CN212926880U - Building rubbish charge-in pipeline - Google Patents

Building rubbish charge-in pipeline Download PDF

Info

Publication number
CN212926880U
CN212926880U CN202021093525.1U CN202021093525U CN212926880U CN 212926880 U CN212926880 U CN 212926880U CN 202021093525 U CN202021093525 U CN 202021093525U CN 212926880 U CN212926880 U CN 212926880U
Authority
CN
China
Prior art keywords
fixedly connected
rectangular plate
pipeline
short
circular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021093525.1U
Other languages
Chinese (zh)
Inventor
李荣辉
冷梦珂
陈强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenganlong Environmental Construction Co ltd
Original Assignee
Shenganlong Environmental Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenganlong Environmental Construction Co ltd filed Critical Shenganlong Environmental Construction Co ltd
Priority to CN202021093525.1U priority Critical patent/CN212926880U/en
Application granted granted Critical
Publication of CN212926880U publication Critical patent/CN212926880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical field of building rubbish, and discloses a building rubbish feeding pipeline, which comprises a feeding pipeline, wherein the left end and the right end of the lower surface of the feeding pipeline are respectively and fixedly connected with a group of first supporting legs and a group of second supporting legs, the opposite two surfaces of the first supporting legs are both inwards provided with a first circular groove, the inner walls of the two first circular grooves are both inwards provided with a first circular groove, the opposite two surfaces of the second supporting legs are both inwards provided with a second circular groove, the device utilizes the gravity and the potential energy of the building rubbish to prevent the inner part of the feeding pipeline from being blocked and the viscous building rubbish adhered on the inner wall of the feeding pipeline from being vibrated, and the device compares the traditional mode of utilizing power sources such as a motor to impact the feeding pipeline to enable the feeding pipeline to vibrate to prevent the feeding pipeline from being blocked, more energy-saving and environment-friendly.

Description

Building rubbish charge-in pipeline
Technical Field
The utility model relates to a building rubbish technical field specifically is a building rubbish charge-in pipeline.
Background
The construction waste refers to residue soil, waste material, residual mud and other wastes generated in the process of construction, laying or dismantling and repairing of various buildings, structures, pipe networks and the like of construction units or personal teams.
Most building rubbish charge-in pipes in the market at present, when using for a long time, because some building rubbish are sticky, can will paste on the inner wall of charge-in pipe, then long-term the possibility that will lead to the jam of charge-in pipe.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building rubbish charge-in pipeline possesses advantages such as prevent to block up.
(II) technical scheme
In order to achieve the above object, the present invention provides the following technical solutions: a construction waste feeding pipeline comprises a feeding pipeline, wherein the left end and the right end of the lower surface of the feeding pipeline are respectively and fixedly connected with a group of first supporting legs and a group of second supporting legs, the opposite two surfaces of the group of first supporting legs are both inwards provided with a first circular groove, the inner walls of the two first circular grooves are both inwards provided with a first circular groove, the opposite two surfaces of the group of second supporting legs are both inwards provided with a second circular groove, the inner walls of the two second circular grooves are both inwards provided with a second circular groove, a first rectangular plate is arranged between the two supporting legs, the right end of the upper surface of the first rectangular plate is fixedly connected with a first rectangular vertical rod, the left surface of the first rectangular vertical rod is uniformly and fixedly connected with a first circular cross rod in an equidistant mode, the left surface of each first circular cross rod is fixedly connected with a first round ball, and the middle parts of the front surface and the back surface of the first, two equal fixedly connected with one circle piece one of two sides that quarter butt one deviates from mutually, two the corresponding circular recess two of inserting respectively of quarter butt one, two the circle piece one corresponds respectively inserts in the circular groove two.
Preferably, it is a set of be provided with a rectangular plate two between the supporting leg one, a rectangle montant two of upper surface left end fixedly connected with of rectangular plate two, a circular horizontal pole two of the even fixedly connected with of right side equidistance of rectangle montant two, every ball two of the equal fixedly connected with in right side of circular horizontal pole two, a quarter butt two of the equal fixedly connected with in two middle parts around rectangular plate two, two the equal fixedly connected with in two sides that quarter butt two deviate from is a round piece two, two in two circular recesses one of inserting that quarter butt two corresponds respectively, two in two round pieces two of inserting that correspond respectively.
Preferably, the length of each round ball II is gradually decreased from bottom to top.
Preferably, the length of each first round cross rod is gradually reduced from bottom to top.
(III) advantageous effects
Compared with the prior art, the utility model provides a building rubbish charge-in pipeline possesses following beneficial effect:
1. the construction waste feeding pipeline is characterized in that when construction waste enters from the upper end of the feeding pipeline and comes out from a discharge port at the lower end of the feeding pipeline, the construction waste can collide with the first rectangular plate and the second rectangular plate, the outer ends of the first rectangular plate and the second rectangular plate are respectively and fixedly connected with the first rectangular vertical rod and the second rectangular vertical rod, so that the opposite ends of the first rectangular plate and the second rectangular plate can be lifted by utilizing the gravity of the first rectangular vertical rod and the gravity of the second rectangular vertical rod, so that when the materials collide with the two ends of the second rectangular plate and the first rectangular plate which are close to each other, the two ends of the second rectangular plate and the first rectangular plate which are close to each other can be moved downwards by utilizing the gravity and potential energy of the construction waste, the two ends of the second rectangular plate and the first rectangular plate which are far away from each other are lifted by utilizing the principle of the seesaws, so that the first circular cross rods and the second circular cross rods fixedly connected on the two opposite sides, thereby make charge-in pipeline produce vibrations to can avoid the inside of charge-in pipeline to be given by building material to be plugged up, can also give vibrations with gluing the viscidity building rubbish on the charge-in pipeline inner wall and get off.
2. This building rubbish charge-in pipeline, this device utilize gravity and the potential energy of utilizing building rubbish self to remove the inside of preventing the charge-in pipeline and be plugged up and will glue viscidity building rubbish on the charge-in pipeline inner wall and give vibrations and get off, through such mode contrast tradition utilize power supplies such as motors to remove striking charge-in pipeline and make the mode that the charge-in pipeline vibrations prevented the charge-in pipeline jam, more energy-concerving and environment-protective.
Drawings
Fig. 1 is a schematic view of a construction waste feed pipe of the present invention;
fig. 2 is a partially enlarged schematic view of a portion a of fig. 1 according to the present invention;
fig. 3 is a schematic view of the first support leg of the present invention.
In the figure: the feeding device comprises a feeding pipeline 1, a first supporting leg 2, a first circular groove 21, a first circular groove 22, a second supporting leg 3, a second circular groove 31, a second circular groove 32, a first rectangular plate 4, a first rectangular vertical rod 41, a first circular cross rod 42, a first round ball 43, a first short rod 44, a first round block 45, a second rectangular plate 5, a second round block 51, a second short rod 52, a second rectangular vertical rod 53, a second round ball 54 and a second circular cross rod 55.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a construction waste feeding pipe comprises a feeding pipe 1, wherein a group of first supporting legs 2 and second supporting legs 3 are fixedly connected to the left and right ends of the lower surface of the feeding pipe 1 respectively, a circular groove 21 is recessed in each of the two opposite surfaces of the group of first supporting legs 2, a circular groove 22 is recessed in each of the inner walls of the two circular grooves 21, a circular groove 31 is recessed in each of the two opposite surfaces of the group of second supporting legs 3, a circular groove 32 is recessed in each of the inner walls of the two circular grooves 31, a rectangular plate 4 is arranged between the group of second supporting legs 3, a rectangular vertical bar 41 is fixedly connected to the right end of the upper surface of the rectangular plate 4, a circular cross bar 42 is uniformly and equidistantly connected to the left surface of the rectangular vertical bar 41, and a round ball 43 is fixedly connected to the left surface of each circular cross bar 42, the middle parts of the front and back surfaces of the first rectangular plate 4 are fixedly connected with a first short rod 44, the two surfaces of the first short rod 44, which deviate from each other, are fixedly connected with a first round block 45, the two short rods 44, which correspond to each other, are inserted into the second circular groove 31, the two round blocks 45, which correspond to each other, are inserted into the second circular groove 32, a rectangular plate 5 is arranged between the first supporting legs 2, the left end of the upper surface of the rectangular plate 5 is fixedly connected with a second rectangular vertical rod 53, the right side of the second rectangular vertical rod 53 is uniformly and fixedly connected with a second circular cross rod 55 in equal distance, the right side of the second circular cross rod 55 is fixedly connected with a second round ball 54, the middle parts of the front and back surfaces of the rectangular plate 5 are fixedly connected with a second short rod 52, the two surfaces of the two short rods 52, which deviate from each other, are fixedly connected with a second round block 51, and the two short rods 52 are correspondingly inserted into the first circular grooves 21, two in the two circle blocks 51 insert two circle blocks 51 respectively and correspondingly, when construction waste enters from the upper end of the feeding pipeline 1 and comes out from the lower end discharge port of the feeding pipeline 1, the construction waste can collide with the first rectangular plate 4 and the second rectangular plate 5, because the outer ends of the first rectangular plate 4 and the second rectangular plate 5 are fixedly connected with the first rectangular vertical rod 41 and the second rectangular vertical rod 53 respectively, the two opposite ends of the second rectangular plate 5 and the first rectangular plate 4 can be lifted by utilizing the gravity of the first rectangular vertical rod 41 and the second rectangular vertical rod 53, when the material collides with the two ends of the second rectangular plate 5 and the first rectangular plate 4 which are close to each other, the two ends of the second rectangular plate 5 and the first rectangular plate 4 which are close to each other can move downwards by utilizing the gravity and the potential energy of the construction waste, the two ends of the second rectangular plate 5 and the first rectangular plate 4 which are far away from each other are lifted by utilizing the principle of the seesaws, and thus the first circular cross rod 42 and the second circular cross rod two vertical rods which are fixedly connected on the two 55 are impacted on the left side wall surface and the right side wall surface of the feed pipeline 1, so that the feed pipeline 1 vibrates, the interior of the feed pipeline 1 can be prevented from being blocked by building materials, viscous building garbage adhered to the inner wall of the feed pipeline 1 can be vibrated down, the length of each round ball II 54 is gradually decreased from bottom to top, and the length of each round cross rod I42 is gradually decreased from bottom to top.
When in use:
the first step is as follows: when the construction waste enters from the upper end of the feeding pipeline 1 and comes out from the discharge port at the lower end of the feeding pipeline 1, the construction waste can impact the first rectangular plate 4 and the second rectangular plate 5, because the outer ends of the first rectangular plate 4 and the second rectangular plate 5 are respectively and fixedly connected with the first rectangular vertical rod 41 and the second rectangular vertical rod 53, the opposite ends of the second rectangular plate 5 and the first rectangular plate 4 can be lifted by utilizing the gravity and the potential energy of the construction waste, when the material impacts the two ends of the second rectangular plate 5 and the first rectangular plate 4 which are close to each other, the two ends of the second rectangular plate 5 and the first rectangular plate 4 which are close to each other can be moved downwards by utilizing the gravity and the potential energy of the construction waste, then the two ends of the second rectangular plate 5 and the first rectangular plate 4 which are far away from each other are lifted by utilizing the principle of the seesaw, and thus the first circular cross rods 42 and the second circular cross rods 55 which are fixedly connected on the opposite sides of the first rectangular vertical rod 41 and the second rectangular vertical rod 53 can impact, thereby make charge-in pipeline 1 produce vibrations to can avoid charge-in pipeline 1's inside to be given by building material to be plugged up, can also give vibrations with the viscidity building rubbish of gluing on charge-in pipeline 1 inner wall.
The second step is that: this device utilizes the gravity and the potential energy of utilizing building rubbish self to remove to prevent that the inside of charge-in pipeline 1 is stopped up and will be glutinous the viscidity building rubbish on 1 inner walls of charge-in pipeline for shaking get off, through such mode contrast traditional power supplies such as utilizing motors remove striking charge-in pipeline 1 and make 1 vibrations of charge-in pipeline prevent the mode that charge-in pipeline 1 blockked up, more energy-concerving and environment-protective.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a building rubbish charge-in pipeline, includes charge-in pipeline (1), both ends difference fixedly connected with a set of supporting leg (2) and supporting leg two (3), a set of about the lower surface of charge-in pipeline (1) the equal indent in relative two sides of supporting leg (2) has a circular recess (21), two the equal indent of inner wall of circular recess (21) has a circular groove (22), a set of the equal indent in relative two sides of supporting leg two (3) has a circular recess two (31), two the equal indent of inner wall of circular recess two (31) has a circular groove two (32), its characterized in that: a set of be provided with a rectangular plate (4) between supporting leg two (3), the upper surface right-hand member fixedly connected with of rectangular plate (4) rectangle montant (41), the even fixedly connected with round horizontal pole (42) of left surface equidistance of rectangle montant (41), every the ball (43) of the equal fixedly connected with in left surface of round horizontal pole (42), short-bar (44) of equal fixedly connected with in two sides around rectangular plate (4) the short-bar (44), two the equal fixedly connected with in two sides that short-bar (44) deviated from mutually is a circle piece (45), two short-bar (44) correspond respectively insert circular recess two (31), two in circle piece (45) correspond respectively insert circular recess two (32).
2. A construction waste feed pipe according to claim 1, characterised in that: a set of be provided with a rectangular plate two (5) between supporting leg (2), the upper surface left end fixedly connected with a rectangle montant two (53) of rectangular plate two (5), the even fixedly connected with a circular horizontal pole two (55) of right side equidistance of rectangle montant two (53), every ball two (54) of the equal fixedly connected with in right side of circular horizontal pole two (55), short-bar two (52) of equal fixedly connected with in two sides around rectangular plate two (5), two the equal fixedly connected with in two sides that short-bar two (52) deviate from mutually has a circle piece two (51), two in two circular recess one (21) of inserting that short-bar two (52) correspond respectively, two circle piece two (51) correspond respectively insert in two circle piece two (51).
3. A construction waste feed pipe according to claim 2, wherein: the length of each round ball II (54) is gradually decreased from bottom to top.
4. A construction waste feed pipe according to claim 1, characterised in that: the length of each round cross rod I (42) is gradually reduced from bottom to top.
CN202021093525.1U 2020-06-15 2020-06-15 Building rubbish charge-in pipeline Active CN212926880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021093525.1U CN212926880U (en) 2020-06-15 2020-06-15 Building rubbish charge-in pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021093525.1U CN212926880U (en) 2020-06-15 2020-06-15 Building rubbish charge-in pipeline

Publications (1)

Publication Number Publication Date
CN212926880U true CN212926880U (en) 2021-04-09

Family

ID=75323938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021093525.1U Active CN212926880U (en) 2020-06-15 2020-06-15 Building rubbish charge-in pipeline

Country Status (1)

Country Link
CN (1) CN212926880U (en)

Similar Documents

Publication Publication Date Title
CN212926880U (en) Building rubbish charge-in pipeline
CN207194409U (en) A kind of building block pouring can
CN204311756U (en) Concrete bank platform template reinforcing fixture
CN211498552U (en) Sound barrier convenient to installation
CN212984266U (en) Assembled wall surface mounting structure
CN211597144U (en) Noise reduction device for building construction management environmental protection and energy saving
CN209160570U (en) A kind of assembly type reinforcing bar waste tank having enough to meet the need
CN204357107U (en) A kind of biodegradation type modifying waste plastic high molecule plastic formwork
CN210598159U (en) Mortar conveyer for construction
CN205224580U (en) Vaulting pole formula loam wall template of adjustable length
CN202401750U (en) Building template
CN219471989U (en) Assembled door opening
CN104088580B (en) A kind of Combined gate having enough to meet the need use and preparation method thereof
CN213682654U (en) Assembled light inner wall board
CN214939115U (en) Road slurry pouring device for municipal works
CN213508485U (en) Energy-conserving underground structure
CN204590001U (en) A kind of cutting type rapid piling device
CN210827314U (en) Water-stop sheet is used in municipal works construction
CN219365614U (en) Prefabricated assembled flag table
CN209976135U (en) Anti-toppling power line pole
CN215520356U (en) A energy-concerving and environment-protective type encloses fender structure for assembly type construction
CN211499960U (en) Ready-package swimming pool
CN211342089U (en) Interim rail guard of foundation ditch
CN207940110U (en) A kind of modified heliogreenhouse
CN208168311U (en) For building the crosshead of enclosure wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant