CN212986524U - Mapping device for on-site construction cost budget of construction cost - Google Patents

Mapping device for on-site construction cost budget of construction cost Download PDF

Info

Publication number
CN212986524U
CN212986524U CN202021632849.8U CN202021632849U CN212986524U CN 212986524 U CN212986524 U CN 212986524U CN 202021632849 U CN202021632849 U CN 202021632849U CN 212986524 U CN212986524 U CN 212986524U
Authority
CN
China
Prior art keywords
rotating shaft
box body
construction cost
belt pulley
fixedly arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021632849.8U
Other languages
Chinese (zh)
Inventor
唐娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021632849.8U priority Critical patent/CN212986524U/en
Application granted granted Critical
Publication of CN212986524U publication Critical patent/CN212986524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model provides a mapping device of on-spot cost budget of engineering cost. The mapping device for the on-site construction cost budget of the construction cost comprises: a box body; the shell is fixedly arranged on one side of the box body; the first rotating shaft is rotatably installed in the shell, and one end of the first rotating shaft extends out of the shell; the crank is fixedly arranged at one end of the first rotating shaft; the first belt pulley is fixedly sleeved on the first rotating shaft; the second rotating shaft is rotatably arranged in the shell, and one end of the second rotating shaft extends into the box body; the second belt pulley is fixedly arranged at one end of the second rotating shaft; the drawstring is sleeved on the first belt pulley and the second belt pulley. The utility model provides a mapping device of on-spot cost budget of engineering cost has convenient to use, can accomodate the advantage of protection to the surveying instrument.

Description

Mapping device for on-site construction cost budget of construction cost
Technical Field
The utility model relates to a mapping device technical field especially relates to a mapping device of on-spot cost budget of engineering cost.
Background
In the process of starting building of the building engineering, firstly, the construction cost of the building engineering needs to be estimated, generally, a field mapping mode is adopted for estimating the construction cost, a mapping device is required to be used in the mapping process, and the conventional mapping device mainly comprises a mapping instrument and a support frame.
However, in the prior art, since the measurement is mostly carried out outdoors or even in the area where weeds are clustered, the weeds and branches may damage the measuring instrument when moving, and therefore, a new construction cost mapping device for field cost budget is needed to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a convenient to use, can accomodate the mapping device of the on-the-spot cost budget of the engineering cost of protection to the surveying instrument.
For solving the technical problem, the utility model provides a mapping device of on-spot cost budget of engineering cost includes: a box body; the shell is fixedly arranged on one side of the box body; the first rotating shaft is rotatably installed in the shell, and one end of the first rotating shaft extends out of the shell; the crank is fixedly arranged at one end of the first rotating shaft; the first belt pulley is fixedly sleeved on the first rotating shaft; the second rotating shaft is rotatably arranged in the shell, and one end of the second rotating shaft extends into the box body; the second belt pulley is fixedly arranged at one end of the second rotating shaft; the drawstring is sleeved on the first belt pulley and the second belt pulley; the first conical gear is fixedly arranged at one end of the second rotating shaft; the partition plate is fixedly arranged in the box body; the two screws are rotatably arranged in the box body; the two second bevel gears are respectively fixedly sleeved on the two screws, and the first bevel gear is meshed with the corresponding second bevel gear; the driving rod is rotatably arranged in the box body; the two third bevel gears are fixedly arranged at the two ends of the driving rod respectively and are meshed with the corresponding second bevel gears respectively; the placing plate is sleeved on the two screw rods in a threaded manner; surveying instrument, surveying instrument fixed mounting is on placing the board.
Preferably, an outlet is formed in the inner wall of the top of the box body, and the outlet is matched with the surveying instrument.
Preferably, the bottom of the box body is hinged with three support frames.
Preferably, two sliding rods are fixedly mounted in the box body, and the placing plate is connected with the two sliding rods in a sliding mode.
Preferably, two supporting blocks are fixedly installed in the box body, and the driving rod is rotatably connected with the two supporting blocks.
Preferably, a rotating groove is formed in one side of the box body, and the first rotating shaft is rotatably connected with the rotating groove.
Compared with the prior art, the utility model provides a mapping device of on-spot cost budget of engineering cost has following beneficial effect:
the utility model provides a mapping device that on-spot cost of engineering cost budgets through first axis of rotation, crank, first belt pulley, second axis of rotation, second belt pulley, stretching strap, first conical gear, baffle, screw rod, second conical gear, actuating lever, third conical gear and place the board and cooperate, can accomodate and open the surveying instrument, can accomodate the surveying instrument to the box when removing the surveying instrument and protect.
Drawings
FIG. 1 is a schematic view of an elevational cross-sectional structure of a mapping apparatus for on-site construction cost budget of construction cost provided by the present invention;
FIG. 2 is an enlarged schematic view of portion A of FIG. 1;
figure 3 is the utility model provides a mapping device's of on-spot cost budget of engineering cost looks sideways at sectional structure sketch map.
Reference numbers in the figures: 1. a box body; 2. a housing; 3. a first rotating shaft; 4. a crank; 5. a first pulley; 6. a second rotating shaft; 7. a second pulley; 8. pulling the belt; 9. a first bevel gear; 10. a partition plate; 11. a screw; 12. a second bevel gear; 13. a drive rod; 14. a third bevel gear; 15. placing the plate; 16. a surveying instrument.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic front sectional structural view of a mapping apparatus for on-site construction cost budget of construction cost according to the present invention; FIG. 2 is an enlarged schematic view of portion A of FIG. 1; figure 3 is the utility model provides a mapping device's of on-spot cost budget of engineering cost looks sideways at sectional structure sketch map. The mapping device for the on-site cost budget of construction cost comprises: a box body 1; the shell 2 is fixedly arranged on one side of the box body 1; a first rotating shaft 3, wherein the first rotating shaft 3 is rotatably installed in the shell 2, and one end of the first rotating shaft 3 extends out of the shell 2; the crank 4 is fixedly arranged at one end of the first rotating shaft 3; the first belt pulley 5 is fixedly sleeved on the first rotating shaft 3; the second rotating shaft 6 is rotatably installed in the shell 2, and one end of the second rotating shaft 6 extends into the box body 1; the second belt pulley 7 is fixedly arranged at one end of the second rotating shaft 6; the drawstring 8 is sleeved on the first belt pulley 5 and the second belt pulley 7; a first bevel gear 9, wherein the first bevel gear 9 is fixedly arranged at one end of the second rotating shaft 6; the partition plate 10 is fixedly arranged in the box body 1; the two screws 11, the two screws 11 are rotatably arranged in the box body 1; two second bevel gears 12, wherein the two second bevel gears 12 are respectively fixedly sleeved on the two screws 11, and the first bevel gear 9 is meshed with the corresponding second bevel gear 12; the driving rod 13, the said driving rod 13 is installed in the container body 1 rotatably; two third bevel gears 14, wherein the two third bevel gears 14 are respectively fixedly installed at two ends of the driving rod 13, and the two third bevel gears 14 are respectively meshed with the corresponding second bevel gears 12; the placing plate 15 is sleeved on the two screw rods 11 in a threaded manner; surveying instrument 16, surveying instrument 16 fixed mounting is on placing board 15.
An outlet is formed in the inner wall of the top of the box body 1 and is matched with the surveying instrument 16.
The bottom of the box body 1 is hinged with three support frames.
Two sliding rods are fixedly installed in the box body 1, and the placing plate 15 is connected with the two sliding rods in a sliding mode.
Two supporting blocks are fixedly installed in the box body 1, and the driving rod 13 is rotatably connected with the two supporting blocks.
A rotating groove is formed in one side of the box body 1, and the first rotating shaft 3 is rotatably connected with the rotating groove.
The utility model provides a mapping device of on-spot cost budget of engineering cost's theory of operation as follows:
during the use, drive first axis of rotation 3 through crank 4 and rotate, first axis of rotation 3 drives first belt pulley 5 and rotates, first belt pulley 5 drives second belt pulley 7 through stretching strap 8 and rotates, second belt pulley 7 drives first bevel gear 9 through second axis of rotation 6 and rotates, first bevel gear 9 drives screw rod 11 through corresponding second bevel gear 12 and rotates, corresponding second bevel gear 12 drives actuating lever 13 through corresponding third bevel gear 14 and rotates, actuating lever 13 drives corresponding second bevel gear 12 through another third bevel gear 14 and rotates, thereby make two screw rods 11 rotate simultaneously, under the effect of screw thread, two screw rods 11 drive same board 15 of placing and rise, place board 15 and then drive surveying instrument 16 and rising, thereby the start-up work to surveying instrument 16 has been accomplished.
Compared with the prior art, the utility model provides a mapping device of on-spot cost budget of engineering cost has following beneficial effect:
the utility model provides a mapping device that engineering cost's on-spot cost budgets, through first axis of rotation 3, crank 4, first belt pulley 5, second axis of rotation 6, second belt pulley 7, stretching strap 8, first conical gear 9, baffle 10, screw rod 11, second conical gear 12, actuating lever 13, third conical gear 14 and place board 15 and cooperate, can accomodate and open surveying instrument 16, can accomodate surveying instrument 16 to box 1 in when removing surveying instrument 16 and protect.
It should be noted that the device structure and the accompanying drawings of the present invention mainly describe the principle of the present invention, and in the technology of this design principle, the settings of the power mechanism, the power supply system, the control system, etc. of the device are not completely described, and the details of the power mechanism, the power supply system, and the control system can be clearly known on the premise that those skilled in the art understand the principle of the present invention.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. A mapping apparatus for on-site construction cost budget for construction costs, comprising:
a box body;
the shell is fixedly arranged on one side of the box body;
the first rotating shaft is rotatably installed in the shell, and one end of the first rotating shaft extends out of the shell;
the crank is fixedly arranged at one end of the first rotating shaft;
the first belt pulley is fixedly sleeved on the first rotating shaft;
the second rotating shaft is rotatably arranged in the shell, and one end of the second rotating shaft extends into the box body;
the second belt pulley is fixedly arranged at one end of the second rotating shaft;
the drawstring is sleeved on the first belt pulley and the second belt pulley;
the first conical gear is fixedly arranged at one end of the second rotating shaft;
the partition plate is fixedly arranged in the box body;
the two screws are rotatably arranged in the box body;
the two second bevel gears are respectively fixedly sleeved on the two screws, and the first bevel gear is meshed with the corresponding second bevel gear;
the driving rod is rotatably arranged in the box body;
the two third bevel gears are fixedly arranged at the two ends of the driving rod respectively and are meshed with the corresponding second bevel gears respectively;
the placing plate is sleeved on the two screw rods in a threaded manner;
surveying instrument, surveying instrument fixed mounting is on placing the board.
2. The apparatus for mapping on-site construction cost budget of construction cost according to claim 1, wherein an outlet is provided on the inner wall of the top of the box body, the outlet being adapted to the mapper.
3. A mapping apparatus for on-site construction cost budget for construction costs as set forth in claim 1 wherein the bottom of the box is hinged with three supports.
4. The apparatus for mapping on-site construction cost budget of construction cost according to claim 1, wherein two sliding rods are fixedly installed in the box body, and the placing plate is slidably connected with the two sliding rods.
5. The apparatus for mapping on-site construction cost budget according to claim 1, wherein two support blocks are fixedly installed in the box body, and the driving rod is rotatably connected with the two support blocks.
6. The apparatus for mapping on-site construction cost budget of construction cost according to claim 1, wherein a rotation groove is formed at one side of the box body, and the first rotation shaft is rotatably connected to the rotation groove.
CN202021632849.8U 2020-08-07 2020-08-07 Mapping device for on-site construction cost budget of construction cost Active CN212986524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021632849.8U CN212986524U (en) 2020-08-07 2020-08-07 Mapping device for on-site construction cost budget of construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021632849.8U CN212986524U (en) 2020-08-07 2020-08-07 Mapping device for on-site construction cost budget of construction cost

Publications (1)

Publication Number Publication Date
CN212986524U true CN212986524U (en) 2021-04-16

Family

ID=75431698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021632849.8U Active CN212986524U (en) 2020-08-07 2020-08-07 Mapping device for on-site construction cost budget of construction cost

Country Status (1)

Country Link
CN (1) CN212986524U (en)

Similar Documents

Publication Publication Date Title
CN212986524U (en) Mapping device for on-site construction cost budget of construction cost
CN209780340U (en) Be used for rural sewage to administer control room
CN208083030U (en) Chemical examination test tube cleaning device in a kind of blood station
CN210293450U (en) Portable wind-powered electricity generation noise detection device
CN211975479U (en) A amount of wind measuring transducer rotary positioning device for UL standard ceiling fan amount of wind room
CN213691360U (en) Agricultural economic data propaganda display device
CN210398151U (en) Gridding air quality monitoring device convenient to maintain
CN210895181U (en) Cloud computing desktop protective structure
CN212159796U (en) A moisture separator for soil detection
CN210719314U (en) Portable water level monitoring device
CN220773239U (en) Weighing apparatus accessory circuit monitoring facilities
CN219164969U (en) Security protection communication device with anti-interference function
CN212009169U (en) Medical image viewing device
CN218823335U (en) Sampling device for soil and water conservation monitoring
CN212138101U (en) Power supply shell structure
CN214119414U (en) Community monitoring device with steering mechanism
CN207201114U (en) A kind of electrical control cabinet of convenient installation
CN216643688U (en) Device convenient for freely steering video recorder and support integrated
CN215492638U (en) Water body sampling and detecting device for biological filter tank
CN217980397U (en) Environmental data monitoring device
CN213970594U (en) Valve body polishing device for production and processing of breaking valve
CN212008853U (en) Distributed motor quality detection system
CN215492975U (en) Viscometer convenient to carry and control humiture
CN211605779U (en) Micropower high-voltage power supply device
CN219064983U (en) Automatic on-line monitoring device for sewage quality

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant