CN212866814U CN202021402322.6U CN202021402322U CN212866814U CN 212866814 U CN212866814 U CN 212866814U CN 202021402322 U CN202021402322 U CN 202021402322U CN 212866814 U CN212866814 U CN 212866814U
Authority
CN
China
Prior art keywords
shaped steel
horizontal
support arm
vertical
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021402322.6U
Other languages
Chinese (zh)
Inventor
王继行
刘春峰
齐冀华
许有越
唐金齐
丛智慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202021402322.6U priority Critical patent/CN212866814U/en
Application granted granted Critical
Publication of CN212866814U publication Critical patent/CN212866814U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A hanging basket fixing device erected on a roof top beam comprises a horizontal support large arm, a vertical front support arm and a vertical rear support arm, wherein the vertical front support arm and the vertical rear support arm are fixed on the horizontal support large arm; u-shaped reinforcing bar clamp subassembly includes U-shaped reinforcing bar clamp, channel-section steel and nut. The utility model discloses place the hanging flower basket on the roof horizontal molding roof beam, make its construction that does not influence the roofing subsequent handling for the overall construction progress saves construction period, and then reduces the emergence of administrative expense and lease expense, has solved the roofing construction and the crisscross problem of outer facade construction process in the building engineering field.

Description

Hanging basket fixing device erected on roof top beam
Technical Field
The utility model relates to a construction field specifically belongs to a erect hanging flower basket fixing device on roofing back timber.
Background
The roof construction in the field of building engineering often has a cross problem with the construction of outer facades. When construction is carried out using a hanging basket, it is a conventional practice to erect the basket on the roof. The front and rear support arms of the hanging basket are erected on a constructed roof floor, and can be dismantled after construction and acceptance of relevant working procedures of the outer vertical surface. In the period, the water-proof, heat preservation, air exhaust, slope finding and other processes of the roof cannot be constructed in the area where the hanging basket support arm is supported. Even if the process of constructing the peripheral area in advance can be realized by the reserved area, the process of treating the reserved area still has the risk of waterproof and other processes.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an erect hanging flower basket fixing device on roofing back timber will solve the process cross problem of roofing construction and facade construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an erect hanging flower basket fixing device on roofing back timber, the hanging flower basket includes the big arm of horizontal support to and be fixed in vertical preceding support arm and the vertical back support arm on the big arm of horizontal support, vertical preceding support arm and vertical back support arm bottom end face all are equipped with horizon bar, its characterized in that: the horizontal rod at the bottom of the vertical rear support arm is fixed with an I-shaped steel beam through a U-shaped steel bar clamp assembly, and two ends of the I-shaped steel beam are fixed with horizontal modeling beams at two sides through another group of U-shaped steel bar clamp assemblies; u shaped steel muscle clamp subassembly includes U shaped steel muscle clamp, channel-section steel and nut, U shaped steel muscle clamp notch is down the back-off on horizon bar or I-shaped steel roof beam, erects a tip and passes behind the channel-section steel, and it is fixed with horizon bar and I-shaped steel roof beam or I-shaped steel roof beam and horizontal molding roof beam pressure fastening through the nut.
Further preferably, wood wedge cushion blocks are arranged between the inner wall of the vertical portion of the U-shaped steel bar clamp and the horizontal rod and between the inner wall of the vertical portion of the U-shaped steel bar clamp and the horizontal shaping beam.
Furthermore, the horizontal rod on the vertical front support arm is welded or fixed by a bolt with a pressure-bearing steel plate, and the pressure-bearing steel plate is fixed on the construction roof through a steel bar anchor bolt.
Furthermore, the hanging flower basket has two sets ofly, two sets of the horizontal pole of vertical back support arm two I-steel roof beams that set up side by side simultaneously are fixed.
Further, every the horizontal bar is fixed with the I-shaped steel beam through at least two sets of U shaped steel muscle clamp subassemblies.
In addition, still be equipped with 10mm thick steel plate backing plate between U shaped steel muscle clamp horizontal part and the horizon bar.
More preferably, the U-shaped steel bar clamp is formed by bending HRB400 steel bars with the diameter of 20mm into a U shape, and the tail ends of the two vertical parts are formed by threading through a threading machine.
Compared with the prior art the utility model has the following characteristics and beneficial effect:
the utility model discloses place the hanging flower basket on the roof level modeling roof beam, make its construction that does not influence the roofing subsequent handling for overall construction progress, save construction period, and then reduce the emergence of administrative expense and lease expense, the criss-cross problem of roofing construction and outer facade construction process of having solved the building engineering field, the roofing construction progress that has avoided the hanging flower basket to erect and lead to at the roofing is delayed, have safety, characteristics such as being suitable for, there are fine popularization and practical value, can produce good economic benefits after extensive popularization and application.
Drawings
Fig. 1 is a schematic structural diagram of a hanging basket according to the present invention;
FIG. 2 is a structural diagram of the position relationship between the horizontal bar and the I-beam of the present invention;
FIG. 3 is a cross-sectional view of section A-A of FIG. 2;
FIG. 4 is a structural diagram of the I-beam and the horizontal shaped beam according to the present invention;
fig. 5 is a structural diagram of a double basket according to the present invention.
Reference numerals: 1-horizontally supporting a large arm; 2-vertical front support arm; 3-vertical rear support arm; 4-horizontal bar; 5-a steel i-beam; 6-U-shaped steel bar hoop; 7-channel steel; 8-a nut; 9-horizontal shaped beam; 10-wood wedge blocks; 11-steel plate backing plate; 12-a pressure-bearing steel plate; 13-steel bar anchor bolt.
Detailed Description
In order to make the technical means, innovative features, objectives and functions realized by the present invention easy to understand, the present invention will be further described below.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
A hanging basket fixing device erected on a roof top beam is disclosed, as shown in figure 1, a hanging basket comprises a horizontal support large arm 1, a vertical front support arm 2 and a vertical rear support arm 3 which are fixed on the horizontal support large arm 1, horizontal rods 4 are arranged on the bottom end faces of the vertical front support arm 2 and the vertical rear support arm 3, the horizontal rods 4 on the vertical front support arm 2 are welded or bolted with a pressure-bearing steel plate 12, the pressure-bearing steel plate is fixed on a construction roof through a steel bar anchor bolt 13, the displacement of the vertical front support arm 2 is limited, and the vertical front support arm 2 is prevented from being separated from a pressure-bearing area; when double-row horizontal modeling beams are constructed at the top of a roof, reinforcing steel bar anchor bolts 13 are embedded into a structure in advance (rear anchor bolts can be adopted when the embedding is inconvenient), pressure-bearing steel plates 12 are installed, the reinforcing steel bar anchor bolts 13 are used for fixing the pressure-bearing steel plates 12, and when hanging baskets are installed, hanging basket front support arms are stably connected with the pressure-bearing steel plates 12 in a welding or bolt connection mode; the steel bar anchor bolt 13 is a steel bar anchor bolt with the diameter of 16mm, the length of not less than 100mm and the tail end provided with a 90-degree hook, and is firmly welded with the steel plate, or a rear M10 anchor bolt is adopted and is tightly connected with the steel plate by a double-layer nut; the steel plate adopts a square size consistent with the width of the beam.
As shown in fig. 2 to 4, a horizontal rod 4 at the bottom of a vertical rear support arm 3 is fixed with an i-shaped steel beam 5 through a U-shaped steel bar hoop component, two ends of the i-shaped steel beam 5 are fixed with horizontal shaping beams 9 at two sides through another group of U-shaped steel bar hoop components, the horizontal shaping beams 9 are roof top beams, and a roof double-row horizontal shaping beam is a roof beam which is arranged on a roof horizontally in two rows inside and outside according to the requirement of building shaping, and the bearing capacity of the roof double-row horizontal shaping beam can meet the hanging load of a hanging basket after being calculated through stress; the size of the I-shaped steel beam 5 is 10a, the size is used for improving the balance weight of the vertical rear support arm 3, the vertical rear support arm 3 is erected on the top surface of the flat I-shaped steel beam 5 to be more stable, and the I-shaped steel is also placed in an area without the horizontal modeling beam 9, so that the flexibility of basket arrangement is improved; the U-shaped steel bar clamp component comprises a U-shaped steel bar clamp 6, a channel steel 7 and a nut 8, the notch of the U-shaped steel bar clamp 6 is downwards buckled on a horizontal rod 4 or an I-shaped steel beam 5, after the end part of a vertical part penetrates through the channel steel 7, the horizontal rod 4 and the I-shaped steel beam 5 or the I-shaped steel beam 5 and a horizontal modeling beam 9 are tightly pressed and fixed through the nut 8, wood wedge cushion blocks 10 are arranged between the inner wall of the vertical part of the U-shaped steel bar clamp 6 and the horizontal rod 4 and the horizontal modeling beam 9, the wood wedge cushion blocks 10 are used for fixing the position of the U-shaped steel bar clamp 6, so that the U-shaped steel bar clamp and the horizontal modeling beam,
as shown in fig. 5, the hanging flower basket has two sets ofly, two I-shaped steel beam 5 that set up side by side are simultaneously fixed to the horizontal pole 4 of two sets of vertical rear branch arms 3, every horizontal pole 4 is fixed with I-shaped steel beam 5 through at least two sets of U-shaped steel muscle clamp subassemblies, still be equipped with 10mm thick steel sheet backing plate 11 between 6 horizontal parts of U-shaped steel muscle clamp and the horizontal pole 4, 11 wide 30mm of steel sheet backing plate, U-shaped steel muscle clamp 6 is bent into the U-shaped by diameter 20 mm's HRB400 reinforcing bar, two perpendicular end forms with mantle fiber machine mantle fiber.
U shaped steel clamp subassembly of fixed horizon bar 4 and horizontal shaping roof beam 9, and fixed horizon bar 4 is the same with the U shaped steel clamp subassembly structure of I-steel roof beam 5, but the concrete size that adopts the component is different, and former U shaped steel clamp 6 is formed by the preparation of phi 20 reinforcing bar clamp, and channel-section steel 7 is the 10# channel-section steel, and nut 8 is M20 nut, and latter U shaped steel clamp 6 is formed by the preparation of phi 16 reinforcing bar clamp, and channel-section steel 7 is the 10# channel-section steel, and nut 8 is M16 nut.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides an erect hanging flower basket fixing device on roofing back timber, the hanging flower basket includes horizontal support big arm (1) to and be fixed in vertical preceding support arm (2) and vertical back support arm (3) on the horizontal support big arm (1), vertical preceding support arm (2) and vertical back support arm (3) bottom terminal surface all are equipped with horizon bar (4), its characterized in that: the horizontal rod (4) at the bottom of the vertical rear support arm (3) is fixed with an I-shaped steel beam (5) through a U-shaped steel bar clamp assembly, and two ends of the I-shaped steel beam (5) are fixed with horizontal shaping beams (9) at two sides through another U-shaped steel bar clamp assembly; u shaped steel muscle clamp subassembly includes U shaped steel muscle clamp (6), channel-section steel (7) and nut (8), U shaped steel muscle clamp (6) notch back-off downwards is on horizon bar (4) or I-shaped steel roof beam (5), erects a tip and passes behind channel-section steel (7), compresses tightly fixed horizon bar (4) and I-shaped steel roof beam (5) or I-shaped steel roof beam (5) and level shaping roof beam (9) through nut (8).
2. A basket securing device as claimed in claim 1, wherein: and wood wedge cushion blocks (10) are arranged between the inner wall of the vertical part of the U-shaped steel bar clamp (6) and the horizontal rod (4) and between the inner wall of the vertical part of the U-shaped steel bar clamp and the horizontal shaping beam (9).
3. A basket securing device as claimed in claim 1, wherein: the upper horizontal rod (4) of the vertical front support arm (2) is welded or bolted with a pressure-bearing steel plate (12), and the pressure-bearing steel plate is fixed on a construction roof through a steel bar anchor bolt (13).
4. A basket securing device as claimed in claim 1, wherein: the hanging baskets are two groups, and two groups of horizontal rods (4) of the vertical rear support arm (3) are fixed by two I-shaped steel beams (5) which are arranged side by side.
5. A basket securing device as claimed in claim 1, wherein: every horizontal pole (4) are fixed with I-shaped steel roof beam (5) through two sets of U shaped steel muscle clamp subassemblies at least.
6. A basket securing device as claimed in claim 1, wherein: still be equipped with 10mm thick steel plate backing plate (11) between U shaped steel muscle clamp (6) horizontal part and horizon bar (4).
7. The hanging basket fixing device erected on the roof top beam as claimed in any one of claims 1 to 6, wherein: u-shaped steel bar clamp (6) are bent into the U-shape by 20mm diameter HRB400 steel bar, and two vertical ends are formed by threading with a threading machine.
CN202021402322.6U 2020-07-16 2020-07-16 Hanging basket fixing device erected on roof top beam Active CN212866814U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021402322.6U CN212866814U (en) 2020-07-16 2020-07-16 Hanging basket fixing device erected on roof top beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021402322.6U CN212866814U (en) 2020-07-16 2020-07-16 Hanging basket fixing device erected on roof top beam

Publications (1)

Publication Number Publication Date
CN212866814U true CN212866814U (en) 2021-04-02

Family

ID=75216237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021402322.6U Active CN212866814U (en) 2020-07-16 2020-07-16 Hanging basket fixing device erected on roof top beam

Country Status (1)

Country Link
CN (1) CN212866814U (en)

Similar Documents

Publication Publication Date Title
CN208220164U (en) Architecture construction security maintenance cantilevered structure
CN212866814U (en) Hanging basket fixing device erected on roof top beam
CN113202185B (en) Energy-saving building steel structure system and installation process thereof
CN212956151U (en) Cast-in-place beam flange plate template system
CN215107329U (en) Support platform for construction of overhanging concrete structure
CN2235462Y (en) Framework for steel bar reinforced concrete walls
CN216157097U (en) Lever type anchoring-free overhanging operation platform erection
CN210886958U (en) Bridge assembled bent cap installation support stores pylon
CN215760403U (en) Steel pipe outrigger pole extension connecting piece
CN213390850U (en) Novel supporting component for preventing deformation of steel structure
CN211973549U (en) Raft board upper portion steel bar support
CN217353562U (en) High altitude structure braced system that encorbelments
CN207194217U (en) A kind of assembled architecture wall
CN214512894U (en) Cornice model with roof steel mesh frame structure extension as keel
CN211923703U (en) Energy-saving high stability steel construction color steel factory building
CN212561585U (en) Raft board reinforcing bar stirrup strutting arrangement
CN213233802U (en) Steel structure supporting beam column for factory building
CN219604529U (en) Factory building concrete frame structure
CN220538423U (en) Reinforcing steel bar reinforcing structure for cast-in-situ box girder construction
CN220645321U (en) Building anti-seismic performance promotes structure
CN218881162U (en) High-rise assembled structure of concrete of encorbelmenting
CN215926949U (en) Steel leaning tower force rod type support structure system
CN217428030U (en) Photovoltaic support suitable for all aluminum materials
CN213449414U (en) Top support cantilever hanging basket hanger in limited space under archaize building slope roof
CN218562339U (en) Fixing device of photovoltaic power plant concrete bored concrete pile embedded bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant