CN213013749U - Municipal administration highway is with preventing waterlogging sponge brick structure - Google Patents

Municipal administration highway is with preventing waterlogging sponge brick structure Download PDF

Info

Publication number
CN213013749U
CN213013749U CN202021377832.2U CN202021377832U CN213013749U CN 213013749 U CN213013749 U CN 213013749U CN 202021377832 U CN202021377832 U CN 202021377832U CN 213013749 U CN213013749 U CN 213013749U
Authority
CN
China
Prior art keywords
sponge brick
sponge
waterlogging
main part
brick structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021377832.2U
Other languages
Chinese (zh)
Inventor
杨飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Changxing Feiyang Construction Engineering Co ltd
Original Assignee
Zhejiang Changxing Feiyang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Changxing Feiyang Construction Engineering Co ltd filed Critical Zhejiang Changxing Feiyang Construction Engineering Co ltd
Priority to CN202021377832.2U priority Critical patent/CN213013749U/en
Application granted granted Critical
Publication of CN213013749U publication Critical patent/CN213013749U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a municipal administration highway is with preventing waterlogging sponge brick structure, including the concrete placement layer of drain bar main part, installation drain bar main part bottom and install the effect board on drain bar main part top, the top surface mounting of effect board has zebra stripes veneer, the bottom on concrete placement layer is provided with the conduction groove, and the conduction groove upwards extends to the effect board top surface of zebra stripes veneer one side through the concrete placement layer, the sponge brick is installed through assembly devices to the conduction inslot portion of drain bar main part, the conduction inslot internally mounted of sponge brick below has the drain frame, the conduction inslot internally mounted of drain frame below has the grid plate frame. The utility model discloses a be provided with a series of structures for this municipal administration highway is with preventing waterlogging sponge brick structure, can be in the both ends of pavement, when municipal administration highway uses, has stronger water permeability, when avoiding pavement both ends ponding, does not have obvious hole, does not influence the personnel walking of coming and going.

Description

Municipal administration highway is with preventing waterlogging sponge brick structure
Technical Field
The utility model relates to a municipal works technical field specifically is a municipal administration highway is with preventing waterlogging sponge brick structure.
Background
As a new stone, the sponge brick is already applied to urban construction due to excellent performance, wherein the sponge brick has good water permeability and does not have obvious pores, and when a road is paved, rainwater can quickly permeate underground, underground water is regulated, and urban living environment is improved.
In actual use, the sponge bricks are actually limited, such as a municipal green road formed by an assembling mode is convenient for people to walk and play a role in municipal engineering decoration, and is rarely applied to a real municipal traffic road, in the existing municipal traffic road, in order to prevent water accumulation, facilitate cleaning and other factors, the road is often designed into a structural form with a high middle and two low sides, and the road laying mode often enables the heights of two ends of a pedestrian passageway crossing the left side and the right side of the road to be lower, so that the water accumulation phenomenon is easily formed, the traffic of coming and going people is obstructed, in order to solve the problem, one or more drainage well covers are installed in a low-lying area in the municipal engineering, the water accumulation is eliminated, the drainage well covers or the drainage net rack have strong sense of concave-convex, large pores exist on the surface, and the obstruction to the coming and going people is easily caused, even cause the occurrence of adverse phenomena such as tripping and the like, and is not favorable for practical use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a municipal administration highway is with preventing waterlogging sponge brick structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a municipal administration highway is with sponge brick structure of preventing waterlogging, includes the concrete placement layer of drain bar main part, installation drain bar main part bottom and installs the effect board on drain bar main part top, the top surface mounting of effect board has zebra stripes veneer, the bottom on concrete placement layer is provided with the conduction groove, and the conduction groove upwards extends to the effect board top surface of zebra stripes veneer one side through concrete placement layer, the sponge brick is installed through assembly devices to the conduction inslot portion of drain bar main part, the conduction inslot internally mounted of sponge brick below has the drain frame, the conduction inslot internally mounted of drain frame below has the grid plate frame.
Preferably, the expansion pieces are arranged on the two side surfaces of the grid plate frame and extend to the interior of the concrete pouring layer.
Preferably, the zebra crossing veneer is formed by splicing connecting lines and a brick board veneer, the brick board veneer is installed on the top end of the sponge bricks, and the connecting lines are installed on the surface of the acting plate between the sponge bricks.
Preferably, a connecting rod is installed between the drainage racks, and the assembling mechanism is installed at the connecting position of the connecting rod and the acting plate.
Preferably, the assembly mechanism comprises expansion nails and assembly blocks, the assembly blocks are arranged on the surfaces of the two sides of the sponge brick, the expansion nails are arranged on the surface of the connecting rod, and the expansion nails sequentially extend into the action plate through the connecting rod and the assembly blocks.
Preferably, the bottom end surface of the action plate above the assembly block is provided with a trapezoidal groove, and the inside of the trapezoidal groove is provided with a detention groove.
Preferably, the interior of the retention tank is filled with a shock-absorbing particle layer.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this municipal administration highway is with preventing waterlogging sponge brick structure, through the drain bar main part, whole board brick structure that mainly forms by concrete placement, can be used in the both ends of the pavement that municipal administration highway was located, especially for the municipal administration highway that the centre is slightly higher both sides slightly lower, can flow to the side and save the condition in pavement both ends low level department at the rainwater, with the help of the high water permeability of sponge brick, will save the rainwater at pavement both ends and flow downwards, avoid rainwater etc. to save and influence pedestrian's business at pavement both ends, and there is not more obvious hole in sponge brick surface, can not cause actual influences such as colliding with the collision to the personnel's walking of business.
2. This municipal administration highway is with preventing waterlogging sponge brick structure, through the brick board veneer, use with the connection line combines, can two liang of concatenations, when being convenient for form complete zebra crossing, the brick board veneer forms for the coating of the strong white material of water permeability, through the conduction groove, the passageway that switches on from top to bottom as the water uses, can use in the sewer of the leading-in below of water, through the drainage frame, make by the rust-resistant panel of grid form and form, can be under the condition that switches on from top to bottom not influencing the water, certain fixed stay carries out to the sponge brick of top.
3. This municipal administration highway is with preventing waterlogging sponge brick structure, through trapezoidal recess, can form the spacing effect of a cell body, carry out spacing top tightly to the assembly piece of sponge brick, carry out the effect of spacing chucking to whole sponge brick from this, and through the inflation nail, can realize the fixed mounting effect between assembly piece and the effect board, and through the delay groove, can form a plurality of pits, accomodate the granule of shock attenuation grained layer, be convenient for when subsequent personnel come and go to etc. and produce the vibration power and act on between assembly piece and trapezoidal groove, receive the shock attenuation granule effect of buffering, can form the shock attenuation effect of buffering.
Drawings
Fig. 1 is a schematic view of the overall internal structure of the present invention;
FIG. 2 is a schematic view of the top surface structure of the present invention;
FIG. 3 is a schematic view of the bracket structure of the present invention;
fig. 4 is a partially enlarged structural diagram of a in fig. 1.
In the figure: 1. expanding the sheet; 2. pouring a concrete layer; 3. a drain board main body; 4. sponge bricks; 5. an action plate; 6. a conduction groove; 7. a grid plate frame; 8. connecting lines; 9. decorating zebra crossing surfaces; 10. decorating the brick board; 11. a connecting rod; 12. a drain frame; 13. expansion nails; 14. a shock-absorbing particle layer; 15. a retention tank; 16. And assembling the block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1 to 4, the waterlogging-preventing sponge brick structure for the municipal road of the embodiment comprises a drainage plate main body 3, a concrete pouring layer 2 installed at the bottom end of the drainage plate main body 3 and an action plate 5 installed at the top end of the drainage plate main body 3, wherein the concrete pouring layer 2 is formed by pouring concrete, the drainage plate main body 3 is mainly acted by the concrete pouring layer 2 and the action plate 5, the action plate 5 is jointed with the ground of the sidewalk when in use, the top end is used as a support surface for people to go, a zebra crossings facing 9, namely white zebra crossings, is installed on the top end surface of the action plate 5, a conduction groove 6 is arranged at the bottom end of the concrete pouring layer 2, the conduction groove 6 extends upwards through the concrete pouring layer 2 to the top end surface of the action plate 5 at the side of the zebra crossings facing 9, and is used as a drainage channel conducting up and down when in use, the sponge brick 4 is installed inside the conduction groove 6 of the, as a new material, can be made by aeolian sand, building rubbish, etc., it has good water permeability, its top surface is flush with the top surface of acting plate 5, the ponding of both ends of sidewalk can be permeated downward through the sponge brick 4, the inside of the conduction slot 16 below the sponge brick 4 is fitted with the drainage frame 12, the drainage frame 12 is the support of the grid form, there are multiple channels that are conducted from top to bottom, it is made of antirust sheet material, such as aluminum alloy material, can carry on certain fixed support to the sponge brick 4 above under the condition that does not influence the water to conduct from top to bottom, avoid the sponge brick 4 from damaging and other bad phenomena to take place by the pressure from top to bottom, the inside of the conduction slot 6 below the drainage frame 12 is fitted with the grid grillage 7, in the use, the drainage frame 12 and grid grillage 7 are the form of aligning from top to bottom, all are the grid structure, can be further fixed support to the drainage frame 12 by the grid grillage 7, the water body flow from top to bottom is not influenced.
Specifically, the extension pieces 1 are installed on the surfaces of the two sides of the grid plate frame 7, the extension pieces 1 extend to the interior of the concrete pouring layer 2 and can be used as installation parts, so that the contact area between the grid plate frame 7 and the concrete pouring layer 2 is increased, and the whole grid plate frame 7 is fixedly installed.
Further, zebra crossing veneer 9 is formed by connecting line 8 and the concatenation of brick board veneer 10, and brick board veneer 10 is installed on the top of sponge brick 4, and the material coating that is white and the water permeability is strong forms on 4 tops of sponge brick, and sponge brick 4 is the non-continuity installation on whole board 5, has great clearance from this each other, and connects line 8 and install 5 surfaces of acting board between sponge brick 4, connects the clearance between the sponge brick 4, forms complete zebra crossing.
Furthermore, a connecting rod 11 is arranged between the drainage racks 12, the connecting rod 11 is made of metal materials, the drainage racks 12 can be fixedly connected, the structural stability is improved, the assembling mechanism is arranged at the connecting position of the connecting rod 11 and the acting plate 5, and the connecting rod 11 participates in the action of the assembling mechanism.
Further, assembly devices includes expansion nail 13 and assembly piece 16, and assembly piece 16 installs the both sides surface at sponge brick 4, wholly is the trapezium, for sponge brick 4's integral type part, and expansion nail 13 installs the surface at connecting rod 11, and expansion nail 13 is the screw part of metal material, and expansion nail 13 extends to inside acting on board 5 through connecting rod 11 and assembly piece 16 in proper order for expansion nail 13 can realize connecting rod 11, assembly piece 16 and act on the fixed connection of board 5, improves structural stability.
Further, 5 bottom surfaces of the action plate above the assembly block 16 are provided with trapezoidal grooves, so that a groove body limiting effect can be formed, the assembly block 16 of the sponge brick 4 is limited and tightly pushed, the whole sponge brick 4 is limited and tightly clamped, the retention groove 15 is formed in the trapezoidal grooves, and the retention groove 15 is a plurality of recessed groove body components.
Further, the inside packing of delay groove 15 has shock attenuation grained layer 14, and optional granule rubber of material, quartz etc. because of the existence of particulate matter, own possesses certain shock attenuation effect, can be accomodate the granule of shock attenuation grained layer 14 by delay groove 15, be convenient for when subsequent personnel come and go etc. to produce the vibration power and act on between assembly piece 16 and trapezoidal recess, receive under the shock attenuation granule effect, can form the shock attenuation effect of buffering.
The using method of the embodiment comprises the following steps: when the sponge brick structure is processed, the whole acting plate 5 needs to be inverted on the ground or in a mold, the sponge bricks 4 required to be used are sequentially clamped into the conduction grooves 6 on the acting plate 5, the assembling blocks 16 are limited and clamped with the trapezoidal grooves, the whole sponge bricks 4 are preliminarily fixed, then the drainage frame 12 and the connecting rod 11 are installed, the bottom ends of the sponge bricks 4 are tightly propped at the top ends, the expansion nails 13 are installed through screw holes, the connecting rod 11, the assembling blocks 16 and the acting plate 5 are fixedly connected, the whole sponge bricks 4 are further fixed, then the grid plate frame 7 is placed on the drainage frame 12 in an aligned mode, concrete is poured by means of the mold, a concrete pouring layer 2 is formed, the grid plate frame 7, the drainage frame 12 and the sponge bricks 4 are fixed, when the processing is completed and the actual installation is carried out, a sewer needs to be arranged at the two end regions of a sidewalk, the rainwater drainage device is used as a water body circulation channel, a groove which is close to the whole action plate 5 in size is formed, the whole sponge brick structure is embedded and installed, after installation is completed, the brick plate decorative surface 10 and the sidewalk zebra crossing decorative surface 9 formed by the connecting lines 8 are used, rainwater is accumulated towards two ends of a sidewalk in subsequent use, particularly when the rainwater is used on a municipal road surface with a high middle part and low sides, at the moment, the rainwater can downwards seep through the sponge bricks 4, impurities in the rainwater are retained above the sponge bricks 4, the rainwater flows downwards through the drainage frame 12 and the grid plate frame 7 and then enters a sewer to continue drainage, and in the whole process, the rainwater can be prevented from being accumulated at two ends of the sidewalk, and influence on coming and going personnel is avoided.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a municipal administration highway is with preventing waterlogging sponge brick structure which characterized in that: including drain bar main part (3), concrete placement layer (2) of installation drain bar main part (3) bottom and install acting plate (5) on drain bar main part (3) top, the top surface mounting of acting plate (5) has zebra stripes veneer (9), the bottom of concrete placement layer (2) is provided with conduction groove (6), and conduction groove (6) upwards extends to acting plate (5) top surface of zebra stripes veneer (9) one side through concrete placement layer (2), sponge brick (4) are installed through assembly devices to conduction groove (6) inside of drain bar main part (3), conduction groove (6) internally mounted of sponge brick (4) below has drain frame (12), conduction groove (6) internally mounted of drain frame (12) below has grid grillage (7).
2. The waterlogging-preventing sponge brick structure for the municipal roads according to claim 1, wherein: the both sides surface of grid grillage (7) all installs extension piece (1), and inside extension piece (1) extended to concrete placement layer (2).
3. The waterlogging-preventing sponge brick structure for the municipal roads according to claim 1, wherein: the zebra crossing veneer (9) is formed by splicing connecting lines (8) and a brick board veneer (10), the brick board veneer (10) is installed on the top end of the sponge bricks (4), and the connecting lines (8) are installed on the surface of the acting plate (5) between the sponge bricks (4).
4. The waterlogging-preventing sponge brick structure for the municipal roads according to claim 1, wherein: and a connecting rod (11) is arranged between the drainage racks (12), and an assembling mechanism is arranged at the connecting part of the connecting rod (11) and the acting plate (5).
5. The waterlogging-preventing sponge brick structure for the municipal roads according to claim 4, wherein: the assembling mechanism comprises expansion nails (13) and assembling blocks (16), the assembling blocks (16) are installed on the surfaces of the two sides of the sponge brick (4), the expansion nails (13) are installed on the surface of the connecting rod (11), and the expansion nails (13) sequentially extend into the action plate (5) through the connecting rod (11) and the assembling blocks (16).
6. The waterlogging-preventing sponge brick structure for the municipal roads according to claim 5, wherein: the bottom end surface of the action plate (5) above the assembly block (16) is provided with a trapezoidal groove, and a detention groove (15) is formed in the trapezoidal groove.
7. The waterlogging-preventing sponge brick structure for the municipal road according to claim 6, wherein: the interior of the retention tank (15) is filled with a shock-absorbing particle layer (14).
CN202021377832.2U 2020-07-14 2020-07-14 Municipal administration highway is with preventing waterlogging sponge brick structure Expired - Fee Related CN213013749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021377832.2U CN213013749U (en) 2020-07-14 2020-07-14 Municipal administration highway is with preventing waterlogging sponge brick structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021377832.2U CN213013749U (en) 2020-07-14 2020-07-14 Municipal administration highway is with preventing waterlogging sponge brick structure

Publications (1)

Publication Number Publication Date
CN213013749U true CN213013749U (en) 2021-04-20

Family

ID=75502914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021377832.2U Expired - Fee Related CN213013749U (en) 2020-07-14 2020-07-14 Municipal administration highway is with preventing waterlogging sponge brick structure

Country Status (1)

Country Link
CN (1) CN213013749U (en)

Similar Documents

Publication Publication Date Title
CN213740419U (en) Light road structure of permeating water
CN201553962U (en) U-shaped filter tank type curb stone made of reinforced concrete or natural stones
CN213013749U (en) Municipal administration highway is with preventing waterlogging sponge brick structure
CN114032728A (en) Green dust-settling environment-friendly construction road and construction method thereof
CN113931029A (en) Municipal administration highway is with preventing waterlogging sponge brick structure
CN208701842U (en) Greenery patches buffer strip system
CN211689739U (en) Bituminous paving curb
CN209555688U (en) A kind of urban construction new road
CN210975416U (en) Highway road surface drainage device
CN211395219U (en) A dysmorphism connecting elements for dropproof
JP4000580B2 (en) Curb stone inside drainage device
CN210288620U (en) Prefabricated resin concrete escape canal
CN217758167U (en) Urban road curb foundation
CN220013260U (en) Waterproof pavement that permeates water of landscape
CN220079606U (en) Permeable concrete pavement structure
CN201151865Y (en) Highway drain system
CN205115951U (en) Porous pavement that can be used to driveway
CN214061117U (en) A curb laying structure for sponge city
CN219862191U (en) Thin-layer spray asphalt color-changing pavement structure
CN218812954U (en) Anti-loosening slow-settling sidewalk brick
CN216739103U (en) Green road for recycled concrete
CN218404883U (en) Roadbed structure of road bridge engineering
CN215051715U (en) Compound ecological environmental protection brick that permeates water
CN216074565U (en) Combined water permeable brick
CN211897693U (en) Road paving structure for residential area, garden, square and parking lot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant