Steel pipe transport collection vehicle for building site
Technical Field
The utility model relates to a construction equipment technical field especially relates to a steel pipe transport collection vehicle for building site.
Background
The steel pipe for construction is one of the most common materials for infrastructure facilities in construction sites, and can be divided into seamless steel pipes and seamed steel pipes according to the seamed and seamless steel pipes. The seamed steel pipe is divided into a spiral steel pipe and a straight seam steel pipe according to the difference of welding seams, and the seamed steel pipe and the straight seam steel pipe are very commonly applied to the aspects of building piling, structure, steel structure, bearing, drainage and the like. However, in a construction site, the steel pipes have uniform diameters, but have different lengths, and need to be precisely selected in the using process, so that when a large number of steel pipes are gathered in a certain area, it is difficult for a person to collect the steel pipes with the same length, and a large amount of manpower and time are consumed in the carrying process. After retrieval, the steel pipe carrying and collecting vehicle for the construction site, which is a Chinese patent with the publication number of CN206967347U, comprises a vehicle body, wherein the top of the vehicle body is fixedly provided with a base, a crane is fixedly arranged on the base, a lifting rope is fixedly arranged on the crane, a fixing frame is fixedly arranged on the lifting rope, a steel pipe cover is fixedly arranged on the fixing frame, scales are fixedly arranged on the steel pipe cover, one end of the steel pipe cover is fixedly provided with a second through hole, a third through hole is fixedly arranged on the steel pipe cover, a first fixing rod is fixedly arranged on the fixing frame, a first automatic clamping device is fixedly arranged on the first fixing rod, a telescopic cylinder is fixedly arranged on the outer side wall of the steel pipe cover, one end of the telescopic cylinder is fixedly provided with a pressing plate, a pressure sensor is fixedly arranged on the pressing plate, a second fixing rod is fixedly arranged on the telescopic cylinder, a second automatic clamping device is fixedly arranged, and more manpower is saved.
But still have the shortcoming in the above-mentioned design, because the position of two self-holding device is adjusted to the inconvenient in the above-mentioned design, lead to the use that is not convenient for adapt to different length steel pipes, therefore we have proposed a steel pipe transport collection vehicle for building site and have been used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming of current building site steel pipe carrier because the relative position to clamping device is not convenient for adjust, lead to not being convenient for adapt to the use of different length steel pipes, and the steel pipe transport collection vehicle for building site who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a steel pipe carrying and collecting vehicle for construction sites comprises a hoisting box and two sliding plates, wherein hoisting rings are fixedly arranged on two sides of the top of the hoisting box, one side, close to each other, of each sliding plate is fixedly connected with one end of a rack, the hoisting box is slidably sleeved on the outer sides of the two racks, a first motor and a second motor are fixedly arranged on the inner wall of the top of the hoisting box and the inner wall of the bottom of the hoisting box respectively, a gear is fixedly arranged on an output shaft of the first motor, the two racks are meshed with the gear, the same transverse shaft is rotatably arranged between the inner walls of the two sides of the hoisting box, bevel gears are fixedly arranged on an output shaft of the second motor and the transverse shaft respectively, the two bevel gears are meshed with each other, one end of a square rod is fixedly connected with two ends of the transverse shaft, vertical grooves are formed in the bottoms of the two sliding plates, the same, rotate respectively between the both sides inner wall around two vertical grooves and install same threaded rod, equal fixed mounting has the worm wheel on two threaded rods, two worm wheels mesh with the worm that corresponds respectively mutually, and two threaded rod outsides all are provided with two and revolve to opposite external screw thread and thread bush and be equipped with two connecting plates, the equal fixed mounting in four connecting plate bottoms has the centre gripping frame, a plurality of through-holes have all been seted up to four centre gripping frame front sides, equal slidable mounting has the horizontal pole in a plurality of through-holes, the one end fixed mounting that is located the horizontal pole of same centre gripping frame has same clamp plate.
Preferably, the other end of each clamping spring is fixedly connected with the corresponding clamping frame, so that the clamping stability of the steel pipe is enhanced.
Preferably, the other ends of the cross rods are fixedly provided with limiting plates, and the limiting plates are movably abutted to the corresponding clamping frames respectively to limit the cross rods.
Preferably, two equal fixed mounting in worm both ends have the spacing collar, and four spacing collars are respectively with two slide both sides activity butt, carry on spacingly to the worm.
Preferably, two limiting rods are fixedly connected between the inner walls of the front side and the rear side of each vertical groove respectively, and the four connecting plates are respectively sleeved on the outer sides of the corresponding limiting rods in a sliding mode to guide the connecting plates.
Preferably, the top of the two sides of the hoisting box is fixedly provided with a cross beam, and the two sliding plates are respectively sleeved on the outer sides of the corresponding cross beams in a sliding manner to guide the two sliding plates.
In the utility model, the steel pipe carrying and collecting vehicle for the construction site is fixed on the lifting rope of the lifting machine on the steel pipe carrying and collecting vehicle through two lifting rings at the top of the lifting box, then the lifting box is driven to move to a specified position by controlling the lifting machine, then the first motor is started, the first motor conveying shaft drives the gear to rotate, and the gear drives two sliding plates to transversely slide outside two cross beams through the meshing with two racks, so that the relative positions of the two sliding plates are adjusted according to the length of the steel pipe;
in the utility model, a steel pipe transport collection vehicle for building site, through opening the second motor, the second motor output shaft drives the cross axle through the transmission between two bevel gears and rotates, the cross axle drives two square poles and rotates, two square poles drive two worms and rotate, two worms drive two worm wheels and rotate at a slow speed, two worm wheels drive two threaded rods and rotate, two threaded rods drive two clamping frames located on the same side to move to one side that is close to each other through the screw-thread fit with two connecting plates respectively, four clamping frames drive two pressing plates located on the same side to move to one side that is close to each other through corresponding clamping springs respectively and carry out clamping to the steel pipe, and through the elasticity assurance of clamping spring, guarantee the clamping stability to the steel pipe;
the utility model has the advantages of reasonable design, be convenient for adjust steel pipe clamping device's relative position to be convenient for carry out the centre gripping to the steel pipe of different length and fix, thereby be convenient for collect hoist and mount transport to the steel pipe, the reliability is high.
Drawings
Fig. 1 is a schematic structural view of a steel pipe carrying and collecting vehicle for a construction site according to the present invention;
FIG. 2 is a schematic structural view of part A of a steel pipe carrying and collecting vehicle for a construction site, which is provided by the utility model;
fig. 3 is the utility model provides a structural schematic diagram of a B-B cross-section of steel pipe transport collection vehicle for building site.
In the figure: 1. hoisting the box; 2. a slide plate; 3. a clamping frame; 4. a rack; 5. a first motor; 6. a gear; 7. a second motor; 8. a horizontal axis; 9. a bevel gear; 10. a square rod; 11. a cross beam; 12. a threaded rod; 13. a vertical groove; 14. a worm; 15. a worm gear; 16. a connecting plate; 17. pressing a plate; 18. a limiting rod; 19. a limiting ring; 20. a cross bar; 21. a clamping spring; 22. and a limiting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a steel pipe carrying and collecting vehicle for construction sites comprises a hoisting box 1 and two sliding plates 2, wherein both sides of the top of the hoisting box 1 are fixedly provided with hoisting rings, one side of each sliding plate 2 close to each other is fixedly connected with one end of a rack 4, the hoisting box 1 is slidably sleeved outside the two racks 4, a first motor 5 and a second motor 7 are respectively and fixedly arranged on the inner wall of the top and the inner wall of the bottom of the hoisting box 1, a gear 6 is fixedly arranged on an output shaft of the first motor 5, the two racks 4 are respectively engaged with the gear 6, a same transverse shaft 8 is rotatably arranged between the inner walls of both sides of the hoisting box 1, bevel gears 9 are respectively and fixedly arranged on the output shaft of the second motor 7 and the transverse shaft 8, the two bevel gears 9 are engaged, both ends of the transverse shaft 8 are respectively and fixedly connected with one end of a square rod 10, vertical grooves 13 are respectively arranged at the, two worms 14 slip cap respectively and establish in the vertical groove 13 outside that corresponds, rotate respectively between the both sides inner wall around two vertical grooves 13 and install same threaded rod 12, equal fixed mounting has worm wheel 15 on two threaded rod 12, two worm wheel 15 mesh with corresponding worm 14 respectively mutually, and two threaded rod 12 outsides all are provided with two and revolve to opposite external screw thread and thread bush and be equipped with two connecting plates 16, the equal fixed mounting in four connecting plates 16 bottoms has centre gripping frame 3, a plurality of through-holes have all been seted up to 3 front sides of four centre gripping frames, equal slidable mounting has horizontal pole 20 in a plurality of through-holes, the one end fixed mounting that is located horizontal pole 20 in same centre gripping frame 3 has same clamp plate 17.
The utility model discloses in, lie in the one end of a plurality of centre gripping springs 21 of one side sentence fixedly connected with that two clamp plates 17 of one side keep away from each other among four clamp plates 17, a plurality of centre gripping springs 21's the other end respectively with the 3 fixed connection of centre gripping frame that correspond, strengthen the centre gripping stability to the steel pipe.
The utility model discloses in, the equal fixed mounting of the other end of a plurality of horizontal poles 20 has limiting plate 22, to individual limiting plate 22 respectively with the 3 movable butts of centre gripping frame that correspond, carry on spacingly to horizontal pole 20.
The utility model discloses in, the equal fixed mounting in two worm 14 both ends has spacing collar 19, and four spacing collars 19 carry on spacingly with two 2 both sides activity butts of slide respectively to worm 14.
The utility model discloses in, two gag lever posts 18 of fixedly connected with respectively between the both sides inner wall around two vertical grooves 13, four connecting plates 16 slide the cover respectively and establish in the 18 outsides of gag lever posts that correspond, lead to connecting plate 16.
The utility model discloses in, the equal fixed mounting in 1 both sides top of hoist and mount case has crossbeam 11, and two slides 2 slide cover respectively and establish in the crossbeam 11 outside that corresponds, lead to two slides 2.
In the utility model, when in use, the two rings at the top of the hoisting box 1 are fixed on the lifting rope of the hoisting machine on the steel pipe carrying and collecting vehicle, then the hoisting box 1 is driven to move to a specified position by controlling the hoisting machine, then the first motor 5 is started, the conveying shaft of the first motor 5 drives the gear 6 to rotate, the gear 6 drives the two sliding plates 2 to transversely slide outside the two cross beams 11 by meshing with the two racks 4, thereby adjusting the relative positions of the two sliding plates 2 according to the length of the steel pipe, then the output shaft of the second motor 7 drives the cross shaft 8 to rotate by the transmission between the two bevel gears 9 by starting the second motor 7, the cross shaft 8 drives the two square rods 10 to rotate, the two square rods 10 drive the two worms 14 to rotate, the two worms 14 drive the two worm gears 15 to rotate at a slow speed, the two worm gears 15 drive the two threaded rods 12 to rotate, two threaded rods 12 drive two clamping frames 3 located on the same side to move to one side close to each other through the thread matching with two connecting plates 16 respectively, and four clamping frames 3 drive two pressing plates 17 located on the same side to move to one side close to each other through corresponding clamping springs 21 to clamp the steel pipe, and the clamping stability of the steel pipe is guaranteed through the elasticity of the clamping springs 21.