CN212985239U - Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system - Google Patents

Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system Download PDF

Info

Publication number
CN212985239U
CN212985239U CN202021847319.5U CN202021847319U CN212985239U CN 212985239 U CN212985239 U CN 212985239U CN 202021847319 U CN202021847319 U CN 202021847319U CN 212985239 U CN212985239 U CN 212985239U
Authority
CN
China
Prior art keywords
tunnel
drainage ditch
steel
central drainage
support system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021847319.5U
Other languages
Chinese (zh)
Inventor
程敬克
张庆峰
马辉杰
岑鹏
丁世昌
杨风帆
吕森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN202021847319.5U priority Critical patent/CN212985239U/en
Application granted granted Critical
Publication of CN212985239U publication Critical patent/CN212985239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a tunnel construction field relates to a tunnel U type reinforced concrete center escape canal construction formwork support system. The related tunnel central drainage ditch template support system is provided with a tunnel central drainage ditch support frame surrounded by four steel panels; the tunnel central drainage ditch supporting frame is positioned in the poured inverted arch concrete; the four steel panels are provided with two vertically arranged steel panels I which are symmetrically arranged and a steel panel II which is positioned at the bottom of the two steel panels I and is transversely arranged; one end of each steel panel II is movably connected with the corresponding steel panel I, and the other ends of the steel panels II are connected into a whole through a bottom die piercing type fixing piece; a cross arm is arranged above the supporting frame of the central drainage ditch of the tunnel; the cross arm is provided with two vertical supporting rods which can move along the cross arm; the vertical supporting rod is positioned in the supporting frame of the central drainage ditch of the tunnel and is fixedly connected with the corresponding steel panel I. The utility model discloses guaranteed that central escape canal headroom size and bottom concrete are sufficient, the template aversion is very simple and convenient, light.

Description

Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system
Technical Field
The utility model relates to a tunnel construction field, concretely relates to tunnel U type reinforced concrete center escape canal template support system.
Background
In the tunnel construction of China, the rock mass has tunnels with water seepage, tunnel central drainage ditches are basically arranged under the road surface so as to meet the drainage of the rock mass and not influence the normal passage of the tunnels; in the prior art, the central drainage ditch of the tunnel mostly adopts an assembled steel template, the central drainage ditch is cast in sections, one section is cast after each assembly and reinforcement, a template reinforcement part needs to be disassembled when the next section is cast, the central drainage ditch is shifted to the next section, the central drainage ditch is assembled and reinforced again, and then concrete is cast; the clearance of the central drainage ditch is difficult to ensure, the line shape is not easy to control, the concrete of the bottom plate is not compact and is not flat, the single block is assembled and disassembled and is shifted, the transfer is very inconvenient, the working procedure is complex, and the work efficiency of installing and reinforcing the template is low.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model aims at providing a tunnel U type reinforced concrete center escape canal template support system.
The utility model adopts the following technical scheme for accomplishing the above purpose:
a U-shaped reinforced concrete central drainage ditch template and a support system for a tunnel are disclosed, wherein the template support system is provided with a tunnel central drainage ditch support frame surrounded by four steel panels; the U-shaped reinforced concrete central drainage ditch supporting frame of the tunnel is positioned in the poured and formed inverted arch concrete; the four steel panels are provided with two vertically arranged steel panels I which are symmetrically arranged and a steel panel II which is positioned at the bottom of the two steel panels I and is transversely arranged; one end of each of the two steel face plates II is bent upwards and then movably connected with the corresponding steel face plate I, and the other ends of the two steel face plates II are connected into a whole through a bottom die penetrating type fixing piece; the two steel panels I and the two steel panels II are connected into a whole to form a tunnel central drainage ditch supporting frame with an opening on the upper end face; a cross arm is arranged above the supporting frame of the central drainage ditch of the tunnel; two ends of the cross arm are respectively supported and fixed on the poured inverted arch concrete; the cross arm is provided with a vertical supporting rod which can horizontally slide along the cross arm; the two vertical supporting rods are symmetrically arranged; the upper ends of the two vertical supporting rods are slidably supported on the cross arm; two the lower extreme of vertical support rod all is located tunnel center escape canal braced frame in, just two vertical support rod all links firmly with steel face plate I that corresponds, constitutes two vertical support rod slides adjustment tunnel center escape canal braced frame inner space's structure in opposite directions or dorsad on the cross arm.
The lower parts between the two vertical supporting rods are connected into a whole through two channel steels arranged back to back; the two back-to-back channel steels can move relatively to adjust the size of the inner space of the tunnel center drainage ditch supporting frame.
And one end of each of the two steel panels II is bent upwards and then movably connected with the corresponding steel panel I through a hinge.
The bottom die feed-through fixing piece is provided with angle steels which are respectively fixed on the two steel face plates II; and the two angle steels are fixed into a whole through a pin shaft, so that the two steel face plates II are fixed into a whole to form the open bottom die.
The end of one of the two steel face plates II is provided with a downward inclined groove, and the groove is positioned at the joint of the two steel face plates II.
The utility model provides a tunnel U type reinforced concrete center escape canal template and support system, adopt the tunnel center escape canal braced frame that four steel face plates enclose, the shaping is once assembled to four steel face plates, be fixed in on two side steel face plates I with the reinforcement part of two side steel face plates I, set up between two side steel face plates between II and cross the fixed, guarantee that I intervals of two side steel face plates are fixed, thereby central escape canal headroom size has been guaranteed, the die block adopts open die block, guarantee that the bottom concrete is full and full, whole sliding groove formula removes during the aversion, the template aversion is very simple and convenient, light, and need not every time monolithic piece to piece and tear open and fix.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1. the inverted arch concrete is poured and formed, and comprises 2 steel panels I and 3, steel panels II and 4, cross arms 5, vertical supporting rods 6, channel steel 7, a tunnel center drainage ditch 8, a reserved drainage port 10, angle steel 11, a pin shaft 12 and a sliding groove.
Detailed Description
The invention is described in connection with the accompanying drawings and the embodiments:
as shown in fig. 1, a tunnel U-shaped reinforced concrete center drain template support system has a tunnel center drain support frame surrounded by four steel panels; the supporting frame of the tunnel central drainage ditch is positioned in the poured inverted arch concrete 1; the four steel panels are provided with two vertically arranged steel panels I2 which are symmetrically arranged and a steel panel II 3 which is positioned at the bottom of the two steel panels I and is transversely arranged; one end of each of the two steel panels II 3 is bent upwards and then movably connected with the corresponding steel panel I2 through a hinge (not shown), and the other ends of the two steel panels II 3 are connected into a whole through a bottom die penetrating type fixing piece; the two steel face plates I2 and the two steel face plates II 3 are connected into a whole to form a tunnel central drainage ditch supporting frame with an opening on the upper end face; a cross arm 4 is arranged above the support frame of the central drainage ditch of the tunnel; two ends of the cross arm 4 are respectively supported and fixed on the poured inverted arch concrete 1; the cross arm 4 is provided with a vertical supporting rod 5 which can horizontally slide along the cross arm; the vertical support rods 5 are symmetrically arranged; the upper ends of the two vertical supporting rods 5 are slidably supported on the cross arm 4; two the lower extreme of vertical support rod 5 all is located tunnel center escape canal braced frame in, and two vertical support rod all links firmly with steel face plate I2 that corresponds, constitutes two vertical support rod slides adjustment tunnel center escape canal braced frame inner space's structure in opposite directions or dorsad on the cross arm.
The lower parts between the two vertical supporting rods 5 are connected into a whole through two channel steels 6 arranged back to back; the two back-to-back channel steels 6 can move relatively to adjust the size of the inner space of the tunnel central drainage ditch supporting frame.
The bottom die feed-through fixing piece is provided with angle steel 10 which is respectively fixed on the two steel panels II; the two angle steels 10 are fixed into a whole through a pin shaft 11, so that the two steel panels II are fixed into a whole to form the open bottom die.
The end of one of the two steel face plates II is provided with a downward inclined slope (not shown in the figure), and the groove is positioned at the joint of the two steel face plates II.

Claims (5)

1. The utility model provides a tunnel U type reinforced concrete center escape canal construction formwork support system which characterized in that: the template support system is provided with a tunnel central drainage ditch support frame surrounded by four steel panels; the supporting frame of the tunnel central drainage ditch is positioned in the poured inverted arch concrete; the four steel panels are provided with two vertically arranged steel panels I which are symmetrically arranged and a steel panel II which is positioned at the bottom of the two steel panels I and is transversely arranged; one end of each of the two steel face plates II is bent upwards and then movably connected with the corresponding steel face plate I, and the other ends of the two steel face plates II are connected into a whole through a bottom die penetrating type fixing piece; the two steel panels I and the two steel panels II are connected into a whole to form a tunnel central drainage ditch supporting frame with an opening on the upper end face; a cross arm is arranged above the supporting frame of the central drainage ditch of the tunnel; two ends of the cross arm are respectively supported and fixed on the poured inverted arch concrete; the cross arm is provided with a vertical supporting rod which can horizontally slide along the cross arm; the two vertical supporting rods are symmetrically arranged; the upper ends of the two vertical supporting rods are slidably supported on the cross arm; two the lower extreme of vertical support rod all is located tunnel center escape canal braced frame in, just two vertical support rod all links firmly with steel face plate I that corresponds, constitutes two vertical support rod slides adjustment tunnel center escape canal braced frame inner space's structure in opposite directions or dorsad on the cross arm.
2. The support system for the tunnel U-shaped reinforced concrete central drainage ditch construction formwork as claimed in claim 1, wherein: the lower parts between the two vertical supporting rods are connected into a whole through two channel steels arranged back to back; the two back-to-back channel steels can move relatively to adjust the size of the inner space of the tunnel center drainage ditch supporting frame.
3. The support system for the tunnel U-shaped reinforced concrete central drainage ditch construction formwork as claimed in claim 1, wherein: and one end of each of the two steel panels II is bent upwards and then movably connected with the corresponding steel panel I through a hinge.
4. The support system for the tunnel U-shaped reinforced concrete central drainage ditch construction formwork as claimed in claim 1, wherein: the bottom die feed-through fixing piece is provided with angle steels which are respectively fixed on the two steel face plates II; and the two angle steels are fixed into a whole through a pin shaft, so that the two steel face plates II are fixed into a whole to form the open bottom die.
5. The support system for the tunnel U-shaped reinforced concrete central drainage ditch construction formwork as claimed in claim 1, wherein: the end of one of the two steel face plates II is provided with a downward inclined groove, and the groove is positioned at the joint of the two steel face plates II.
CN202021847319.5U 2020-08-31 2020-08-31 Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system Active CN212985239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021847319.5U CN212985239U (en) 2020-08-31 2020-08-31 Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021847319.5U CN212985239U (en) 2020-08-31 2020-08-31 Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system

Publications (1)

Publication Number Publication Date
CN212985239U true CN212985239U (en) 2021-04-16

Family

ID=75435922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021847319.5U Active CN212985239U (en) 2020-08-31 2020-08-31 Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system

Country Status (1)

Country Link
CN (1) CN212985239U (en)

Similar Documents

Publication Publication Date Title
CN204551483U (en) A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication
CN108952008A (en) Insert-type steel pipe concrete column and construction method
CN206859713U (en) The supporting construction of superposed type side wall
CN212985239U (en) Tunnel U-shaped reinforced concrete center drainage ditch construction formwork support system
CN215331463U (en) Roofing pipeline concrete protection mound forming die
CN107725073B (en) Tunnel construction method based on simple trestle
CN212054725U (en) Cast-in-place reinforced concrete arch-covering formwork system
CN218233146U (en) Supporting device for pouring drainage side ditch
CN214301647U (en) Irrigation canal coping formwork structure
CN214883072U (en) Reinforced concrete arch culvert reinforcing structure with enlarged cross section
CN212771977U (en) Simple broken line falsework connection structure of cast-in-situ variable-section beam body
CN210256628U (en) Self-adaptive outer mold system for prefabricating concrete
CN211646241U (en) Prefabricated disassembly-free template anti-impact tooth wall
CN215057352U (en) Rotary excavating and sliding formwork device for large-mouth well
CN215630002U (en) Large shield starting well open-cut reverse-construction ultra-deep foundation pit permanent-temporary combined supporting structure
CN221664727U (en) Top arch concrete formwork support
CN215252922U (en) Concrete pouring template structure between steel enclosing purlin and supporting structure
CN220099621U (en) Combined supporting structure of bailey beam
CN218843124U (en) Supporting structure is backfilled in fertile groove
CN214616567U (en) Tunnel pile arch type open cut tunnel beam arch prefabricated assembly structure
CN213661165U (en) Reinforced composite formwork-free cable trench
CN218027784U (en) Prefabricated enclosure foundation structure
CN218195953U (en) Multi-fulcrum continuous beam bridge type prefabricated pedestal
CN217400309U (en) But auxiliary forming instrument of concrete is striden to pin-connected panel height
CN216305921U (en) Shield starting reaction frame for covering and digging narrow space of top-down subway station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant