CN212957909U - Electric power tower - Google Patents
Electric power tower Download PDFInfo
- Publication number
- CN212957909U CN212957909U CN202021261219.4U CN202021261219U CN212957909U CN 212957909 U CN212957909 U CN 212957909U CN 202021261219 U CN202021261219 U CN 202021261219U CN 212957909 U CN212957909 U CN 212957909U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- base
- screw
- rod
- rod body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
An electric power tower comprises a base, a bottom plate and a rod body, wherein the base is of a rectangular structure, four screw-thread steels are fixed in the base, the height of each screw-thread steel is higher than that of the base, the bottom plate is of a rectangular structure, four circular through holes which are in one-to-one correspondence with the screw-thread steels are formed in the bottom plate, the top ends of the screw-thread steels penetrate through the corresponding circular through holes, a hexagonal nut is further arranged at the top end of each screw-thread steel, a gasket is arranged between the bottom end of the hexagonal nut and the top end of the bottom plate, the rod body is fixedly connected with the bottom plate in a welding mode, four reinforcing ribs are uniformly arranged along the circumferential direction of the joint of the rod body and the bottom plate, one end of each reinforcing rib is fixedly connected with the rod body, the other end of each reinforcing rib is fixedly connected with the bottom plate, a, the top end of the rod body is provided with a pair of cross arms.
Description
Technical Field
The utility model relates to a power equipment field, concretely relates to electric power tower.
Background
With the continuous expansion of urban construction scale, the demand of urban development on land resources is increasing day by day, so that new requirements are provided for the construction and development of power transmission lines. The power transmission line conflicts with the development and utilization of land resources, the construction and development of the two aspects cause serious influence and restriction, the power grid is an energy artery for social and economic construction and urban development, the safe, rapid and efficient construction of the power grid has certain promotion effect on the urban construction development, and the pace of urban development and construction can be greatly promoted. And the quick high-efficient construction of electric wire netting, the construction of electric power tower is the key, and electric power tower mostly has the defect such as the quality is heavy, perishable, corrosion or fracture, durability is poor, life is shorter at present to also have certain degree of difficulty in the operation maintenance operation of construction transportation, installation and later stage, consequently need a new electric power tower urgently, in order to solve present shaft tower defect.
SUMMERY OF THE UTILITY MODEL
In order to solve the defect problem, the utility model provides an electric power tower, the construction does not need the component process basically, only need with electric power tower cross arm with the cat ladder install finish after carry out whole assemblage can, construction speed is much faster than the iron tower construction, improvement efficiency of construction that can be great, reduction of erection time.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an electric power tower comprises a base, a bottom plate and a rod body, wherein the base is of a rectangular structure, four screw-thread steels are fixed in the base, the height of each screw-thread steel is higher than that of the base, the bottom plate is of a rectangular structure, four circular through holes which are in one-to-one correspondence with the screw-thread steels are formed in the bottom plate, the top ends of the screw-thread steels penetrate through the corresponding circular through holes, a hexagonal nut is further arranged at the top end of each screw-thread steel, a gasket is arranged between the bottom end of the hexagonal nut and the top end of the bottom plate, the rod body is fixedly connected with the bottom plate in a welding mode, four reinforcing ribs are uniformly arranged along the circumferential direction of the joint of the rod body and the bottom plate, one end of each reinforcing rib is fixedly connected with the rod body, the other end of each reinforcing rib is fixedly connected with the bottom plate, a, the top end of the rod body is provided with a pair of cross arms.
As an optimal technical scheme of the utility model, the base forms for adopting concrete integrated into one piece preparation.
As an optimal technical scheme of the utility model, the screw-thread steel is in pre-buried income during base preparation the base.
As an optimized technical scheme of the utility model, the body of rod is the steel pipe.
Drawings
Fig. 1 is a schematic structural view of an electric tower according to the present invention;
fig. 2 is the utility model relates to an electric power tower top view.
The symbols in the drawings illustrate that:
base 1, screw-thread steel 2, bottom plate 3, gasket 4, hexagon nut 5, strengthening rib 6, cat ladder 7, the body of rod 8, cross arm 9, circular through-hole 10.
Detailed Description
The invention will now be described in further detail with reference to the accompanying drawings.
As shown in figure 1, the electric tower comprises a base 1, a bottom plate 3 and a rod body 8, wherein the base 1 is of a rectangular structure and is made of concrete through integral forming, the base 1 is laid under the ground, four screw-thread steels 2 are fixed on the base 1, the bottom ends of the screw-thread steels 2 are inserted into the base 1, the height of the screw-thread steels is higher than that of the base, the bottom plate 3 is of a rectangular structure, four circular through holes 10 corresponding to the screw-thread steels 2 one by one are formed in the bottom plate 3, the top ends of the screw-thread steels 2 penetrate through the corresponding circular through holes 10, a hexagonal nut 5 is further arranged at the top end of the screw-thread steel 2, a gasket 4 is arranged between the bottom end of the hexagonal nut 5 and the top end of the bottom plate 3, the bottom plate 3 is fixed on the base 1 through the hexagonal nut 5 and the gasket 10, and the rod body 8 is fixedly connected with the bottom plate 3 in, the body of rod 8 adopts the steel pipe preparation, along the body of rod 8 with the junction circumference direction of bottom plate 3 evenly is equipped with four strengthening ribs 6, 6 one end of strengthening rib and 8 fixed connection of the body of rod, the other end of strengthening rib 6 with 3 fixed connection of bottom plate, strengthening rib 6 can be right the body of rod 8 with the fixed connection intensity of bottom plate 3 plays further enhancement, be equipped with 6 cat ladders 7 that set up along the direction of height of the body of rod 8 on the lateral wall of the body of rod 8, make things convenient for maintenance personal to overhaul the electric power of trouble, 8 tops of the body of rod are equipped with a pair of cross arm 9.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.
Claims (4)
1. The utility model provides an electric power tower, includes base (1), bottom plate (3) and body of rod (8), its characterized in that: the base (1) is of a rectangular structure, four screw-thread steels (2) are fixed in the base (1), the screw-thread steels (2) are higher than the base (1), the bottom plate (3) is of a rectangular structure, four circular through holes (10) corresponding to the screw-thread steels (2) one to one are formed in the bottom plate (3), the top ends of the screw-thread steels (2) penetrate through the corresponding circular through holes (10), a hexagonal nut (5) is further arranged at the top end of the screw-thread steel (2), a gasket (4) is arranged between the bottom end of the hexagonal nut (5) and the top end of the bottom plate (3), the rod body (8) is fixedly connected with the bottom plate (3) in a welding mode, four reinforcing ribs (6) are uniformly arranged along the circumferential direction of the connection position of the rod body (8) and the bottom plate (3), one end of each reinforcing rib (6) is fixedly connected with the rod body (8), the other end of strengthening rib (6) with bottom plate (3) fixed connection, be equipped with a plurality of cat ladder (7) that set up along the direction of height of the body of rod on the lateral wall of the body of rod (8), the body of rod top is equipped with a pair of cross arm (9).
2. An electric tower as claimed in claim 1, wherein: the base is made of concrete in an integrated mode.
3. An electric tower as claimed in claim 1, wherein: the deformed steel bars are embedded into the base when the base is manufactured.
4. An electric tower as claimed in claim 1, wherein: the rod body is a steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021261219.4U CN212957909U (en) | 2020-07-01 | 2020-07-01 | Electric power tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021261219.4U CN212957909U (en) | 2020-07-01 | 2020-07-01 | Electric power tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212957909U true CN212957909U (en) | 2021-04-13 |
Family
ID=75389208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021261219.4U Active CN212957909U (en) | 2020-07-01 | 2020-07-01 | Electric power tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212957909U (en) |
-
2020
- 2020-07-01 CN CN202021261219.4U patent/CN212957909U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204081623U (en) | The servicing unit of a kind of reducing desulfurizing tower upside-down mounting | |
CN112900626A (en) | Beam-column joint structure of fabricated building and construction method thereof | |
CN212957909U (en) | Electric power tower | |
CN201443475U (en) | Sectional type high-power wind turbine tower | |
CN202039377U (en) | Prestressed steel stranded wire-combined anchor bolt | |
CN212957924U (en) | Door type guyed tower shank corrosion internal-pasting reinforcing device | |
CN210887282U (en) | Steel grating ring type wind power tower foundation ring facility | |
CN206329446U (en) | A kind of guide flange structure | |
CN211421160U (en) | Assembled transmission line shaft tower basis | |
CN210002434U (en) | Reinforcing member for concrete weak area at flange under fan foundation ring | |
CN209115905U (en) | A kind of foundation bolt for vibratory equipment | |
CN112727700A (en) | Cylindrical foundation of offshore wind power, lattice type anti-icing device and wind generating set | |
CN206220472U (en) | A kind of bracing means for improving bracing members stability of strutting system | |
CN201963021U (en) | Post-tensioning prestressing-force multi-section concrete wind-power generation tower frame | |
CN220184250U (en) | Concrete pole coupling mechanism | |
CN211287971U (en) | High-performance wind power tower barrel foundation ring | |
CN110565680A (en) | Steel grating ring type wind power tower foundation ring facility and construction method | |
CN215369942U (en) | Detachable trolley for shield track | |
CN220687492U (en) | Reinforced wind power tower | |
CN215631320U (en) | Elevator well connection structure | |
CN110054074B (en) | Assembly and method for hoisting reinforced bar formwork integrated components in groups | |
CN210563690U (en) | Electric power iron tower installation base | |
CN103388336A (en) | Main purline part for inner support | |
CN219549031U (en) | Reinforcement type back taper seat | |
CN212716102U (en) | Foundation-based communication base station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 546100 Shop 201-213, Building 9, Liyuan Yajing Community, No. 1, Xinqiao Road, Laibin City, Guangxi Zhuang Autonomous Region Patentee after: Guangxi Xingyuan Electric Power Survey and Design Co.,Ltd. Address before: 546100 Room 203, building 1, Liyuan Yajing community, No.1 Xinqiao Road, Laibin City, Guangxi Zhuang Autonomous Region Patentee before: LAIBIN XINGYUAN ELECTRIC POWER DESIGN CO.,LTD. |