CN212957774U - Strutting arrangement is used in steel construction engineering construction - Google Patents
Strutting arrangement is used in steel construction engineering construction Download PDFInfo
- Publication number
- CN212957774U CN212957774U CN202021649700.0U CN202021649700U CN212957774U CN 212957774 U CN212957774 U CN 212957774U CN 202021649700 U CN202021649700 U CN 202021649700U CN 212957774 U CN212957774 U CN 212957774U
- Authority
- CN
- China
- Prior art keywords
- slot
- vaulting pole
- lifter plate
- engineering construction
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 33
- 239000010959 steel Substances 0.000 title claims abstract description 33
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 238000009412 basement excavation Methods 0.000 claims abstract description 5
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a support arrangement is used in steel construction engineering construction, including supporting the base, the top excavation of supporting the base is equipped with a plurality of spouts, and the inside sliding connection of spout has trapezoidal slider, is equipped with the lifter plate between the trapezoidal slider, and the top fixedly connected with sleeve of lifter plate, telescopic inside are inserted and are equipped with the vaulting pole, and the top fixedly connected with backup pad of the vaulting pole at top is compared with prior art, the beneficial effects of the utility model are that: this strutting arrangement's vaulting pole has set up the multisection and can select the festival number as required, roughly splices the vaulting pole to the bottom of steel construction after, and the lift of the contact point of the inclined plane of rethread trapezoidal slider and lifter plate carries out the regulation of less scope to the backup pad at vaulting pole top, has increased the accurate nature of support, improves the welded accuracy.
Description
Technical Field
The utility model relates to a strutting arrangement, in particular to strutting arrangement is used in steel construction engineering construction belongs to building auxiliary assembly technical field.
Background
The steel structure engineering is a structure mainly made of steel, mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, all the members or components are usually connected by welding seams, bolts or rivets, and the steel structure engineering is one of main building structure types, is light in self weight and simple and convenient to construct, and is widely applied to the fields of large-scale plants, bridges, venues, super-high buildings and the like.
In steel construction building work process, need use strutting arrangement to support steel usually, make things convenient for the welding of steel construction, among the prior art, the support of traditional steel construction mostly only uses the roughly steel pipe of length etc. to establish the backing plate again and supports, and because the backing plate thickness is also certain usually, the length that leads to supporting is difficult to master, influences steel construction welded accurate nature, for this reason, provides a strutting arrangement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a strutting arrangement is used in steel construction engineering construction has set up the multisection and can select the festival number as required, roughly splices the bottom back of steel construction with the vaulting pole, and the inclined plane of rethread trapezoidal slider carries out the regulation of less scope with the backup pad at vaulting pole top with the lift of the contact point of lifter plate, has increased the accurate nature of support, improves welded accuracy.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model relates to a strutting arrangement is used in steel construction engineering construction, which comprises a supporting pedestal and is characterized by further comprising, the top excavation of supporting the base is equipped with a plurality of spouts, the inside sliding connection of spout has trapezoidal slider, be equipped with the lifter plate between the trapezoidal slider, the top fixedly connected with sleeve of lifter plate, telescopic inside is inserted and is equipped with vaulting pole, top the top fixedly connected with backup pad of vaulting pole.
As a preferred technical scheme of the utility model, the bottom fixedly connected with inserted block of vaulting pole, the one end excavation that the inserted block was kept away from to the vaulting pole is equipped with a slot, the inserted block is pegged graft with a slot.
As a preferred technical scheme of the utility model, the middle part of inserted block is dug and is equipped with No. three slots, the position that the vaulting pole is located the both sides of a slot and relative No. three slots is dug and is equipped with No. two slots, No. three slots are pegged graft with the inside of No. two slots and are had the gag lever post, the both ends of gag lever post are all rotated and are connected with spacing, the diameter of spacing equals with the diameter of gag lever post.
As an optimal technical scheme of the utility model, the position of the relative trapezoidal slider in bottom of lifter plate is excavated and is equipped with the chute, the inclined plane of trapezoidal slider and the inclined plane contact of chute.
As a preferred technical scheme of the utility model, the inside of spout is rotated and is connected with the threaded rod, threaded rod and trapezoidal slider threaded connection.
