CN212891786U - Tubular material stacking device for building construction - Google Patents

Tubular material stacking device for building construction Download PDF

Info

Publication number
CN212891786U
CN212891786U CN202021911566.7U CN202021911566U CN212891786U CN 212891786 U CN212891786 U CN 212891786U CN 202021911566 U CN202021911566 U CN 202021911566U CN 212891786 U CN212891786 U CN 212891786U
Authority
CN
China
Prior art keywords
fixedly connected
slide bar
block
slider
reset spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021911566.7U
Other languages
Chinese (zh)
Inventor
陈伟鉴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021911566.7U priority Critical patent/CN212891786U/en
Application granted granted Critical
Publication of CN212891786U publication Critical patent/CN212891786U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to a stack device technical field, specifically be a device is stacked to tubulose material for construction, stack the device main part including the tubulose, the tubulose is stacked the middle part top left side of device main part and has been seted up first fluting, and the first slide bar of first grooved both ends middle part fixedly connected with, sliding connection has first slider on the outer wall of first slide bar, the right side middle part welding of first slider has first reset spring. The utility model discloses a be provided with first slide bar, second reset spring, second slide bar, second slider and third reset spring, the first pull ring of pulling drives spacing inserted block under second slide bar, second slider and third reset spring's mutually supporting and breaks away from the limiting displacement who plays first slider on first slide bar to first slider, and comparatively convenient pipeline both sides carry out the centre gripping fixed, prevent that it from rolling to break away from and cause the incident.

Description

Tubular material stacking device for building construction
Technical Field
The utility model relates to a stack device technical field, specifically be a device is stacked to tubulose material for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. It includes foundation engineering construction, major structure construction, roofing engineering construction, decoration engineering construction etc. but because the engineering volume is huge, the demand of material is also very big, but the construction site is because stacking mixed and disorderly and leading to the fact the influence to the construction easily, and the tubular material demand is huge in the construction, and it places and becomes the main problem, and current tubular material stacks the device and has satisfied people's demand basically, still has a series of problems.
Because traditional tubulose device of stacking comprises the mount, and can't fix according to how much tubular, scatter easily and influence the working efficiency, and place the mixed and disorderly danger that produces easily, therefore it is imperative to demand a device is stacked to tubulose material for construction and is solved above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device is stacked to tubular material for construction to the traditional tubulose of proposing is stacked the device and is constituteed by the mount in solving above-mentioned background art, and can't be fixed according to how much of tubulose, scatters easily and influences the working efficiency, and places mixed and disorderly problem that produces danger easily.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a device is stacked to tubulose material for construction, stacks the device main part including the tubulose, the tubulose is stacked the middle part top left side of device main part and has been seted up first fluting, and the first slide bar of first grooved both ends middle part fixedly connected with, sliding connection has first slider on the outer wall of first slide bar, the right side middle part welding of first slider has first reset spring, and the one end welding that first slider was kept away from to first reset spring is at first grooved right side middle part, first reset spring encircles on the outer wall of first slide bar, the top middle part of first slider is through the spacing grip block of fixedly connected with, and the tubulose is stacked the middle part top right side upper end of device main part and is passed through another spacing grip block of fixedly connected with, and spacing grip block left side equidistance is glued and is had skid proof block.
Preferably, the left side the second fluting has been seted up to the left side lower extreme of spacing grip block, and the slotted both ends middle part fixedly connected with second slide bar of second, sliding connection has the second slider on the outer wall of second slide bar, and the bottom middle part welding of second slider has third reset spring, the one end welding that second slider was kept away from to third reset spring is at the slotted bottom middle part of second, and third reset spring encircles on the outer wall of second slide bar, the spacing inserted block of left side middle part fixedly connected with of second slider, and spacing inserted block bottom insert establish the inslot that first slide bar top equidistance was seted up, and the first pull ring of top middle part fixedly connected with of spacing inserted block.
Preferably, the right-hand member equidistance fixedly connected with of spacing grip block is flexible, and the right-hand member of flexible piece is fixed connection all on the right-hand member outer wall of supporting rod, flexible piece middle part is connected all and is located the welding and have the second reset spring, and the second reset spring keeps away from flexible piece middle part junction and all welds on supporting rod left side fixed block, second reset spring is all around on the outer wall of flexible piece.
Preferably, the inner walls of the two sides of the tubular stacking device main body are symmetrically provided with third slots, the middle parts of the two ends of each third slot are fixedly connected with third sliding rods, the outer wall of the third slide bar is connected with a third slide block in a sliding way, the middle part of the right side of the third slide block on the left side is provided with a rotating shaft through fixed connection, the right side of the rotating shaft is fixedly connected with the middle part of the left side of the covering connecting plate, the right side of the covering connecting plate is inserted in the middle part of the left side of the right third sliding block, and the right side of the top end of the covering connecting plate is fixedly connected with an auxiliary position plate, the middle part of the auxiliary position plate is penetrated with an inserted leather plug, the right end of the inserted leather plug is inserted into a leather plug groove which is arranged on the left side of the third sliding rod at equal intervals, the middle part of the left side of the inserted leather plug is fixedly connected with the middle end of the right side of the second pull ring, and the two ends of the right side of the second pull ring are symmetrically welded with fourth return springs, and one ends of the fourth return springs, far away from the second pull ring, are welded on the left side of the auxiliary plate.
Preferably, the bottom end of the covering connecting plate is glued with a protective cushion, and the protective cushion is attached to the pipeline.
Preferably, the middle part of the top end of the covering connecting plate is fixedly connected with a pull handle, and anti-skid grains are arranged inside the pull handle.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the tubular material stacking device for building construction is provided with a first slide bar, a first slide block, a limiting insert block, a first pull ring, a telescopic block, a second return spring, a second slide bar, a second slide block and a third return spring, pulls the first pull ring, the second slide bar, the second slide block and the third return spring are mutually matched to drive the limit insert block to separate from the limit function of the first slide block on the first slide bar on the first slide block, then the left limit clamping block is pulled to unfold the middle part, then the fixed-quantity pipeline is placed to push the left limit clamping block to be matched with the right limit clamping block, then the telescopic block fixedly connected with the right end of the left limiting and clamping block is matched with a second return spring to fix the two sides of the pipeline, the two sides of the pipeline can be clamped and fixed conveniently through the structure, so that safety accidents caused by the fact that the pipeline falls off and is separated are prevented;
2. this device is stacked to tubulose material for construction is provided with the third fluting, the third slide bar, the third slider, insert and establish the leather plug, second pull ring and fourth reset spring, because the continuous reduction of pipeline quantity, make the third slider slide to relevant position on the outer wall of third slide bar and assist the locking to the pipeline, then stimulate the second pull ring, drive under the elastic action of fourth reset spring and insert and establish inserting of the third slide bar that the leather plug accomplished third fluting middle part fixed connection, then accomplish spacing to the lid and close the connecting plate according to the connection of assisting the position board, can be comparatively convenient according to the pipeline stack height adjust its device and accomplish its locking stack.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the structure of the utility model in use;
fig. 3 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 4 is an enlarged schematic structural view of the utility model at the position B in fig. 2;
fig. 5 is an enlarged schematic structural diagram of the present invention at C in fig. 1.
In the figure: 1. a tubular stacking device body; 101. a first slot; 102. a first slide bar; 103. A first slider; 104. a first return spring; 105. limiting the inserting block; 106. a first pull ring; 2. a limiting clamping block; 201. a telescopic block; 202. a second return spring; 203. a clamping rod; 204. an anti-slip bump; 205. a second slot; 206. a second slide bar; 207. a second slider; 208. a third return spring; 3. a third slot is formed; 301. a third slide bar; 302. a third slider; 4. a rotating shaft; 5. covering the connecting plate; 501. a protective cushion; 502. pulling a handle; 6. an auxiliary position plate; 601. inserting a leather plug; 602. a second tab; 603. and a fourth return spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a tubular material stacking device for building construction comprises a tubular stacking device body 1, wherein a first open groove 101 is formed in the left side of the top end of the middle of the tubular stacking device body 1, a first slide rod 102 is fixedly connected to the middle of the two ends of the first open groove 101, a first slide block 103 is slidably connected to the outer wall of the first slide rod 102, a first reset spring 104 is welded to the middle of the right side of the first slide block 103, one end, far away from the first slide block 103, of the first reset spring 104 is welded to the middle of the right side of the first open groove 101, the first reset spring 104 surrounds the outer wall of the first slide rod 102, a limiting clamping block 2 is fixedly connected to the middle of the top end of the first slide block 103, another limiting clamping block 2 is fixedly connected to the upper end of the right side of the top end of the middle of the tubular stacking device body 1, anti-skid bumps 204 are glued to the left side of the, the integrity of the device is ensured.
The second slot 205 has been seted up to the left side lower extreme of the spacing grip block 2 in left side, and the both ends middle part fixedly connected with second slide bar 206 of second slot 205, sliding connection has second slider 207 on the outer wall of second slide bar 206, and the welding of the bottom middle part of second slider 207 has third reset spring 208, the one end welding that second slider 207 was kept away from to third reset spring 208 is in the bottom middle part of second slot 205, and third reset spring 208 encircles on the outer wall of second slide bar 206, the spacing inserted block 105 of left side middle part fixedly connected with of second slider 207, and the inslot that sets up at first slide bar 102 top equidistance is inserted to spacing inserted block 105 bottom, and the first pull ring 106 of top middle part fixedly connected with of spacing inserted block 105, its effect lies in that it is spacing to comparatively convenient removal processing pipeline, the rationality of device has been guaranteed.
The flexible piece 201 of the equidistant fixedly connected with of right-hand member of spacing grip block 2, and the right-hand member of flexible piece 201 is all fixed connection on the right-hand member outer wall of supporting rod 203, flexible piece 201 middle part is connected all to be located the welding and is had second reset spring 202, and second reset spring 202 keeps away from flexible piece 201 middle part junction and all welds on supporting rod 203 left side fixed block, second reset spring 202 is all around on the outer wall of flexible piece 201, it is its cushioning effect to the pipeline fibre that is used for, ensure the security of device.
The inner walls of two sides of the tubular stacking device body 1 are symmetrically provided with third grooves 3, the middle parts of two ends of each third groove 3 are fixedly connected with third slide bars 301, the outer walls of the third slide bars 301 are slidably connected with third slide blocks 302, the middle part of the right side of each left side third slide block 302 is provided with a rotating shaft 4 through a fixed connection, the right side of each rotating shaft 4 is fixedly connected with the middle part of the left side of each cover connecting plate 5, the right side of each cover connecting plate 5 is inserted in the middle part of the left side of the corresponding right side third slide block 302, the right side of the top end of each cover connecting plate 5 is fixedly connected with an auxiliary position plate 6, an inserted leather plug 601 penetrates through the middle part of each auxiliary position plate 6, the right end of the inserted leather plug 601 is inserted in a leather plug groove equidistantly formed in the left side of each third slide bar 301, the middle part of the left side of the inserted leather plug 601 is fixedly connected to the middle end of the right side of, one end of the fourth return spring 603 far away from the second pull ring 602 is welded on the left side of the auxiliary position plate 6, which is used for conveniently unlocking the pipeline at the price, thereby ensuring the convenience of the device.
The bottom of the cover connecting plate 5 is glued with the protective cushion 501, the protective cushion 501 is attached to the pipeline, the protection between the device and the pipeline is achieved, the safety of the device and the pipeline is guaranteed, and the service life of the device is prolonged.
Cover and close top middle part fixedly connected with of connecting plate 5 and draw handle 502, and draw the inside of handle 502 to be provided with anti-skidding line, its effect lies in that the pulling that can be comparatively convenient covers connecting plate 5, has ensured the convenience of device.
The working principle is as follows: pulling the first pull ring 106, driving the limiting insert 105 to be separated from the limiting effect of the first slide block 103 on the first slide bar 102 on the first slide block 103 under the mutual matching of the second slide bar 206, the second slide block 207 and the third return spring 208, then pulling the left limiting clamping block 2, unfolding the middle part, then placing a fixed-quantity pipeline, pushing the left limiting clamping block 2 to be mutually matched with the right limiting clamping block 2, and then completing the fixing of two sides of the pipeline under the mutual matching of the telescopic block 201 fixedly connected with the right end of the left limiting clamping block 2 and the second return spring 202;
due to the fact that the number of pipelines is continuously reduced, the third sliding block 302 slides to a corresponding position on the outer wall of the third sliding rod 301 to perform auxiliary locking on the pipelines, then the second pull ring 602 is pulled, the inserted leather plug 601 is driven under the elastic action of the fourth return spring 603 to complete inserting of the third sliding rod 301 fixedly connected with the middle portion of the third groove 3, then the covering connection plate 5 is limited according to the connection of the auxiliary position plate 6, and the operation is finished.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a device is stacked to tubular material for construction, includes that the tubulose stacks device main part (1), its characterized in that: the left side of the top end of the middle part of the tubular stacking device main body (1) is provided with a first open slot (101), the middle parts of the two ends of the first open slot (101) are fixedly connected with a first sliding rod (102), the outer wall of the first sliding rod (102) is connected with a first sliding block (103) in a sliding way, a first return spring (104) is welded at the middle part of the right side of the first sliding block (103), and one end of the first return spring (104) far away from the first sliding block (103) is welded in the middle of the right side of the first open slot (101), the first return spring (104) surrounds the outer wall of the first slide bar (102), the middle part of the top end of the first sliding block (103) is fixedly connected with a limiting clamping block (2), and the upper end of the right side of the top end of the middle part of the tubular stacking device main body (1) is fixedly connected with another limiting clamping block (2), and antiskid lugs (204) are glued on the left side of the limiting clamping block (2) at equal intervals.
2. The tubular material piling device for building construction according to claim 1, wherein: the left side second fluting (205) has been seted up to the left side lower extreme of spacing grip block (2), and the both ends middle part fixedly connected with second slide bar (206) of second fluting (205), sliding connection has second slider (207) on the outer wall of second slide bar (206), and the welding of the bottom middle part of second slider (207) has third reset spring (208), the welding of the one end that second slider (207) was kept away from in third reset spring (208) is at the bottom middle part of second fluting (205), and third reset spring (208) encircle on the outer wall of second slide bar (206), the left side middle part fixedly connected with of second slider (207) has spacing inserted block (105), and spacing inserted block (105) bottom is inserted and is established in the inslot that first slide bar (102) top equidistance was seted up, and the top middle part fixedly connected with first pull ring (106) of spacing inserted block (105).
3. The tubular material piling device for building construction according to claim 2, wherein: the right-hand member of spacing grip block (2) equidistance fixedly connected with stretches out and draws back piece (201), and the right-hand member of stretching out and drawing back piece (201) is all fixed connection on the right-hand member outer wall of clamping rod (203), stretch out and draw back piece (201) middle part is connected all to be located the welding and is had second reset spring (202), and second reset spring (202) keep away from that flexible piece (201) middle part is connected all to be welded on clamping rod (203) left side fixed block, second reset spring (202) encircle on the outer wall of flexible piece (201) everywhere.
4. The tubular material piling device for building construction according to claim 1, wherein: the tubular stacking device is characterized in that third grooves (3) are symmetrically formed in the inner walls of the two sides of the tubular stacking device body (1), third sliding rods (301) are fixedly connected to the middle portions of the two ends of each third groove (3), third sliding blocks (302) are slidably connected to the outer walls of the third sliding rods (301), a rotating shaft (4) is fixedly connected to the middle portion of the right side of each third sliding block (302), the right side of each rotating shaft (4) is fixedly connected to the middle portion of the left side of the corresponding covering connecting plate (5), the right side of each covering connecting plate (5) is inserted into the middle portion of the left side of the corresponding third sliding block (302), auxiliary position plates (6) are fixedly connected to the right side of the top end of each covering connecting plate (5), inserted leather plugs (601) penetrate through the middle portions of the auxiliary position plates (6), the right ends of the inserted leather plugs (601) are inserted into leather plug grooves formed in the left sides of the third sliding, the middle part of the left side of the inserted leather plug (601) is fixedly connected to the middle end of the right side of the second pull ring (602), the two ends of the right side of the second pull ring (602) are symmetrically welded with fourth return springs (603), and one ends, far away from the second pull ring (602), of the fourth return springs (603) are welded on the left side of the auxiliary position plate (6).
5. The tubular material piling device for building construction according to claim 4, wherein: the bottom end of the covering connecting plate (5) is glued with a protective soft pad (501), and the protective soft pad (501) is attached to the pipeline.
6. The tubular material piling device for building construction according to claim 4, wherein: the middle part of the top end of the covering connecting plate (5) is fixedly connected with a pull handle (502), and anti-skid grains are arranged inside the pull handle (502).
CN202021911566.7U 2020-09-04 2020-09-04 Tubular material stacking device for building construction Expired - Fee Related CN212891786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021911566.7U CN212891786U (en) 2020-09-04 2020-09-04 Tubular material stacking device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021911566.7U CN212891786U (en) 2020-09-04 2020-09-04 Tubular material stacking device for building construction

Publications (1)

Publication Number Publication Date
CN212891786U true CN212891786U (en) 2021-04-06

Family

ID=75256403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021911566.7U Expired - Fee Related CN212891786U (en) 2020-09-04 2020-09-04 Tubular material stacking device for building construction

Country Status (1)

Country Link
CN (1) CN212891786U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776123A (en) * 2022-05-12 2022-07-22 苏州栖地工程设计顾问有限公司 Long service life's assembled building main part

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776123A (en) * 2022-05-12 2022-07-22 苏州栖地工程设计顾问有限公司 Long service life's assembled building main part

Similar Documents

Publication Publication Date Title
CN212891786U (en) Tubular material stacking device for building construction
CN217292388U (en) Mechanical clamping jaw manufactured by mechanical equipment
CN205542130U (en) Convenient cable of connecting and unpacing apart
CN210493006U (en) Split type smart card
CN210106761U (en) Chemical equipment pipeline supporting device
CN206542165U (en) Shackle insulator street code
CN211842234U (en) Dicing machine with cleaning function
CN210353563U (en) Can splice and split formula draw-bar box
CN201924361U (en) Cable traction pile extractor
CN205901184U (en) Cable laying device
CN212693284U (en) Portable contaminated soil stratified sampling device with protection function
CN216741449U (en) Curtain grouting drilling tripping anti-squeezing safety fork tongs
CN204450446U (en) A kind of nail-fetching device for building
CN213449722U (en) Telegraph pole with climbing pole pedal
CN210908835U (en) Angle iron pile pulling device
CN213293280U (en) Bag with double bag openings
CN203361151U (en) Light and portable ground anchor
CN211809751U (en) Multifunctional cart for sports equipment
CN113937655B (en) Dragging device special for high-voltage line hanging
CN203566624U (en) Hook unplugging device
CN213539784U (en) Interim protector in construction entrance to a cave
CN210440002U (en) Conduit fisher
CN215168580U (en) Pole bushing type basis reinforcing apparatus among distribution network line
CN211722007U (en) Turning device for buckling heavy clothes
CN214952253U (en) Soil sampling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210406

Termination date: 20210904

CF01 Termination of patent right due to non-payment of annual fee