CN213011519U - High-density steel bar connecting frame - Google Patents

High-density steel bar connecting frame Download PDF

Info

Publication number
CN213011519U
CN213011519U CN202021294939.0U CN202021294939U CN213011519U CN 213011519 U CN213011519 U CN 213011519U CN 202021294939 U CN202021294939 U CN 202021294939U CN 213011519 U CN213011519 U CN 213011519U
Authority
CN
China
Prior art keywords
cover
splice bar
revolved
sleeve
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021294939.0U
Other languages
Chinese (zh)
Inventor
顾秋明
谢必涛
陈庆杰
詹海萍
程光耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lejia Construction Engineering Co ltd
Original Assignee
Lejia Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lejia Construction Engineering Co ltd filed Critical Lejia Construction Engineering Co ltd
Priority to CN202021294939.0U priority Critical patent/CN213011519U/en
Application granted granted Critical
Publication of CN213011519U publication Critical patent/CN213011519U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the construction, specifically be a high intensive steel bar connection frame, including coupling mechanism, coupling mechanism includes adapter sleeve, steel cable, fixed cover, slow pressure spring, couple, the inside of adapter sleeve is provided with the steel cable, the one end of steel cable is connected with fixed cover, the upper portion of fixed cover is provided with slow pressure spring, the upper portion of slow pressure spring is provided with the couple, coupling mechanism's lower part is provided with combination mechanism, combination mechanism includes that the bottom plate, bears the weight of and detains, long splice bar, wide splice bar, high splice bar, first cover, second revolve cover, third revolve cover, fourth revolve the cover. The utility model discloses a combination mechanism's setting has realized the quick dismantlement and the equipment of device to can build the frame according to the building materials volume of difference at the job site, can also carry out stable promotion removal to the building materials under couple and slow compression spring's effect after building the frame.

Description

High-density steel bar connecting frame
Technical Field
The utility model belongs to the technical field of the construction, specifically relate to a high intensive steel bar connection frame.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. But the reinforcing steel bar connecting frame has large limitation and cannot be flexibly changed when in use.
It is noted that the information disclosed in this background section of the invention is only for enhancement of understanding of the general background of the invention, and should not be taken as an acknowledgement or any form of suggestion that this information constitutes prior art already known to a person skilled in the art.
SUMMERY OF THE UTILITY MODEL
For solving the problem that exists among the prior art, the utility model discloses a combination mechanism's setting has realized the quick dismantlement and the equipment of device to can build the frame according to the building materials volume of difference at the job site, can also carry out stable promotion removal to the building materials under couple and slow compression spring's effect after building the frame.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a high intensive bar connection frame, includes coupling mechanism, coupling mechanism includes adapter sleeve, steel cable, fixed cover, slow pressure spring, couple, the inside of adapter sleeve is provided with the steel cable, the one end of steel cable is connected with fixed cover, the upper portion of fixed cover is provided with slow pressure spring, the upper portion of slow pressure spring is provided with the couple, coupling mechanism's lower part is provided with combined mechanism, combined mechanism includes bottom plate, bears the weight of and detains, long splice bar, wide splice bar, high splice bar, first spiral cover, second spiral cover, third spiral cover, fourth spiral cover, the both sides of bottom plate are provided with bear the weight of and detain, connect through the high splice bar between the fourth spiral cover, the front portion and the rear portion of second spiral cover are provided with wide splice bar, the both sides of fourth spiral cover all are provided with long splice bar, the first rotary sleeves are connected through the high connecting ribs, and the third rotary sleeves are arranged on the lower portion of the fixed sleeve.
On the basis of the technical scheme, the connecting sleeve is movably connected with the steel rope, the steel rope is movably connected with the fixing sleeve, the fixing sleeve is connected with the pressure-relieving spring through a bolt, and the fixing sleeve is connected with the hook through a bolt.
On the basis of the technical scheme, the base plate is connected with the bearing buckle through a bolt, the long connecting rib is connected with the first rotary sleeve through threads, and the long connecting rib is connected with the second rotary sleeve through threads.
On the basis of the technical scheme, the wide connecting rib and the first cover of turning round pass through threaded connection, the wide connecting rib with the second is turned round and is passed through threaded connection, the high connecting rib with the first cover of turning round passes through threaded connection, the high connecting rib with the fourth is turned round and is passed through threaded connection.
On the basis of the technical scheme, the third rotary sleeve is in threaded connection with the wide connecting rib, and the third rotary sleeve is in threaded connection with the long connecting rib.
Compared with the prior art, the beneficial effects of the utility model are that:
utilize setting up of adapter sleeve can be connected with the frame, when placing the heavy object in the frame inside and lifting, pressure can be alleviated to the slow-pressing spring and the frame of preventing damage is prevented, to the equipment accessible of frame spiral cover and splice bar equipment to can assemble according to the volume of the article that bear, the loading end of bottom plate as the frame can be under the effect of bearing the knot, fixed with the frame, and whole device can be convenient under the effect of couple be connected with hoisting device.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
fig. 1 is an axonometric view of a highly dense steel bar connecting frame of the present invention;
fig. 2 is a top view of the high-density steel bar connecting frame according to the present invention;
fig. 3 is an axonometric view of a connecting bar of the high-density steel bar connecting frame of the utility model;
figure 4 is an axonometric view of high intensive steel bar connection frame bottom plate.
The reference numerals are explained below:
1. a connecting mechanism; 101. connecting sleeves; 102. a steel cord; 103. fixing a sleeve; 104. a pressure relief spring; 105. hooking; 2. a combination mechanism; 201. a base plate; 202. a bearing buckle; 203. a long connecting rib; 204. wide connecting ribs; 205. high connecting ribs; 206. a first rotary sleeve; 207. a second rotary sleeve; 208. a third rotary sleeve; 209. and a fourth rotating sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Examples
Referring to fig. 1-4, the present invention provides a technical solution: comprises a connecting mechanism 1, the connecting mechanism 1 comprises a connecting sleeve 101, a steel rope 102, a fixed sleeve 103, a pressure-relieving spring 104 and a hook 105, the steel rope 102 is arranged in the connecting sleeve 101, one end of the steel rope 102 is connected with the fixed sleeve 103, the upper part of the fixed sleeve 103 is provided with the pressure-relieving spring 104, the upper part of the pressure-relieving spring 104 is provided with the hook 105, the lower part of the connecting mechanism 1 is provided with a combination mechanism 2, the combination mechanism 2 comprises a bottom plate 201, a bearing buckle 202, a long connecting rib 203, a wide connecting rib 204, a high connecting rib 205, a first rotating sleeve 206, a second rotating sleeve 207, a third rotating sleeve 208 and a fourth rotating sleeve 209, the bearing buckle 202 is arranged on two sides of the bottom plate 201, the fourth rotating sleeves 209 are connected through the high connecting rib 205, the wide connecting ribs 204 are arranged on the front part and the rear part of the second rotating sleeve 207, the long connecting ribs 203 are arranged on two sides of the fourth rotating, the third swivel sleeve 208 is disposed at the lower portion of the stationary sleeve 103.
On the basis of the above-described embodiment: the connecting sleeve 101 is movably connected with the steel rope 102, so that the installation is convenient, the steel rope 102 is movably connected with the fixing sleeve 103, the fixing sleeve 103 is connected with the pressure-relieving spring 104 through a bolt, so that the pressure caused by bearing a heavy object can be relieved, and the fixing sleeve 103 is connected with the hook 105 through a bolt, so that the machine can be conveniently used for fixing and lifting; the base plate 201 is connected with the bearing buckle 202 through a bolt, so that the bearing buckle is convenient to place, the long connecting rib 203 is connected with the first rotary sleeve 206 through a thread, and the long connecting rib 203 is connected with the second rotary sleeve 207 through a thread; the wide connecting rib 204 is connected with the first rotating sleeve 206 through threads, the wide connecting rib 204 is connected with the second rotating sleeve 207 through threads, the high connecting rib 205 is connected with the first rotating sleeve 206 through threads, and the high connecting rib 205 is connected with the fourth rotating sleeve 209 through threads; the third rotary sleeve 208 is in threaded connection with the wide connecting rib 204, the third rotary sleeve 208 is in threaded connection with the long connecting rib 203, the machine frame of the whole device is formed by the connection of the rotary sleeves and the connecting ribs, and the machine frame can be assembled into a required size while being convenient to disassemble.
The utility model discloses a theory of operation and use flow: utilize the setting of adapter sleeve 101 can be connected with the frame, when placing the heavy object in the frame inside and lifting, pressure can be alleviated and the frame is prevented from damaging to slow pressure spring 104, the equipment accessible of frame is revolved the cover and is assembled with the splice bar, and can assemble according to the volume of the article that bear, the loading end of frame is regarded as to bottom plate 201, can be under the effect of bearing buckle 202, fixed with the frame, and whole device can be convenient under the effect of couple 105 be connected with hoisting device.
Although some specific embodiments of the present invention have been described in detail by way of illustration, it should be understood by those skilled in the art that the above illustration is only for purposes of illustration and is not intended to limit the scope of the invention. It will be appreciated by those skilled in the art that modifications may be made to the above embodiments without departing from the scope and spirit of the invention. The scope of the invention is defined by the appended claims.

Claims (5)

1. The utility model provides a high intensive steel bar connection frame, includes coupling mechanism (1), coupling mechanism (1) is including adapter sleeve (101), steel cable (102), fixed cover (103), slow pressure spring (104), couple (105), the inside of adapter sleeve (101) is provided with steel cable (102), the one end of steel cable (102) is connected with fixed cover (103), the upper portion of fixed cover (103) is provided with slow pressure spring (104), the upper portion of slow pressure spring (104) is provided with couple (105), its characterized in that: the lower part of coupling mechanism (1) is provided with combined mechanism (2), combined mechanism (2) are including bottom plate (201), bear and detain (202), long splice bar (203), wide splice bar (204), high splice bar (205), first cover (206), second are revolved cover (207), third are revolved cover (208), fourth are revolved cover (209), the both sides of bottom plate (201) are provided with bear and detain (202), pass through between the fourth is revolved cover (209) high splice bar (205) are connected, the second is revolved the front portion and the rear portion of cover (207) and is provided with wide splice bar (204), the fourth is revolved the both sides of cover (209) and is all provided with long splice bar (203), first revolve and pass through between cover (206) high splice bar (205) are connected, the third is revolved cover (208) and is set up the lower part of fixed cover (103).
2. The high-density reinforcing bar connecting frame according to claim 1, wherein: the connecting sleeve (101) is movably connected with the steel rope (102), the steel rope (102) is movably connected with the fixing sleeve (103), the fixing sleeve (103) is connected with the pressure-relieving spring (104) through a bolt, and the fixing sleeve (103) is connected with the hook (105) through a bolt.
3. The high-density reinforcing bar connecting frame according to claim 1, wherein: the base plate (201) is connected with the bearing buckle (202) through a bolt, the long connecting rib (203) is connected with the first rotary sleeve (206) through a thread, and the long connecting rib (203) is connected with the second rotary sleeve (207) through a thread.
4. The high-density reinforcing bar connecting frame according to claim 1, wherein: wide splice bar (204) with first cover (206) is revolved and is passed through threaded connection, wide splice bar (204) with second is revolved cover (207) and is passed through threaded connection, high splice bar (205) with first cover (206) is revolved and is passed through threaded connection, high splice bar (205) with fourth is revolved cover (209) and is passed through threaded connection.
5. The high-density reinforcing bar connecting frame according to claim 1, wherein: the third rotary sleeve (208) is in threaded connection with the wide connecting rib (204), and the third rotary sleeve (208) is in threaded connection with the long connecting rib (203).
CN202021294939.0U 2020-07-06 2020-07-06 High-density steel bar connecting frame Active CN213011519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021294939.0U CN213011519U (en) 2020-07-06 2020-07-06 High-density steel bar connecting frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021294939.0U CN213011519U (en) 2020-07-06 2020-07-06 High-density steel bar connecting frame

Publications (1)

Publication Number Publication Date
CN213011519U true CN213011519U (en) 2021-04-20

Family

ID=75500708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021294939.0U Active CN213011519U (en) 2020-07-06 2020-07-06 High-density steel bar connecting frame

Country Status (1)

Country Link
CN (1) CN213011519U (en)

Similar Documents

Publication Publication Date Title
CN208345565U (en) A kind of gantry crane suspension hook
CN213011519U (en) High-density steel bar connecting frame
CN103674390B (en) A kind of winch brake power test unit and method
CN211712462U (en) Convenient operation's indoor threading pole for hoist and mount
CN202400754U (en) Mast crane
CN208072990U (en) CONSTRUCTION OPERATIONS platform
CN205590168U (en) Overturning lifting device
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN213569142U (en) High lifting machine of security for civil engineering
CN210658056U (en) Bridge steel stand hoist and mount device of turning
CN211813041U (en) Municipal administration blowdown iron pipe hangs gets fixing device
CN211712509U (en) Threading equipment for hoisting power equipment
CN207759922U (en) Large span suspender
CN216945819U (en) A stull formula hoist subassembly device for high-efficient hoist and mount bored concrete pile steel reinforcement cage
CN206503351U (en) A kind of hanging basket wire rope fixing device
CN204826599U (en) Builder's jack drawknot device
CN215160196U (en) Prefabricated component hoisting device with adjustable hoisting position and combined hoisting device
CN218539075U (en) Fork type tightening rigging safe and practical
CN205132987U (en) Tower crane jib loading boom arm internode wear to sell hydro -cylinder supporting structure
CN211310552U (en) Protection device for hoisting large part
CN217838064U (en) Auxiliary pipeline installation device
CN211572021U (en) Adjustable connecting device used between steel beam and concrete beam
CN217867720U (en) Steel construction promotes node fixing device
KR200496065Y1 (en) Flexible angle type shackle structure
CN214935286U (en) Wind power tower cylinder hoist and mount shoulder pole roof beam device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant