CN213015360U - Connecting piece for building construction scaffold erection - Google Patents

Connecting piece for building construction scaffold erection Download PDF

Info

Publication number
CN213015360U
CN213015360U CN202020380849.7U CN202020380849U CN213015360U CN 213015360 U CN213015360 U CN 213015360U CN 202020380849 U CN202020380849 U CN 202020380849U CN 213015360 U CN213015360 U CN 213015360U
Authority
CN
China
Prior art keywords
steel pipe
butt joint
building construction
fixedly connected
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020380849.7U
Other languages
Chinese (zh)
Inventor
顾文斌
吴玉华
薛莹
舒海燕
孙超
黄广清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Jiangnan Construction Project Management Co ltd
Original Assignee
Suzhou Jiangnan Construction Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Jiangnan Construction Project Management Co ltd filed Critical Suzhou Jiangnan Construction Project Management Co ltd
Priority to CN202020380849.7U priority Critical patent/CN213015360U/en
Application granted granted Critical
Publication of CN213015360U publication Critical patent/CN213015360U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to the technical field of building construction, specifically disclose a connecting piece for building construction scaffold, including vertical steel pipe, horizontal steel pipe and solid fixed ring, vertical steel pipe and horizontal steel pipe are crisscross and place, the left side of vertical steel pipe is provided with the fixed block, the central point on the right side of fixed block is fixedly connected with first slipmat, the right side of first slipmat closely laminates with vertical steel pipe left side surface; the utility model discloses building construction scaffold puts up and uses connecting piece, through the fixed block that sets up, steel cable, solid fixed ring, first butt joint piece and second butt joint piece isotructure, make this connecting piece when using, only need twist and move a bolt and can fix horizontal steel pipe and vertical steel pipe, practiced thrift the time that the staff installed or dismantled the scaffold greatly, solved traditional connecting piece and need twice tighten the bolt, problem that wastes time and energy.

