CN212956138U - Pier body top mould strutting arrangement - Google Patents
Pier body top mould strutting arrangement Download PDFInfo
- Publication number
- CN212956138U CN212956138U CN202020974826.9U CN202020974826U CN212956138U CN 212956138 U CN212956138 U CN 212956138U CN 202020974826 U CN202020974826 U CN 202020974826U CN 212956138 U CN212956138 U CN 212956138U
- Authority
- CN
- China
- Prior art keywords
- pier body
- template
- telescopic
- telescopic machanism
- clamping plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model belongs to the technical field of the bridge construction, especially, relate to a pier shaft top mould strutting arrangement. The supporting device comprises two templates and a telescopic mechanism, wherein the templates are used for supporting the top mold; every the template corresponds at least and is provided with two telescopic machanism, every telescopic machanism's one end all rotationally connects corresponding the bottom of template, every telescopic machanism's the other end all rotationally connects on the pier body. The utility model discloses in, because the form setting of top mould is supported by telescopic machanism, the operation personnel can carry out the installation of template with the help of telescopic machanism, and need not hoist and mount the operation again, and the safety risk is little, also is difficult for receiving the environmental impact, in addition, because the angle at telescopic machanism's both ends can be adjusted, consequently, can be through telescopic machanism's flexible and rotation, the gesture of quick adjustment template to accord with the design needs, the efficiency of construction is high, has fine practicality.
Description
Technical Field
The utility model belongs to the technical field of the bridge construction, especially, relate to a pier shaft top mould strutting arrangement.
Background
In the bridge construction, the top mould construction of the pier body of the traditional vase pier generally adopts the steel forming template construction, and for facilitating the installation and the disassembly of the top mould, the top mould is formed by assembling different templates. Because the top die is arranged in a suspended manner, when the templates of the top die are installed, a crane is needed for hoisting operation, and generally, after one template is installed in place, another template is installed by the same method.
In the course of implementing the present invention, the applicant has found that there are at least the following disadvantages in the prior art:
1. in the prior art, as the template is installed by hoisting operation through a crane, the overhead hoisting operation is required when an operator installs and detaches the top die, and the safety risk is high;
2. during installation, the top die is suspended, so that the installation precision is low, repeated adjustment is needed, and the construction efficiency is low;
3. the hoisting device is greatly influenced by the field environment during installation, such as wind power and other environmental factors.
Therefore, improvements in the prior art are needed.
SUMMERY OF THE UTILITY MODEL
To the problem that above-mentioned prior art exists, the utility model provides a pier shaft top mould strutting arrangement.
The utility model discloses a following technical scheme realizes above-mentioned purpose:
the utility model provides a pier shaft top mould strutting arrangement which characterized in that, strutting arrangement includes:
the die plate is used for supporting the top die, and the two die plates are arranged oppositely;
the telescopic mechanism is arranged on the template, at least two telescopic mechanisms are correspondingly arranged on the template, one end of each telescopic mechanism is rotatably connected to the bottom of the corresponding template, and the other end of each telescopic mechanism is rotatably connected to the pier body.
Furthermore, the template is provided with a first connecting piece at one end correspondingly connected with the telescopic mechanism, and one end of the telescopic mechanism is connected to the bottom of the corresponding template through the first connecting piece.
Furthermore, the first connecting piece comprises two first clamping plates which are fixedly arranged at the bottom of the template relatively;
one end of the telescopic mechanism is provided with a first connecting plate, the first connecting plate penetrates through the two first clamping plates, and the first connecting plate and the two first clamping plates are rotatably connected through a first pin shaft.
Furthermore, the pier body is correspondingly connected with a second connecting piece arranged at the other end of the telescopic mechanism, and the other end of the telescopic mechanism is connected to the pier body through the second connecting piece.
Furthermore, the second connecting piece comprises two second clamping plates which are oppositely and fixedly arranged on the pier body;
the other end of telescopic machanism is provided with the second connecting plate, the second connecting plate is worn to establish two in the second splint, the second connecting plate and two the second splint pass through second round pin axle rotatable coupling.
Furthermore, two second splint of second connecting piece relatively fixed set up on the support truss on the pier shaft.
Furthermore, the telescopic mechanism is a telescopic oil cylinder.
Furthermore, the telescopic oil cylinder is a bidirectional telescopic oil cylinder.
Further, the template is in an arc shape consistent with the bottom of the top die.
The utility model has the advantages that:
through the utility model provides a pier shaft top mould strutting arrangement is when installing the top mould, earlier with telescopic machanism install on the pier shaft, again with the template mounting on telescopic machanism, through the angle between adjustment telescopic machanism and the pier shaft to and the angle between template and the telescopic machanism, can make arranging of template accord with the design angle, after template angular adjustment finishes, with telescopic machanism's both ends locking, make the template have fixed gesture, carry out the installation of top mould again.
By the above, because the formwork installation of the top formwork is supported by the telescopic mechanism, the operation personnel can install the formwork with the help of the telescopic mechanism, the hoisting operation is not needed, the safety risk is small, the formwork is not easily influenced by the environment, in addition, the angles at the two ends of the telescopic mechanism can be adjusted, and therefore the posture of the formwork can be rapidly adjusted through the stretching and the rotation of the telescopic mechanism, so that the formwork meets the design requirement, the construction efficiency is high, and the formwork installation device has good practicability.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a schematic structural view of a pier body top mold supporting device according to an embodiment of the present invention;
fig. 2 is a schematic structural view of the pier body top mold supporting device shown in fig. 1 in a use state;
FIG. 3 is a schematic structural view of the telescoping mechanism mounted on the pier body;
FIG. 4 is a schematic view of the template mounted on the telescoping mechanism;
FIG. 5 is a schematic diagram of the structure of the template with its pose adjusted in place;
FIG. 6 is a schematic diagram of the two templates being adjusted in position.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Fig. 1 is the utility model discloses a pier shaft top mould strutting arrangement's of embodiment structural schematic diagram, fig. 2 are the pier shaft top mould strutting arrangement shown in fig. 1 and at the structural schematic diagram of user state, combine fig. 1 and fig. 2, the utility model discloses a pier shaft top mould strutting arrangement includes template 1 and telescopic machanism 2, and wherein, template 1 is used for supporting top mould 3, and template 1 is provided with two relatively, and every template 1 corresponds at least and is provided with two telescopic machanism 2, and every telescopic machanism 2's one end all rotationally connects in the bottom of template 1 that corresponds, and every telescopic machanism 2's the other end all rotationally connects on pier shaft 4.
Through the utility model provides a when pier shaft top mould strutting arrangement installs the top mould, install telescopic machanism 2 on pier shaft 4 earlier, as shown in fig. 3, install template 1 on telescopic machanism 2 again, as shown in fig. 4, through the angle between adjustment telescopic machanism and the pier shaft, and the angle between template and the telescopic machanism, can make arranging of template accord with the design angle, as shown in fig. 5, adopt the same mode install another template 11 can, as shown in fig. 6, after 1 angular adjustment of two templates finishes, lock telescopic machanism 2's both ends, make template 1 have fixed gesture, carry out the installation of top mould 3 again, it is shown in fig. 2 promptly.
By the above, because the formwork installation of the top formwork is supported by the telescopic mechanism, the operation personnel can install the formwork with the help of the telescopic mechanism, the hoisting operation is not needed, the safety risk is small, the formwork is not easily influenced by the environment, in addition, the angles at the two ends of the telescopic mechanism can be adjusted, and therefore the posture of the formwork can be rapidly adjusted through the stretching and the rotation of the telescopic mechanism, so that the formwork meets the design requirement, the construction efficiency is high, and the formwork installation device has good practicability.
In addition, the installation and the angle adjustment of telescopic machanism 2 and template 1 all can be gone on in the bottom of pier shaft 4, and the locking at telescopic machanism 2's both ends can be gone on with the help of pier shaft 4 to avoid the construction safety and the problem of environmental impact that the hoist and mount operation brought.
With reference to fig. 1, in the embodiment of the present invention, the template 1 is provided with the first connecting member at the corresponding one end of the telescopic mechanism 2, and the one end of the telescopic mechanism 2 is connected to the bottom of the corresponding template 1 through the first connecting member, so as to realize the rotatable connection between the one end of the telescopic mechanism 2 and the template 2.
Further, with reference to fig. 1, the first connecting member of the embodiment of the present invention includes two first clamping plates 5, the two first clamping plates 5 are relatively fixed and disposed at the bottom of the mold plate 1, the one end of the telescopic mechanism 2 is provided with the first connecting plate 6, the first connecting plate 6 is disposed in the two first clamping plates 5, and the first connecting plate 6 and the two first clamping plates are rotatably connected through the first pin 7, so as to realize the one end of the telescopic mechanism 2 and the rotatable connection of the mold plate 2.
The embodiment of the utility model provides an in, two first splint 5 can adopt welding or integrated into one piece's mode to fix in template 1's bottom, and after telescopic machanism 2 and template 1's angular adjustment target in place, can realize the relative locking between telescopic machanism 2 and the template 1 through the both ends installation lock nut at first round pin axle 7.
With reference to fig. 1, in the embodiment of the present invention, the pier shaft 4 is provided with a second connecting member at the other end corresponding to the connection of the telescopic mechanism 2, and the other end of the telescopic mechanism 2 is connected to the pier shaft 4 through the second connecting member, so as to realize the rotatable setting between the other end of the telescopic mechanism 2 and the pier shaft 4.
Further, referring to fig. 1, in the embodiment of the present invention, the second connecting member includes two second clamping plates 8, and the two second clamping plates 8 are relatively fixed to the pier body 4; and the other end of telescopic machanism 2 is provided with second connecting plate 9, and second connecting plate 9 wears to establish in two second splint 8, and second connecting plate 9 and two second splint 8 pass through second round pin axle 10 rotatable coupling to realize the rotatable setting between telescopic machanism 2's the other end and the pier shaft 4.
The embodiment of the utility model provides an in, two second splint can adopt welding or integrated into one piece's mode relatively fixed set up on the supporting truss 10 on pier shaft 4, like this, can be with the help of the supporting truss 11 of having installed on pier shaft 4 to further improve the efficiency of construction, and after telescopic machanism 2 and pier shaft 4's angular adjustment target in place, can realize the relative locking between telescopic machanism 2 and the pier shaft 4 through the both ends installation lock nut at second round pin axle 10.
The embodiment of the utility model provides an in, telescopic machanism 2 can be for flexible hydro-cylinder, has strong and stable efficiency of holding power, and flexible hydro-cylinder can further preferably be two-way flexible hydro-cylinder to have great flexible stroke.
The utility model discloses template 1 can be the arc unanimous with top mould 3 bottom, of course, and it also can be according to the corresponding deformation of top mould 3's shape, the embodiment of the utility model provides a do not limit to this.
The following embodiments are preferred embodiments of the present invention, which are only used to facilitate the description of the present invention, and are not intended to limit the present invention in any form, and any person who knows commonly in the art can use the present invention to make local changes or modifications within the scope of the technical features of the present invention, and the technical features of the present invention are not separated from the present invention.
Claims (9)
1. The utility model provides a pier shaft top mould strutting arrangement which characterized in that, strutting arrangement includes:
the die plate is used for supporting the top die, and the two die plates are arranged oppositely;
the telescopic mechanism is arranged on the template, at least two telescopic mechanisms are correspondingly arranged on the template, one end of each telescopic mechanism is rotatably connected to the bottom of the corresponding template, and the other end of each telescopic mechanism is rotatably connected to the pier body.
2. The pier body top formwork supporting device according to claim 1, wherein the formwork is provided with a first connecting piece at one end correspondingly connected with the telescopic mechanism, and one end of the telescopic mechanism is connected to the bottom of the corresponding formwork through the first connecting piece.
3. The pier body top mold supporting device according to claim 2, wherein the first connecting piece comprises two first clamping plates, and the two first clamping plates are relatively and fixedly arranged at the bottom of the template;
one end of the telescopic mechanism is provided with a first connecting plate, the first connecting plate penetrates through the two first clamping plates, and the first connecting plate and the two first clamping plates are rotatably connected through a first pin shaft.
4. The pier body top mold supporting device according to claim 1, wherein the pier body is provided with a second connecting member at the other end correspondingly connected with the telescoping mechanism, and the other end of the telescoping mechanism is connected to the pier body through the second connecting member.
5. The pier body top mold supporting device according to claim 4, wherein the second connecting member comprises two second clamping plates, and the two second clamping plates are fixedly arranged on the pier body relatively;
the other end of telescopic machanism is provided with the second connecting plate, the second connecting plate is worn to establish two in the second splint, the second connecting plate and two the second splint pass through second round pin axle rotatable coupling.
6. The pier body top mold supporting device according to claim 5, wherein the two second clamping plates of the second connecting member are relatively and fixedly arranged on a supporting truss on the pier body.
7. The pier body top mold supporting device according to any one of claims 1 to 6, wherein the telescoping mechanism is a telescoping cylinder.
8. The pier body top mold supporting device according to claim 7, wherein the telescopic cylinder is a bidirectional telescopic cylinder.
9. The pier body top formwork support device according to any one of claims 1 to 6, wherein the formwork is in an arc shape corresponding to the bottom of the top formwork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020974826.9U CN212956138U (en) | 2020-06-01 | 2020-06-01 | Pier body top mould strutting arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020974826.9U CN212956138U (en) | 2020-06-01 | 2020-06-01 | Pier body top mould strutting arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212956138U true CN212956138U (en) | 2021-04-13 |
Family
ID=75376885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020974826.9U Active CN212956138U (en) | 2020-06-01 | 2020-06-01 | Pier body top mould strutting arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212956138U (en) |
-
2020
- 2020-06-01 CN CN202020974826.9U patent/CN212956138U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212956138U (en) | Pier body top mould strutting arrangement | |
CN209522507U (en) | A kind of counter weight device, crane and counterweight vehicle | |
CN210715610U (en) | Bearing convenient to fix | |
CN211073577U (en) | Telescopic steel truss installation auxiliary mechanical arm hand | |
CN207673023U (en) | A kind of architectural engineering assembled column auxiliary bar aligning device | |
CN103407906B (en) | A kind of super lifting device and surpassed supporting leg | |
CN214214169U (en) | Quick-drying pouring mold for special concrete box-shaped beam for bridge | |
CN212078774U (en) | Load-bearing tripod | |
CN114147756A (en) | Gripper and mechanical arm for assembling large-tonnage prefabricated structural block | |
CN220182520U (en) | Jacket stands up anti-deformation frock with adjustable | |
CN206267536U (en) | A kind of steel column material distributing machine | |
CN204778582U (en) | Scissors style jack | |
CN207046669U (en) | It is a kind of can fine adjustment lifting tool | |
CN220393254U (en) | Novel hoisting calibration equipment | |
CN218434477U (en) | Fan-shaped section convenient to hoist and mount | |
CN216737292U (en) | Tower body device of tower crane | |
CN210648239U (en) | Steel wire is with supplying line frame | |
CN218226687U (en) | Live working operation arm for electric power overhaul | |
CN214462855U (en) | Damaged muscle quick patching device that exposes of concrete | |
CN215329336U (en) | Simple operation device convenient for installation of expansion joint | |
CN210635606U (en) | Rotary adjusting lifting appliance for segmental beam | |
CN218371420U (en) | Temporary platform convenient to disassemble and used for tower crane | |
CN215289683U (en) | Bridge maintenance car | |
CN116873723A (en) | Jacket stands up anti-deformation frock with adjustable | |
CN218931548U (en) | Tower crane attachment anchor ear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |