CN213018325U - Pre-buried leak protection connects uses visor structure - Google Patents

Pre-buried leak protection connects uses visor structure Download PDF

Info

Publication number
CN213018325U
CN213018325U CN202021463708.8U CN202021463708U CN213018325U CN 213018325 U CN213018325 U CN 213018325U CN 202021463708 U CN202021463708 U CN 202021463708U CN 213018325 U CN213018325 U CN 213018325U
Authority
CN
China
Prior art keywords
buried
ring
ring channel
protective cover
socket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021463708.8U
Other languages
Chinese (zh)
Inventor
钱鑫波
师辉俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Original Assignee
Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongcai Pipes Science and Technology Co Ltd filed Critical Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Priority to CN202021463708.8U priority Critical patent/CN213018325U/en
Application granted granted Critical
Publication of CN213018325U publication Critical patent/CN213018325U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model belongs to the technical field of drainage pipe's technique and specifically relates to a pre-buried leak protection connects uses visor structure. The utility model provides a pre-buried leak protection connects uses visor plate structure, includes closing plate and the socket ring of setting on the closing plate, the outer wall of socket ring on be provided with the ring channel along the circumferencial direction, the inside of ring channel be provided with the inflation gasbag, the ring channel in lie in the outside correspondence of inflation gasbag and be provided with sealed the pad, closing plate and socket ring on correspond and be provided with the screw hole that extends to the ring channel, screw hole female connection have with inflation gasbag matched with adjusting bolt. The utility model discloses it is all convenient that the installation is demolishd, can prevent moreover that the concrete thick liquid from flowing in and causing the jam.

