CN212957686U - Construction is with platform of unloading - Google Patents

Construction is with platform of unloading Download PDF

Info

Publication number
CN212957686U
CN212957686U CN202021010059.6U CN202021010059U CN212957686U CN 212957686 U CN212957686 U CN 212957686U CN 202021010059 U CN202021010059 U CN 202021010059U CN 212957686 U CN212957686 U CN 212957686U
Authority
CN
China
Prior art keywords
fixedly connected
embedded part
movable track
main beam
workbin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021010059.6U
Other languages
Chinese (zh)
Inventor
董鼎华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Public State Exhibition Co ltd
Original Assignee
Beijing Public State Exhibition Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Public State Exhibition Co ltd filed Critical Beijing Public State Exhibition Co ltd
Priority to CN202021010059.6U priority Critical patent/CN212957686U/en
Application granted granted Critical
Publication of CN212957686U publication Critical patent/CN212957686U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gates (AREA)

Abstract

The utility model discloses a discharging platform for building construction, which comprises a girder, a movable track and a material box, wherein one end of the girder is provided with a fixing part, the tail end of the girder is provided with a limit baffle, the movable track is arranged at the inner side of the girder by bolts, one end of the movable track is fixedly connected with the limit baffle, the other end of the movable track is fixedly connected with a crossbeam, the limit baffle, the movable track and the inner side of the crossbeam are fixedly connected with a reinforced cross brace and a reinforced vertical brace, the material box moves in the movable track, one side of the material box is provided with a discharging door, the utility model has simple structure and convenient and rapid installation and removal, the material box can automatically pass in and out along the movable track through rollers by the arranged movable track and a driving device, the material transportation is more rapid and labor-saving, the bottom of the girder is provided with a support bar, the bearing, causing damage to the building.

Description

Construction is with platform of unloading
Technical Field
The utility model relates to a building technical field specifically is a platform of unloading for construction.
Background
The platform of unloading is that the job site often sets up various interim operation panels and handling frame, generally be used for the turnover transportation of material, therefore the platform of unloading's safety is especially important, when the platform of unloading moves at every turn, whether the platform has too big deformation should be examined, whether there are phenomenons such as tiny crack in the welding seam, the platform installation of unloading now is loaded down with trivial details, and need punch on the building and anchor, can cause the destruction to the floor, influence the stability of floor, and this kind of fixed mode is insecure, it is easy not hard up to use the anchor position for a long time, the security performance is not enough, and inconvenient removal.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction is with platform of unloading to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a discharging platform for building construction comprises a main beam, a movable track and a material box, and is characterized in that a fixing piece is installed at one end of the main beam, the fixing piece is fixed on a first embedded part through a nut, a first connecting piece is fixedly connected to the lower side of the main beam, the first connecting piece is fixed on a second embedded part through a nut, a supporting rod is fixedly connected to one end of the lower side of the main beam, the other end of the supporting rod is fixedly connected with a second connecting piece, a second connecting piece is fixed on a third embedded part through a nut, a limit baffle is installed at the tail end of the main beam, the movable track is installed on the inner side of the main beam through a bolt, one end of the movable track is fixedly connected with the limit baffle, the other end of the movable track is fixedly connected with a cross beam, a reinforcing cross brace and a reinforcing vertical brace are fixedly connected to, the other end is fixed at the top of the material box by a lock catch, a fixing ring is installed at the bottom of the material box, a rotating shaft is installed in the fixing ring, rollers are installed at two ends of the rotating shaft, a driven gear is arranged at one end of the rotating shaft on the inner side of each roller, a protective cover is fixed on the lower portion of one side of the material box above each driven gear, and a motor, a speed reducer and a.
As a further aspect of the present invention: the first embedded part, the second embedded part and the third embedded part are all arranged in a building, and threads corresponding to the screw caps are arranged at one ends of the first embedded part, the second embedded part and the third embedded part.
As a further aspect of the present invention: the movable rail, the limiting baffle, the cross beam, the reinforcing cross brace and the reinforcing vertical brace are welded.
As a further aspect of the present invention: the rotating shaft is connected with the fixing ring in a rotating mode, and the rotating shaft is fixedly connected with the idler wheel and the driven gear.
As a further aspect of the present invention: the driven gear is meshed with the driving gear.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses simple structure, the installation and demolish convenient and fast, through the removal track and the drive arrangement who sets up, make the workbin can pass in and out along the removal track is on its own through the gyro wheel, material handling is more swift laborsaving and need not workman's business turn over platform, and the workbin side is equipped with unloads the bin gate, it is more convenient to unload when the material is carried in to the building, the girder bottom is provided with the bracing piece, can strengthen the bearing capacity of platform, and the crossbeam, strengthen the stull, it makes platform stability higher to strengthen setting up of erectting, need punch to the building when avoiding installing the platform of unloading through the mode that sets up the built-in fitting, cause.
Drawings
Fig. 1 is a schematic structural diagram of a discharging platform for building construction in a front view.
Fig. 2 is a schematic structural diagram of a discharging platform for building construction in a top view.
Fig. 3 is a cross-sectional structural view of the main beam.
In the figure: the main beam comprises a main beam 1, a movable rail 2, a material box 3, a fixing piece 4, a screw cap 5, a first embedded part 6, a first connecting piece 7, a second embedded part 8, a supporting rod 9, a second connecting piece 10, a third embedded part 11, a limiting baffle 12, a bolt 13, a cross beam 14, a reinforcing cross brace 15, a reinforcing vertical brace 16, a discharge door 17, a lock catch 18, a fixing ring 19, a rotating shaft 20, a roller 21, a driven gear 22, a protective cover 23, a motor 24, a speed reducer 25 and a driving gear 26.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in the embodiment of the present invention, an unloading platform for building construction includes a main beam 1, a movable rail 2 and a material box 3, wherein a fixing member 4 is installed at one end of the main beam 1, the fixing member 4 is fixed on a first embedded part 6 by a nut 5, a first connecting member 7 is fixedly connected to the lower side of the main beam 1, the first connecting member 7 is fixed on a second embedded part 8 by the nut 5, a supporting rod 9 is fixedly connected to one end of the lower side of the main beam 1, the other end of the supporting rod 9 is fixedly connected to a second connecting member 10, the second connecting member 10 is fixed on a third embedded part 11 by the nut 5, the first embedded part 6, the second embedded part 8 and the third embedded part 11 are all disposed in a building, and one end of the first embedded part is provided with a thread corresponding to the nut 5, the end of the main beam 1 is installed with a limit baffle 12, the movable rail 2 is, one end of the movable track 2 is fixedly connected with a limit baffle 12, the other end of the movable track is fixedly connected with a cross beam 14, the inner sides of the limit baffle 12, the movable track 2 and the cross beam 14 are fixedly connected with a reinforced cross beam 15 and a reinforced vertical beam 16, the movable track 2, the limit baffle 12, the cross beam 14, the reinforced cross beam 15 and the reinforced vertical beam 16 are welded, the feed box 3 moves in the movable track, one side of the feed box 3 is provided with a discharge door 17, one end of the discharge door 17 is rotatably connected with the bottom of the feed box 3, the other end of the discharge door is fixed at the top of the feed box 3 through a lock catch 18, the bottom of the feed box 3 is provided with a fixed ring 19, a rotating shaft 20 is installed in the fixed ring 19, the rotating shaft 20 is rotatably connected with the fixed ring 19, rollers 21 are installed at two ends of the rotating shaft 20, one end of the, the protective cover 23 is internally provided with a motor 24, a reducer 25 and a driving gear 26, and the driven gear 22 is meshed with the driving gear 26.
The utility model discloses a working process is: when the discharging platform for building construction is used, firstly, the motor 24 is started to drive the driving gear 26 to rotate, the driving gear 26 drives the driven gear 22 to rotate, the rotating shaft 20 and the roller 21 are made to rotate, then the material box 3 is moved outwards along the moving track 2 until being blocked by the limit baffle 12 to stop moving, after the building materials are hoisted to the material box 3 by the tower crane, the motor 24 drives the driving gear 26 to reversely rotate, the driving gear 26 drives the driven gear 22 to rotate, the rotating shaft 20 and the roller 21 are made to rotate, then the material box 3 is moved towards the building along the moving track 2 until the roller 21 is blocked by the cross beam 14 to stop moving, then the lock catch 18 is opened, the discharging door 17 is laid flat to discharge, the discharging door 17 is closed after discharging is finished, the lock catch 18 is locked, and the material box 3 is moved outwards again to perform secondary charging.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. A discharging platform for building construction comprises a main beam (1), a movable track (2) and a material box (3), and is characterized in that a fixing piece (4) is installed at one end of the main beam (1), the fixing piece (4) is fixed on a first embedded part (6) through a nut (5), a first connecting piece (7) is fixedly connected to the lower side of the main beam (1), the first connecting piece (7) is fixed on a second embedded part (8) through the nut (5), a supporting rod (9) is fixedly connected to one end of the lower side of the main beam (1), the other end of the supporting rod (9) is fixedly connected with a second connecting piece (10), the second connecting piece (10) is fixed on a third embedded part (11) through the nut (5), a limit baffle (12) is installed at the tail end of the main beam (1), the movable track (2) is installed on the inner side of the main beam (1) through a bolt (13), one end of the movable track (2, the other end is fixedly connected with a cross beam (14), the limiting baffle (12), the moving track (2) and the inner side of the cross beam (14) are fixedly connected with a reinforcing cross brace (15) and a reinforcing vertical brace (16), workbin (3) removes in the removal track, workbin (3) one side is equipped with unloads bin gate (17), it rotates with workbin (3) bottom to unload bin gate (17) one end and is connected, the other end is fixed at workbin (3) top by hasp (18), solid fixed ring (19) are installed to workbin (3) bottom, install axis of rotation (20) in solid fixed ring (19), gyro wheel (21) are installed at axis of rotation (20) both ends, axis of rotation (20) one end is provided with driven gear (22) in gyro wheel (21) inboard, driven gear (22) top workbin (3) one side lower part is fixed with safety cover (23), install motor (24) in safety cover (23), reduction gear (25) and driving gear (26).
2. The discharging platform for building construction according to claim 1, wherein the first embedded part (6), the second embedded part (8) and the third embedded part (11) are all arranged in a building, and one end of each embedded part is provided with a thread corresponding to the screw cap (5).
3. The discharging platform for building construction according to claim 1, wherein the moving track (2), the limiting baffle (12), the cross beam (14), the reinforcing cross brace (15) and the reinforcing vertical brace (16) are welded.
4. The discharging platform for building construction according to claim 1, wherein the rotating shaft (20) is rotatably connected with the fixed ring (19), and the rotating shaft (20) is fixedly connected with the roller (21) and the driven gear (22).
5. The construction discharge platform according to claim 1, wherein the driven gear (22) and the driving gear (26) are engaged.
CN202021010059.6U 2020-06-04 2020-06-04 Construction is with platform of unloading Active CN212957686U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021010059.6U CN212957686U (en) 2020-06-04 2020-06-04 Construction is with platform of unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021010059.6U CN212957686U (en) 2020-06-04 2020-06-04 Construction is with platform of unloading

Publications (1)

Publication Number Publication Date
CN212957686U true CN212957686U (en) 2021-04-13

Family

ID=75384479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021010059.6U Active CN212957686U (en) 2020-06-04 2020-06-04 Construction is with platform of unloading

Country Status (1)

Country Link
CN (1) CN212957686U (en)

Similar Documents

Publication Publication Date Title
EP3094794B1 (en) Load carrying platform shuttle
CN206856544U (en) A kind of dregs dumper
CN212957686U (en) Construction is with platform of unloading
CN212224671U (en) Construction is with platform of unloading
CN109050621B (en) Material transporting vehicle convenient for discharging for building construction
CN217201897U (en) Lifting machine convenient to unloading
CN215361481U (en) Material handling equipment for building engineering
CN2820780Y (en) Coil material loading device for ship's hold
CN212450442U (en) Heavy type lifting machine with guiding and locking functions
CN209040499U (en) A kind of skyscraper refuse collection device
CN210738106U (en) Material transfer platform applied to construction
CN212130552U (en) Shield tunnel safety plugging device
CN215944397U (en) Cargo box lifting unloading device for engineering truck
CN212668216U (en) High altitude construction car for construction convenient to transportation building rubbish
CN219158460U (en) Exempt from pre-buried platform of unloading
CN105523484A (en) Tunnel rescuing method and device thereof
CN218619263U (en) Blanking platform of steel structure processing toothless saw
CN207523540U (en) A kind of AUTOMATIC ZONING shelf and lorry for boxcar
CN111086730A (en) Transport pallet and preform transport device
CN217734908U (en) Construction is with platform of unloading
CN220618257U (en) Bulk loading and lifting device
CN217975459U (en) Storage bin platform of unloading
CN221087836U (en) Turnover mechanism for machining pivot box for bulldozer
CN219506056U (en) Movable support base for ship maintenance
CN218779323U (en) Movable protection platform for bridge construction