CN212866735U - Quick anchor clamps of construction - Google Patents

Quick anchor clamps of construction Download PDF

Info

Publication number
CN212866735U
CN212866735U CN201921853040.5U CN201921853040U CN212866735U CN 212866735 U CN212866735 U CN 212866735U CN 201921853040 U CN201921853040 U CN 201921853040U CN 212866735 U CN212866735 U CN 212866735U
Authority
CN
China
Prior art keywords
rod
cover plate
slider
long rod
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921853040.5U
Other languages
Chinese (zh)
Inventor
张燕
杨义椿
魏华祎
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921853040.5U priority Critical patent/CN212866735U/en
Application granted granted Critical
Publication of CN212866735U publication Critical patent/CN212866735U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model provides a rapid fixture for building construction, which comprises a first seat body and a second seat body which are oppositely arranged, wherein a gap is arranged between the first seat body and the second seat body, a connecting rod and a long rod are arranged in the gap, and the connecting rod, the long rod and an operating rod are connected; the operating rod comprises a handle rubber sleeve, a first side rod and a second side rod, the first side rod and the second side rod are arranged on the handle rubber sleeve, the first side rod is connected to one side of the connecting rod and one side of the long rod, and the second side rod is connected to the other side of the connecting rod and the other side of the long rod; the long rod is provided with a movable screw rod and a pushing piece.

Description

Quick anchor clamps of construction
Technical Field
The utility model relates to a building tool technical field, in particular to quick anchor clamps of construction.
Background
The quick fixture for building construction is a very common tool in indoor construction, especially in indoor decoration. For example, patent document CN208304833U discloses a pressure adjustment device for a quick clamp, which comprises a body having a first opening at one end and a second opening at the other end, wherein the first opening and the second opening are communicated with each other; a fixing piece, one end of which extends into the body from the second opening and is fixed on the body; a movable piece, one end of which is provided with a first stop block, and the diameter of the first stop block is larger than the first opening hole but smaller than the second opening hole; the first stop block is positioned in the body, and the other end of the movable piece penetrates out of the first opening hole, so that the movable piece is movably combined with the body; and the elastic element is arranged in the body, one end of the elastic element is abutted with the fixed piece, and the other end of the elastic element is abutted with the movable piece. The pressure adjusting device of the rapid clamp only uses the single-chip seat body as a support, and has small support area and poor stability.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a quick anchor clamps of construction, it is stable to support, more easy-to-use.
The technical scheme of the utility model is that the rapid fixture for building construction comprises a first seat body and a second seat body which are oppositely arranged, a gap is arranged between the first seat body and the second seat body, a connecting rod and a long rod are arranged in the gap, and the connecting rod, the long rod and an operating rod are connected; the operating rod comprises a handle rubber sleeve, a first side rod and a second side rod, the first side rod and the second side rod are arranged on the handle rubber sleeve, the first side rod is connected to one side of the connecting rod and one side of the long rod, and the second side rod is connected to the other side of the connecting rod and the other side of the long rod; the long rod is provided with a movable screw rod and a pushing piece.
As an implementation mode, a movable slide way is arranged in the long rod, the movable screw rod penetrates through the movable slide way, an upper cover plate and an upper nut are arranged at the upper end of the movable screw rod, the upper cover plate covers the upper part of the movable slide way, a lower cover plate and a lower nut are arranged at the lower end of the movable screw rod, the lower cover plate covers the lower part of the movable slide way, the upper nut and the lower nut enable the upper cover plate and the lower cover plate to be tightly attached to the long rod respectively, and the pushing piece is arranged below the lower nut.
Compared with the prior art, the utility model, the beneficial effect is that, provide the support through the first pedestal and the second pedestal that the components of a whole that can function independently set up. Because still have the space between first pedestal and second pedestal, consequently can increase the support area, make the quick anchor clamps of construction have better stability. On the basis of the arrangement of the gap, the connecting rod, the long rod, the operating rod and other parts are also correspondingly changed.
Drawings
Fig. 1 is a first perspective view of a rapid fixture for building construction according to an embodiment of the present invention;
fig. 2 is a second perspective view of the rapid jig for building construction according to the embodiment of the present invention;
fig. 3 is a third perspective view of the rapid fixture for building construction provided by the embodiment of the present invention.
In the figure: 1. a first seat body; 2. a second seat body; 3. a void; 4. a connecting rod; 5. a long rod; 6. an operating lever; 61. a handle rubber sleeve; 62. a first side bar; 63. a second side bar; 7. a movable screw; 8. a pushing member; 51. a movable slideway; 9. an upper cover plate; 10. screwing a nut; 11. a lower cover plate; 12. a lower nut; 13. a first slider; 14. a second slider; 15. a finger groove; 16. a first connecting member; 17. a second connecting member.
Detailed Description
The foregoing and additional embodiments and advantages of the present invention will be apparent from and more fully described in the following detailed description of the invention, taken in conjunction with the accompanying drawings. It is obvious that the described embodiments are only some of the embodiments of the present invention, and not all of them.
In one embodiment, as shown in FIG. 1. The fast fixture for building construction provided by the embodiment comprises a first base body 1 and a second base body 2 which are oppositely arranged. The first seat body 1 and the second seat body 2 are opposite left and right in the figure. A gap 3 is formed between the first seat body 1 and the second seat body 2, and the supporting area of the first seat body 1 and the second seat body 2 can be increased through the gap. Besides, a connecting rod 4 and a long rod 5 are arranged in the gap 3. The connecting rod 4 and the long rod 5 are both connected with the operating rod 6, and the linkage mode is based on the traditional working principle and is not described in detail. The operating rod 6 comprises a handle rubber sleeve 61, a first side rod 62 and a second side rod 63 which are arranged on the handle rubber sleeve 61, the first side rod 62 is connected to one side of the connecting rod 4 and the long rod 5, and the second side rod 63 is connected to the other side of the connecting rod 4 and the long rod 5. In this embodiment, the structure of the handle cuff 61 is substantially adapted in practice to fit the arrangement of the void 3. In addition, the long rod 5 is provided with a movable screw 7 and a pushing part 8.
Therefore, in the present embodiment, the support is provided by the first seat 1 and the second seat 2 which are separately provided. Because still have space 3 between first pedestal 1 and second pedestal 2, consequently can increase the support area, make the quick anchor clamps of building construction have better stability. On the basis of the arrangement of the gap 3, the connecting rod 4, the long rod 5, the operating rod 6 and other parts are also correspondingly changed.
In one embodiment, as shown in FIG. 1. The quick anchor clamps of construction that this embodiment provided, be equipped with movable slide 51 in the stock 5, movable screw 7 runs through movable slide 51, movable screw 7's upper end is equipped with upper cover plate 9 and upper nut 10, upper cover plate 9 covers in movable slide 51 top, movable screw 7's lower extreme is equipped with lower cover plate 11 and lower nut 12, lower cover plate 11 covers in movable slide 51 below, upper nut 10 and lower nut 12 make upper cover plate 9 and lower cover plate 11 paste tight stock 5 respectively, support and push away 8 settings in lower nut 12 below. In the present embodiment, this part of the structure basically follows the conventional structure, and no change is made. And, the upper and lower cover sheets 9 and 11 are identical in shape.
In one embodiment, as shown in FIG. 2. In the present embodiment, the long rod 5 of the rapid building construction fixture is further provided with a first slider 13 and a second slider 14, and in the present embodiment, the first slider 13 and the second slider 14 can slide on the long rod 5. And, first slider 13 and second slider 14 set up in the activity slide 51 above and lie in the both sides of activity slide 51, and upper cover plate 9 passes through first slider 13 and second slider 14 and pastes tight stock 5. Therefore, in the present embodiment, the first slider 13 and the second slider 14 are provided to provide a certain buffer to prevent the damage of the components on the long rod 5 when the operation rod 6 is hard to be pulled up.
In one embodiment, as shown in fig. 1-2. The embodiment provides a rapid clamp for building construction, wherein a finger groove 15 is arranged on a handle rubber sleeve 61. And, the handle gum cover 61 is a flexible cover.
In one embodiment, as shown in FIG. 3. The embodiment provides a rapid building construction clamp, a first connecting piece 16 is arranged on a connecting rod 4, and the first connecting piece 16 provides rotary connection. The first connecting member 16 includes two, and the link 4 and the operating lever 6 are connected by the first connecting member 16. The long rod 5 is provided with a second connecting piece 17, and the second connecting piece 17 provides a rotary connection. The second connecting piece 17 comprises two, the long rod 5 and the operating rod 6 are connected through the second connecting piece 17.

Claims (7)

1. The rapid fixture for building construction is characterized by comprising a first seat body (1) and a second seat body (2) which are oppositely arranged, wherein a gap (3) is formed between the first seat body (1) and the second seat body (2), a connecting rod (4) and a long rod (5) are arranged in the gap (3), and the connecting rod (4), the long rod (5) and an operating rod (6) are connected; the operating rod (6) comprises a handle rubber sleeve (61), and a first side rod (62) and a second side rod (63) which are arranged on the handle rubber sleeve (61), wherein the first side rod (62) is connected to one side of the connecting rod (4) and the long rod (5), and the second side rod (63) is connected to the other side of the connecting rod (4) and the long rod (5); the long rod (5) is provided with a movable screw rod (7) and a pushing piece (8).
2. The rapid building construction clamp according to claim 1, wherein a movable slideway (51) is arranged in the long rod (5), the movable screw (7) penetrates through the movable slideway (51), an upper cover plate (9) and an upper nut (10) are arranged at the upper end of the movable screw (7), the upper cover plate (9) covers the movable slideway (51), a lower cover plate (11) and a lower nut (12) are arranged at the lower end of the movable screw (7), the lower cover plate (11) covers the lower part of the movable slideway (51), the upper nut (10) and the lower nut (12) enable the upper cover plate (9) and the lower cover plate (11) to be tightly attached to the long rod (5), and the pushing piece (8) is arranged below the lower nut (12).
3. The construction quick clamp according to claim 2, characterized in that the upper cover sheet (9) and the lower cover sheet (11) are identical in shape.
4. The rapid construction jig according to claim 2, wherein a first slider (13) and a second slider (14) are further provided on the long rod (5), the first slider (13) and the second slider (14) are provided above the movable slideway (51) and located at both sides of the movable slideway (51), and the upper cover sheet (9) is attached to the long rod (5) through the first slider (13) and the second slider (14).
5. The rapid clamp for building construction according to claim 4, wherein the handle rubber sleeve (61) is provided with a finger groove (15).
6. The construction quick clamp according to claim 5, wherein the handle rubber sleeve (61) is a flexible sleeve.
7. The rapid building construction clamp according to claim 6, wherein a first connecting piece (16) is arranged on the connecting rod (4), the first connecting piece (16) comprises two, and the connecting rod (4) and the operating rod (6) are connected through the first connecting piece (16); be equipped with second connecting piece (17) on stock (5), second connecting piece (17) include two, stock (5) with action bars (6) pass through second connecting piece (17) are connected.
CN201921853040.5U 2019-10-31 2019-10-31 Quick anchor clamps of construction Expired - Fee Related CN212866735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921853040.5U CN212866735U (en) 2019-10-31 2019-10-31 Quick anchor clamps of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921853040.5U CN212866735U (en) 2019-10-31 2019-10-31 Quick anchor clamps of construction

Publications (1)

Publication Number Publication Date
CN212866735U true CN212866735U (en) 2021-04-02

Family

ID=75185270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921853040.5U Expired - Fee Related CN212866735U (en) 2019-10-31 2019-10-31 Quick anchor clamps of construction

Country Status (1)

Country Link
CN (1) CN212866735U (en)

Similar Documents

Publication Publication Date Title
CN204545805U (en) Eccentric lever weld clamp device
CN207586020U (en) A kind of puller system tablet shares clamping device
CN212866735U (en) Quick anchor clamps of construction
CN216292071U (en) Rotary tillage blade assembly with adjustable rotary tillage width
CN110261637B (en) Anemometer fixing frame
CN104973259B (en) Aircraft seat Power Transfer Unit installing rack
CN107713344A (en) A kind of computer installation of hydraulic structure vertical working stand
CN208017126U (en) A kind of computer installation of hydraulic structure vertical working rack
CN109512174A (en) A kind of preceding attachment device of drawer sliding rail modularization adjusting
CN208840612U (en) The pipe clamping device of direct current saw aluminium machine
CN104057369B (en) The fixture of grinding digital cuttings
CN211278067U (en) Multipurpose water pump pliers
CN201009177Y (en) Improved structure of universal pliers
CN209736759U (en) Adjustable baffle device for portable band saw
CN207746993U (en) Damping piece mounting device for sebific duct
CN201536549U (en) Pet comb with elastic grab handle
CN205571572U (en) Extend locking device of workstation
CN208197051U (en) Carpenter's cold press position-limited edge Board position adjuster
CN210840571U (en) Novel rotary cultivator blade holder
CN213616255U (en) Adjustable circuit board fixing frame
CN208584446U (en) A kind of jig that jack closes up
CN215689011U (en) Clamping and shearing integrated special forceps-shearing tool for ophthalmic surgery
CN204585078U (en) Plumbing combination pliers constructs
CN210760167U (en) Automobile air conditioner air outlet blade adjusting device
CN209971840U (en) Printing machine printed matter fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210402

Termination date: 20211031