Description

Pre-buried leak protection connects uses visor structure
Technical Field
The utility model belongs to the technical field of drainage pipe's technique and specifically relates to a pre-buried leak protection connects uses visor structure.
Background
The pre-buried leak protection that current actual construction used connects all does not adopt visor plate structure, and the pre-buried leak protection of joint will be pre-established before the drain pipe installation in traditional drainage riser poling installation process and in newly-built floor, though saved complicated processes such as through-flow hole, poling, hang mould secondary and pour, the hole is mended and concrete placement is not closely knit, the root of a pipe that reasons such as shrink arouse leaks, but the shutoff of the bellmouth on the pre-buried leak protection connects at present generally adopts the sticky tape to block up in the time, concrete thick liquid flows into in the pre-buried leak protection connects and causes the pipeline to block up when probably leading to pouring and smashing.
Disclosure of Invention
The utility model discloses mainly be to the shutoff of the bellmouth on the pre-buried leak protection connects at present generally adopt the sticky tape to come the temporary jam, probably lead to pouring when smashing concrete thick liquid flow in the pre-buried leak protection connect in cause the problem of pipeline jam, it is all convenient to provide an installation and demolish, can prevent moreover that concrete thick liquid from flowing in and causing the pre-buried leak protection of jam to connect and use visor plate structure.
The purpose of the utility model is mainly realized by the following scheme: the utility model provides a pre-buried leak protection connects uses visor plate structure, includes closing plate and the socket ring of setting on the closing plate, the outer wall of socket ring on be provided with the ring channel along the circumferencial direction, the inside of ring channel be provided with the inflation gasbag, the ring channel in lie in the outside correspondence of inflation gasbag and be provided with sealed the pad, closing plate and socket ring on correspond and be provided with the screw hole that extends to the ring channel, screw hole female connection have with inflation gasbag matched with adjusting bolt. The size of the socket ring is matched with the size of a socket on the embedded leakage-proof joint, when the socket ring is installed, the socket ring is clamped into the socket on the embedded leakage-proof joint, the outer wall of the socket ring is attached to the inner wall of the socket of the embedded leakage-proof joint, the sealing plate completely covers the port of the embedded leakage-proof joint, mortar and other sundries can be prevented from mixing, an annular groove is arranged on the outer wall of the socket ring along the circumferential direction, an expansion airbag is arranged inside the annular groove, a sealing gasket is correspondingly arranged on the outer side of the expansion airbag inside the annular groove, threaded holes extending to the annular groove are correspondingly arranged on the sealing plate and the socket ring, an adjusting bolt matched with the expansion airbag is connected in the threaded hole in a threaded manner, after the socket ring is clamped into the socket on the embedded leakage-proof joint, the adjusting bolt is screwed into the threaded hole, so that the screw on the adjusting bolt, the sealing gasket can be tightly attached to the inner wall of the socket of the embedded leakage-proof joint, so that the sealing effect is further improved, concrete slurry can be prevented from flowing in, the whole protective cover plate can be prevented from falling off, and the stability is good; when the embedded anti-leakage connector is detached, the adjusting bolt is screwed out firstly, so that the expansion air bag is reset, the attaching force of the sealing gasket to the inner wall of the embedded anti-leakage connector bell and spigot is weakened, and the protective cover plate is conveniently separated from the embedded anti-leakage connector.
Preferably, the middle part of the sealing plate is provided with a groove. The middle part of closing plate is provided with the recess, makes things convenient for the staff installation to dismantle.
Preferably, the bottom of the adjusting bolt is provided with a protective pad. Adjusting bolt's bottom is provided with the protection and fills up, and the setting of protection pad can prevent that adjusting bolt's screw rod from causing the damage to inflation gasbag, improves life.
Preferably, the number of the threaded holes is 2. The quantity of screw hole is 2, thereby is convenient for extrude inflation gasbag and adjust the sealed laminating power of filling up with pre-buried leak protection joint bell and spigot inner wall, and the installation is very firm.
Preferably, the sealing plate is provided with a preformed groove. Be provided with the preformed groove on the closing plate, the setting up of preformed groove makes the staff can punch it easily and take out the protection apron after pouring the completion.
Preferably, the gasket is made of a rubber material. The sealing gasket is made of rubber materials, so that the cost is low, the elasticity is good, and the processing is convenient.
Preferably, the protective pad is made of a rubber material. The protection pad is made of rubber materials, has good elasticity and cannot damage the inflatable air bag.
Therefore, the utility model discloses a pre-buried leak protection connects and uses visor plate structure possesses following advantage: the utility model discloses simple structure, the installation is dismantled all very conveniently, and stability during the use is high, can prevent that the concrete thick liquid from flowing in and causing the jam.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a cross-sectional view at a-a in fig. 2.
Illustration of the drawings: 1-pre-buried leak-proof joint, 2-sealing plate, 3-preformed groove, 4-groove, 5-threaded hole, 6-socket ring, 7-adjusting bolt, 8-annular groove, 9-expansion air bag, 10-sealing pad and 11-protective pad.
Detailed Description
The technical solution of the present invention is further specifically described below by way of examples and with reference to the accompanying drawings.
Example 1:
as shown in figures 1, 2 and 3, a protective cover plate structure for a pre-buried leakage-proof joint comprises a sealing plate 2 and a socket ring 6 arranged on the sealing plate 2, wherein a groove 4 is arranged in the middle of the sealing plate 2, so that the installation and the disassembly of workers are convenient, the size of the socket ring 6 is matched with the size of a socket on the pre-buried leakage-proof joint 1, when the protective cover plate structure is installed, the socket ring 6 is clamped into the socket on the pre-buried leakage-proof joint 1, the outer wall of the socket ring 6 is attached to the inner wall of the socket of the pre-buried leakage-proof joint 1, the sealing plate 2 completely covers the port of the pre-buried leakage-proof joint 1, so that mortar and other impurities can be avoided from being mixed in, an annular groove 8 is arranged on the outer wall of the socket ring 6 along the circumferential direction, an expansion air bag 9 is arranged inside the annular groove 8, a sealing gasket 10 is, an adjusting bolt 7 matched with an expansion air bag 9 is connected with the thread of the threaded hole 5 in a threaded manner, after the bell and spigot ring 6 is clamped into a bell and spigot on the embedded leakage-proof joint 1, a worker screws the adjusting bolt 7 into the threaded hole 5, so that a screw on the adjusting bolt 7 extrudes the expansion air bag 9, the expansion air bag 9 is extruded and deformed and then is abutted against the sealing gasket 10, the sealing gasket 10 can be tightly attached to the inner wall of the bell and spigot of the embedded leakage-proof joint 1, the sealing effect is further improved, concrete slurry can be prevented from flowing in, the whole protective cover plate can be prevented from falling off, and the stability is good; when the embedded leakage-proof joint is disassembled, the adjusting bolt 7 is screwed out, so that the expansion air bag 9 is reset, the adhesive force of the sealing gasket 10 to the inner wall of the bell and spigot of the embedded leakage-proof joint 1 is weakened, and the protective cover plate is conveniently separated from the embedded leakage-proof joint 1; the number of the threaded holes 5 is 2, so that the expansion air bag 9 can be conveniently extruded to adjust the joint force between the sealing gasket 10 and the inner wall of the bell socket of the embedded leakage-proof joint 1, and the installation is very stable.
The bottom of adjusting bolt 7 is provided with protection pad 11, and protection pad 11's setting can prevent that adjusting bolt 7's screw rod from causing the damage to inflation gasbag 9, improves life.
Be provided with the reservation groove 3 on the closing plate 2, the setting up of reservation groove 3 makes the staff can punch it easily and take out the protection apron after pouring the completion.
The sealing gasket 10 is made of rubber materials, so that the cost is low, the elasticity is good, and the processing is convenient.
The protection pad 11 is made of a rubber material, has good elasticity, and does not damage the inflatable air bag 9.
It should be understood that this example is for illustrative purposes only and is not intended to limit the scope of the present invention. Furthermore, it should be understood that various changes and modifications of the present invention may be made by those skilled in the art after reading the teachings of the present invention, and these equivalents also fall within the scope of the appended claims.

Claims (7)

1. The utility model provides a pre-buried leak protection visor structure for joint, its characterized in that includes the closing plate and sets up the socket ring on the closing plate, the outer wall of socket ring on be provided with the ring channel along the circumferencial direction, the inside of ring channel be provided with the inflation gasbag, the ring channel in lie in the outside correspondence of inflation gasbag and be provided with sealed the pad, closing plate and socket ring on correspond and be provided with the screw hole that extends to the ring channel, screw hole female connection have with inflation gasbag matched with adjusting bolt.
2. The structure of a protective cover plate for pre-buried leakage-proof joints according to claim 1, wherein a groove is formed in the middle of the sealing plate.
3. The structure of the protective cover plate for the pre-buried leakproof joint as recited in claim 1, wherein a protective pad is arranged at the bottom of the adjusting bolt.
4. The structure of a protective cover plate for pre-buried leakage-proof joints according to claim 1, 2 or 3, wherein the number of the threaded holes is 2.
5. The structure of a protective cover plate for pre-buried leakage-proof joints according to claim 1, 2 or 3, wherein the sealing plate is provided with a pre-groove.
6. The structure of a protective cover plate for pre-buried leakproof joints as claimed in claim 1, 2 or 3, wherein the sealing gasket is made of a rubber material.
7. The structure of a protective cover plate for pre-buried leakproof joints as claimed in claim 3, wherein the protective pad is made of a rubber material.
CN202021463708.8U 2020-07-22 2020-07-22 Pre-buried leak protection connects uses visor structure Active CN213018325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021463708.8U CN213018325U (en) 2020-07-22 2020-07-22 Pre-buried leak protection connects uses visor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021463708.8U CN213018325U (en) 2020-07-22 2020-07-22 Pre-buried leak protection connects uses visor structure

Publications (1)

Publication Number Publication Date
CN213018325U true CN213018325U (en) 2021-04-20

Family

ID=75517531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021463708.8U Active CN213018325U (en) 2020-07-22 2020-07-22 Pre-buried leak protection connects uses visor structure

Country Status (1)

Country Link
CN (1) CN213018325U (en)

Similar Documents

Publication Publication Date Title
CN208687168U (en) Water supply and drainage assembling pipe joint
CN213018325U (en) Pre-buried leak protection connects uses visor structure
CN114396521A (en) Detachable anti-falling self-sealing connection method and structure for corrugated pipeline
CN205402086U (en) Pipeline that leaks is salvageed and is used sealing member
CN207316316U (en) Plough groove type Three-way half joint
CN111075947A (en) Simple cut-off device, using method thereof and pipeline provided with device
CN211849452U (en) Special gun for cement grouting leaking stoppage
CN209603257U (en) A kind of high-building construction drainage pipeline connection structure
CN101344192A (en) Water-blocking device used for pipe
CN211574318U (en) Pressure water piping plugging device
CN211175699U (en) Wear floor with pre-buried pipe fitting and positioner
CN210288398U (en) Concrete infiltration is handled outer back pressure cementer that seals
CN211118039U (en) Wall pipe assembly
CN209115765U (en) Full angle rotary adjustable discharging device
CN210800440U (en) Multifunctional half joint
CN205670069U (en) Blast furnace copper cooling stave hydraulic pressure pressure testing device
CN201330903Y (en) Bellows joint member
CN211145337U (en) Novel mud jacking rubber ring
CN219870107U (en) Anti-blocking structure of pressure measuring device buried in concrete
CN207848565U (en) Keep away water valve
CN216078791U (en) Fastening type multifunctional connection water pipe
CN205605841U (en) Novel 360 rotatory delivery port
CN209703858U (en) The connection structure of roof drain and roof drainage mouth and rain pipe
CN217581355U (en) Drain pipe orifice protection device
CN212241484U (en) Prefabricated assembled convenient location leak protection thick liquid metal slip casting bellows

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant