, of the second supporting tube (2112), and a threaded hole for inserting the fastening bolt (2115) is formed in the second lining (2116).
4. The pretreatment device for construction of the top wall of the building house according to claim 1, wherein: the base frame (21) comprises a fixing support (212) and an adjusting support (213) arranged at the bottom of the fixing support (212), the adjusting support (213) comprises two supporting legs (2131), the supporting legs (2131) are rotatably arranged on two sides of the fixing support (212), a sliding groove (12) is formed in the base (1), and one end, far away from the fixing support (212), of each supporting leg (2131) is slidably arranged in the sliding groove (12).
5. The pretreatment device for construction of the top wall of a building house according to claim 4, wherein: the supporting leg (2131) is kept away from one end of fixed bolster (212) and is rotated and be provided with backing sheet (2132), the bottom of backing sheet (2132) is provided with slider (2133), slider (2133) slide and set up in spout (12), the both sides of backing sheet (2132) all are provided with locating pin (2134), the length direction that the both sides that just are located spout (12) on base (1) all distribute along spout (12) has a plurality of confession locating pins (2134) to insert constant head tank (13) of establishing.
6. The pretreatment device for construction of the top wall of a building house according to claim 5, wherein: the sliding block (2133) is a T-shaped block, and the sliding groove (12) is a T-shaped groove.
7. The pretreatment device for construction of the top wall of the building house according to claim 1, wherein: the dust collecting device is characterized in that an ash collecting groove (5) is formed in the supporting frame (2) and located outside the positioning support (3), an ash guide pipe (51) is arranged at the bottom of the ash collecting groove (5), a collecting groove (6) is formed in the base (1), the top end of the ash guide pipe (51) is communicated with the ash collecting groove (5), and the bottom end of the ash guide pipe (51) is communicated with the collecting groove (6).
8. The pretreatment device for construction of the top wall of a building house according to claim 7, wherein: the two ends of the ash guide pipe (51) are provided with lining plates (52), the lining plates (52) are provided with connecting bolts (53), and threaded holes for the connecting bolts (53) to be inserted are formed in the ash receiving groove (5) and the collecting groove (6).
CN202021708762.4U 2020-08-17 2020-08-17 Construction pretreatment device for building roof Expired - Fee Related CN213034237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021708762.4U CN213034237U (en) 2020-08-17 2020-08-17 Construction pretreatment device for building roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021708762.4U CN213034237U (en) 2020-08-17 2020-08-17 Construction pretreatment device for building roof

Publications (1)

Publication Number Publication Date
CN213034237U true CN213034237U (en) 2021-04-23

Family

ID=75531764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021708762.4U Expired - Fee Related CN213034237U (en) 2020-08-17 2020-08-17 Construction pretreatment device for building roof

Country Status (1)

Country Link
CN (1) CN213034237U (en)

Similar Documents

Publication Publication Date Title
CN210967809U (en) Motor casing base processing machine integrating cutting and drilling
CN213034237U (en) Construction pretreatment device for building roof
CN116352574A (en) Steel pipe equipment of polishing
CN219275393U (en) Stone material processing chamfer equipment
CN210388582U (en) Wall grinding device is used to fitment
CN217702126U (en) High-efficient steel welding set
CN211540614U (en) Motor mounting structure capable of adjusting polishing angle
CN213917614U (en) A multi-angle grinding device for car fastener
CN210550212U (en) Paint polisher
CN214869256U (en) A mechanical device that polishes for building decorative panel processing
CN221849819U (en) Production roller platform
CN221871357U (en) Round tea pot surface polishing device
CN219724843U (en) Wheel carrier bolt processingequipment
CN220863472U (en) Cylinder body grinding device
CN219504368U (en) Groove polishing device
CN221436072U (en) Polishing machine convenient to change polishing wheel
CN221364394U (en) Angle grinder capable of adjusting clamping area at multiple angles
CN221313744U (en) Multi-angle polishing grinding tool
CN218801300U (en) High-efficient grinding device
CN215919931U (en) Bright pipe polishing device for heating
CN216097959U (en) Edge grinding device
CN212311602U (en) Panel terminal surface grinding tool based on handheld rig
CN219380298U (en) Wear-resistant steel ball polishing machine
CN215357599U (en) Pipe fitting tip coating grinding device
CN218226077U (en) Polishing device for inner wall of large metal pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210423