Compared with the prior art, the beneficial effects of the utility model are that: this strutting arrangement's vaulting pole has set up the multisection and can select the festival number as required, roughly splices the vaulting pole to the bottom of steel construction after, and the lift of the contact point of the inclined plane of rethread trapezoidal slider and lifter plate carries out the regulation of less scope to the backup pad at vaulting pole top, has increased the accurate nature of support, improves the welded accuracy.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic sectional structural view of the support base of the present invention;
fig. 3 is a schematic sectional structural view of the stay bar of the present invention.
In the figure: 1. a support base; 2. a chute; 3. a trapezoidal slider; 4. a threaded rod; 5. a lifting plate; 6. a chute; 7. a sleeve; 8. a stay bar; 9. a support plate; 10. a first slot; 11. a second slot; 12. inserting a block; 13. a third slot; 14. a limiting rod; 15. and (5) a limiting strip.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model relates to a support device for steel structure engineering construction, including supporting base 1, the top excavation of supporting base 1 is equipped with a plurality of spouts 2, and the inside sliding connection of spout 2 has trapezoidal slider 3, is equipped with lifter plate 5 between trapezoidal slider 3, and lifter plate 5's top fixedly connected with sleeve 7, sleeve 7's inside is inserted and is equipped with vaulting pole 8, the top fixedly connected with backup pad 9 of the vaulting pole 8 at top.
The bottom of the support rod 8 is fixedly connected with an insert 12, one end of the support rod 8, which is far away from the insert 12, is provided with a first slot 10, the insert 12 is inserted with the first slot 10, the height of the support rod 8 can be increased through a splicing mode and can be adjusted according to different construction heights, the middle of the insert 12 is provided with a third slot 13, the support rod 8 is positioned at two sides of the first slot 10, a second slot 11 is arranged at a position corresponding to the third slot 13, a limiting rod 14 is inserted inside the third slot 13 and the second slot 11, two ends of the limiting rod 14 are rotatably connected with limiting strips 15, the diameter of each limiting strip 15 is equal to that of the corresponding limiting rod 14, the limiting rods 14 are prevented from falling off from the connecting position of the two support rods 8 through the limiting strips 15, the connecting limiting firmness is increased, the bottom of the lifting plate 5 is provided with a chute 6 corresponding to the position of the trapezoidal sliding block 3, the inclined plane of the trapezoidal sliding block 3 is in contact with the inclined plane, trapezoidal slider 3 slides in the bottom of lifter plate 5 and receives the restriction, prevents that lifter plate 5 from sideslipping, and the inside rotation of spout 2 is connected with threaded rod 4, and threaded rod 4 and 3 threaded connection of trapezoidal slider insert the height of control lifter plate 5 to the bottom of lifter plate 5 through trapezoidal slider 3 of rotation control of threaded rod 4.
Specifically, when the utility model is used, the supporting base 1 is placed below the steel structure to be made, the number of the support rods 8 is selected according to the height of the steel structure, the support rods 8 are spliced by inserting the support rods 8 into the first slot 10 through the inserting blocks 12, the limiting rods 14 are inserted into the third slot 13 and the second slot 11 after the limiting rods 14 and the limiting strips 15 are controlled to be positioned on the same straight line, spacing 8 carries on spacingly, loosen spacing 15 backs, spacing 15 is automatic to drop, prevent that gag lever post 14 from being extracted, increase spacing stability, after 8 regulation of vaulting pole are accomplished, the predetermined height that is located the steel construction only remains less distance, rotate threaded rod 4, threaded rod 4 drives trapezoidal slider 3 and inserts in the chute 6 of lifter plate 5 bottom, along with 3 inclined planes of trapezoidal slider rise with the contact surface of chute 6, 5 lifting of lifter plate, backup pad 9 lifting thereupon supports the steel construction.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second", "third", "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby the features defined as "first", "second", "third", "fourth" may explicitly or implicitly include at least one such feature.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a strutting arrangement is used in steel construction engineering construction, a serial communication port, including supporting base (1), the top excavation that supports base (1) is equipped with a plurality of spouts (2), the inside sliding connection of spout (2) has trapezoidal slider (3), be equipped with lifter plate (5) between trapezoidal slider (3), top fixedly connected with sleeve (7) of lifter plate (5), the inside of sleeve (7) is inserted and is equipped with vaulting pole (8), the top fixedly connected with backup pad (9) of vaulting pole (8).
2. The supporting device for the steel structure engineering construction is characterized in that an inserting block (12) is fixedly connected to the bottom of the supporting rod (8), a first inserting groove (10) is formed in one end, far away from the inserting block (12), of the supporting rod (8), and the inserting block (12) is inserted into the first inserting groove (10).
3. The supporting device for the steel structure engineering construction is characterized in that a third slot (13) is formed in the middle of the inserting block (12), the supporting rod (8) is located on two sides of the first slot (10), a second slot (11) is formed in the position, opposite to the third slot (13), of the supporting rod (8), a limiting rod (14) is inserted into the third slot (13) and the second slot (11), limiting strips (15) are rotatably connected to two ends of the limiting rod (14), and the diameter of each limiting strip (15) is equal to that of each limiting rod (14).
4. The supporting device for the steel structure engineering construction according to claim 1, wherein a chute (6) is drilled at the bottom of the lifting plate (5) relative to the position of the trapezoidal sliding block (3), and the inclined surface of the trapezoidal sliding block (3) is in contact with the inclined surface of the chute (6).
5. The supporting device for the steel structure engineering construction according to claim 1, wherein a threaded rod (4) is rotatably connected to the inside of the sliding chute (2), and the threaded rod (4) is in threaded connection with the trapezoidal sliding block (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021649700.0U CN212957774U (en) | 2020-08-11 | 2020-08-11 | Strutting arrangement is used in steel construction engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021649700.0U CN212957774U (en) | 2020-08-11 | 2020-08-11 | Strutting arrangement is used in steel construction engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212957774U true CN212957774U (en) | 2021-04-13 |
Family
ID=75351261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021649700.0U Expired - Fee Related CN212957774U (en) | 2020-08-11 | 2020-08-11 | Strutting arrangement is used in steel construction engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212957774U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113696954A (en) * | 2021-07-29 | 2021-11-26 | 王强祖 | Heavy object perk handling device of construction engineering construction |
-
2020
- 2020-08-11 CN CN202021649700.0U patent/CN212957774U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113696954A (en) * | 2021-07-29 | 2021-11-26 | 王强祖 | Heavy object perk handling device of construction engineering construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212957774U (en) | Strutting arrangement is used in steel construction engineering construction | |
CN214615453U (en) | Early-dismantling supporting device for building engineering | |
CN212773562U (en) | Instrument based on unwrapping wire is made level on slope | |
CN216075699U (en) | Assembly type building connection structure | |
CN110593309A (en) | Construction method of full-hall scaffold supporting system with slope comprehensive pipe gallery | |
CN211312836U (en) | Fixed firm assembled building steelframe | |
CN113323143A (en) | Building steel tube bundle supporting platform structure | |
CN210013466U (en) | Template support frame convenient to accomodate | |
CN113914613B (en) | Lantern frame capable of guaranteeing verticality of ultrahigh single-column and construction method thereof | |
CN217556949U (en) | Supporting device for excavation of building engineering foundation | |
CN219241143U (en) | Connection structure for dry hanging large plate convenient to install | |
CN211920678U (en) | Positioning device for hoisting angle of lattice column | |
CN217751138U (en) | Heating pipe supporting and positioning device | |
CN214442687U (en) | Be used for prefabricated location bed-jig of utility tunnel steel reinforcement cage | |
CN220893169U (en) | Combined ruler | |
CN216009799U (en) | Supporting component for laying drainage pipeline | |
CN219453490U (en) | Novel measure buckle | |
CN116427406B (en) | Immersed tube sinking device for water conservancy construction | |
CN214657782U (en) | Reinforced steel structure connecting piece | |
CN216340086U (en) | High strength building steel structure | |
CN217839704U (en) | Bridge construction is with interim mound convenient to dismouting | |
CN217923773U (en) | Vertical static load test of single pile uses device | |
CN210032209U (en) | Energy-conserving EPS module cast in situ concrete shear wall structure | |
CN218800169U (en) | Bridge railing reinforcing bar installation positioner | |
CN212153399U (en) | A connecting piece and excavation supporting construction for excavation supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210413 |
|
CF01 | Termination of patent right due to non-payment of annual fee |