CN212866932U - Assembled partition wall plate installation device for building engineering - Google Patents

Assembled partition wall plate installation device for building engineering Download PDF

Info

Publication number
CN212866932U
CN212866932U CN202021633337.3U CN202021633337U CN212866932U CN 212866932 U CN212866932 U CN 212866932U CN 202021633337 U CN202021633337 U CN 202021633337U CN 212866932 U CN212866932 U CN 212866932U
Authority
CN
China
Prior art keywords
threaded rod
movable block
sliding chute
wall
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021633337.3U
Other languages
Chinese (zh)
Inventor
程志祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021633337.3U priority Critical patent/CN212866932U/en
Application granted granted Critical
Publication of CN212866932U publication Critical patent/CN212866932U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an assembly type partition wall plate installation device for building engineering relates to assembly type installation technical field, including the base plate, first spout has been seted up at base plate top middle part, and the inside activity of first spout is provided with first movable block, and the top of first movable block extends to the base plate top, and first movable block bottom is run through and is provided with first threaded rod, and the one end of first threaded rod inserts first spout back inner wall middle part, and the other end of first threaded rod runs through first spout front inner wall middle part to it is positive to extend to the base plate. The utility model discloses a go into the draw-in groove with the partition wall board card inside, can drive the second threaded rod and rotate through rotating the bull stick, make the second movable block reciprocate to adjust the partition wall board height, simultaneously through rotating first threaded rod, can let first movable block back-and-forth movement, the distance of adjustment partition wall board and mounted position is favorable to the easy to assemble partition wall board, reduces the labour, improves the installation effectiveness.

Description

Assembled partition wall plate installation device for building engineering
Technical Field
The utility model relates to an assembled installation technical field, in particular to assembled partition wall plate installation device for building engineering.
Background
Buildings assembled by prefabricated parts on the construction site are called as fabricated buildings, and are divided into five types, namely block buildings, plate buildings, box buildings, framework plate buildings, lifting plate and rise buildings and the like according to the forms and construction methods of prefabricated parts.
When the existing assembled partition board is installed, workers need to manually move and align, a large amount of manpower is consumed, the efficiency is low, the position is inaccurate, and the installation by the workers is inconvenient.
Therefore, it is necessary to provide a prefabricated partition panel installation apparatus for construction engineering to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fabricated partition wall plate block installation device for building engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an assembly type partition wall plate block mounting device for constructional engineering comprises a base plate, wherein a first sliding groove is formed in the middle of the top end of the base plate, a first movable block is movably arranged in the first sliding groove, the top end of the first movable block extends to the top of the base plate, a first threaded rod is arranged at the bottom end of the first movable block in a penetrating mode, one end of the first threaded rod is inserted into the middle of the inner wall of the back face of the first sliding groove, the other end of the first threaded rod penetrates through the middle of the inner wall of the front face of the first sliding groove and extends to the front face of the base plate, two ends of the first threaded rod are rotatably connected with the inner wall of the first sliding groove through bearings, the first threaded rod is in threaded connection with the first movable block, a second sliding groove is formed in the middle of the back face of the first movable block, a cavity is formed in the lower end of the interior of the, and the rear end of second movable block extends to the second spout outside, the second movable block is located the inside one end of second spout and runs through and is provided with the second threaded rod, and second threaded rod and second movable block threaded connection, second spout top inner wall middle part is inserted on the top of second threaded rod, and inside the bottom of second threaded rod runs through second spout bottom inner wall middle part and extends to the cavity, the both ends of second threaded rod are rotated through bearing and second spout inner wall respectively and are connected, the bottom mounting of second threaded rod is provided with first tapered gear, the inside second tapered gear that is provided with first tapered gear looks adaptation of cavity, the positive inner wall middle part of cavity runs through and is provided with the bull stick, and the bull stick passes through the bearing and is connected with first movable block rotation, the one end of bull stick and one side middle part fixed connection of second tapered gear.
Preferably, the one end that the cavity was kept away from to the bull stick and the one end that first spout was kept away from to first threaded rod all fixedly are provided with the rocker, base plate bottom four corners department all fixedly is provided with the universal wheel.
Preferably, a plurality of circular grooves are formed in the inner wall of the bottom end of the first sliding groove, and the circular grooves are distributed in a rectangular array.
Preferably, it is a plurality of the inside all activity of circular slot is provided with the ball, and first movable block bottom all laminates with a plurality of ball tops and is connected.
Preferably, one side of the top end of the second movable block, which is far away from the second sliding groove, is penetrated through to form a clamping groove, inner walls of two sides of the clamping groove extend to surfaces of two sides of the second movable block, and a damping layer is fixedly arranged on the inner wall of the clamping groove.
Preferably, four corners on the top of the substrate are provided with third threaded rods in a penetrating manner, the four third threaded rods are respectively located on one side of the universal wheel, the third threaded rods are in threaded connection with the substrate, and the top ends of the third threaded rods and the bottom end of the third threaded rods are respectively and fixedly provided with a screwing block and a supporting plate.
The utility model discloses a technological effect and advantage:
1. the partition board is clamped into the clamping groove, the second threaded rod can be driven to rotate by rotating the rotating rod, the second movable block is enabled to move up and down, so that the height of the partition board is adjusted, meanwhile, the first movable block can be enabled to move back and forth by rotating the first threaded rod, the distance between the partition board and the installation position is adjusted, the partition board is convenient to install, the labor force is reduced, and the installation efficiency is improved;
2. the damping layer is arranged, so that on one hand, the friction force can be increased, the partition plate can be prevented from sliding out of the clamping groove, and on the other hand, the partition plate can be prevented from rubbing with the inner wall of the clamping groove to generate abrasion;
3. the utility model discloses a third threaded rod, twist the setting of piece and backup pad, can be when using, twist the piece through rotating four respectively, make third threaded rod downstream, prop up the base plate until four backup pads, be favorable to preventing that the device from sliding, influence normal installation.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic side sectional structure view of fig. 1 of the present invention.
Fig. 3 is a schematic structural diagram of a in fig. 2 according to the present invention.
In the figure: 1. a substrate; 2. a first chute; 3. a first movable block; 4. a first threaded rod; 5. a second chute; 6. a cavity; 7. a second movable block; 8. a second threaded rod; 9. a first bevel gear; 10. a second bevel gear; 11. a rotating rod; 12. a rocker; 13. a card slot; 14. a damping layer; 15. a universal wheel; 16. a third threaded rod; 17. twisting the block; 18. a support plate; 19. a circular groove; 20. and a ball.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a as shown in fig. 1-3 assembled partition wall plate installation device for building engineering, including base plate 1, first spout 2 has been seted up at 1 top middle part of base plate, 2 inside activities of first spout are provided with first movable block 3, and the top of first movable block 3 extends to 1 top of base plate, 3 bottoms of first movable block are run through and are provided with first threaded rod 4, and the one end of first threaded rod 4 inserts 2 back inner wall middle parts of first spout, the other end of first threaded rod 4 runs through 2 front inner wall middle parts of first spout to it is positive to extend to base plate 1, the both ends of first threaded rod 4 all are connected with 2 inner wall rotations of first spout through the bearing, 3 threaded connection of first threaded rod 4 and first movable block.
A second sliding groove 5 is arranged in the middle of the back of the first movable block 3, a cavity 6 is arranged at the lower end of the inside of the first movable block 3, the cavity 6 is positioned at the bottom of the second sliding groove 5, a second movable block 7 is movably arranged in the second sliding groove 5, the rear end of the second movable block 7 extends to the outside of the second sliding groove 5, a second threaded rod 8 penetrates through one end of the second movable block 7 positioned in the second sliding groove 5, the second threaded rod 8 is in threaded connection with the second movable block 7, the top end of the second threaded rod 8 is inserted into the middle of the inner wall at the top end of the second sliding groove 5, the bottom end of the second threaded rod 8 penetrates through the middle of the inner wall at the bottom end of the second sliding groove 5 and extends to the inside of the cavity 6, two ends of the second threaded rod 8 are respectively in rotating connection with the inner wall of the second sliding groove 5 through bearings, and a first bevel gear 9, 6 inside second taper gears 10 that are provided with and first taper gears 9 looks adaptation of cavity, 6 front inner wall middle parts of cavity run through and are provided with bull stick 11, and bull stick 11 passes through the bearing and rotates with first movable block 3 and be connected, one end of bull stick 11 and one side middle part fixed connection of second taper gears 10 are through going into the partition board card inside draw-in groove 13, can drive second threaded rod 8 through rotating bull stick 11 and rotate, make second movable block 7 reciprocate to adjust the partition board height, simultaneously through rotating first threaded rod 4, can let 3 back-and-forth movements of first movable block, adjust the distance of partition board and mounted position, be favorable to the easy to assemble partition board, reduce the labour, improve the installation effectiveness.
Further, a plurality of circular slots 19 have been seted up to 2 bottom inner walls of first spout, and a plurality of circular slots 19 are the rectangular array and distribute, and are a plurality of 19 inside all activities of circular slot are provided with ball 20, and just 3 bottoms of first movable block are all laminated with a plurality of balls 20 tops and are connected, through the setting of a plurality of circular slots 19 and ball 20, are favorable to reducing frictional force, reduce the wearing and tearing of 3 bottoms of first movable block.
All run through on 1 top of base plate four corners department and be provided with third threaded rod 16, and four third threaded rods 16 are located universal wheel 15 one side respectively, third threaded rod 16 and 1 threaded connection of base plate, 16 tops of third threaded rod are provided with the bottom is fixed respectively and are twisted piece 17 and backup pad 18, through third threaded rod 16, twist the setting of piece 17 and backup pad 18, can be when using, twist piece 17 through rotating four respectively, make third threaded rod 16 downstream, prop up base plate 1 until four backup pads 18, be favorable to preventing that the device from sliding, influence normal installation.
Secondly, the one end that cavity 6 was kept away from to bull stick 11 and first threaded rod 4 kept away from first spout 2 is all fixed to be provided with rocker 12, 1 bottom four corners department of base plate all fixes and is provided with universal wheel 15, one side that second spout 5 was kept away from on 7 tops of second movable block runs through and has seted up draw-in groove 13, and the both sides inner wall of draw-in groove 13 extends to 7 both sides surfaces of second movable block, draw-in groove 13 inner wall is fixed and is provided with damping layer 14, through the setting of damping layer 14, can increase frictional force on the one hand, is favorable to preventing inside partition plate roll-off draw-in groove 13, and on the other hand is favorable to preventing partition plate and draw-in groove 13 inner.
The utility model discloses the theory of operation:
when the device is used, the device is moved to a use place, firstly, the plurality of twisting blocks 17 are rotated to enable the third threaded rod 16 to move downwards until the four supporting plates 18 support the substrate 1, then, the partition board is clamped into the clamping groove 13, the position of the partition board is adjusted according to an actual installation position, firstly, the rocker 12 fixedly connected with the rocker 11 is rotated to enable the rocker 11 to rotate, the rocker 11 drives the second conical gear 10 to rotate, the second conical gear 10 drives the first conical gear 9 and the second threaded rod 8 to rotate, the second threaded rod 8 drives the second movable block 7 to move up and down for fine adjustment while rotating, after the partition board is aligned with the top installation position, the rocker 12 fixedly connected with the first threaded rod 4 is rotated to enable the first movable block 3 to move in the first sliding groove 2 until the partition board moves to the installation position, and then, a worker finishes the installation of the top of the partition board, and then, the rocker 12 fixedly connected with the rotating rod 11 is rotated again, so that the second movable block 7 moves downwards until the bottom end of the partition board is separated from the clamping groove 13, then the device is moved away, and finally the partition board is installed finally.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (6)

1. The utility model provides a fabricated partition wall plate block installation device for building engineering, includes base plate (1), its characterized in that: the middle part of the top end of the base plate (1) is provided with a first sliding chute (2), the inside of the first sliding chute (2) is movably provided with a first movable block (3), the top end of the first movable block (3) extends to the top of the base plate (1), the bottom end of the first movable block (3) is provided with a first threaded rod (4) in a penetrating way, one end of the first threaded rod (4) is inserted into the middle part of the inner wall of the back side of the first sliding chute (2), the other end of the first threaded rod (4) penetrates through the middle part of the inner wall of the front side of the first sliding chute (2) and extends to the front side of the base plate (1), the two ends of the first threaded rod (4) are rotatably connected with the inner wall of the first sliding chute (2) through bearings, the first threaded rod (4) is in threaded connection with the first movable block (3), the middle part of the back side of the first movable block (3) is provided with a second sliding, and the cavity (6) is positioned at the bottom of the second sliding chute (5), a second movable block (7) is movably arranged in the second sliding chute (5), the rear end of the second movable block (7) extends to the outer side of the second sliding chute (5), a second threaded rod (8) penetrates through one end of the second movable block (7) positioned in the second sliding chute (5), the second threaded rod (8) is in threaded connection with the second movable block (7), the top end of the second threaded rod (8) is inserted into the middle part of the inner wall at the top end of the second sliding chute (5), the bottom end of the second threaded rod (8) penetrates through the middle part of the inner wall at the bottom end of the second sliding chute (5) and extends to the interior of the cavity (6), the two ends of the second threaded rod (8) are respectively in rotating connection with the inner wall of the second sliding chute (5) through bearings, a first conical gear (9) is fixedly arranged at the bottom end of the second threaded rod (8), the cavity (6) is internally provided with a second bevel gear (10) matched with the first bevel gear (9), the middle part of the front inner wall of the cavity (6) is provided with a rotating rod (11) in a penetrating mode, the rotating rod (11) is rotatably connected with the first movable block (3) through a bearing, and one end of the rotating rod (11) is fixedly connected with the middle part of one side of the second bevel gear (10).
2. The assembly type partition wall plate block installation device for construction engineering according to claim 1, wherein: one end of the rotating rod (11) far away from the cavity (6) and one end of the first threaded rod (4) far away from the first sliding chute (2) are both fixedly provided with a rocker (12), and four corners of the bottom end of the substrate (1) are both fixedly provided with universal wheels (15).
3. A fabricated partition panel installation device for construction engineering according to claim 2, wherein: a plurality of circular slots (19) are formed in the inner wall of the bottom end of the first sliding groove (2), and the circular slots (19) are distributed in a rectangular array mode.
4. A fabricated partition panel installation device for construction engineering according to claim 3, wherein: a plurality of the inside ball (20) that all moves about of circular slot (19) is provided with, and first movable block (3) bottom all laminates with a plurality of ball (20) top and is connected.
5. The assembly type partition wall plate block installation device for construction engineering according to claim 4, wherein: one side of the top end of the second movable block (7) far away from the second sliding groove (5) is penetrated through and provided with a clamping groove (13), the inner walls of the two sides of the clamping groove (13) extend to the surfaces of the two sides of the second movable block (7), and a damping layer (14) is fixedly arranged on the inner wall of the clamping groove (13).
6. A fabricated partition panel installation device for construction engineering according to claim 5, wherein: the base plate (1) top four corners department all runs through and is provided with third threaded rod (16), and four third threaded rods (16) are located universal wheel (15) one side respectively, third threaded rod (16) and base plate (1) threaded connection, third threaded rod (16) top and bottom are fixed respectively and are provided with wrong piece (17) and backup pad (18).
CN202021633337.3U 2020-08-08 2020-08-08 Assembled partition wall plate installation device for building engineering Expired - Fee Related CN212866932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021633337.3U CN212866932U (en) 2020-08-08 2020-08-08 Assembled partition wall plate installation device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021633337.3U CN212866932U (en) 2020-08-08 2020-08-08 Assembled partition wall plate installation device for building engineering

Publications (1)

Publication Number Publication Date
CN212866932U true CN212866932U (en) 2021-04-02

Family

ID=75220223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021633337.3U Expired - Fee Related CN212866932U (en) 2020-08-08 2020-08-08 Assembled partition wall plate installation device for building engineering

Country Status (1)

Country Link
CN (1) CN212866932U (en)

Similar Documents

Publication Publication Date Title
CN210918166U (en) Scaffold for elevator shaft
CN212866932U (en) Assembled partition wall plate installation device for building engineering
CN213572609U (en) Ceiling conversion layer structure
CN110451358A (en) A kind of cable taking-up device of disassembly easy to install
CN212866799U (en) Attached scaffold main body for constructional engineering
CN211899728U (en) Installation device for large-span inclined roof floating awning curtain wall
CN213774423U (en) Hanging basket suspension device
CN218283812U (en) Drilling equipment for construction based on computer software
CN214994987U (en) Connecting device capable of finely adjusting curtain wall up and down
CN214658244U (en) Assembled three-dimensional greening wallboard
CN220889284U (en) Floor with leveling function
CN215291573U (en) Curtain height-adjustable's support structure
CN212957499U (en) Novel mortar plastering device based on building engineering
CN219176031U (en) Fixing device of civil engineering fence for civil engineering
CN211574649U (en) Combined type ultrafilter supporting device
CN211803951U (en) Drilling device for processing injection mold
CN215670892U (en) Scaffold for building engineering
CN212389064U (en) Mounting member for building construction
CN217900057U (en) Universal adjustable civil air conditioner outdoor unit support
CN218493013U (en) Portal support piece of scaffold
CN212689557U (en) Telescopic building template
CN214899910U (en) Indoor and outdoor dual-purpose cable bridge with reinforcing structure
CN215254715U (en) Bearing structure for construction
CN218933614U (en) Assembled building conversion layer grouting sleeve positioning tool
CN212836590U (en) But height-adjusting's stable form engineering construction scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210402

Termination date: 20210808