CN212956702U - Hydraulic engineering construction river channel desilting equipment - Google Patents

Hydraulic engineering construction river channel desilting equipment Download PDF

Info

Publication number
CN212956702U
CN212956702U CN202021402107.6U CN202021402107U CN212956702U CN 212956702 U CN212956702 U CN 212956702U CN 202021402107 U CN202021402107 U CN 202021402107U CN 212956702 U CN212956702 U CN 212956702U
Authority
CN
China
Prior art keywords
box
side wall
fixedly connected
hydraulic engineering
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021402107.6U
Other languages
Chinese (zh)
Inventor
李龙啸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021402107.6U priority Critical patent/CN212956702U/en
Application granted granted Critical
Publication of CN212956702U publication Critical patent/CN212956702U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a hydraulic engineering construction river channel dredging equipment, which comprises a box body, wherein the top of the box body is fixedly connected with a second shell, the inner side wall of the second shell is provided with a sludge pump, the water inlet end of the sludge pump is communicated with a third pipe body, the water outlet end of the sludge pump is communicated with a fourth pipe body, the outer side wall of the fourth pipe body penetrates through the outer side wall of the box body, the top of the inner side wall of the box body is provided with a spray head, and the water inlet end of the spray head is communicated with the second pipe body; this device is after the desilting operation is accomplished, and this device can form the clean scraping plate mechanism that can the sideslip through setting up of lead screw, threaded sleeve, bracing piece, motor and plate body, and the arc wall has been seted up at the plate body top, and the plate body collision fourth body and shower nozzle can be avoided to the arc wall, and clean scraping plate mechanism can carry out cleaning to the inside silt of remaining of box, and collocation second body and shower nozzle wash the box inside for the maintenance and the cleanness of this device are more convenient.

Description

Hydraulic engineering construction river channel desilting equipment
Technical Field
The utility model relates to an environmental management technical field specifically is a hydraulic engineering construction river course desilting equipment.
Background
As is well known, river channel siltation increasingly affects the normal performance of various functions such as flood control, flood drainage, irrigation, water supply, navigation and the like, and river channel dredging engineering is performed in order to recover the normal functions of river channels and promote the rapid and continuous development of the economic society. The river channel becomes deep and wide through treatment, the river water becomes clear, the production conditions and the living environment of the masses are obviously improved, and the purposes of 'clear water, smooth river, green bank and beautiful landscape' are achieved, and the river channel dredging generally refers to the treatment of the river channel and belongs to the hydraulic engineering.
The invention is disclosed in China: CN207538092U discloses a river course water pollution desilting equipment, this desilting equipment has set up the filter screen in the inside in cabin, the filter screen has played the effect of drainage, water is filtered the filter screen inboard and is discharged through the pump body, can reduce the water content in the silt, it occupies to the space in cabin to have reduced water, can improve desilting efficiency, the pollution of sewage to the environment in transit has been avoided, the front side of inhaling the silt pipe has set up agitating unit, can get up thick silt stirring, conveniently absorb.
However, a certain problem still exists, and current device can leave silt in appointed area or deposit the mechanism in the clearance silt, often needs artifical manual clean residual silt at the in-process of later stage collection, and silt has a large amount of irritability gas, causes the influence to operating personnel's health easily, for this reason, provides a hydraulic engineering construction river course desilting equipment.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a hydraulic engineering construction river course desilting equipment.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a river dredging device for hydraulic engineering construction comprises a box body, wherein a second shell is fixedly connected to the top of the box body, a sludge pump is installed on the inner side wall of the second shell, the water inlet end of the sludge pump is communicated with a third tube body, the water outlet end of the sludge pump is communicated with a fourth tube body, the outer side wall of the fourth tube body penetrates through the outer side wall of the box body, a spray nozzle is installed at the top of the inner side wall of the box body, the water inlet end of the spray nozzle is communicated with the second tube body, the outer side wall of the second tube body penetrates through the outer side wall of the box body, a third shell is fixedly connected to one side of the box body, a motor is installed on the inner side wall of the third shell, a lead screw is fixedly connected to the output end of the motor, the outer side wall of the lead screw penetrates through the box, the utility model discloses a lead screw, including box, lead screw, threaded sleeve, arc wall, four bracing pieces, the inside wall symmetry fixedly connected with of box four bracing pieces, the lateral wall threaded connection of lead screw has threaded sleeve, threaded sleeve's lateral wall welding has the plate body, the arc wall has been seted up at the top of plate body, four the lateral wall of bracing piece all runs through one side of plate body.
Preferably, the lower surface of the box body is communicated with a first pipe body, and a valve is installed on the outer side wall of the first pipe body.
Preferably, one end of the third pipe body is communicated with a sewage suction pipe, and one end of the sewage suction pipe is fixedly connected with a filter head.
Preferably, one side fixedly connected with of box pushes away the handle, the bottom symmetry fixedly connected with four support columns of box, four the equal fixedly connected with universal wheel in bottom of support column.
Preferably, the front surface of the box body is embedded with an observation window.
Preferably, the top of the box body is fixedly connected with a winding roller, and the upper surface of the winding roller is provided with a rotating handle.
(III) advantageous effects
Compared with the prior art, the utility model provides a hydraulic engineering construction river course desilting equipment possesses following beneficial effect:
this device is after the desilting operation is accomplished, and this device can form the clean scraping plate mechanism that can the sideslip through setting up of lead screw, threaded sleeve, bracing piece, motor and plate body, and the arc wall has been seted up at the plate body top, and the plate body collision fourth body and shower nozzle can be avoided to the arc wall, and clean scraping plate mechanism can carry out cleaning to the inside silt of remaining of box, and collocation second body and shower nozzle wash the box inside for the maintenance and the cleanness of this device are more convenient.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of an observation window according to the present invention;
fig. 3 is a schematic structural diagram of the middle plate body of the present invention.
In the figure: 1. a box body; 2. a first pipe body; 3. a universal wheel; 4. a valve; 5. a screw rod; 6. a push handle; 7. a second tube body; 8. a spray head; 9. a sludge pump; 10. a second housing; 11. turning a handle; 12. a winding roller; 13. a third tube; 14. a sewage suction pipe; 15. a filter head; 16. a threaded sleeve; 17. a motor; 18. a third housing; 19. a support pillar; 20. a plate body; 21. a support bar; 22. an arc-shaped slot; 23. an observation window; 24. a fourth tube.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: a hydraulic engineering construction river dredging device comprises a box body 1, a second shell body 10 is fixedly connected to the top of the box body 1, a sludge pump 9 is installed on the inner side wall of the second shell body 10, a water inlet end of the sludge pump 9 is communicated with a third tube body 13, a water outlet end of the sludge pump 9 is communicated with a fourth tube body 24, the outer side wall of the fourth tube body 24 penetrates through the outer side wall of the box body 1, a spray head 8 is installed on the top of the inner side wall of the box body 1, a water inlet end of the spray head 8 is communicated with the second tube body 7, the outer side wall of the second tube body 7 penetrates through the outer side wall of the box body 1, one side of the box body 1 is fixedly connected with a third shell body 18, a motor 17 is installed on the inner side wall of the third shell body 18, a lead screw 5 is fixedly connected to the output end of the motor 17, one end, far away from the output, the lateral wall threaded connection of lead screw 5 has threaded sleeve 16, and threaded sleeve 16's lateral wall welding has plate body 20, and arc wall 22 has been seted up at the top of plate body 20, and the lateral wall of four bracing pieces 21 all runs through one side of plate body 20.
In this embodiment, specifically: the lower surface of the box body 1 is communicated with a first pipe body 2, and the outer side wall of the first pipe body 2 is provided with a valve 4; the first pipe 2 can discharge sludge, and the valve 4 can control the discharge switch of the first pipe 2.
In this embodiment, specifically: one end of the third pipe body 13 is communicated with a sewage suction pipe 14, and one end of the sewage suction pipe 14 is fixedly connected with a filter head 15; the third pipe body 13, the sewage suction pipe 14 and the sludge pump 9 form a dredging mechanism, and the filter head 15 can filter impurities.
In this embodiment, specifically: one side of the box body 1 is fixedly connected with a push handle 6, the bottom of the box body 1 is symmetrically and fixedly connected with four support columns 19, and the bottoms of the four support columns 19 are fixedly connected with universal wheels 3; the supporting column 19 and the universal wheel 3 form a moving mechanism of the device, and an operator can push the pushing handle 6 to drive the device to transport.
In this embodiment, specifically: an observation window 23 is embedded in the front surface of the box body 1; the operator can observe the components inside the tank 1 and the amount of sludge through the observation window 23.
In this embodiment, specifically: the top of the box body 1 is fixedly connected with a winding roller 12, and the upper surface of the winding roller 12 is provided with a rotating handle 11; when the third pipe 13 is not used, the third pipe 13 can be wound around the winding roller 12 and can be stored by rotating the rotating handle 11.
The model of the motor 17 in this embodiment is: 57BG 76.
The model of the sludge pump 9 in this embodiment is: WQ 9-22-2.2.
To sum up, the working principle and the working process of the dredging equipment for the river channel in the hydraulic engineering construction are that when the dredging equipment is used, firstly, an operator pushes the push handle 6 to drive the universal wheels 3 at the bottoms of the four support columns 19 to move and transport, the foot brake plates are arranged on one sides of the universal wheels 3 and can fix the position of the dredging equipment, after the dredging operation of the dredging equipment is completed, the operator discharges sludge in the box body 1, the residual sludge can be adhered in the equipment if not cleaned in time, the cleaning difficulty can be increased after drying, the manual cleaning can affect the body of the operator, the cleaning scraper mechanism capable of transversely moving can be formed by the arrangement of the screw rod 5, the threaded sleeve 16, the support rod 21, the motor 17 and the plate body 20, the operation of the motor 17 drives the screw rod 5 to rotate, and the threaded sleeve 16 connected with the screw rod 5 can transversely move on the screw rod 5 under the fixed supporting action of the support rod 21, the device can clean residual sludge in the box body 1, wherein the top of the plate body 20 is provided with an arc-shaped groove 22, the arc-shaped groove 22 can prevent the plate body 20 from touching a fourth pipe body 24 and a spray head 8, the second pipe body 7 and the spray head 8 are matched to clean the inside of the box body 1, so that the device is more convenient to maintain and clean, after the dredging operation is completed, an operator can discharge the sludge in the box body 1 through the first pipe body 2 by rotating a valve 4, the third pipe body 13 and a sewage suction pipe 14 can extract and clean the sludge through a sludge pump 9, the second shell body 10 and the third shell body 18 can respectively play a role in protecting and fixing the sludge pump 9 and a motor 17, a filter head 15 can effectively prevent sundries or stones from entering the device, the operator can observe parts and sludge stock in the box body 1 through an observation window 23, and the third pipe body 13 can be wound on a winding roller 12 when not used, rotate 11 to accomodate third body 13 through rotating, this device is installed and is used for control motor 17 and sludge pump 9 to start and the switch block of closing, and the switch block is connected with external commercial power for supply power for motor 17 and sludge pump 9.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a hydraulic engineering construction river course desilting equipment, includes box (1), its characterized in that: the top of the box body (1) is fixedly connected with a second shell (10), a sludge pump (9) is installed on the inner side wall of the second shell (10), the water inlet end of the sludge pump (9) is communicated with a third tube body (13), the water outlet end of the sludge pump (9) is communicated with a fourth tube body (24), the outer side wall of the fourth tube body (24) penetrates through the outer side wall of the box body (1), a spray head (8) is installed at the top of the inner side wall of the box body (1), the water inlet end of the spray head (8) is communicated with a second tube body (7), the outer side wall of the second tube body (7) penetrates through the outer side wall of the box body (1), one side of the box body (1) is fixedly connected with a third shell (18), the inner side wall of the third shell (18) is provided with a motor (17), and the output end of the motor (17, the lateral wall of lead screw (5) runs through box (1), lead screw (5) are kept away from the one end of motor (17) output rotate through the pivot connect in the inside wall of box (1), four bracing pieces (21) of the inside wall symmetry fixedly connected with of box (1), the lateral wall threaded connection of lead screw (5) has threaded sleeve (16), the lateral wall welding of threaded sleeve (16) has plate body (20), arc wall (22), four have been seted up at the top of plate body (20) the lateral wall of bracing piece (21) all runs through one side of plate body (20).
2. The hydraulic engineering construction river channel dredging equipment of claim 1, wherein: the lower surface intercommunication of box (1) has first body (2), valve (4) are installed to the lateral wall of first body (2).
3. The hydraulic engineering construction river channel dredging equipment of claim 1, wherein: one end of the third pipe body (13) is communicated with a sewage suction pipe (14), and one end of the sewage suction pipe (14) is fixedly connected with a filter head (15).
4. The hydraulic engineering construction river channel dredging equipment of claim 1, wherein: one side fixedly connected with of box (1) pushes away handle (6), four support columns (19) of the bottom symmetry fixedly connected with of box (1), four the equal fixedly connected with universal wheel (3) in bottom of support column (19).
5. The hydraulic engineering construction river channel dredging equipment of claim 1, wherein: the front surface of the box body (1) is embedded with an observation window (23).
6. The hydraulic engineering construction river channel dredging equipment of claim 1, wherein: the top of box (1) fixedly connected with twine roller (12), twine the last surface mounting of roller (12) and change handle (11).
CN202021402107.6U 2020-07-16 2020-07-16 Hydraulic engineering construction river channel desilting equipment Expired - Fee Related CN212956702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021402107.6U CN212956702U (en) 2020-07-16 2020-07-16 Hydraulic engineering construction river channel desilting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021402107.6U CN212956702U (en) 2020-07-16 2020-07-16 Hydraulic engineering construction river channel desilting equipment

Publications (1)

Publication Number Publication Date
CN212956702U true CN212956702U (en) 2021-04-13

Family

ID=75393126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021402107.6U Expired - Fee Related CN212956702U (en) 2020-07-16 2020-07-16 Hydraulic engineering construction river channel desilting equipment

Country Status (1)

Country Link
CN (1) CN212956702U (en)

Similar Documents

Publication Publication Date Title
CN112031069A (en) Rainwater recycling device for building
CN212956702U (en) Hydraulic engineering construction river channel desilting equipment
CN112624377A (en) Sewage treatment plant convenient to arrange mud
CN210497551U (en) Sludge cleaning and recovering device for sewage treatment tank
CN209778422U (en) Water treatment system
CN210342055U (en) Channel long side slope desilting filter
CN210369291U (en) Hydraulic engineering pipeline dredging device
CN206661772U (en) A kind of swash plate purging system in inclined-plate clarifying basin
CN213223428U (en) Long service life's new material belt cleaning device
CN212102276U (en) Small-size integrated water treatment facilities
CN212314594U (en) Garbage cleaning and collecting device for constructional engineering
CN210133089U (en) Engineering car washer
CN216766189U (en) Efficient municipal hydraulic engineering of desilting is with environmental protection desilting device
CN213508629U (en) River course sediment removal device for hydraulic engineering with mud-water separation function
CN216149148U (en) Industrial sewage treatment system
CN211513572U (en) Sewage treatment plant convenient to take out rubbish
CN221086655U (en) Mud tank cleaning device convenient for cleaning mud
CN216810205U (en) Landscape pond building structure
CN211987230U (en) Desilting device of primary sedimentation tank
CN211948625U (en) Hydraulic engineering silt device of decontaminating
CN213049597U (en) Wastewater treatment filtering device
CN217943046U (en) Sand removing device of high-pressure water cutting machine
CN217204366U (en) Novel water conservancy desilting device
CN212896114U (en) Waterproof drainage device of hydraulic engineering construction
CN218405604U (en) Water conservancy construction high efficiency sediment removal device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210413