CN212896706U - Temporary drainage structure for house construction - Google Patents

Temporary drainage structure for house construction Download PDF

Info

Publication number
CN212896706U
CN212896706U CN202021477370.1U CN202021477370U CN212896706U CN 212896706 U CN212896706 U CN 212896706U CN 202021477370 U CN202021477370 U CN 202021477370U CN 212896706 U CN212896706 U CN 212896706U
Authority
CN
China
Prior art keywords
drainage
piece
groove
shaped groove
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021477370.1U
Other languages
Chinese (zh)
Inventor
付飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021477370.1U priority Critical patent/CN212896706U/en
Application granted granted Critical
Publication of CN212896706U publication Critical patent/CN212896706U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a building construction temporary drainage structure in the technical field of construction site temporary drainage structures, which comprises a first drainage part and a second drainage part, wherein a first U-shaped groove and a second U-shaped groove are arranged at the two ends of the first drainage part and one end of the second drainage part, a U-shaped gasket is arranged in the first U-shaped groove, and a U-shaped connecting plate is arranged in the second U-shaped groove; a filtering steel plate is arranged above the first drainage piece and the second drainage piece, slotted holes are formed in two sides of the filtering steel plate, a limiting block is fixedly connected below the slotted holes of the filtering steel plate, and a lifting piece is connected in the slotted holes in a sliding mode; a bent pipe is arranged between the two second drainage pieces, a rotating groove is formed in the other end of each second drainage piece, a connecting ring is rotatably connected in the rotating groove, a threaded cylinder is fixedly connected to the outer end of the connecting ring, and the threaded cylinder is in threaded connection with the bent pipe; the utility model discloses the installation is simple, and the engineering time is short, and is quick detachable, and recoverable the use moreover can not the polluted environment, can avoid the rainwater to erode the escape canal and lead to blockking up and collapsing.

Description

Temporary drainage structure for house construction
Technical Field
The utility model relates to an interim drainage structures technical field of building site specifically is interim drainage structures of building construction.
Background
Once a large amount of rainfall exists in the house construction process, the whole foundation is soaked, and after long-term soaking, foundation settlement may exceed the requirements of the regulations, so that the whole building has great potential safety hazards, and therefore, the temporary drainage work on the construction site is particularly important, the economic loss is reduced to the maximum extent for scientifically developing the drainage work in the flood season, the construction safety is ensured, and effective drainage measures are specially made according to the actual conditions on the site.
At present, the method of temporary drainage ditches is mostly adopted in traditional house construction engineering, mainly by using masonry for lining, casting by using concrete or directly excavating, forming, paving a geomembrane and the like, the masonry or concrete drainage ditches waste materials, the construction process is complicated, the construction time is long, the dismantling difficulty is high after the construction is finished, and new construction waste is generated to pollute the environment after the dismantling; the soil drainage ditch is seriously scoured by water flow directly, and is easy to cause blockage or collapse.
Based on this, the utility model designs a temporary drainage structures of building construction to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
In order to solve the above problem, the utility model provides a following technical scheme:
the temporary drainage structure for building construction comprises a first drainage piece and a second drainage piece, wherein a first U-shaped groove and a second U-shaped groove are formed in the two ends of the first drainage piece and one end of the second drainage piece; a filtering steel plate is arranged above the first drainage piece and the second drainage piece, slotted holes are formed in two sides of the filtering steel plate, a limiting block is fixedly connected below the slotted holes of the filtering steel plate, and a lifting piece is connected in the slotted holes in a sliding mode; two be equipped with the return bend between the second drainage spare, the second drainage spare other end is equipped with rotates the groove, it is connected with the go-between to rotate the inslot rotation, the go-between is kept away from outer end fixedly connected with screw thread section of thick bamboo, screw thread section of thick bamboo and return bend threaded connection.
When the water draining device works, the U-shaped sealing sheet can prevent water from seeping out from a gap between the two water draining pieces; the U-shaped connecting plate can compact the U-shaped sealing piece and can play a role in connecting two adjacent drainage pieces. The filtering steel plate can prevent large garbage from entering the drainage piece, and the drainage piece is prevented from being blocked. The limiting block can prevent the lifting piece from falling into the drainage piece from the slotted hole. The return bend plays the effect of connecting two second drainage component, makes whole drainage system intercommunication integrative.
As a further aspect of the present invention, the first and second drainage members have wing plates fixedly connected to both sides of the upper portion thereof. During operation, need dig earlier the water drainage tank, then put into water drainage tank with drainage member, the pterygoid lamina can support drainage member.
As a further aspect of the present invention, the second U-shaped groove is located above the first U-shaped groove and the width of the second U-shaped groove is greater than the first U-shaped groove. The U-shaped sealing sheet is convenient to put in firstly and then the U-shaped connecting plate is fixed.
As a further scheme of the utility model, first drainage spare and second drainage spare both sides upper portion are equipped with the draw-in groove, the fixed surface is connected with the cardboard under the filtering steel sheet both sides, cardboard and draw-in groove sliding connection, cardboard outer wall parcel has flexible material. During operation, the cardboard and the draw-in groove cooperation can prevent to filter the steel sheet and move all around, and flexible material can increase the frictional force of cardboard and draw-in groove, makes the steel sheet of filtering can not break away from the draw-in groove easily.
As a further aspect of the present invention, the slot includes a first slot and a second slot, and the second slot is wider than the first slot. When the lifting plate works, the second slotted hole is convenient for fingers to pull out the lifting plate.
As a further aspect of the utility model, carry and draw the piece including carrying the arm-tie, carrying the pull rod and carrying the pull ring, carrying the pull rod and being the threaded rod, carrying the pull rod and carrying arm-tie fixed connection, carry pull ring and carrying the pull rod threaded connection.
As a further aspect of the present invention, the diameter of the lifting ring is larger than the width of the first slot, and the lifting rod is slidably connected to the first slot.
As a further proposal of the utility model, the cross section of the rotating groove is trapezoidal. During operation, the section of thick bamboo of screw thread can be prevented for trapezoidal pivoted groove and break away from second drainage piece.
Advantageous effects
Compared with the prior art, the beneficial effects of the utility model are that:
by arranging the first drainage piece, the second drainage piece, the bent pipe, the filtering steel plate and other structures, the construction site drainage system can be formed by simple assembly, is simple to install, short in construction time, easy to disassemble and capable of being recycled, and does not pollute the environment; simultaneously, rainwater flows in the first drainage piece, the second drainage piece and the bent pipe, and the U-shaped sealing sheet prevents rainwater from permeating, so that the rainwater is prevented from scouring the drainage ditch to cause blockage and collapse.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is an enlarged schematic view of a portion a of fig. 1 according to the present invention;
FIG. 3 is a schematic cross-sectional view of the present invention;
fig. 4 is an enlarged schematic view of a portion B of fig. 3 according to the present invention;
fig. 5 is an enlarged schematic view of a portion C of fig. 3 according to the present invention;
fig. 6 is an enlarged schematic view of a portion D of fig. 3 according to the present invention;
fig. 7 is a schematic view of the lifting member of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1-a first drainage part, 2-a second drainage part, 3-a first U-shaped groove, 4-a second U-shaped groove, 5-a U-shaped sealing sheet, 6-a U-shaped connecting plate, 7-a fixing plate, 8-a filtering steel plate, 9-a slotted hole, 10-a limiting block, 11-a lifting part, 12-a bent pipe, 13-a rotating groove, 14-a connecting ring, 15-a threaded cylinder, 16-a wing plate, 17-a clamping groove, 18-a clamping plate, 19-a lifting plate, 20-a lifting rod, 21-a lifting ring, 22-a first slotted hole and 23-a second slotted hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution:
the temporary drainage structure for building construction comprises a first drainage piece 1 and a second drainage piece 2, wherein a first U-shaped groove 3 and a second U-shaped groove 4 are formed in two ends of the first drainage piece 1 and one end of the second drainage piece 2, a U-shaped sealing sheet 5 is arranged in the first U-shaped groove 3, a U-shaped connecting plate 6 is arranged in the second U-shaped groove 4, a fixing plate 7 is fixedly connected to the upper end of the U-shaped connecting plate 6, and the fixing plate 7 is fixedly connected with the first drainage piece 1 and the second drainage piece 2 through bolts; a filtering steel plate 8 is arranged above the first drainage piece 1 and the second drainage piece 2, slot holes 9 are formed in two sides of the filtering steel plate 8, a limiting block 10 is fixedly connected below the slot holes 9 of the filtering steel plate 8, and a lifting piece 11 is connected in the slot holes 9 in a sliding mode; an elbow pipe 12 is arranged between the two second water discharging pieces 2, a rotating groove 13 is arranged at the other end of each second water discharging piece 2, a connecting ring 14 is rotationally connected in the rotating groove 13, a threaded cylinder 15 is fixedly connected to the connecting ring 14 far away from the outer end, and the threaded cylinder 15 is in threaded connection with the elbow pipe 12.
When the water draining device works, the U-shaped sealing sheet 5 can prevent water from seeping out from a gap between the two water draining pieces; the U-shaped connecting plate 6 can compact the U-shaped sealing sheet 5 and can play a role in connecting two adjacent drainage pieces. The filtering steel plate 8 can prevent large garbage from entering the drainage piece, and the drainage piece is prevented from being blocked. The stopper 10 prevents the pulling-up member 11 from falling into the drainage member from the slot hole 9. The bent pipe 12 serves to connect the two second drainage members 2, so that the entire drainage system is communicated integrally.
Wherein, the upper parts of both sides of the first and second drainage members 1 and 2 are fixedly connected with wing plates 16. In operation, the drainage channel is dug first, and then the drainage member is placed in the drainage channel, and the wing plate 16 can support the drainage member.
The second U-shaped groove 4 is positioned above the first U-shaped groove 3 and the width of the second U-shaped groove 4 is larger than that of the first U-shaped groove 3. The U-shaped sealing sheet 5 is conveniently put in firstly, and then the U-shaped connecting plate 6 is fixed.
First drainage 1 and the 2 both sides upper portions of second drainage are equipped with draw-in groove 17, and 8 both sides lower fixed surface of filter plate have cardboard 18, cardboard 18 and draw-in groove 17 sliding connection, and 18 outer wall parcels of cardboard have flexible material. During operation, cardboard 18 and draw-in groove 17 cooperation can prevent to filter steel sheet 8 from controlling about from, and flexible material can increase the frictional force of cardboard 18 and draw-in groove 17, makes filter steel sheet 8 can not break away from draw-in groove 17 easily.
The slot 9 includes a first slot 23 and a second slot 23, and the width of the second slot 23 is larger than that of the first slot 23. In operation, the second slot 23 facilitates the pulling of the lifting plate 19 by a finger.
The lifting piece 11 comprises a lifting plate 19, a lifting rod 20 and a lifting ring 21, the lifting rod 20 is a threaded rod, the lifting rod 20 is fixedly connected with the lifting plate 19, and the lifting ring 21 is in threaded connection with the lifting rod 20.
The lifting ring 21 has a diameter larger than the width of the first slot 23, and the lifting ring 20 is slidably connected with the first slot 23.
The rotary groove 13 has a trapezoidal cross-sectional shape. In operation, the trapezoidal cross-section of the turning groove 13 prevents the threaded cylinder 15 from being disengaged from the second drain member 2.
One specific application of this embodiment is:
use the utility model discloses the time, need dig earlier water drainage tank, water drainage tank ground is as level as possible around. Then the first drainage member 1 and the second drainage member 2 are tightly placed in a drainage groove, and wing plates 16 on two sides of the drainage members are covered on the ground; second drainage parts 2 are all put into to the drain tank turning to put into return bend 12 between two second drainage parts 2, and rotatory screw thread section of thick bamboo 15 makes screw thread section of thick bamboo 15 and return bend 12 threaded connection, return bend 12 communicates two second drainage parts 2 this moment.
Put into U-shaped gasket 5 in the first U-shaped groove 3 of adjacent drainage component, then put into U-shaped connecting plate 6 in second U-shaped groove 4, then through the bolt with fixed plate 7 and two adjacent drainage component fixed connection. The clamping plates 18 fixedly connected with the lower surface of the filtering steel plate 8 are sequentially inserted into the clamping grooves 17 of the first drainage part 1 and the second drainage part 2. When heavy rainfall is encountered, rainwater on the construction site is drained through the drainage system consisting of the first drainage member 1, the second drainage member 2 and the bent pipe 12.
After the construction is finished, fingers can be inserted into the second slotted holes 23 to pull out the lifting plates 19, then the lifting plates 19 are held to take down the filter steel plates 8, and then the drainage system is disassembled and recycled.
The utility model discloses the installation is simple, and the engineering time is short, and is quick detachable, and recoverable the use moreover can not the polluted environment, can avoid the rainwater to erode the escape canal and lead to blockking up and collapsing.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (8)

1. Temporary drainage structures of construction is built in room, including first drainage spare (1) and second drainage spare (2), its characterized in that: a first U-shaped groove (3) and a second U-shaped groove (4) are formed in the two ends of the first drainage piece (1) and one end of the second drainage piece (2), a U-shaped sealing piece (5) is arranged in the first U-shaped groove (3), a U-shaped connecting plate (6) is arranged in the second U-shaped groove (4), a fixing plate (7) is fixedly connected to the upper end of the U-shaped connecting plate (6), and the fixing plate (7) is fixedly connected with the first drainage piece (1) and the second drainage piece (2) through bolts; a filtering steel plate (8) is arranged above the first drainage piece (1) and the second drainage piece (2), slotted holes (9) are formed in two sides of the filtering steel plate (8), a limiting block (10) is fixedly connected to the filtering steel plate (8) below the slotted holes (9), and a lifting piece (11) is connected in the slotted holes (9) in a sliding mode; two be equipped with return bend (12) between second drainage spare (2), second drainage spare (2) other end is equipped with rotation groove (13), it is connected with go-between (14) to rotate groove (13) internal rotation, outer end fixedly connected with screw thread section of thick bamboo (15) are kept away from in go-between (14), screw thread section of thick bamboo (15) and return bend (12) threaded connection.
2. The temporary drainage structure for house construction according to claim 1, wherein: and wing plates (16) are fixedly connected to the upper parts of the two sides of the first drainage piece (1) and the second drainage piece (2).
3. The temporary drainage structure for house construction according to claim 1, wherein: the second U-shaped groove (4) is positioned above the first U-shaped groove (3) and the width of the second U-shaped groove (4) is larger than that of the first U-shaped groove (3).
4. The temporary drainage structure for house construction according to claim 1, wherein: first drainage spare (1) and second drainage spare (2) both sides upper portion are equipped with draw-in groove (17), filter plate (8) both sides lower fixed surface is connected with cardboard (18), cardboard (18) and draw-in groove (17) sliding connection, cardboard (18) outer wall parcel has flexible material.
5. The temporary drainage structure for house construction according to claim 1, wherein: the slotted hole (9) comprises a first slotted hole (22) and a second slotted hole (23), and the width of the second slotted hole (23) is larger than that of the first slotted hole (22).
6. The temporary drainage structure for house construction according to claim 1, wherein: the lifting piece (11) comprises a lifting plate (19), a lifting rod (20) and a lifting ring (21), the lifting rod (20) is a threaded rod, the lifting rod (20) is fixedly connected with the lifting plate (19), and the lifting ring (21) is in threaded connection with the lifting rod (20).
7. The temporary drainage structure for house construction according to claim 6, wherein: the lifting ring (21) is larger than the width of the first slotted hole (22), and the lifting ring (20) is connected with the first slotted hole (22) in a sliding mode.
8. The temporary drainage structure for house construction according to claim 1, wherein: the cross section of the rotating groove (13) is trapezoidal.
CN202021477370.1U 2020-07-24 2020-07-24 Temporary drainage structure for house construction Expired - Fee Related CN212896706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021477370.1U CN212896706U (en) 2020-07-24 2020-07-24 Temporary drainage structure for house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021477370.1U CN212896706U (en) 2020-07-24 2020-07-24 Temporary drainage structure for house construction

Publications (1)

Publication Number Publication Date
CN212896706U true CN212896706U (en) 2021-04-06

Family

ID=75292313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021477370.1U Expired - Fee Related CN212896706U (en) 2020-07-24 2020-07-24 Temporary drainage structure for house construction

Country Status (1)

Country Link
CN (1) CN212896706U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113668677A (en) * 2021-09-06 2021-11-19 江阴市晨辉市政建设工程有限责任公司 Prefabricated assembled drainage structures for town road

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113668677A (en) * 2021-09-06 2021-11-19 江阴市晨辉市政建设工程有限责任公司 Prefabricated assembled drainage structures for town road

Similar Documents

Publication Publication Date Title
CN110725341B (en) Basement outer wall embedded sleeve and pipeline gap leakage treatment method
CN211665803U (en) Advanced water stop post-cast strip structure of basement bottom plate
CN212896706U (en) Temporary drainage structure for house construction
CN111519734B (en) Silt dredging method for river channel hidden culvert
CN213508523U (en) Foundation pit drainage structure
CN209584986U (en) A kind of antiseepage dam structure
CN112814126A (en) Municipal road-based rainwater collection device and construction method thereof
CN211646407U (en) Attached drainage device under stock girder steel
CN212612247U (en) Small-sized sewage intercepting box culvert for river treatment
CN208235959U (en) A kind of building construction temporary drainage structure
CN111851410A (en) Hydraulic engineering ecological slope protection and construction method
CN211341062U (en) Anti-collapse slope drainage structure for geotechnical engineering
CN209538245U (en) A kind of late poured band structure of basement bottom board
CN210887313U (en) Sealed and anti-flooding electric power inspection well
CN110094578A (en) A kind of new waterproof casing and its construction method
CN205444116U (en) Channel construction structures
CN217500364U (en) Hydraulic engineering desilting device
CN219621808U (en) Bank protection foundation pit drainage structure
CN213508771U (en) Municipal administration rainwater penetrant unit
CN214832826U (en) Tower crane foundation is located basement outer wall from drainage structures
CN217517606U (en) Environment-friendly foundation pit slope soil nailing wall structure
CN220394637U (en) Basement waterproof building structure
CN220099938U (en) Environment-friendly slope protection seepage-proofing structure
CN215053149U (en) Deep basal pit precipitation well plugging device
CN214116668U (en) Foundation does not have hole precipitation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210406