CN212981327U - A clamping device for building brick - Google Patents

A clamping device for building brick Download PDF

Info

Publication number
CN212981327U
CN212981327U CN202021819858.8U CN202021819858U CN212981327U CN 212981327 U CN212981327 U CN 212981327U CN 202021819858 U CN202021819858 U CN 202021819858U CN 212981327 U CN212981327 U CN 212981327U
Authority
CN
China
Prior art keywords
building brick
brick body
layer board
building
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021819858.8U
Other languages
Chinese (zh)
Inventor
林渊
卢艳
杨艳萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoguan Xinchengxing Construction Engineering Co ltd
Original Assignee
Shaoguan Xinchengxing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoguan Xinchengxing Construction Engineering Co ltd filed Critical Shaoguan Xinchengxing Construction Engineering Co ltd
Priority to CN202021819858.8U priority Critical patent/CN212981327U/en
Application granted granted Critical
Publication of CN212981327U publication Critical patent/CN212981327U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a clamping device for building brick, it includes the base and is used for bearing the layer board of building brick body, the base up end is opened there is the holding tank that is used for holding the building brick body, the layer board level sets up in the holding tank diapire, wherein a set of mutual just right two lateral walls of base are provided with respectively with layer board vertically montant, two be provided with the horizontal pole that is located building brick body top between the montant, two sliding connection has the clamp plate between the montant, be provided with the elastic component that orders about the clamp plate and press from both sides tight building brick body between horizontal pole and the clamp plate. This application has the effect that reduces the probability of building brick landing.

Description

A clamping device for building brick
Technical Field
The application relates to the field of building construction tools, in particular to a clamping device for building bricks.
Background
At present, house buildings are important components in the building industry of China, and building bricks are important building materials for building engineering.
In general, bricks are transported from a production site to an engineering project and often need to be transported to a use site through secondary transportation, and in one engineering project, the consumption of the bricks is huge and a large amount of manual transportation is needed.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: because the building brick is generally transferred through staff or basket, the building brick easily slips off in the handling process, influences handling efficiency, has the hidden danger that the foot is injured by a crashing object simultaneously.
SUMMERY OF THE UTILITY MODEL
In order to reduce the probability of building brick landing, this application provides a clamping device for building brick.
The application provides a clamping device for building brick adopts following technical scheme:
the utility model provides a clamping device for building brick, includes the base and is used for bearing the layer board of building brick body, open the base up end has the holding tank that is used for holding the building brick body, the layer board level sets up in the holding tank diapire, one of them two lateral walls that a set of mutual just right of base are provided with respectively with layer board vertically montant, two be provided with the horizontal pole that is located building brick body top between the montant, two sliding connection has the clamp plate between the montant, be provided with the elastic component that orders about the clamp plate and press from both sides tight building brick body between horizontal pole and the clamp plate.
By adopting the technical scheme, the supporting plate is placed in the base accommodating groove, the building bricks are placed on the supporting plate side by side, and the side wall of the accommodating groove provides horizontal pretightening force for the building brick body, so that the sliding probability of the building bricks is reduced; meanwhile, through the arrangement of the transverse rods and the vertical rods, the transverse rods and the two vertical rods form a handle for a carrying person to lift the base, so that the carrying person can carry the building brick body conveniently; under the elastic action of elastic component, the clamp plate compresses tightly the building brick downwards, and then stabilizes the building brick body in the holding tank, is favorable to reducing the probability that the building brick body rocked in handling, is favorable to reducing the probability that the building brick body drops.
Preferably, the pressure plate extends along the length direction parallel to the cross rod, and the two vertical rods penetrate through the pressure plate.
Through adopting above-mentioned technical scheme, run through the clamp plate setting through the montant for the clamp plate slides along montant length direction, and the montant plays the guide effect, is favorable to the stable slip of clamp plate, and the clamp plate extends along being on a parallel with horizontal pole length direction simultaneously, is favorable to the area of contact of clamp plate and building brick body, is favorable to pressing from both sides tight polylith building brick.
Preferably, the elastic part is two pressure springs which are respectively arranged around the vertical rod, and two ends of each pressure spring are respectively and fixedly connected to the peripheral surface of the cross rod and one side of the pressure plate, which faces the cross rod.
Through adopting above-mentioned technical scheme, encircle two montants respectively through two pressure springs to make the elasticity direction of pressure spring and montant length direction keep unanimous, and then put the clamp plate both ends with the extrusion force is evenly divided, also be favorable to reducing the probability that the pressure spring breaks away from the montant simultaneously.
Preferably, the outer peripheral surface of the cross rod is fixedly sleeved with an anti-skid sleeve.
Through adopting above-mentioned technical scheme, cup joint the antiskid cover at the horizontal pole outer peripheral face, be favorable to reducing the transport personnel and cause the condition that the horizontal pole takes off the hand because of the hand skids.
Preferably, one side of the pressing plate, which faces the cross rod, is hinged with a hook, and when the hook is hooked on the outer peripheral surface of the anti-slip sleeve, the pressing plate is separated from the building brick body.
Through adopting above-mentioned technical scheme, when needs get and put the building brick, up remove the clamp plate and make clamp plate and building brick body separation to with the couple hookup at the antiskid cover outer peripheral face, thereby keep the state of clamp plate and building brick body separation, the transport personnel of being convenient for get the operation of putting to the building brick.
Preferably, the bottom wall of the accommodating groove is provided with a through groove in a penetrating manner, the lower end face of the supporting plate is fixedly provided with four supporting legs penetrating through the through groove, the four supporting legs are respectively arranged at four corners of the lower end face of the supporting plate, and the sum of the height dimension of the supporting legs and the thickness dimension of the supporting plate is larger than the height dimension of the base.
Through adopting above-mentioned technical scheme, when putting this clamping device down, base and layer board take place relative displacement to make the layer board stretch out from holding tank upper end opening, thereby removed the restriction of holding tank lateral wall to the building brick, the porter of being convenient for gets and puts the building brick.
Preferably, the peripheral surfaces of the four support legs abut against the inner side wall of the through groove.
Through adopting above-mentioned technical scheme for the base leads to the groove and hugs closely the outer peripheral face of four stabilizer blades and slides, and the stabilizer blade has played the effect of direction, is favorable to the steady slip of base.
Preferably, cushion blocks are fixed at one ends of the four support legs far away from the supporting plate, and the peripheral sides of the cushion blocks protrude out of the peripheral sides of the support legs.
Through adopting above-mentioned technical scheme, through the setting of cushion to the area of contact of increase stabilizer blade lower extreme and ground is favorable to improving the stability of layer board, and simultaneously, the protruding stabilizer blade in cushion week side sets up, makes the cushion play spacing effect, reduces the condition of stabilizer blade roll-off spout, has reduced the probability of base and layer board separation.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the pressing plate is driven by the elastic piece to clamp the building brick body on the supporting plate, the pressing plate exerts a supporting force of the building brick body, meanwhile, the side wall of the accommodating groove of the base surrounds the building brick body, and the side wall of the accommodating groove provides a horizontal pre-tightening force for the building brick body, so that the sliding probability of the building brick body is favorably reduced;
2. through running through logical groove at the holding tank diapire to terminal surface sets up the stabilizer blade under the layer board, makes stabilizer blade height dimension and layer board thickness dimension sum be greater than base height dimension simultaneously. Therefore, when the clamping device is lowered, the supporting plate is ejected out of the opening at the upper end of the containing groove, and the building bricks can be conveniently taken and placed by a carrier.
Drawings
Fig. 1 is a schematic view of the overall structure of a clamping device for a building tile according to an embodiment of the present application.
Fig. 2 is a vertical sectional view of a pallet and a base of a clamping device for a building tile according to an embodiment of the present application.
Description of reference numerals: 1. a base; 11. accommodating grooves; 12. a through groove; 2. a support plate; 21. a support leg; 22. cushion blocks; 3. a building brick body; 4. a vertical rod; 5. a cross bar; 51. an anti-slip sleeve; 6. a diagonal bar; 7. a pressure spring; 8. pressing a plate; 81. and (4) hanging hooks.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses a clamping device for building brick. Referring to figures 1 and 2, a clamping device for a building block comprises a base 1 and a pallet 2 for carrying a body 3 of the building block. The holding tank 11 that is used for holding building brick body 3 is opened to base 1 up end, and holding tank 11 opening is the rectangle. The layer board 2 level is placed on 11 diapalls of holding tank, and building brick body 3 places at layer board 2 up end side by side. The circumferential side of the supporting plate 2 is abutted against the inner side wall of the accommodating groove 11. The middle parts of one group of two outer side walls of the base 1, which are opposite to each other, are respectively fixed with vertical rods 4 which are vertical to the supporting plate 2, and the vertical rods 4 vertically extend upwards. The two sides of the vertical rod 4 are respectively fixed with an inclined rod 6 which is arranged in a downward inclined manner, and one end of each inclined rod 6, which is far away from the vertical rod 4, is fixedly connected with the side wall of the base 1. The same cross rod 5 is fixed between the ends, far away from the base 1, of the two vertical rods 4, and the cross rod 5 is perpendicular to the vertical rods 4. The cross bar 5 is positioned above the building brick body 3. The middle part of the cross rod 5 is fixedly sleeved with an anti-skid sleeve 51.
Referring to fig. 1 and 2, a pressing plate 8 is arranged between the two vertical rods 4, the pressing plate 8 extends along a direction parallel to the length direction of the cross rod 5, and the two vertical rods 4 vertically penetrate through the pressing plate 8 along the thickness direction of the pressing plate 8. An elastic part is fixed between the cross bar 5 and the pressing plate 8. The elastic component is specifically two pressure springs 7 that encircle montant 4 respectively and set up, and pressure spring 7 both ends are fixed connection respectively in the one side of horizontal pole 5 outer peripheral face and clamp plate 8 orientation horizontal pole 5. When the lower end face of the pressing plate 8 is abutted to the building brick body 3, the pressure spring 7 is in a compressed state.
Referring to fig. 1 and 2, a hook 81 is hinged to the middle of one side of the pressing plate 8 facing the cross bar 5, when the hook 81 is hooked on the outer circumferential surface of the anti-slip sleeve 51, the pressing spring 7 is further compressed, and the pressing plate 8 is separated from the building brick body 3 and forms a sufficient space for taking and placing the building brick body 3.
Referring to fig. 1 and 2, a through groove 12 penetrates through the middle of the bottom wall of the accommodating groove 11, and the opening of the through groove 12 is rectangular. The terminal surface is fixed with four stabilizer blades 21 that pass logical groove 12 and set up under 2 of layer board, and four corners of terminal surface are put down to four stabilizer blades 21 branch, and four stabilizer blade 21 lateral walls are laminated with four corner lateral walls that lead to groove 12 respectively. The sum of the height dimension of the support leg 21 and the thickness dimension of the supporting plate 2 is larger than the height dimension of the base 1. A cushion block 22 is fixed to one end of the four legs 21 away from the pallet 2, and the peripheral side of the cushion block 22 protrudes out of the peripheral side of the legs 21.
The implementation principle of the clamping device for the building brick in the embodiment of the application is as follows:
when carrying the building brick body 3, a carrying person firstly places the clamping device on the construction ground, in the lowering process, the base 1 slides downwards along the height direction of the four support legs 21, the supporting plate 2 extends out of the upper end opening of the accommodating groove 11, the carrying person can conveniently place the building brick body 3, the carrying person places a plurality of building brick bodies 3 on the supporting plate 2 side by side, then moves the pressing plate 8 upwards, the hooks 81 are separated from the cross rods 5 to realize unlocking, then the pressing plate 8 tightly supports the building brick bodies 3 under the action of the elastic force of the pressure springs 7, then holds the anti-skidding sleeves 51 on the cross rods 5 and lifts up, so as to lift the building brick bodies 3, in the process, the base 1 and the supporting plate 2 generate relative displacement until the bottom wall of the accommodating groove 11 is abutted against the lower end surface of the supporting plate 2, the side wall of the accommodating groove 11 provides horizontal pre-tightening force for the building brick bodies 3, and the pressing plate 8 applies the abutting force, is favorable for reducing the probability of the building brick body 3 slipping.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A clamping device for building bricks which is characterized in that: including base (1) and layer board (2) that are used for bearing building brick body (3), base (1) up end is opened has holding tank (11) that are used for holding building brick body (3), layer board (2) level sets up in holding tank (11) diapire, base (1) wherein a set of mutual just right two lateral walls be provided with respectively with layer board (2) vertically montant (4), two be provided with horizontal pole (5) that are located building brick body (3) top between montant (4), two sliding connection has clamp plate (8) between montant (4), be provided with the elastic component who orders about clamp plate (8) and press from both sides tight building brick body (3) between horizontal pole (5) and clamp plate (8).
2. A clamping arrangement for a building block as claimed in claim 1, wherein: the pressing plate (8) extends along the length direction parallel to the cross rod (5), and the two vertical rods (4) penetrate through the pressing plate (8).
3. A clamping arrangement for a building block as claimed in claim 2, wherein: the elastic pieces are two pressure springs (7) which are arranged around the vertical rod (4) respectively, and two ends of each pressure spring (7) are fixedly connected to the outer peripheral surface of the cross rod (5) and one side, facing the cross rod (5), of the pressure plate (8) respectively.
4. A clamping arrangement for a building block as claimed in claim 1, wherein: the outer peripheral surface of the cross rod (5) is fixedly sleeved with an anti-skid sleeve (51).
5. A clamping arrangement for a building block as claimed in claim 4, wherein: one side of the pressing plate (8) facing the cross rod (5) is hinged with a hook (81), and when the hook (81) is hooked on the outer peripheral surface of the anti-slip sleeve (51), the pressing plate (8) is separated from the building brick body (3).
6. A clamping arrangement for a building block as claimed in claim 1, wherein: holding tank (11) diapire run through has logical groove (12), the terminal surface is fixed with four and passes under layer board (2) stabilizer blade (21) that logical groove (12) set up, four stabilizer blade (21) divide and put layer board (2) four corners of terminal surface down, stabilizer blade (21) height dimension and layer board (2) thickness dimension sum are greater than base (1) height dimension.
7. A clamping arrangement for a building block as claimed in claim 6, wherein: the peripheral surfaces of the four support legs (21) are abutted to the inner side wall of the through groove (12).
8. A clamping arrangement for a building block as claimed in claim 7, wherein: cushion blocks (22) are fixed at one ends of the four support legs (21) far away from the supporting plate (2), and the peripheral sides of the cushion blocks (22) protrude out of the peripheral sides of the support legs (21).
CN202021819858.8U 2020-08-27 2020-08-27 A clamping device for building brick Expired - Fee Related CN212981327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021819858.8U CN212981327U (en) 2020-08-27 2020-08-27 A clamping device for building brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021819858.8U CN212981327U (en) 2020-08-27 2020-08-27 A clamping device for building brick

Publications (1)

Publication Number Publication Date
CN212981327U true CN212981327U (en) 2021-04-16

Family

ID=75436464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021819858.8U Expired - Fee Related CN212981327U (en) 2020-08-27 2020-08-27 A clamping device for building brick

Country Status (1)

Country Link
CN (1) CN212981327U (en)

Similar Documents

Publication Publication Date Title
CN212981327U (en) A clamping device for building brick
CN108945059A (en) A kind of Ceramic manufacturing feeding device of Anti-fall
CN215852400U (en) Multifunctional novel material rack
CN205060084U (en) Automatic packing machine
CN204587617U (en) A kind of multifunctional slide packing chest
CN213567071U (en) A tray for building materials are placed
CN209853646U (en) Rubber pad transportation frame
CN202295752U (en) Plate holder
CN221140124U (en) ECP board stacking device
CN219669104U (en) Seven words transportation structure of dry-hanging ceramic veneer
CN206318315U (en) Plate shearing machine cradle
CN213262475U (en) Ceramic tile production transfer device
CN217049428U (en) Combined material rack for steel pipe production, storage and logistics
CN218431280U (en) Conveyer is used in board processing production
CN212608139U (en) Liftable stacking device
CN208393677U (en) A kind of Mobile vertical glass packaging platform
CN215883701U (en) Building decoration material carrier
CN220243903U (en) Ceramic transportation tray
CN221089436U (en) Integral loading and unloading frame matched with steam pressurized concrete slab maintenance
CN211594465U (en) Novel sand air entrainment panel is stacked device
CN213677690U (en) Tray for logistics transportation
CN212048339U (en) Logistics tray
CN212529726U (en) Raw material conveying device for chemical production
CN216104215U (en) Conveying device for ceramic tiles
CN214302935U (en) Concrete module collection dress handling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210416