Description

Connecting piece for building construction scaffold erection
Technical Field
The utility model relates to a construction technical field specifically is a construction scaffold puts up and uses connecting piece.
Background
Before whitewashing the outer wall in the construction, the scaffold frame has all to be set up earlier, current scaffold frame is all through many vertical steel pipes and many horizontal steel pipes and utilize the connecting piece to combine, and the connecting piece is when using, the most difficult is this operation of tightening bolt, this operation can consume staff's certain physical power, and current connecting piece all need tighten two bolts and just difficult fix horizontal steel pipe and vertical steel pipe when using, it wastes time and energy to operate, greatly increased the time that the staff installed and dismantled the scaffold frame, consequently need design an easy to assemble dismantlement, and the connecting piece that can fix vertical steel pipe and horizontal steel pipe fast.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a building construction scaffold puts up and uses connecting piece possesses easy to assemble dismantlement, and can advantages such as quick fixation vertical steel pipe and horizontal steel pipe, has solved traditional connecting piece and has needed twice bolt tightening, the problem that wastes time and energy.
The utility model provides a building construction scaffold puts up and uses connecting piece, includes vertical steel pipe, horizontal steel pipe and solid fixed ring, vertical steel pipe is crisscross with horizontal steel pipe and places, the left side of vertical steel pipe is provided with the fixed block, the first slipmat of central authorities' position fixedly connected with on fixed block right side, the right side and the vertical steel pipe left side surface of first slipmat closely laminate, solid fixed ring has been cup jointed in the equal activity of position that horizontal steel pipe surface is close to the front and the back, the position that the fixed block right side is close to the front and the back all is connected with two solid fixed rings through the steel cable.
The utility model discloses building construction scaffold puts up and uses connecting piece, wherein the left central authorities of fixed block position fixedly connected with connecting rod, the left central authorities of connecting rod position fixedly connected with handle, the handle is made for a rigid plastic, through the connecting rod and the handle that set up, makes the fixed block more convenient when the installation.
The utility model discloses building construction scaffold puts up and uses connecting piece, wherein two solid fixed rings all include and go up a contraceptive ring and the lower ring, should go up a contraceptive ring right side and be close to the first butt joint piece of the fixedly positioned connection with of central authorities, should go up the fixedly positioned connection with second butt joint piece that the right side of lower ring is close to central authorities, the left central authorities of solid fixed ring fixedly positioned connection has the hinge, and the hinge through setting up makes better opening and closing of solid fixed ring.
The utility model discloses building construction scaffold puts up and uses connecting piece, the equal fixedly connected with second slipmat in top and bottom of well solid fixed ring inboard wherein, first slipmat and second slipmat are the non-slip rubber and make, and first slipmat and second slipmat through the setting make vertical steel pipe and horizontal steel pipe fixed more firm.
The utility model discloses building construction scaffold puts up and uses connecting piece, wherein first butt joint piece and the positive central position of second butt joint piece all set up threaded hole, the draw-in groove has transversely been seted up along the level to the position that second butt joint piece top is close to central authorities, the size of this draw-in groove and the big or small looks adaptation of first butt joint piece, the right-hand view shape of second butt joint piece is the U-shaped, threaded hole female connection has clamping screw, clamping screw is close to the surface threaded connection at the back and has the nut, and is more swift and convenient when first butt joint piece and the second butt joint piece that make the retaining ring fixed through setting up.
The utility model discloses building construction scaffold puts up and uses connecting piece, wherein the steel cable twists into for the nonrust steel wire of stranded wire and possesses the flexible characteristic, fixed block and two solid fixed rings are fixed well back steel cable for the state of straightening with horizontal steel pipe and vertical steel pipe, and the steel cable through setting up makes fixed block and two solid fixed rings better be connected.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses building construction scaffold puts up and uses connecting piece, through the fixed block that sets up, steel cable, solid fixed ring, first butt joint piece and second butt joint piece isotructure, make this connecting piece when using, only need twist and move a bolt and can fix horizontal steel pipe and vertical steel pipe, practiced thrift the time that the staff installed or dismantled the scaffold greatly, solved traditional connecting piece and need twice tighten the bolt, problem that wastes time and energy.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
FIG. 1 is a schematic view of the overall side view structure of the present invention;
FIG. 2 is a schematic view of the overall top view structure of the present invention;
fig. 3 is an enlarged schematic view of a portion a of fig. 2 according to the present invention;
fig. 4 is an enlarged schematic structural diagram of fig. 2B according to the present invention.
In the figure: 01. longitudinal steel pipes; 02. a transverse steel pipe; 03. a fixed block; 04. a connecting rod; 05. a grip; 06. a first non-slip mat; 07. a steel cord; 08. a fixing ring; 09. fixing the screw rod; 10. a nut; 11. A hinge; 12. a second non-slip mat; 13. a first butt-joint block; 14. a second butting block; 15. a threaded bore.
Detailed Description
In the following description, numerous implementation details are set forth in order to provide a more thorough understanding of the present invention. It should be understood, however, that these implementation details should not be used to limit the invention. That is, in some embodiments of the invention, details of these implementations are not necessary. In addition, some conventional structures and components are shown in simplified schematic form in the drawings.
In addition, the descriptions related to "first", "second", etc. in the present invention are only for description purposes, not specifically referring to the order or sequence, and are not intended to limit the present invention, but only to distinguish the components or operations described in the same technical terms, and are not to be construed as indicating or implying any relative importance or implicit indication of the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, the technical solutions in the embodiments may be combined with each other, but it must be based on the realization of those skilled in the art, and when the technical solutions are contradictory or cannot be realized, the combination of the technical solutions should not be considered to exist, and is not within the protection scope of the present invention.
Please refer to fig. 1-4, the utility model discloses a connecting piece is used in building construction scaffold frame setting, including vertical steel pipe 01, horizontal steel pipe 02 and solid fixed ring 08, vertical steel pipe 01 is crisscross with horizontal steel pipe 02 and places, the left side of vertical steel pipe 01 is provided with fixed block 03, the first slipmat 06 of central authorities' position fixedly connected with on fixed block 03 right side, the right side of first slipmat 06 closely laminates with vertical steel pipe 01 left side surface, the solid fixed ring 08 has been cup jointed in the equal activity of position that horizontal steel pipe 02 surface is close to the front and the back, the position that the fixed block 03 right side is close to the front and the back all is connected with two solid fixed ring 08 through steel cable 07.
The left central point fixedly connected with connecting rod 04 of fixed block 03, the left central point fixedly connected with handle 05 of connecting rod 04, handle 05 are that a rigid plastic makes, through connecting rod 04 and handle 05 that set up, make fixed block 03 more convenient when the installation.
The two fixing rings 08 each include an upper ring and a lower ring, a first butt block 13 is fixedly connected to a position on the right side of the upper ring close to the center, a second butt block 14 is fixedly connected to a position on the right side of the lower ring close to the center, a hinge 11 is fixedly connected to a position on the left side of the fixing ring 08, and the fixing ring 08 is better opened and closed through the hinge 11.
The top and the bottom of the inner side of the fixing ring 08 are fixedly connected with second anti-skid pads 12, the first anti-skid pads 06 and the second anti-skid pads 12 are made of anti-skid rubber, and the longitudinal steel pipes 01 and the transverse steel pipes 02 are fixed more stably through the arranged first anti-skid pads 06 and the second anti-skid pads 12.
Threaded hole 15 has all been seted up to the positive central point of first butt joint piece 13 and second butt joint piece 14, the draw-in groove has transversely been seted up along the level to the position that second butt joint piece 14 top is close to central authorities, the size of this draw-in groove and the big or small looks adaptation of first butt joint piece 13, the right-hand member of second butt joint piece 14 appears for the U-shaped, 15 threaded connection in the threaded hole has clamping screw 09, clamping screw 09 is close to the surface threaded connection at the back has nut 10, it is more swift and convenient when first butt joint piece 13 and the second butt joint piece 14 that make solid fixed ring 08 fixed through setting up.
The steel rope 07 is formed by twisting a plurality of strands of stainless steel wires and has the characteristic of being bendable, after the transverse steel pipe 02 and the longitudinal steel pipe 01 are fixed by the fixing block 03 and the two fixing rings 08, the steel rope 07 is in a stretched straight state, and the fixing block 03 is better connected with the two fixing rings 08 through the arranged steel rope 07.
When using the utility model discloses the time: the handle 05 is grasped firstly, the first anti-skid pads 06 on the fixing blocks 03 are aligned to the longitudinal steel tube 01, then the two fixing rings 08 on the two sides are opened by the hinges 11 and sleeved on the longitudinal steel tube 01, the two fixing rings 08 are closed, the first butt joint block 13 on the upper ring is inserted into the second butt joint block 14 on the lower ring, the fixing screw 09 is screwed into the threaded hole 15 formed by overlapping the first butt joint block 13 and the second butt joint block 14, the two fixing rings 08 are fixed by the screw cap 10, the fixing screw 09 only needs to be screwed once no matter whether the scaffold is disassembled or according to the scaffold, and the time for assembling or disassembling is greatly saved.
The above description is only an embodiment of the present invention, and is not intended to limit the present invention. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a building construction scaffold puts up and uses connecting piece, includes vertical steel pipe (01), horizontal steel pipe (02) and solid fixed ring (08), its characterized in that: vertical steel pipe (01) and horizontal steel pipe (02) are crisscross and place, the left side of vertical steel pipe (01) is provided with fixed block (03), the first slipmat (06) of central authorities position fixedly connected with on fixed block (03) right side, the right side and the vertical steel pipe (01) left side surface of first slipmat (06) closely laminate, solid fixed ring (08) have been cup jointed in the equal activity of position that horizontal steel pipe (02) surface is close to the front and the back, the position that fixed block (03) right side is close to the front and the back all is connected with two solid fixed ring (08) through steel cable (07).
2. The connecting member for building construction scaffold erection according to claim 1, wherein: the left central point of fixed block (03) puts fixedly connected with connecting rod (04), the left central point fixedly connected with handle (05) of connecting rod (04), handle (05) are made for rigid plastic.
3. The connecting member for building construction scaffold erection according to claim 1, wherein: the two fixing rings (08) comprise an upper ring and a lower ring, a first butt joint block (13) is fixedly connected to the position, close to the center, of the right side of the upper ring, a second butt joint block (14) is fixedly connected to the position, close to the center, of the right side of the lower ring, and a hinge (11) is fixedly connected to the position, close to the center, of the left side of each fixing ring (08).
4. The connecting member for building construction scaffold erection according to claim 1, wherein: the top and the bottom of the inner side of the fixing ring (08) are fixedly connected with second anti-skid pads (12), and the first anti-skid pads (06) and the second anti-skid pads (12) are made of anti-skid rubber.
5. The connecting member for building construction scaffold erection according to claim 3, wherein: threaded holes (15) are formed in the center positions of the front faces of the first butt joint block (13) and the second butt joint block (14), a clamping groove is formed in the position, close to the center, of the top of the second butt joint block (14) in a horizontal direction, the size of the clamping groove is matched with that of the first butt joint block (13), the right view of the second butt joint block (14) is U-shaped, a fixing screw rod (09) is connected to the inner threads of the threaded holes (15), and a nut (10) is connected to the outer surface, close to the back face, of the fixing screw rod (09) in a threaded mode.
6. The connecting member for building construction scaffold erection according to claim 1, wherein: the steel rope (07) is formed by twisting a plurality of strands of stainless steel wires and has the characteristic of being bendable, and the steel rope (07) is in a stretched straight state after the transverse steel pipe (02) and the longitudinal steel pipe (01) are fixed by the fixing block (03) and the two fixing rings (08).
CN202020380849.7U 2020-03-24 2020-03-24 Connecting piece for building construction scaffold erection Expired - Fee Related CN213015360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020380849.7U CN213015360U (en) 2020-03-24 2020-03-24 Connecting piece for building construction scaffold erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020380849.7U CN213015360U (en) 2020-03-24 2020-03-24 Connecting piece for building construction scaffold erection

Publications (1)

Publication Number Publication Date
CN213015360U true CN213015360U (en) 2021-04-20

Family

ID=75442572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020380849.7U Expired - Fee Related CN213015360U (en) 2020-03-24 2020-03-24 Connecting piece for building construction scaffold erection

Country Status (1)

Country Link
CN (1) CN213015360U (en)

Similar Documents

Publication Publication Date Title
CN208189812U (en) A kind of cable intermediate joint
CN210693347U (en) Building electrical pipeline connects with adjustable be convenient for installation
CN213015360U (en) Connecting piece for building construction scaffold erection
CN106284853A (en) Screw-thread steel plug-in type branch sleeve for building and using method thereof
CN107968368B (en) Fast-assembling splicing sleeve
CN206070885U (en) Screw-thread steel plug-in type branch sleeve for building
CN203891539U (en) D-shaped cross section composite sectional material applied to steel pylons
CN216563766U (en) Wiring device for electric power engineering
CN213546022U (en) Adjustable composite rod-shaped suspension insulator
CN111441571A (en) Connecting piece for building construction scaffold erection
CN211690768U (en) Novel net rack rod piece
CN204174842U (en) A kind of concavo-convex bar splice
CN211523504U (en) Combined truss convenient to connect
CN209167607U (en) Cable disk storage device more than a kind of combined type suitable for ADSS optical cable
CN2182209Y (en) Connector for reinforcing bar
CN205429651U (en) Strain clamp
CN217439355U (en) Reinforcing cage connecting device that stabilizes for construction
CN2182210Y (en) Connecting device for reinforcing bar
CN2182207Y (en) Connector for reinforcing bar
CN215341996U (en) Cable structure and cable connection structure thereof
CN216390361U (en) Sealed device of being qualified for next round of competitions of steel pipe end
CN208502398U (en) A kind of attachment device of fiber glass reinforced plastic chimney
CN220306656U (en) Novel non-moving fire non-crimping type grounding round steel connecting device
CN213115221U (en) Connecting joint for building structure
CN212435328U (en) Novel nut with supporting net

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Linfeng

Inventor after: Wu Yuhua

Inventor after: Xue Ying

Inventor after: Shu Haiyan

Inventor after: Sun Chao

Inventor after: Huang Guangqing

Inventor before: Gu Wenbin

Inventor before: Wu Yuhua

Inventor before: Xue Ying

Inventor before: Shu Haiyan

Inventor before: Sun Chao

Inventor before: Huang Guangqing

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210420

CF01 Termination of patent right due to non-payment of annual fee