CN212954199U - Integral lifting construction mechanism of structural platform - Google Patents
Integral lifting construction mechanism of structural platform Download PDFInfo
- Publication number
- CN212954199U CN212954199U CN202020373369.8U CN202020373369U CN212954199U CN 212954199 U CN212954199 U CN 212954199U CN 202020373369 U CN202020373369 U CN 202020373369U CN 212954199 U CN212954199 U CN 212954199U
- Authority
- CN
- China
- Prior art keywords
- platform
- truss
- welding
- steel
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model provides a construction machine constructs for whole promotion of structural platform. The integral lifting construction mechanism of the structure platform comprises a pipe truss platform assembly and a truss lifting platform assembly, the pipe truss platform assembly comprises a supporting steel beam, side keel pipes and reinforcing rib pipes, the supporting steel beam forms a combined frame through welding the plurality of side keel pipes, the combined frame is welded with the plurality of reinforcing rib pipes, the plurality of combined frame are mutually fixed and welded to form the pipe truss platform, the truss lifting platform assembly comprises an H-shaped steel beam, a reinforcing steel pipe and a welding steel beam, the supporting steel beam forms the combined truss frame through welding, the combined truss frame is fixedly welded with the plurality of welding steel beams which are vertically arranged, the welding steel beams are fixedly welded with the supporting steel beams, and the combined truss frame is fixedly welded with the reinforcing steel pipes. The utility model provides a structure platform's whole promotion construction machinery has fast, practices thrift advantages such as turnover material, safe and reliable.
Description
Technical Field
The utility model relates to a building technical field especially relates to a structure platform's whole promotion construction machinery.
Background
The large-span steel truss has the advantages of high installation precision, safety, reliability, short construction period and the like, has huge superiority and development prospect in process and technology, has high speed, saves turnover materials, is safe and reliable and the like for the integral lifting technology, but various equipment and operation processes for lifting still have more variable factors due to different projects, so that the research on the integral lifting process using the existing structure as a platform can effectively reduce the use of measures, ensure that the process is more mature and further save the cost.
Therefore, it is necessary to provide an integral lifting mechanism for a structural platform to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a whole promotion construction machine who has fast, practices thrift turnover material, safe and reliable's structure platform.
In order to solve the technical problem, the utility model provides a structure platform's whole promotion construction machinery includes: the pipe truss platform assembly comprises supporting steel beams, side keel pipes and reinforcing rib pipes, wherein a plurality of supporting steel beams with the same specification form a combined frame by welding a plurality of side keel pipes, a plurality of reinforcing rib pipes are welded on the combined frame, and a plurality of combined frames are mutually fixedly welded to form the pipe truss platform; truss lifting platform subassembly, truss lifting platform subassembly includes H shaped steel roof beam, consolidates steel pipe and welding girder steel, many support girder steels that the specification is the same constitute combination truss frame through the welding, and the fixed welding has many perpendicular welding girder steels that set up on the combination truss frame, the fixed welding of support girder steel on welding girder steel and the pipe truss platform subassembly, the fixed welding has many vertically and horizontally staggered's reinforcement steel pipe on the combination truss frame, a plurality of combination truss frame reciprocal anchorage welding constitute the lift platform.
Preferably, the pipe truss platform that a plurality of pipe truss platform subassembly welding formed is fixed mounting at the lateral wall of building top layer floor, and the pipe truss platform is gone up the fixed construction platform operation steel sheet of having built, and is provided with the protection railing around the construction platform operation steel sheet, and fixed mounting has the reinforcing bar and supplies the stair about the pedestrian in the pipe truss platform between support girder steel and the building top layer floor.
Preferably, a plurality of hydraulic lifting machines are fixedly installed on a lifting platform formed by welding a plurality of truss lifting platform components.
Preferably, the support steel beams in the pipe truss platform assembly are triangular in longitudinal section.
Compared with the prior art, the utility model provides a structural platform's whole promotion construction machinery has following beneficial effect:
the utility model provides an integral lifting construction mechanism of a structural platform, a pipe truss platform consisting of a plurality of truss platform components is arranged at the overhanging part of the top layer or the floor layer of a building, a lifting platform consisting of a plurality of truss lifting platform components is welded at the bottom of the pipe truss platform, a hydraulic lifting machine arranged on the lifting platform lifts the overhanging steel structure on the ground through a steel strand, and the platform which can be used for lifting the whole structure is structurally arranged, the hydraulic lifting machine for lifting is additionally arranged on the lifting platform, thereby well avoiding factors which are unfavorable for working efficiency and safety, such as narrow space or high-altitude operation, and the like, and the platform is dismantled also very conveniently, very labour saving and time saving, and compared in setting up and promote support and other structures, this structure has fast to whole lifting technology, practices thrift turnover material, a great deal of advantages such as safe and reliable.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of an integral lifting construction mechanism of a structural platform according to the present invention;
FIG. 2 is a schematic structural view of the pipe truss platform assembly shown in FIG. 1;
fig. 3 is a schematic structural view of the truss lift platform assembly of fig. 1.
Reference numbers in the figures: 1. the pipe truss platform subassembly, 11, support girder steel, 12, side keel pipe, 13, strengthening rib pipe, 2, truss elevating platform subassembly, 21, H shaped steel roof beam, 22, reinforcement steel pipe, 23, welding girder steel.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural diagram of a preferred embodiment of an integral lifting construction mechanism of a structural platform according to the present invention; FIG. 2 is a schematic structural view of the pipe truss platform assembly shown in FIG. 1; fig. 3 is a schematic structural view of the truss lift platform assembly of fig. 1. The integral lifting construction mechanism of the structure platform comprises: a pipe truss platform assembly 1 and a truss lift platform assembly 2.
In the specific implementation process, as shown in fig. 1 and 2, the pipe truss platform assembly 1 includes supporting steel beams 11, side keel pipes 12 and reinforcing rib pipes 13, a plurality of supporting steel beams 11 with the same specification form a combined frame by welding a plurality of side keel pipes 12, and a plurality of reinforcing rib pipes 13 are welded on the combined frame, a plurality of combined frames are mutually fixed and welded to form the pipe truss platform, the truss platform assembly 2 includes an H-shaped steel beam 21, a reinforcing steel pipe 22 and a welding steel beam 23, a plurality of supporting steel beams 11 with the same specification form a combined truss frame by welding, and a plurality of welding steel beams 23 which are vertically arranged are fixedly welded on the combined truss frame, the welding steel beam 23 is fixedly welded with the supporting steel beams 11 on the pipe truss platform assembly 1, a plurality of criss-cross reinforcing steel pipes 22 are fixedly welded on the combined truss frame, a plurality of combined truss frames are mutually fixed and welded to form a lifting platform, and a plurality of hydraulic lifting machines are fixedly arranged on a lifting platform formed by welding a plurality of truss lifting platform components 2.
It should be noted that: install the pipe truss platform that comprises a plurality of pipe truss platform subassemblies 1 in the part of encorbelmenting of building top layer or floor layer, and the promotion platform of constituteing by a plurality of truss hoisting platform subassemblies 2 on the welding of pipe truss platform bottom, and the hydraulic lifting machine of installation promotes the steel construction of encorbelmenting on ground through steel strand wires on the promotion platform, can be used for the whole platform that promotes of structure through structurally setting up, the hydraulic lifting machine of promotion is set up on promoting the platform, fine having avoided being unfavorable for work efficiency and security's factors by narrow and small space or aerial work etc. moreover, the platform is dismantled also very conveniently, unusual labour saving and time saving, compare in setting up lifting support and other structures, this structure has fastly to whole lifting technology, practice thrift the turnover material, a great deal of advantages such as safe and reliable.
Referring to fig. 1, fixed construction platform operation steel sheet of having built on the pipe truss platform, and construction platform operation steel sheet be provided with all around and prevent the railing, support among the pipe truss platform between girder steel 11 and the building top floor fixed mounting have the reinforcing bar and supply the pedestrian stair about, guarantee construction safety, make the reduction of the work load of hoist and mount by a maximum margin, shorten the unnecessary time limit for a project, and at the in-process of hoist and mount, can not influence other professional constructions, make the progress of total time limit for a project change in control.
The utility model provides a structural platform's whole promotion construction machinery's theory of operation as follows:
the pipe truss platform composed of a plurality of pipe truss platform components 1 is arranged on the overhanging part of the top layer or the floor layer of the building, the lifting platform composed of a plurality of truss lifting platform components 2 is welded at the bottom of the pipe truss platform, a hydraulic lifting machine arranged on the lifting platform lifts the overhanging steel structure on the ground through a steel strand, the platform which can be used for integrally lifting the structure is structurally arranged, the hydraulic lifting machine for lifting is additionally arranged on the lifting platform, the factors which are not good for working efficiency and safety, such as narrow space or high-altitude operation, and the like are well avoided, the platform is very convenient to disassemble, time and labor are saved, compared with the lifting support and other structures, the structure has the advantages of high speed for the integral lifting technology, material conservation, safety and reliability, and the guard construction platform is provided with guard bars around the operation steel plate, support fixed mounting between girder steel 11 and the building top floor and have reinforcing bar and supply the pedestrian's stair of going up and down in the pipe truss platform, guarantee construction safety makes the reduction of the work load of hoist and mount by a maximum margin, shortens the unnecessary time limit for a project, and at the in-process of hoist and mount moreover, can not influence other professional constructions, makes the progress of total time limit for a project change in control.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
The above is only the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention can be used in other related technical fields, directly or indirectly, or in the same way as the present invention.
Claims (4)
1. The utility model provides a construction machine constructs that wholly promotes of structural platform which characterized in that includes:
the pipe truss platform assembly (1) comprises a support steel beam (11), side keel pipes (12) and reinforcing rib pipes (13), wherein the support steel beams (11) with the same specification form a combined frame by welding the side keel pipes (12), the combined frame is welded with the reinforcing rib pipes (13), and the combined frames are mutually fixed and welded to form the pipe truss platform;
truss hoisting platform subassembly (2), truss hoisting platform subassembly (2) include H shaped steel roof beam (21), consolidate steel pipe (22) and welding girder steel (23), and many specifications are the same support girder steel (11) constitute the combination truss frame through the welding, and fixed welding has many perpendicular welding girder steel (23) that set up on the combination truss frame, support girder steel (11) fixed welding on welding girder steel (23) and the pipe truss platform subassembly (1), fixed welding has many vertically and horizontally staggered's reinforcement steel pipe (22) on the combination truss frame, and a plurality of combination truss frame reciprocal anchorage welding constitute lift platform.
2. The integral lifting construction mechanism of the structural platform according to claim 1, wherein a plurality of pipe truss platforms welded by the pipe truss platform assembly (1) are fixedly installed on the side wall of the top floor of the building, a construction platform operation steel plate is fixedly built on each pipe truss platform, protective railings are arranged around the construction platform operation steel plate, and reinforcing steel bars and stairs for pedestrians to go up and down are fixedly installed between the supporting steel beams (11) and the top floor of the building in each pipe truss platform.
3. The integral lifting construction mechanism of the structural platform as claimed in claim 1, wherein a plurality of hydraulic lifting machines are fixedly installed on a lifting platform formed by welding a plurality of the truss lifting platform assemblies (2).
4. An integral lifting construction mechanism for a structural platform according to claim 1 characterised in that the support steel beams (11) in the tube-truss platform assembly (1) are triangular in longitudinal section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020373369.8U CN212954199U (en) | 2020-03-23 | 2020-03-23 | Integral lifting construction mechanism of structural platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020373369.8U CN212954199U (en) | 2020-03-23 | 2020-03-23 | Integral lifting construction mechanism of structural platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212954199U true CN212954199U (en) | 2021-04-13 |
Family
ID=75340726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020373369.8U Active CN212954199U (en) | 2020-03-23 | 2020-03-23 | Integral lifting construction mechanism of structural platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212954199U (en) |
-
2020
- 2020-03-23 CN CN202020373369.8U patent/CN212954199U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106939707B (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN103635643A (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
CN111997342B (en) | Cantilever framework supporting structure protruding out of building and construction method thereof | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN211775640U (en) | Modular staircase regularization steel protection passageway | |
WO2022252829A1 (en) | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building | |
CN205444975U (en) | Large -scale room lid steel construction construction braced system with view platform | |
CN101298796A (en) | Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof | |
CN212954199U (en) | Integral lifting construction mechanism of structural platform | |
CN210659200U (en) | High-rise building elevator shaft operation platform | |
CN213509519U (en) | Regularization formula elevartor shaft handling frame structure | |
CN101664963B (en) | Multifunctional operating platform for large-volume prestressed concrete box girder tensioning | |
CN110469126B (en) | Binding trolley for concrete reinforcing steel bars and binding construction method thereof | |
CN218970751U (en) | Large-span steel truss gallery deflection control temporary buttress device | |
CN220226146U (en) | Frame post reinforcement operation platform | |
CN219793672U (en) | Integral hoisting type operation platform for installing rectangular high pier steel bars | |
CN219585680U (en) | Railing hoisting accessory | |
CN218406383U (en) | Super high-rise truss type cantilever formwork support device | |
CN218116111U (en) | Cylindrical pier top construction work platform | |
CN211622525U (en) | Can have enough to meet need elevartor shaft construction operation platform | |
CN220814833U (en) | Flower basket type cantilever frame dismantling operation platform | |
CN216947902U (en) | Hydraulic lifting truss platform system for high pier turnover formwork construction | |
CN212612022U (en) | High mound reinforcement integral type shaped steel scaffold frame | |
CN215519855U (en) | Prefabricated shaped steel scaffold that construction can promote in high-rise building well | |
CN217461450U (en) | Electric formwork climbing frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |