CN213014265U - Spiral anchor construction device - Google Patents
Spiral anchor construction device Download PDFInfo
- Publication number
- CN213014265U CN213014265U CN202021523813.6U CN202021523813U CN213014265U CN 213014265 U CN213014265 U CN 213014265U CN 202021523813 U CN202021523813 U CN 202021523813U CN 213014265 U CN213014265 U CN 213014265U
- Authority
- CN
- China
- Prior art keywords
- telescopic link
- telescopic rods
- bracing piece
- telescopic
- spiral anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a spiral anchor construction equipment, including vertical guide rail, it is provided with the mount table to slide on the vertical guide rail, the upper end of mount table is provided with the rotation axis, be provided with horizontally first telescopic link on the rotation axis, the free end of first telescopic link is provided with the bracing piece, the one end that first telescopic link was kept away from to the bracing piece articulates there is vertical mounting panel, the upper end of bracing piece is articulated with the one end of second telescopic link, the other end slope of second telescopic link upwards articulates with the upper end of mounting panel, the one end that the bracing piece was kept away from to the mounting panel is installed speed reducer driven spiral anchor clamps. The utility model discloses a cooperation of rotation axis, first telescopic link and second telescopic link is suitable for different positions, different inclination's spiral anchor construction.
Description
Technical Field
The utility model relates to a screw anchor technical field especially indicates a screw anchor construction equipment.
Background
When the rotatory foundation ditch of spiral anchor, can follow vertical perpendicular screw in, also can be certain angle with vertical and lean out the rotation, current spiral anchor construction equipment is mostly the vertical migration of spiral anchor clamps, can carry out the perpendicular screw in of spiral anchor, nevertheless be unfavorable for spiral anchor slope screw in foundation ditch, in order to improve the stability on spiral anchor basis, if adopt 3 spiral anchors to be three toper screw in foundation ditches, involve the adjustment of spiral anchor inclination, the circumference position of 3 spiral anchors is set for and the interval adjustment between the three, current spiral anchor construction equipment is not convenient for carry out foretell adjustment.
SUMMERY OF THE UTILITY MODEL
The utility model provides a spiral anchor construction equipment, through the cooperation of rotation axis, first telescopic link and second telescopic link, be suitable for different positions, different inclination's spiral anchor construction.
The technical scheme of the utility model is realized like this: the utility model provides a spiral anchor construction equipment, including vertical guide rail, it is provided with the mount table to slide on the vertical guide rail, the upper end of mount table is provided with the rotation axis, be provided with the first telescopic link of horizontally on the rotation axis, the free end of first telescopic link is provided with the bracing piece, the one end that first telescopic link was kept away from to the bracing piece articulates there is vertical mounting panel, the upper end of bracing piece is articulated with the one end of second telescopic link, the other end slope of second telescopic link upwards articulates with the upper end of mounting panel, the one end that the bracing piece was kept away from to the mounting panel is installed.
Furthermore, two first horizontal guiding telescopic rods are arranged between the rotating shaft and the supporting rod, the first telescopic rods are hydraulic telescopic rods, and the two first guiding telescopic rods are located on two sides of the first telescopic rods.
Furthermore, two second guide telescopic rods parallel to the second telescopic rods are arranged between the supporting rod and the mounting plate, the lower ends of the second guide telescopic rods are hinged to the supporting rod, the upper ends of the second guide telescopic rods are hinged to the mounting plate, the second telescopic rods are hydraulic telescopic rods, and the two second guide telescopic rods are located on two sides of the second telescopic rods.
The utility model has the advantages that:
the utility model discloses a rotate the rotation axis and realize along the screw in position of circumference adjustment screw anchor, through the screw in position of first telescopic link along radial adjustment screw anchor, through the slope screw in angle of second telescopic link adjustment screw anchor, be suitable for different positions, different inclination's screw anchor construction.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of fig. 1.
Vertical guide rail 1, mount table 2, spout 3, pulley 4, chain 5, hoist engine 6, rotation axis 7, rotary drive mechanism 8, photoelectricity proximity switch 9, first telescopic link 10, bracing piece 11, first direction telescopic link 12, mounting panel 13, second telescopic link 14, speed reducer 15, spiral anchor clamps 16, second direction telescopic link 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1-2, a spiral anchor construction device comprises a vertical guide rail 1, wherein a mounting table 2 is arranged on the vertical guide rail 1 in a sliding manner, the vertical guide rail 1 is an i-shaped guide rail, a sliding groove 3 is formed in the mounting table 2, pulleys 4 which vertically move along the i-shaped guide rail are arranged on two sides of the sliding groove 3, the mounting table 2 is connected with a chain 5, the chain 5 is connected with a winding mechanism such as a winch 6, the mounting table 2 is controlled to move up and down by winding and unwinding the chain 5, and the mounting table 2 can also move up and down by other linear driving mechanisms.
The upper end of the mounting table 2 is provided with a rotating shaft 7, the rotating shaft 7 is connected with a rotating driving mechanism 8, the rotating driving mechanism 8 is a stepping motor, and the edge of the mounting table 2 is provided with a photoelectric proximity switch 9 used for positioning the rotating angle along the circumferential direction. Be fixed with the first telescopic link 10 of horizontally on the rotation axis 7, the free end of first telescopic link 10 is fixed with bracing piece 11, is fixed with the first direction telescopic link 12 of two horizontally between rotation axis 7 and the bracing piece 11, and first telescopic link 10 is hydraulic telescoping rod, and two first direction telescopic links 12 are located the both sides of first telescopic link 10.
The one end that first telescopic link 10 was kept away from to bracing piece 11 articulates there is vertical mounting panel 13, and the upper end of bracing piece 11 is articulated with the one end of second telescopic link 14, and the other end slope of second telescopic link 14 upwards is articulated with the upper end of mounting panel 13, and the one end that bracing piece 11 was kept away from to mounting panel 13 is installed speed reducer 15 driven spiral anchor clamps 16, and speed reducer 15 is gear motor. Be provided with two second direction telescopic links 17 parallel with second telescopic link 14 between bracing piece 11 and the mounting panel 13, the lower extreme of second direction telescopic link 17 is articulated with bracing piece 11, and the upper end is articulated with mounting panel 13, and second telescopic link 14 is hydraulic telescoping rod, and two second direction telescopic links 17 are located the both sides of second telescopic link 14.
The utility model provides a spiral anchor construction equipment, still includes the PLC controller, and hoist engine 6, step motor, photoelectricity proximity switch 9, first telescopic link 10, speed reducer 15, second telescopic link 14 all link to each other with the PLC controller.
The application method of the embodiment comprises the following steps: the first telescopic rod 10 is extended, the clamp is driven to move to a set position along the radial direction through the support rod 11, the second telescopic rod 14 is contracted, the spiral anchor clamp 16 is driven to rotate outwards to a set angle through the mounting plate 13, the upper end of a spiral anchor is fixed through the bolt anchor clamp, the speed reducer 15 and the winch 6 are started, the winch 6 unwinds the chain 5, the mounting table 2 moves downwards along the vertical guide rail 1, the speed reducer 15 drives the spiral anchor to rotate at the same time, the spiral anchor rotates obliquely downwards to enter a foundation pit, then the stepping motor is started to drive the rotating shaft 7 to rotate, the rotating shaft 7 drives the spiral anchor clamp 16 to rotate by a set angle through the first telescopic rod 10, when the photoelectric proximity switch 9 senses the first hydraulic telescopic rod, the stepping motor stops working, the chain 5 is wound by the winch 6, the mounting table 2 moves upwards along the vertical guide rail 1, and the upper end of the next, and screwing the next spiral anchor into the foundation pit.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (3)
1. The utility model provides a spiral anchor construction equipment, includes vertical guide rail (1), and it is provided with mount table (2), its characterized in that to slide on vertical guide rail (1): the upper end of mount table (2) is provided with rotation axis (7), be provided with first telescopic link of horizontally (10) on rotation axis (7), the free end of first telescopic link (10) is provided with bracing piece (11), the one end that first telescopic link (10) were kept away from in bracing piece (11) articulates there is vertical mounting panel (13), the upper end of bracing piece (11) is articulated with the one end of second telescopic link (14), the other end slope of second telescopic link (14) upwards is articulated with the upper end of mounting panel (13), speed reducer (15) driven spiral anchor clamps (16) are installed to the one end that bracing piece (11) were kept away from in mounting panel (13).
2. A screw anchor constructing device according to claim 1, wherein: two horizontal first guiding telescopic rods (12) are arranged between the rotating shaft (7) and the supporting rod (11), the first telescopic rods (10) are hydraulic telescopic rods, and the two first guiding telescopic rods (12) are located on two sides of the first telescopic rods (10).
3. A screw anchor constructing device according to claim 1 or 2, wherein: two second guide telescopic rods (17) parallel to the second telescopic rods (14) are arranged between the supporting rod (11) and the mounting plate (13), the lower ends of the second guide telescopic rods (17) are hinged to the supporting rod (11), the upper ends of the second guide telescopic rods are hinged to the mounting plate (13), the second telescopic rods (14) are hydraulic telescopic rods, and the two second guide telescopic rods (17) are located on two sides of the second telescopic rods (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021523813.6U CN213014265U (en) | 2020-07-28 | 2020-07-28 | Spiral anchor construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021523813.6U CN213014265U (en) | 2020-07-28 | 2020-07-28 | Spiral anchor construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213014265U true CN213014265U (en) | 2021-04-20 |
Family
ID=75460007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021523813.6U Active CN213014265U (en) | 2020-07-28 | 2020-07-28 | Spiral anchor construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213014265U (en) |
-
2020
- 2020-07-28 CN CN202021523813.6U patent/CN213014265U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN115417291B (en) | Wind turbine generator system base hoist mechanism | |
CN213014265U (en) | Spiral anchor construction device | |
CN219606260U (en) | Integral lifting device for pipeline | |
CN209250555U (en) | Tracking system for photovoltaic module | |
CN218373384U (en) | Bearing structure is used in bridge construction | |
CN217076840U (en) | Pipeline installation auxiliary device for water supply and drainage | |
CN216190716U (en) | Bridge body erecting equipment | |
CN211396742U (en) | Building engineering strutting arrangement | |
CN114032773A (en) | Bridge body erecting equipment and method | |
JPH09243435A (en) | Lift for ultrasonic sensor | |
CN221396850U (en) | Hoisting device for water supply and drainage construction | |
CN220449647U (en) | Winch slewing mechanism | |
CN220564187U (en) | Rope arranging mechanism of tower crane | |
CN220857976U (en) | Photovoltaic power generation board installation adjustment mechanism | |
CN221700931U (en) | Overhead hoist for power transmission and transformation engineering | |
CN117228552B (en) | Hoisting device for installing mining fan | |
CN216169941U (en) | Mast dumping device | |
CN220300196U (en) | Multifunctional lifting device for building construction | |
CN220761170U (en) | H-shaped steel multi-angle cutting device | |
CN216918401U (en) | Tower crane with illumination function | |
CN116177417B (en) | Generator stator bar hoisting device | |
CN221876362U (en) | Pile foundation steel reinforcement cage hoist device | |
CN219881719U (en) | Municipal administration tube well construction auxiliary device | |
CN218019376U (en) | Portable high-efficient equipment that adds of concrete waterproofing agent | |
CN220914858U (en) | Live working robot convenient for replacing suspension insulator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |