CN212927144U - Floor is construction hoist and mount ladder temporarily - Google Patents

Floor is construction hoist and mount ladder temporarily Download PDF

Info

Publication number
CN212927144U
CN212927144U CN202021680795.2U CN202021680795U CN212927144U CN 212927144 U CN212927144 U CN 212927144U CN 202021680795 U CN202021680795 U CN 202021680795U CN 212927144 U CN212927144 U CN 212927144U
Authority
CN
China
Prior art keywords
mounting hole
mounting holes
stair
support column
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021680795.2U
Other languages
Chinese (zh)
Inventor
周贤东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hongsheng Construction Group Co ltd
Original Assignee
Fujian Hongsheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hongsheng Construction Group Co ltd filed Critical Fujian Hongsheng Construction Group Co ltd
Priority to CN202021680795.2U priority Critical patent/CN212927144U/en
Application granted granted Critical
Publication of CN212927144U publication Critical patent/CN212927144U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a floor is hoist and mount ladder temporarily under construction, including base, middle platform and roof, the base the middle platform there is the mounting hole in the roof, and the erection bracing post is connected each part in the mounting hole, the base with be equipped with between the middle platform first stair, middle platform with the second stair are equipped with between the roof, the utility model provides a floor is hoist and mount ladder temporarily under construction can tear down into each subassembly with whole device before transporting the building site, transports appointed place through the truck and assembles it. The traditional hoisting ladder is not only too large in size, but also too high in height, so that the transportation is inconvenient, for example, many places are limited and high, and potential safety hazards exist. The utility model discloses a floor is construction hoist and mount ladder temporarily can dismantle the transportation after the construction is accomplished.

Description

Floor is construction hoist and mount ladder temporarily
Technical Field
The utility model relates to a construction technical field, especially a floor is construction hoist and mount ladder temporarily.
Background
Every city has many building sites of being under construction, all there is many hoist and mount ladders on the building site, and the construction workman uses hoist and mount ladder to carry out construction to the construction department of some high positions, and traditional hoist and mount ladder forms through the welding, and traditional hoist and mount ladder is not only bulky, and highly too high, leads to transporting inconveniently, for example many places are all high limitedly, have the potential safety hazard, and after the construction was accomplished, welded hoist and mount ladder was difficult to transport.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model aims at providing a floor is construction hoist and mount ladder temporarily can dismantle the transport to each part thereof.
The embodiment of the utility model provides an in adopt following scheme to realize: the hoisting ladder for the temporary floor construction comprises a base, a middle platform and a top plate, wherein first mounting holes are symmetrically formed in the front and back of the left part of the base, second mounting holes are symmetrically formed in the front and back of the middle part of the base, third mounting holes are symmetrically formed in the front and back of the right part of the base, first supporting columns are mounted in the first mounting holes, second supporting columns are mounted in the second mounting holes, third supporting columns are mounted in the third mounting holes, and a limiting block is arranged in the middle of each third supporting column; a fourth mounting hole is symmetrically formed in the front and back of the left part of the bottom of the middle table, the top of the second support column is inserted into the fourth mounting hole, a fifth mounting hole is symmetrically formed in the front and back of the right part of the bottom of the middle table, a limiting groove corresponding to the limiting block is formed in the fifth mounting hole, the third support column penetrates through the fifth mounting hole upwards, and the limiting block in the middle of the third support column is clamped on the limiting groove of the fifth mounting hole; the middle part of the top plate is provided with a stair opening, the front part and the rear part of the left part of the top plate are symmetrically provided with sixth mounting holes, the front part and the rear part of the right part of the top plate are symmetrically provided with seventh mounting holes, the top of the first support column is inserted into the sixth mounting holes, and the top of the third support column is inserted into the seventh mounting holes; first recess has been seted up between two first mounting holes, the second recess has been seted up to the left part of middle platform, the roof is close to the third recess has been seted up in the left side of stair mouth, the base with install first stair between the middle platform, the both ends of first stair all are connected with first fixed plate, first fixed plate is installed respectively on the first recess with on the front portion of second recess, middle platform with install the second stair between the roof, the both ends of second stair all are connected with the second fixed plate, the second fixed plate is installed respectively on the third recess with on the rear portion of second recess.
The utility model discloses an in the embodiment, first stair the second stair the middle platform with the guardrail all is equipped with to the roof.
The utility model discloses an in the embodiment, first fixed plate respectively with first recess with the front portion of second recess is connected through the screw, the second fixed plate respectively in the front portion of second recess with the third recess is connected through the screw.
The utility model discloses an in the embodiment, first mounting hole with the bottom of first support column is connected through the screw, the second mounting hole with the bottom of second support column is connected through the screw, the third mounting hole with the bottom of third support column is connected through the screw, the fourth mounting hole with the top of second support column is connected through the screw, the fifth mounting hole with the middle part of third support column is connected through the screw, the sixth mounting hole with the top of first support column is connected through the screw, the seventh mounting hole with the top of third support column is connected through the screw.
In an embodiment of the present invention, the base is fixed on the ground.
The utility model has the advantages that: the utility model provides a floor is construction hoist and mount ladder temporarily can be torn open into each subassembly with whole device before transporting the building site, transports through the truck and assembles it to appointed place. The traditional hoisting ladder is not only too large in size, but also too high in height, so that the transportation is inconvenient, for example, many places are limited and high, and potential safety hazards exist. The utility model discloses a can dismantle hoist and mount ladder can dismantle the transportation after the construction is accomplished.
Drawings
Fig. 1 is a perspective view of a preferred embodiment of a temporary floor construction lifting ladder.
Fig. 2 is a perspective view of the base.
Fig. 3 is a perspective view of the intermediate stage and sectional views of fourth and fifth mounting holes thereof.
Fig. 4 is a perspective view of the top plate and sectional views of the sixth and seventh mounting holes.
Fig. 5 is a perspective view of a first staircase and a second staircase.
Fig. 6 is a perspective view of the first support column, the second support column, and the third support column.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1 to 6, the utility model provides a floor temporary construction hoisting ladder, including base 1, intermediate platform 2 and roof 3, first mounting hole 12 has been seted up to the front and back symmetry of the left part of base 1, second mounting hole 13 has been seted up to the front and back symmetry of the middle part of base 1, third mounting hole 14 has been seted up to the front and back symmetry of the right part of base 1, all install first support column 4 in first mounting hole 12, all install second support column 5 in the second mounting hole 13, all install third support column 6 in the third mounting hole 14, the middle part of third support column 6 is provided with stopper 61; fourth mounting holes 22 are symmetrically formed in the front and back of the left portion of the bottom of the middle table 2, the top of the second support column 5 is inserted into the fourth mounting holes 22, fifth mounting holes 23 are symmetrically formed in the front and back of the right portion of the bottom of the middle table 2, a limiting groove 231 corresponding to the limiting block 61 is formed in the fifth mounting hole 23, the third support column 6 penetrates through the fifth mounting hole 23 upwards, the limiting block 61 in the middle of the third support column 6 is clamped on the limiting groove 231 of the fifth mounting hole 23, and therefore stability of the middle table 2 is enhanced; a stair opening 31 is formed in the middle of the top plate 3, sixth mounting holes 33 are symmetrically formed in the front and back of the left portion of the top plate 3, seventh mounting holes 34 are symmetrically formed in the front and back of the right portion of the top plate 3, the top of the first support column 4 is inserted into the sixth mounting holes 33, and the top of the third support column 6 is inserted into the seventh mounting holes 34; first recess 11 has been seted up between two first mounting holes 12, second recess 21 has been seted up to the left part of middle platform 2, roof 3 is close to third recess 32 has been seted up in the left side of stair mouth 31, base 1 with install first stair 7 between the middle platform 2, the both ends of first stair 7 all are connected with first fixed plate 81, first fixed plate 81 is installed respectively on first recess 11 with on the front portion of second recess 21, middle platform 2 with install second stair 8 between the roof 3, the both ends of second stair 8 all are connected with second fixed plate 82, second fixed plate 82 is installed respectively on third recess 32 with on the rear portion of second recess 21, when installing stair, the fixed plate just blocks in the recess, has guaranteed stair's stability.
Please continue to refer to fig. 1, the utility model provides a temporary floor construction hoisting ladder, the first stair 7, the second stair 8, the middle platform 2 and the roof 3 are all equipped with the guardrail 9, can increase the security of device.
Referring to fig. 1 to 5, the present invention provides a floor temporary construction lifting ladder, wherein the first fixing plate 81 is connected to the front portions of the first groove 11 and the second groove 21 by screws, the second fixing plate 82 is connected to the front portion of the second groove 21 and the third groove 32 by screws, and the first fixing plate 81 and the second fixing plate 82 are fastened to the stability of the first groove 11, the second groove 21 and the third groove 32 by screws.
Please continue to refer to fig. 1 to 6, the utility model provides a floor is construction hoist and mount ladder temporarily, first mounting hole 12 with the bottom of first support column 4 is connected through the screw, second mounting hole 13 with the bottom of second support column 5 is connected through the screw, third mounting hole 14 with the bottom of third support column 6 is connected through the screw, fourth mounting hole 22 with the top of second support column 5 is connected through the screw, fifth mounting hole 23 with the middle part of third support column 6 is connected through the screw, sixth mounting hole 33 with the top of first support column 4 is connected through the screw, seventh mounting hole 34 with the top of third support column 6 is connected through the screw, locks in the dismantlement installation through the screw convenience.
With continuing reference to fig. 1 and 2, the present invention provides a floor temporary construction lifting ladder, wherein the base 1 is fixed on the ground.
The utility model discloses the theory of operation below has:
assembling the first and second support columns at the designated construction position, fixing the base 1 on the ground, installing the bottom of the first support column 4 in the first installation hole 12, installing the bottom of the second support column 5 in the second installation hole 13, installing the bottom of the third support column 6 in the third installation hole 14, inserting the middle platform 2 from the top of the third support column 6 to the middle of the third support column 6, clamping the limit block 61 in the middle of the third support column 6 on the limit groove 231 in the fifth installation hole 23, installing the top of the first support column 4 in the sixth installation hole 33, installing the top of the third support column 6 in the seventh installation hole 34, screwing the screws of the installation holes to fasten and fix, placing the first fixing plates 81 at the two ends of the first stair 7 in the front of the first and second grooves 11 and 21, placing the second fixing plates 82 at the two ends of the second stair 8 in the rear of the second and third grooves 21 and 32, the guardrail 9 is finally installed after the bolts are screwed for fixation.
The above description is only for the preferred embodiment of the present invention, and should not be interpreted as limiting the scope of the present invention, which is intended to cover all the equivalent changes and modifications made in accordance with the claims of the present invention.

Claims (5)

1. The utility model provides a floor is construction hoist and mount ladder temporarily which characterized in that: the support comprises a base, a middle table and a top plate, wherein first mounting holes are symmetrically formed in the front and back of the left part of the base, second mounting holes are symmetrically formed in the front and back of the middle part of the base, third mounting holes are symmetrically formed in the front and back of the right part of the base, first supporting columns are mounted in the first mounting holes, second supporting columns are mounted in the second mounting holes, third supporting columns are mounted in the third mounting holes, and a limiting block is arranged in the middle of each third supporting column; a fourth mounting hole is symmetrically formed in the front and back of the left part of the bottom of the middle table, the top of the second support column is inserted into the fourth mounting hole, a fifth mounting hole is symmetrically formed in the front and back of the right part of the bottom of the middle table, a limiting groove corresponding to the limiting block is formed in the fifth mounting hole, the third support column penetrates through the fifth mounting hole upwards, and the limiting block in the middle of the third support column is clamped on the limiting groove of the fifth mounting hole; the middle part of the top plate is provided with a stair opening, the front part and the rear part of the left part of the top plate are symmetrically provided with sixth mounting holes, the front part and the rear part of the right part of the top plate are symmetrically provided with seventh mounting holes, the top of the first support column is inserted into the sixth mounting holes, and the top of the third support column is inserted into the seventh mounting holes; first recess has been seted up between two first mounting holes, the second recess has been seted up to the left part of middle platform, the roof is close to the third recess has been seted up in the left side of stair mouth, the base with install first stair between the middle platform, the both ends of first stair all are connected with first fixed plate, first fixed plate is installed respectively on the first recess with on the front portion of second recess, middle platform with install the second stair between the roof, the both ends of second stair all are connected with the second fixed plate, the second fixed plate is installed respectively on the third recess with on the rear portion of second recess.
2. The hoisting ladder for temporary floor construction according to claim 1, wherein: the first staircase, the second staircase, the intermediate platform and the top plate are all provided with guardrails.
3. The hoisting ladder for temporary floor construction according to claim 1, wherein: the first fixing plate is connected with the front parts of the first groove and the second groove through screws, and the second fixing plate is connected with the front part of the second groove and the third groove through screws.
4. The hoisting ladder for temporary floor construction according to claim 1, wherein: the first mounting hole is connected with the bottom of the first supporting column through a screw, the second mounting hole is connected with the bottom of the second supporting column through a screw, the third mounting hole is connected with the bottom of the third supporting column through a screw, the fourth mounting hole is connected with the top of the second supporting column through a screw, the fifth mounting hole is connected with the middle of the third supporting column through a screw, the sixth mounting hole is connected with the top of the first supporting column through a screw, and the seventh mounting hole is connected with the top of the third supporting column through a screw.
5. The hoisting ladder for temporary floor construction according to claim 1, wherein: the base is fixed on the ground.
CN202021680795.2U 2020-08-13 2020-08-13 Floor is construction hoist and mount ladder temporarily Active CN212927144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021680795.2U CN212927144U (en) 2020-08-13 2020-08-13 Floor is construction hoist and mount ladder temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021680795.2U CN212927144U (en) 2020-08-13 2020-08-13 Floor is construction hoist and mount ladder temporarily

Publications (1)

Publication Number Publication Date
CN212927144U true CN212927144U (en) 2021-04-09

Family

ID=75298304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021680795.2U Active CN212927144U (en) 2020-08-13 2020-08-13 Floor is construction hoist and mount ladder temporarily

Country Status (1)

Country Link
CN (1) CN212927144U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700340A (en) * 2021-08-05 2021-11-26 福建省城投科技有限公司 Temporary stair for building construction and displacement method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700340A (en) * 2021-08-05 2021-11-26 福建省城投科技有限公司 Temporary stair for building construction and displacement method thereof

Similar Documents

Publication Publication Date Title
US20100025151A1 (en) Integral safety system which can be used for construction
CN212927144U (en) Floor is construction hoist and mount ladder temporarily
EP1700973B1 (en) Ladder support bracket
CA3121081A1 (en) System and method for vertical and horizontal in-fill installation
WO2003095350A8 (en) Safety fence at upper part of cab
US20040040224A1 (en) Mounting of tubular steel columns on concrete base
US9435131B2 (en) Portable and reusable connection device having secure anchor point
KR200493538Y1 (en) Binding structure of stair railing
CN215052220U (en) Novel back-buckling type safe sand cylinder of cast-in-place beam steel pipe support
CN211775603U (en) Combined type step construction platform
WO2005007551A1 (en) Working scaffold system of elevator
CN112832691A (en) Oil derrick reinforced structure
CN211143999U (en) Novel building construction encloses and covers
CN214942212U (en) Photovoltaic field area construction work platform
CN217172858U (en) Support column for building elevator derrick
JPH076287Y2 (en) Standing structure of columns
CN218952778U (en) Disc bolt type scaffold
CN214996176U (en) Municipal administration public facilities built-in fitting mounting tool
CN214329654U (en) Steel-structure stairway for multi-story high-rise building housing
CN216689086U (en) Whole construction system of rectangle post steel mould
CN217232852U (en) Movable railing device for opening
CN210263873U (en) Attached lifting scaffold auxiliary plate mounting structure
KR200189911Y1 (en) Moveable temporary cinstruction scaffolding tumble hold equipment
CN215828135U (en) Guardrail mounting structure at upper end part and lower end part of escalator
CN210400368U (en) Leveling device for municipal road supporting stand column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant