Prior art keywords
cable saddle
hoisting
rows
steel
lattice type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021371806.9U
Other languages
Chinese (zh)
Inventor
刘燕舞
孙嘉
祁建林
徐翾玄
焦文政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Construction Co Ltd Of Cccc Second Highway Engineering Co ltd
Original Assignee
CCCC SHEC Second Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Second Engineering Co Ltd filed Critical CCCC SHEC Second Engineering Co Ltd
Priority to CN202021371806.9U priority Critical patent/CN212954042U/en
Application granted granted Critical
Publication of CN212954042U publication Critical patent/CN212954042U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型属于悬索桥施工技术领域,具体涉及一种格构式散索鞍吊装门架,包括立柱和起吊设备,立柱的数量为2排,每排立柱的数量为2根以上,2排立柱间隔竖直分布且2排立柱的顶端之间通过型钢连接,2排立柱顶端的型钢上连接起吊设备,2排立柱的底端连接散索鞍基础,立柱采用格构式型钢,解决了现有技术中门柱式门架对散索鞍进行吊装时,吊装安装需要添加支腿,安装困难,自重高,抗风能力差,吊装稳定性差,施工难度大的问题,具有安装简单,自重轻,抗风能力强,吊装稳定性高,操作较为简单,施工难度小的特点。

Figure 202021371806

The utility model belongs to the technical field of suspension bridge construction, and in particular relates to a lattice type scattered cable saddle hoisting gantry, which comprises a column and a lifting device. Vertically distributed and the tops of the two rows of columns are connected by section steel, the section steel at the top of the two rows of columns is connected to the lifting equipment, the bottom ends of the two rows of columns are connected to the foundation of the cable saddle, and the columns are made of lattice type steel, which solves the problem of the existing technology. When hoisting the scattered cable saddle by the central gantry gantry, the hoisting and installation need to add legs, which is difficult to install, high self-weight, poor wind resistance, poor hoisting stability, and difficult construction. It has the problems of simple installation, light weight, resistance to It has the characteristics of strong wind capacity, high hoisting stability, simple operation and low construction difficulty.

Figure 202021371806

Description

Lattice formula cable saddle hoist and mount portal
Technical Field
The utility model belongs to the technical field of the suspension bridge construction, concretely relates to lattice formula scattered cable saddle hoist and mount portal.
Background
In the suspension bridge work progress, need to hoist scattered cable saddle, scattered cable saddle hoist and mount often adopt gatepost formula portal to hoist, and gatepost formula portal installation needs add the landing leg, and the installation difficulty, the dead weight is high, and anti-wind ability is poor, and hoist and mount stability is poor, and the construction degree of difficulty is big.
SUMMERY OF THE UTILITY MODEL
The utility model provides a lattice formula loose cable saddle hoist and mount portal purpose is when overcoming prior art well door column type portal and hoist scattered cable saddle, and the landing leg need be added in the hoist and mount installation, and the installation difficulty is done oneself with dignity height, and anti-wind ability is poor, hoist and mount poor stability, the big problem of the construction degree of difficulty.
For this, the utility model provides a lattice formula scattered cable saddle hoist and mount portal, including the stand with lift by crane the equipment, the quantity of stand is 2 rows, and the quantity of every row of stand is more than 2, connects through shaped steel between the top of 2 rows of stand interval vertical distribution and 2 rows of stands, connects on the shaped steel on 2 rows of stand tops and lifts by crane the equipment, and the bottom of 2 rows of stands is connected with scattered cable saddle basis, and the stand adopts lattice formula shaped steel.
The steel column is characterized by further comprising channel steel, and the channel steel is transversely and longitudinally distributed and connected between the stand columns.
The side of the upright post is provided with a crawling ladder.
And the section steel at the top end of the upright post is provided with a guardrail.
The hoisting equipment is a winch.
The number of the winches is 2.
The bottom end of the upright post is connected with the cable saddle foundation through the embedded part.
The lifting lugs are arranged on the section steel at the top end of the stand column and connected below the section steel at the top end of the stand column.
The pulley block is arranged on the section steel at the top end of the upright post and is connected with the lifting lug.
The embedded part adopts a bolt and an embedded steel plate.
The utility model has the advantages that: the utility model provides a this lattice formula scattered cable saddle hoisting portal, including stand and lifting equipment, the quantity of stand is 2 rows, and the quantity of every row of stand is more than 2, 2 rows of stand interval vertical distribution and 2 rows of stand top between connect through shaped steel, connect lifting equipment on the shaped steel of 2 rows of stand tops, 2 rows of bottom of stand are connected with scattered cable saddle foundation, the stand adopts lattice type shaped steel; the cable scattering saddle is hoisted by adopting a portal frame, the portal frame adopts section steel as an upright post, the section steel adopts lattice section steel, cross braces and parallel links are transversely arranged between the upright posts, diagonal braces and parallel links are longitudinally arranged on the upright post, a cat ladder is arranged on the upright post for workers to walk up and down, the section steel is adopted at the top of the upright post as a cross beam and a longitudinal beam, hoisting equipment is connected to the cross beam, guardrails are arranged on two sides of the outer side of the cross beam for ensuring the walking safety of the workers, the hoisting equipment is erected on the cross beam at the top end of the upright post for hoisting, adjusting and lowering the cable scattering saddle, lifting lugs are arranged on the cross beam and; compared with other hoisting methods, the lattice type portal frame of the utility model does not need to add supporting legs, and has the advantages of simple installation, light dead weight, strong wind resistance, high hoisting stability, simple operation and small construction difficulty; 2 hoisting devices are adopted for hoisting, and the cable saddle is hoisted through two points, so that the gravity center is more stable, and the conditions of spinning and the like are not easy to generate; the angle of the cable saddle is adjusted through the hoisting equipment, so that the installation precision of the cable saddle is controlled more easily, and the engineering quality is ensured; according to the design of the bridge, the anchor concrete has a certain inclination, the mountain area is narrow, the hoisting portal frame is easily adapted to the local terrain, the construction operability is high, the lattice type truss structure is a plane or space structure which is composed of straight bars and generally has triangular units, and the structural rod piece mainly bears axial tension or pressure, so that the strength of materials is fully utilized, and compared with other structures, the anchor concrete can save materials, reduce self weight and increase rigidity.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
FIG. 1 is a front view of a lattice cable saddle lifting gantry structure;
FIG. 2 is a top view of a lattice cable saddle lifting gantry structure;
FIG. 3 is a left side view of a lattice cable saddle lifting gantry structure;
fig. 4 is a right side view of the lattice cable saddle lifting gantry structure.
Description of reference numerals: 1. a column; 2. a stringer; 3. a cross beam; 4. a scissor support; 5. parallel connection; 6. a column shoe; 7. a cable saddle foundation; 8. hoisting equipment; 9. bracing; 10. a winch spandrel girder; 11. a guardrail; 12. lifting lugs; 13. a tackle pulley set; 14. the ladder is climbed.
Detailed Description
Example 1:
as shown in figure 1, a lattice formula scattered cable saddle hoist and mount portal, including stand 1 and lifting devices 8, the quantity of stand 1 is 2 rows, and the quantity of every row of stand 1 is more than 2, and 2 rows of stand 1 interval vertical distribution and 2 rows of connect through shaped steel between the top of stand 1, connect lifting devices 8 on the shaped steel on 2 rows of stand 1 tops, and 2 rows of bottom of stand 1 are connected with scattered cable saddle basis 7, and stand 1 adopts lattice formula shaped steel.
The cable saddle is hoisted by adopting a portal, the portal adopts section steel as stand columns 1, the section steel adopts lattice section steel, the top parts between the stand columns 1 adopt the section steel as cross beams 3 and longitudinal beams 2, and hoisting equipment 8 is erected on the cross beams 3 at the top ends of the stand columns 1 for hoisting, adjusting and lowering the cable saddle; compared with other hoisting methods, the lattice type portal frame of the utility model does not need to add supporting legs, is simple to install, light in dead weight, strong in wind resistance, high in hoisting stability, simple to operate and small in construction difficulty, and can control the installation precision of the cable saddle more easily by adjusting the angle of the cable saddle through hoisting equipment, thereby ensuring the engineering quality; according to the design of the bridge, the anchor concrete has a certain inclination, the mountain area is narrow, the hoisting portal frame is easily adapted to the local terrain, the construction operability is high, the lattice type truss structure is a plane or space structure which is composed of straight bars and generally has triangular units, and the structural rod piece mainly bears axial tension or pressure, so that the strength of materials is fully utilized, and compared with other structures, the anchor concrete can save materials, reduce self weight and increase rigidity.
Example 2:
on the basis of the embodiment 1, as shown in fig. 2-4, the vertical column structure further comprises channel steel, wherein the channel steel is distributed and connected between the vertical columns 1 in the transverse direction and the longitudinal direction; the channel-section steel is the double pin channel-section steel, and double pin channel-section steel intensity is high, bears greatly, transversely lays two between the stand 1 and pieces together groove 20 and allies oneself with 5 as bridging 4 and tie, and stand 1 vertically lays two and pieces together groove 20 and allies oneself with 5 as bracing 9 and tie, and stand 1 transversely and vertically lays tie 5 the same or different, can improve the stability of integral hoisting portal, and then further improve wind resistance.
The side surface of the upright post 1 is provided with a ladder stand 14. The crawling ladder 14 can be arranged on the side surface of the upright posts 1 in the right row, and can also be arranged as required, for example, the crawling ladder 14 is arranged on the side surface of all the upright posts 1, or the crawling ladder 14 is arranged on the side surface of a single upright post 1, and the crawling ladder is arranged on the upright posts 1 for workers to walk up and down, so that the operation is facilitated, and the convenience is improved.
And the section steel at the top end of the upright post 1 is provided with a guardrail 11. The guardrail 11 is arranged at the outer side of the cross beam 3 of the upright post 1 and used for ensuring the walking safety and improving the construction safety of workers.
The hoisting equipment 8 is a winch. The winch can vertically lift, horizontally or obliquely drag the cable saddle, and has the advantages of simple operation, large rope winding amount and convenient displacement.
The number of the winches is 2. The hoisting adopts 2 windlasses, through two hoisting scattered cable saddle, the focus is more stable, is difficult for producing the condition such as spin, adjusts scattered cable saddle angle through the windlass, and the scattered cable saddle installation accuracy of easier control guarantees the engineering quality.
The bottom end of the upright post 1 is connected with a cable saddle foundation 7 through an embedded part. The bottom end column foot 6 of the upright column 1 is connected with the cable saddle foundation 7 through the embedded part, and the embedded part is beneficial to the installation and fixation of the upright column 1 and the cable saddle foundation 7.
The profile steel at the top end of the upright post 1 is provided with a lifting lug 12, and the lifting lug 12 is connected below the profile steel at the top end of the upright post 1. Between the stand 1 the top adopts shaped steel as crossbeam 3 and longeron 2, and lug 12 is connected on crossbeam 3, sets up lug 12 on crossbeam 3 and is connected with the scattered cable saddle through tackle pulley group 13, simple structure, and it is convenient to connect, and maneuverability is strong.
The trolley assembly 13 is arranged on the section steel at the top end of the upright post 1, and the trolley assembly 13 is connected with the lifting lug 12. The hoist engine passes through the lug and connects the pulley group, is connected with scattered cable saddle through the pulley group, and pulley group labour saving and time saving, convenient operation improves the efficiency of construction.
The embedded part adopts a bolt and an embedded steel plate. The bolt and the embedded steel plate are simple in structure, stable in connection and low in cost.
Example 3:
design of an anchorage portal frame of the Jinan Jinshajiang river bridge:
adopting 2 rows of upright posts 1, wherein each row of upright posts 1 comprises 2 upright posts 1, the upright posts 1 adopt 700 multiplied by 300H lattice type steel, column feet 6 of the upright posts 1 adopt embedded parts to be connected with a cable saddle foundation 7, and the embedded parts adopt M30 bolts and embedded steel plates; transversely lay two grooves 20 of piecing together between the stand 1 and act as bridging and tie up, the stand is vertically laid two grooves 20 of piecing together and is regarded as bracing and tie up, lay the vertical ladder on the stand and supply the workman to walk from top to bottom, 700 x 300H shaped steel is adopted as crossbeam and longeron on the stand top, lay the bracing simultaneously, the guardrail is laid on stand crossbeam outside both sides, lay 4 windlass spandrel girders 10 on the crossbeam, the roof beam of windlass spandrel girder 10 is erect the hoist engine and is used for lifting by crane, the adjustment, transfer the rope saddle, it is connected with the rope saddle through the tackle pulley group to set up the lug on the crossbeam.
In the hoisting construction of the bulk cable saddle of the Jinan Jinshajiang bridge, the bulk cable saddle is transported to a designated position below a portal frame by a freight vehicle, lifted by a hoisting portal frame, placed to the ground after the vehicle leaves, a wood board is laid on the ground in advance to prevent the bulk cable saddle from damaging the concrete surface of an anchorage, then a worker welds and temporarily fixes a lifting lug at the back of the worker, the bulk cable saddle is lifted after the welding is finished, the angle of the bulk cable saddle is controlled by a hoisting point steel wire rope, the measurement and the monitoring are carried out, then the bulk cable saddle is placed at the position where the truck is placed at the designated position through a winch, the bulk cable saddle is connected with a bulk cable saddle bottom plate, the bulk cable saddle temporary fixing system is simultaneously connected, and the steel wire rope is loosened after the.
The hoisting portal frame is simple in structure, light in self weight and convenient to construct, hoisting stability is improved, construction is simple and convenient, construction risks are reduced, and the hoisting problem of the cable saddle is well solved.
In the description of the present invention, it should be understood that if there is an orientation or positional relationship indicated by terms such as "upper", "lower", "front", etc., it is based on the orientation or positional relationship shown in the drawings, and it is not intended to indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore the terms describing the positional relationship in the drawings are for illustrative purposes only and are not to be construed as limiting the present patent.
The above illustration is merely an illustration of the present invention, and does not limit the scope of the present invention, and all designs identical or similar to the present invention are within the scope of the present invention.

Claims (10)

1.一种格构式散索鞍吊装门架,其特征在于:包括立柱(1)和起吊设备(8),立柱(1)的数量为2排,每排立柱(1)的数量为2根以上,2排立柱(1)间隔竖直分布且2排立柱(1)的顶端之间通过型钢连接,2排立柱(1)顶端的型钢上连接起吊设备(8),2排立柱(1)的底端连接有散索鞍基础(7),立柱(1)采用格构式型钢。1. a lattice type scattered cable saddle hoisting gantry is characterized in that: comprise upright column (1) and lifting equipment (8), the quantity of upright post (1) is 2 rows, and the quantity of each row upright post (1) is 2 Above the root, two rows of uprights (1) are vertically spaced apart, and the tops of the two rows of uprights (1) are connected by section steel, and the section steel at the top of the two rows of uprights (1) is connected to a lifting device (8), and the two rows of uprights (1) The bottom end of ) is connected with a scattered cable saddle foundation (7), and the upright column (1) adopts lattice type steel. 2.如权利要求1所述的格构式散索鞍吊装门架,其特征在于:还包括槽钢,立柱(1)之间横向、纵向均布设连接有槽钢。2. The lattice-type scattered cable saddle hoisting gantry according to claim 1, characterized in that: it further comprises channel steel, and channel steel is arranged and connected horizontally and longitudinally between the uprights (1). 3.如权利要求1所述的格构式散索鞍吊装门架,其特征在于:所述立柱(1)的侧面开设有爬梯(14)。3. The lattice type hoisting gantry of the cable saddle according to claim 1, wherein a ladder (14) is provided on the side of the upright column (1). 4.如权利要求3所述的格构式散索鞍吊装门架,其特征在于:所述立柱(1)顶端的型钢上开设有护栏(11)。4 . The lattice type hoisting gantry for cable saddles according to claim 3 , wherein a guardrail ( 11 ) is provided on the profile steel at the top of the upright column ( 1 ). 5 . 5.如权利要求1所述的格构式散索鞍吊装门架,其特征在于:所述起吊设备(8)为卷扬机。5. The lattice type hoisting gantry of the cable saddle according to claim 1, characterized in that: the hoisting device (8) is a hoist. 6.如权利要求5所述的格构式散索鞍吊装门架,其特征在于:所述卷扬机的数量为2台。6 . The lattice type cable saddle hoisting gantry according to claim 5 , wherein the number of said hoists is two. 7 . 7.如权利要求1所述的格构式散索鞍吊装门架,其特征在于:所述立柱(1)的底端通过预埋件连接散索鞍基础(7)。7 . The lattice type hoisting gantry for the cable saddle according to claim 1 , wherein the bottom end of the upright column ( 1 ) is connected to the cable saddle foundation ( 7 ) through embedded parts. 8 . 8.如权利要求5所述的格构式散索鞍吊装门架,其特征在于:所述立柱(1)顶端的型钢上设置吊耳(12),吊耳(12)连接在立柱(1)顶端的型钢下面。8. The lattice-type scattered cable saddle hoisting gantry according to claim 5, characterized in that: a lifting lug (12) is provided on the profile steel at the top of the column (1), and the lifting lug (12) is connected to the column (1). ) at the top of the section steel. 9.如权利要求8所述的格构式散索鞍吊装门架,其特征在于:还包括滑车组(13),滑车组(13)安装在立柱(1)顶端的型钢上且滑车组(13)连接吊耳(12)。9. lattice type scattered cable saddle hoisting gantry as claimed in claim 8, is characterized in that: also comprises pulley block (13), pulley block (13) is installed on the profile steel at the top of column (1) and pulley block (13) 13) Connect the lifting lugs (12). 10.如权利要求7所述的格构式散索鞍吊装门架,其特征在于:所述预埋件采用螺栓与预埋钢板。10 . The lattice type scattered cable saddle hoisting gantry according to claim 7 , wherein the embedded parts are bolts and embedded steel plates. 11 .
CN202021371806.9U 2020-07-14 2020-07-14 Lattice formula cable saddle hoist and mount portal Active CN212954042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021371806.9U CN212954042U (en) 2020-07-14 2020-07-14 Lattice formula cable saddle hoist and mount portal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021371806.9U CN212954042U (en) 2020-07-14 2020-07-14 Lattice formula cable saddle hoist and mount portal

Publications (1)

Publication Number Publication Date
CN212954042U true CN212954042U (en) 2021-04-13

Family

ID=75392319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021371806.9U Active CN212954042U (en) 2020-07-14 2020-07-14 Lattice formula cable saddle hoist and mount portal

Country Status (1)

Country Link
CN (1) CN212954042U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115893211A (en) * 2022-12-22 2023-04-04 中铁广州工程局集团有限公司 An integrated lateral translation system for the hoisting of loose cable saddles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115893211A (en) * 2022-12-22 2023-04-04 中铁广州工程局集团有限公司 An integrated lateral translation system for the hoisting of loose cable saddles

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN112575948B (en) A roof truss composed of a string beam and a cantilever truss and a construction method thereof
CN105113803B (en) A high-altitude sliding hoisting device and its implementation method for a mountain corridor truss
CN112502474A (en) Dismantling device and method for indoor large steel framework
CN205205685U (en) Span wire pier is function portal device at most
CN107253675B (en) A self-propelled tower crown crane
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN102535939A (en) Inversely assembling process for standing stay wire V-type tower
CN116853963B (en) A hoisting device and hoisting method for main beam of cable-stayed bridge
CN117702899A (en) Installation construction method of ultra-large span heavy steel corridor
CN117144808A (en) Self-lifting corrugated steel web PC beam bridge asynchronous hanging basket structure and construction method
CN212954042U (en) Lattice formula cable saddle hoist and mount portal
CN214883028U (en) A door-shaped formwork hanger for steel-concrete composite beams
CN212105057U (en) A high-altitude large-span cantilever formwork operating platform
CN204983693U (en) Hoist device slides in mountain area corridor truss high altitude
CN217896261U (en) Cable crane tower with integrated lifting buckles
CN219260998U (en) An anchor cable tensioner
CN218714838U (en) Self-lifting heavy-load construction platform
CN114855631B (en) Installation method of multi-beam cable tower
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN107700363B (en) A bridge tower platform with self-contained lifting system and its construction method
CN112502473B (en) Supporting bearing capacity conversion device and method for dismantling large steel framework by using same
CN214531431U (en) Truss combination roof truss of opening string roof beam and encorbelmenting
CN215828215U (en) Self-balancing large-span net rack lifting structure
CN117188760A (en) Upper suspension and lower bearing combined concrete formwork supporting structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250311

Address after: 210000 No. 396 Binjiang Avenue, Jiangbei new area, Nanjing, Jiangsu

Patentee after: East China Construction Co., Ltd. of CCCC Second Highway Engineering Co.,Ltd.

Country or region after: China

Address before: 710119 No.29, No.1 Enterprise Park, West Avenue, high tech Zone, Xi'an City, Shaanxi Province

Patentee before: CCCC-SHEC SECOND ENGINEERING Co.,Ltd.