CN212887477U - Face pipe erects mounting structure - Google Patents

Face pipe erects mounting structure Download PDF

Info

Publication number
CN212887477U
CN212887477U CN202021498176.1U CN202021498176U CN212887477U CN 212887477 U CN212887477 U CN 212887477U CN 202021498176 U CN202021498176 U CN 202021498176U CN 212887477 U CN212887477 U CN 212887477U
Authority
CN
China
Prior art keywords
pipeline
tube
tube bank
structure according
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021498176.1U
Other languages
Chinese (zh)
Inventor
丁建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Lisheng Construction Engineering Co ltd
Original Assignee
Shanghai Lisheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Lisheng Construction Engineering Co ltd filed Critical Shanghai Lisheng Construction Engineering Co ltd
Priority to CN202021498176.1U priority Critical patent/CN212887477U/en
Application granted granted Critical
Publication of CN212887477U publication Critical patent/CN212887477U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to an face pipe erects mounting structure relates to pipeline installation technical field, and it includes the bed frame, be provided with the stand on the bed frame, the stand lateral wall is provided with the bearing rod, the fixed tube bank that is provided with on the bearing rod, the tube bank inside wall is provided with flexible fixed column, the one end that the tube bank inside wall was kept away from to flexible fixed column is provided with the fixed block that is used for the butt pipeline. This application has the performance that improves and faces the pipeline of pipe installation device adaptation pipe diameter variation in size.

Description

Face pipe erects mounting structure
Technical Field
The utility model belongs to the technical field of the piping erection technique and specifically relates to a face pipe erects mounting structure.
Background
In modern life, the pipeline is indispensable in daily life, needs in time to repair after the pipeline damages, needs to erect the interim pipeline that is used for convenient restoration pipeline that sets up temporarily when pipeline repair process.
The Chinese utility model patent with the publication number of CN210658612U discloses an erection installation structure applied to municipal drainage pipelines, which belongs to the technical field of municipal pipelines and comprises a bearing rod and two support rods, wherein the support rods are vertically arranged on the ground; the inside cavity of branch sets up, is provided with axis and the collinear elastic component of branch axis in the branch, is provided with the connecting plate in the branch, and the elastic component clamp sets up in connecting plate and branch between the lateral wall that is close to ground, offers on the branch to be used for communicateing the external spout inside with branch, is provided with on the connecting plate to be used for wearing out the inside bearing bar that is connected with the accepting pole of branch. When interim pipeline transportation rivers, interim pipeline produces the vibration, and the vibrational force is cushioned to elastic component department through the adapter rod conduction, makes adapter rod and interim pipeline synchronous vibration when fixed interim pipeline, has reduced interim pipeline snap-on subaerial and takes place the phenomenon emergence that the rigidity collided and lead to interim pipeline damage with ground.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: in the in-service use, face a pipe installation device and can not adapt to the pipeline that the pipe diameter size is different, there is certain limitation in use, and practical application is not good.
SUMMERY OF THE UTILITY MODEL
In order to improve the performance of facing the pipeline of pipe installation device adaptation pipe diameter variation in size, this application provides one kind and faces pipe support and establish mounting structure.
The application provides a pair of face pipe support and establish mounting structure adopts following technical scheme:
the utility model provides a face pipe erects mounting structure, includes the bed frame, be provided with the stand on the bed frame, the stand lateral wall is provided with the bearing rod, the fixed tube bank that is provided with on the bearing rod, the tube bank inside wall is provided with flexible fixed column, the one end that the tube bank inside wall was kept away from to flexible fixed column is provided with the fixed block that is used for the butt pipeline.
Through adopting above-mentioned technical scheme, the bed frame erects and plays the supporting role to the stand on the structural plane, and the bearing rod on the stand plays the bearing effect to the tube bank, wears to establish in the tube bank when the pipeline, adjusts the length of flexible fixed column and makes fixed block and pipeline butt fixed, can adapt to the pipeline of the different pipe diameters size, has improved and has faced the application that the mounting structure was established to the pipe support.
Preferably, an elastic pad is arranged at one end, far away from the telescopic fixing column, of the fixing block.
Through adopting above-mentioned technical scheme, when fixed block and pipeline looks butt, elastic deformation takes place for the cushion on the fixed block and tightly butts with the pipeline, and sets up the operation back when the pipeline, and the medium in the pipeline strikes the pipeline and produces vibrations, and the cushion can absorb vibrations for the pipeline is more stable in the tube bank.
Preferably, the supporting rod is arranged on the side wall of the upright in a sliding manner, and a driving piece for driving the supporting rod to move is arranged on the upright.
Through adopting above-mentioned technical scheme, when the pipeline height with face the pipe support and establish mounting structure's tube bank height and not match, rise through driving piece drive bearing board to the height of tube bank on the adjustment bearing board has improved and has faced the not application nature of co-altitude pipeline facing mounting structure to the pipe support.
Preferably, the upright post is provided with a marking ruler.
Through adopting above-mentioned technical scheme, when going up through driving piece drive bearing board, can carry out the accurate regulation according to the mark chi on the height and the stand that the pipeline was located, improved and faced the accurate regulating power of pipe rack and establish mounting structure.
Preferably, a graduated scale is arranged on the telescopic fixing column.
Through adopting above-mentioned technical scheme, in the tube bank has not been put into to the pipeline, adjust the length of flexible fixed column according to the pipe diameter size of pipeline and the scale on the flexible fixed column for when the pipeline was worn to establish in the tube bank, fixed block and the pipeline lateral wall butt on the flexible fixed column have improved and have faced the convenience that the pipe support established the mounting structure and used.
Preferably, a plurality of support legs are arranged on one side wall of the base frame far away from the upright post.
Through adopting above-mentioned technical scheme, when placing at the structural plane and face the pipe support and establish mounting structure, the stabilizer blade on the bed frame has improved and has faced the stability that the pipe support established mounting structure.
Preferably, one end of the support leg, which is far away from the upright post, is provided with a leveling member.
Through adopting above-mentioned technical scheme, make through the leveling spare on the adjustment stabilizer blade face the pipe support and establish mounting structure and can keep steadily at the structural plane of unevenness, overall structure is more steady when placing on the structural plane, has improved and has faced the suitability that the pipe support established mounting structure.
Preferably, an elastic connecting piece is arranged between the supporting rod and the tube bundle.
Through adopting above-mentioned technical scheme, after the pipeline began to operate, when the medium impact pipeline in the pipeline produced vibrations, elastic connection spare can further absorb vibrations, has improved and has faced the stability that the pipe support established mounting structure.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the telescopic fixing columns are arranged on the inner side walls of the tube bundles, when the pipeline penetrates through the tube bundles, the length of the telescopic fixing columns is adjusted, so that the fixing blocks are abutted and fixed with the pipeline, and the elastic pads on the fixing blocks are elastically deformed to be tightly abutted against the outer side walls of the pipeline, so that the telescopic fixing columns can be adapted to pipelines with different pipe diameters;
2. through set up fixed stabilizer blade on a lateral wall of keeping away from the stand at the bed frame, when facing pipe support and establishing mounting structure and place on different structural planes, adjust the leveling piece on the base stabilizer blade for it is more steady to face pipe support and establishing mounting structure and place on the structural plane.
Drawings
FIG. 1 is a schematic overall view of a temporary pipe erection installation structure in the present embodiment;
fig. 2 is a schematic view showing the telescopic fixing column in the embodiment.
Description of reference numerals: 1. a base frame; 2. a column; 3. a support rod; 4. a tube bundle; 5. fixing the rod; 6. a telescopic fixing column; 61. a fixed tube; 62. a travel bar; 7. a fixing member; 8. a fixed block; 9. an elastic pad; 10. a drive member; 11. marking a ruler; 12. a graduated scale; 13. a support leg; 14. a leveling member; 141. a slide pipe; 142. a fixing ring; 15. an elastic connecting member; 16. a screw.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses face pipe support and establish mounting structure.
Referring to fig. 1 and 2, an adjacent pipe erection installation structure comprises a base frame 1 presenting a cuboid, wherein two fixed support legs 13 are arranged at two ends of the base frame 1 on a side wall of the base frame 1 close to a structural surface, and in the embodiment, the support legs 13 can be triangular frames. One end of the supporting leg 13, which is far away from the base frame 1, is provided with a leveling member 14, the leveling member 14 comprises a sliding pipe 141 sleeved on the supporting leg 13 and a fixing ring 142 fixedly arranged on the sliding pipe 141, and a screw 16 penetrates through the fixing ring 142. When placing and facing a tub mounting structure at different structural planes, can adjust slide 141 on the tripod, utilize the screw rod 16 fixed slide 141 in the position on stabilizer blade 13 for it is more steady on the structural plane to place bed frame 1, has improved and has faced the stability that the pipe erects mounting structure.
Be provided with two cylinder stands 2 on the bed frame 1, and 2 surfaces of stand are provided with mark chi 11, and two 2 double-phases of stands slide to parallel bed frame 1 of lateral wall and are provided with cuboid bearing rod 3, and bearing rod 3 is kept away from and is provided with circular tube bank 4 through the fixed dead lever 5 on the lateral wall of bed frame 1, and the one end that bearing rod 3 was kept away from to stand 2 is provided with drive bearing rod 3 along the gliding driving piece 10 of 2 directions of stand, and driving piece 10 can be the cylinder in this embodiment. When placing and face the pipe support and establish mounting structure, according to the height of pipeline and the mark chi 11 on the stand 2, utilize the cylinder on the stand 2 to remove the height that holds in the palm pole 3 and then adjust tube bank 4 to the interim of the not high pipeline of adaptation erects.
4 inside walls of tube bank evenly are provided with four flexible fixed columns 6, and flexible fixed column 6 is including being cylindric fixed pipe 61 and with fixed pipe 61 matched with carriage release lever 62, the one end of fixed pipe 61 and the welding of 4 inside walls of tube bank, wear to be equipped with the mounting 7 of fixed carriage release lever 62 position on the fixed pipe 61, and carriage release lever 62 can freely slide in fixed pipe 61. In this embodiment, the fixing member 7 may be a screw. One end of the movable rod 62 far away from the fixed tube 61 is provided with a cuboid fixed block 8 for abutting against the pipeline. When the pipeline wears to establish in tube bank 4, adjust the carriage release lever 62 and make the fixed block 8 and the pipeline lateral wall looks butt of carriage release lever 62 one end, through the screw rod to the tight effect of carriage release lever 62, make the unable slip of carriage release lever 62, and then fixed pipeline for the pipeline can the different pipe diameter size's of adaptation pipeline, has improved and has faced the suitability that the mounting structure was established to the pipe support.
Be provided with elastic connection 15 between support rod 3 and tube bank 4, elastic connection 15 is the halfpace type, and during elastic connection 15 was worn to establish by dead lever 5, elastic connection 15 can be the EPT rubber in this embodiment. When the pipeline runs, the elastic connecting piece 15 can absorb the vibration of the pipe bundle 4 caused by the vibration of the pipeline, and the overall stability of the pipe erection installation structure is improved.
The outer side wall of the moving rod 62 on the telescopic fixing column 6 is fixedly provided with a graduated scale 12. When placing and facing the pipe and establishing mounting structure, can be according to the pipe diameter size adjustment carriage release lever 62 that will wear to establish the pipeline in the tube bank 4 and stretch out the length of fixed pipe 61 for the pipeline is located the central point of tube bank 4 and puts, has improved the stability of pipeline in tube bank 4.
The one end that elastic telescopic rod was kept away from to fixed block 8 is provided with 8 assorted cushion 9 of fixed block, and when the 62 butts of carriage release lever were on the pipeline, elastic deformation took place with the pipeline tightly butt for cushion 9 on the fixed block 8, and when the pipeline offered the operation back, the medium impact pipeline in the pipeline produced vibrations, and cushion 9 can absorb vibrations, has improved the stability of pipeline in tube bank 4.
The implementation principle of the pipe erection installation structure of the embodiment of the application is as follows: the pedestal 1 is erected on a structural surface to support the upright post 2, and the pedestal 1 is placed on the structural surface more stably by adjusting the sliding pipe 141 of the lower support leg 13 of the pedestal 1 and the screw 16 for fixing the sliding pipe 141. Be provided with bearing rod 3 on the bed frame 1, be provided with tube bank 4 on the bearing rod 3, be provided with elastic connection spare 15 between bearing rod 3 and the tube bank 4. When erectting the pipeline, according to the height that the pipeline was located and the mark chi 11 on the stand 2, utilize cylinder drive supporting rod 3 on the stand 2 to move on stand 2 and then adjust the height of tube bank 4, when the pipeline was erect in tube bank 4, adjust the carriage release lever 62 among the flexible fixed column 6 and make fixed block 8 and the pipeline looks butt of carriage release lever 62 one end, and fixed block 8 is provided with cushion 9 with the one end of pipeline looks butt, and according to scale 12 on the 62 lateral walls of carriage release lever, it makes the pipeline be in tube bank 4 center to adjust the pipeline position.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a face pipe erects mounting structure which characterized in that: including bed frame (1), be provided with stand (2) on bed frame (1), stand (2) lateral wall is provided with bearing rod (3), fixed tube bank (4) that are provided with on bearing rod (3), tube bank (4) inside wall is provided with flexible fixed column (6), the one end that tube bank (4) inside wall was kept away from in flexible fixed column (6) is provided with fixed block (8) that are used for the butt pipeline.
2. The tube-adjacent installation structure according to claim 1, wherein: and an elastic pad (9) is arranged at one end of the fixing block (8) far away from the telescopic fixing column (6).
3. The tube-adjacent installation structure according to claim 1, wherein: the bearing rod (3) is arranged on the side wall of the upright post (2) in a sliding manner, and a driving piece (10) for driving the bearing rod (3) to move is arranged on the upright post (2).
4. The tube-adjacent installation structure according to claim 1, wherein: and a marking ruler (11) is arranged on the upright post (2).
5. The tube-adjacent installation structure according to claim 1, wherein: and a graduated scale (12) is arranged on the telescopic fixing column (6).
6. The tube-adjacent installation structure according to claim 1, wherein: a plurality of support legs (13) are arranged on one side wall of the base frame (1) far away from the upright post (2).
7. The tube-adjacent installation structure according to claim 6, wherein: and one end of the support leg (13) far away from the upright post (2) is provided with a leveling piece (14).
8. The tube-adjacent installation structure according to claim 1, wherein: an elastic connecting piece (15) is arranged between the supporting rod (3) and the tube bundle (4).
CN202021498176.1U 2020-07-25 2020-07-25 Face pipe erects mounting structure Active CN212887477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021498176.1U CN212887477U (en) 2020-07-25 2020-07-25 Face pipe erects mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021498176.1U CN212887477U (en) 2020-07-25 2020-07-25 Face pipe erects mounting structure

Publications (1)

Publication Number Publication Date
CN212887477U true CN212887477U (en) 2021-04-06

Family

ID=75292785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021498176.1U Active CN212887477U (en) 2020-07-25 2020-07-25 Face pipe erects mounting structure

Country Status (1)

Country Link
CN (1) CN212887477U (en)

Similar Documents

Publication Publication Date Title
CN208765635U (en) A kind of automobile engine bracket locating check fixture
CN211425458U (en) High accuracy cadastral survey centering rod
CN212887477U (en) Face pipe erects mounting structure
CN209978893U (en) Mapping instrument positioning device for engineering mapping
CN210374168U (en) Solar heat pump convenient to installation
CN208132770U (en) High-accuracy clamp is used in a kind of detection of construction engineering waterproof material
CN212616044U (en) Damping device of power equipment
CN208458749U (en) A kind of Surveying Engineering high accuracy gyroscope instrument adjusting bracket
CN215824622U (en) Welding positioning tool for multi-caliber straight pipe flange
CN102059548B (en) Steel wire drawing and centering device for steam turbine assembly
CN212960204U (en) Anti-vibration device of material conveying pipeline
CN204855063U (en) Shock absorber presss from both sides tight automatic centering device and uses device's shock absorber test machine
CN209021771U (en) A kind of surface grinding machine
CN208774252U (en) It is a kind of for stablizing the fixture of printing machine
CN105066975A (en) Plumb-hanging device for construction measurement
CN213985069U (en) Spirit level fixed bolster for building engineering
CN220472621U (en) Novel range finder
CN214939076U (en) Building construction road surface flatness detection device
CN110977534A (en) Casting machining clamping jaw
CN106289785B (en) Gas turbine positioning supporting frame
CN219867086U (en) Surveying and mapping device fixing frame structure
CN219829671U (en) Device for measuring transition zone in thickened end of drill pipe body
CN105537465B (en) Steel rib straightening machine for construction
CN214149786U (en) Vibration exciter test platform
CN204902843U (en) A device that is used for plummet that suspends in midair of engineering survey

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant